CN209780175U - Upper and lower passage frames for manhole construction on the roof - Google Patents
Upper and lower passage frames for manhole construction on the roof Download PDFInfo
- Publication number
- CN209780175U CN209780175U CN201920442145.5U CN201920442145U CN209780175U CN 209780175 U CN209780175 U CN 209780175U CN 201920442145 U CN201920442145 U CN 201920442145U CN 209780175 U CN209780175 U CN 209780175U
- Authority
- CN
- China
- Prior art keywords
- climbing frame
- fixed
- roof
- manhole
- frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Ladders (AREA)
Abstract
本实用新型涉及一种屋面上人孔施工用的上下通道架,屋面形成有围设于上人孔四周且相互连接的多个防护墙,上下通道架包括:立设固定于楼板的爬架,爬架穿设于上人孔且顶部凸伸出防护墙,爬架的四周和对应的防护墙通过拉结杆拉结固定,爬架内部形成有上下贯穿的供人通过的空间且爬架间隔固定有横向的踏杆;围设于爬架的四周的密目安全网;固定于爬架顶部的防坠吊索。本实用新型防护墙可起到围护上人孔的作用。将爬架的四周和对应的防护墙通过拉结杆拉结固定,爬架的相对两侧受力平衡,以保证爬架的稳定性,解决了无法到屋面上进行施工作业的问题。
The utility model relates to an upper and lower channel frame for manhole construction on the roof. The roof is formed with a plurality of protective walls surrounding the upper manhole and connected to each other. The upper and lower channel frames include: a climbing frame erected and fixed on the floor, The climbing frame is installed in the upper manhole and the top protrudes out of the protective wall. The surroundings of the climbing frame and the corresponding protective wall are fixed by tie rods. Inside the climbing frame, there is a space for people to pass through up and down, and the climbing frame is spaced apart. There are horizontal running bars fixed; dense mesh safety nets around the climbing frame; anti-drop slings fixed on the top of the climbing frame. The protective wall of the utility model can play the role of enclosing the upper manhole. The surroundings of the climbing frame and the corresponding protective walls are fixed by tie rods, and the forces on the opposite sides of the climbing frame are balanced to ensure the stability of the climbing frame and solve the problem of being unable to carry out construction work on the roof.
Description
技术领域technical field
本实用新型涉及建筑施工领域,尤指一种屋面上人孔施工用的上下通道架。The utility model relates to the field of building construction, in particular to an upper and lower channel frame for manhole construction on the roof.
背景技术Background technique
在建筑施工中,有的屋面留置上人孔作为屋面检修口,当结构施工完成后且无施工升降机时,且因施工原因将外脚手架拆除,则会导致施工作业人员无法到屋面上进行施工作业。During construction, manholes are left on some roofs as roof inspection openings. When the structural construction is completed and there is no construction elevator, and the external scaffolding is removed due to construction reasons, construction workers cannot go to the roof to carry out construction work. .
实用新型内容Utility model content
本实用新型的目的在于克服现有技术的缺陷,提供一种屋面上人孔施工用的上下通道架,解决现有技术中当结构施工完成后且无施工升降机时,且因施工原因将外脚手架拆除,则会导致施工作业人员无法从到屋面上进行施工作业的问题。The purpose of this utility model is to overcome the defects of the prior art, to provide an upper and lower channel frame for the construction of manholes on the roof, to solve the problem in the prior art when the construction of the structure is completed and there is no construction elevator, and due to construction reasons, the outer scaffolding If it is dismantled, it will lead to the problem that construction workers cannot carry out construction work from the roof.
实现上述目的的技术方案是:The technical scheme for realizing the above-mentioned purpose is:
本实用新型提供一种屋面上人孔施工用的上下通道架,屋面形成有围设于所述上人孔四周且相互连接的多个防护墙,所述上下通道架包括:The utility model provides an upper and lower channel frame for manhole construction on the roof. The roof is formed with a plurality of protective walls surrounding the upper manhole and connected to each other. The upper and lower channel frames include:
立设固定于楼板的爬架,所述爬架穿设于上人孔且顶部凸伸出防护墙,所述爬架的四周和对应的防护墙通过拉结杆拉结固定,所述爬架内部形成有上下贯穿的供人通过的空间且所述爬架间隔固定有横向的踏杆;A climbing frame fixed on the floor is installed vertically. The climbing frame is installed in the manhole and the top protrudes out of the protective wall. The surroundings of the climbing frame and the corresponding protective wall are fixed by tie rods. The climbing frame A space for people to pass through up and down is formed inside, and the climbing frame is fixed with horizontal step bars at intervals;
围设于所述爬架的四周的密目安全网;以及a dense mesh safety net surrounding the climbing frame; and
固定于所述爬架顶部的防坠吊索。A fall arrest sling fixed to the top of the climbing frame.
本实用新型屋面上人孔施工用的上下通道架的有益效果:Beneficial effects of the upper and lower channel frame used for manhole construction on the roof of the utility model:
本实用新型通过采用爬架立设于楼板且顶部凸伸出上人孔,所述爬架内部形成有上下贯穿的供人通过的空间,且所述爬架间隔固定有横向的踏杆,从而施工人员可通过踏杆在爬架内部的空间上升,通过上人孔进入到屋顶。屋面形成有围设于所述上人孔四周且相互连接的多个防护墙,防护墙可起到围护上人孔的作用。将爬架的四周和对应的防护墙通过拉结杆拉结固定,爬架的相对两侧受力平衡,以保证爬架的稳定性。围设于所述爬架的四周的密目安全网可将立杆之间的缝隙进行围挡,保证施工作业人员上下通行安全及防止高空坠物。通过固定于所述爬架的顶部的防坠吊索,施工人员上下爬架时,可将防坠吊索挂于安全带上,增加施工作业人员上下安全性。本实用新型解决了现有技术中当结构施工完成后且无施工升降机时,且因施工原因将外脚手架拆除,则会导致施工作业人员无法到屋面上进行施工作业的问题。In the utility model, the climbing frame is erected on the floor and the top protrudes out of the upper manhole. The inside of the climbing frame is formed with a space for people to pass through up and down, and the climbing frame is fixed with horizontal step bars at intervals, so that Construction personnel can ascend in the space inside the climbing frame through the step bars, and enter the roof through the manhole. The roof is formed with a plurality of protective walls surrounding the upper manhole and connected to each other, and the protective walls can play a role in protecting the upper manhole. The surroundings of the climbing frame and the corresponding protective walls are fixed by tie rods, and the forces on the opposite sides of the climbing frame are balanced to ensure the stability of the climbing frame. The dense mesh safety nets surrounding the climbing frame can block the gaps between the vertical poles to ensure the safety of construction workers going up and down and prevent objects from falling from height. Through the anti-fall sling fixed on the top of the climbing frame, when the construction personnel climb up and down the climbing frame, the anti-fall sling can be hung on the safety belt, which increases the safety of the construction workers going up and down. The utility model solves the problem in the prior art that when the construction of the structure is completed and there is no construction elevator, and the external scaffolding is removed due to construction reasons, construction workers cannot go to the roof to carry out construction work.
本实用新型屋面上人孔施工用的上下通道架的进一步改进在于,所述爬架包括:The further improvement of the upper and lower channel frames used for manhole construction on the roof of the utility model is that the climbing frames include:
立设固定于所述楼板的四个立杆,所述立杆穿设于所述上人孔且顶部凸伸出所述防护墙,所述立杆位于相邻两个所述防护墙的夹角位置;以及Four vertical poles are erected and fixed on the floor. The vertical poles pass through the manhole and protrude from the protective wall at the top. The vertical poles are located between two adjacent protective walls. angular position; and
间隔固定于四个所述立杆的防护框,所述防护框包括所述踏杆。The protective frames are fixed to the four poles at intervals, and the protective frames include the step bars.
本实用新型屋面上人孔施工用的上下通道架的进一步改进在于,所述拉结杆的一端竖向贴设固定于所述防护墙的外侧面,所述拉结杆的另一端横向弯折设于所述防护墙的顶部,且和对应的所述立杆固定。The further improvement of the upper and lower aisle frame used for manhole construction on the roof of the utility model is that one end of the tie rod is vertically pasted and fixed on the outer surface of the protective wall, and the other end of the tie rod is horizontally bent It is arranged on the top of the protective wall and fixed with the corresponding upright pole.
本实用新型屋面上人孔施工用的上下通道架的进一步改进在于,The further improvement of the upper and lower channel frame used for manhole construction on the roof of the utility model is that,
位于顶部和底部的所述防护框形成有缺口;The protective frames at the top and the bottom are formed with notches;
位于中部的所述防护框为闭合框。The protective frame located in the middle is a closed frame.
附图说明Description of drawings
图1为本实用新型屋面上人孔施工用的上下通道架的主视图。Fig. 1 is the front view of the upper and lower channel frame used for manhole construction on the roof of the utility model.
图2为图1中A-A方向的剖视图。Fig. 2 is a sectional view along A-A direction in Fig. 1 .
图3为图1中B-B方向的剖视图。Fig. 3 is a sectional view along B-B direction in Fig. 1 .
具体实施方式Detailed ways
下面结合附图和具体实施例对本实用新型作进一步说明。Below in conjunction with accompanying drawing and specific embodiment the utility model is further described.
参阅图1,显示了本实用新型屋面上人孔施工用的上下通道架的主视图。图2为图1中A-A方向的剖视图。图3为图1中B-B方向的剖视图。结合图1至图3所示,本实用新型屋面上人孔施工用的上下通道架包括:Referring to Fig. 1, have shown the front view of the upper and lower passage frame that manhole construction is used on the roof of the present utility model. Fig. 2 is a sectional view along A-A direction in Fig. 1 . Fig. 3 is a sectional view along B-B direction in Fig. 1 . As shown in Fig. 1 to Fig. 3, the upper and lower aisle frames for manhole construction on the roof of the utility model include:
屋面形成有围设于所述上人孔四周且相互连接的多个防护墙30,所述上下通道架包括:The roof is formed with a plurality of protective walls 30 surrounding the upper manhole and connected to each other. The upper and lower channel frames include:
立设固定于楼板10的爬架20,所述爬架20穿设于上人孔且顶部凸伸出防护墙30,所述爬架20的四周和对应的防护墙30通过拉结杆60拉结固定,所述爬架20内部形成有上下贯穿的供人通过的空间且所述爬架20间隔固定有横向的踏杆21;A climbing frame 20 fixed on the floor 10 is vertically installed. The climbing frame 20 is passed through the manhole and the top protrudes out of the protective wall 30 . The climbing frame 20 is formed with a space for people to pass through up and down inside the climbing frame 20, and the climbing frame 20 is fixed with horizontal step bars 21 at intervals;
围设于所述爬架20的四周的密目安全网40;以及A dense mesh safety net 40 surrounding the climbing frame 20; and
固定于所述爬架20顶部的防坠吊索50。The anti-drop sling 50 fixed on the top of the climbing frame 20 .
作为本实用新型屋面上人孔施工用的上下通道架的一较佳实施方式,所述爬架20包括:As a preferred embodiment of the upper and lower aisle frame used for manhole construction on the roof of the utility model, the climbing frame 20 includes:
立设固定于所述楼板10的四个立杆22,所述立杆22穿设于所述上人孔且顶部凸伸出所述防护墙30,所述立杆22位于相邻两个所述防护墙30的夹角位置;以及Four vertical poles 22 fixed on the floor 10 are erected. The vertical poles 22 are pierced through the manhole and protrude from the protective wall 30 at the top. The vertical poles 22 are located at two adjacent The angular position of the protective wall 30; and
间隔固定于四个所述立杆22的防护框,所述防护框23包括所述踏杆21。The protective frames fixed to the four uprights 22 at intervals, the protective frames 23 include the step bars 21 .
作为本实用新型屋面上人孔施工用的上下通道架的一较佳实施方式,As a preferred embodiment of the upper and lower aisle frames for manhole construction on the roof of the utility model,
所述拉结杆60的一端竖向贴设固定于所述防护墙30的外侧面,所述拉结杆60的另一端横向弯折设于所述防护墙30的顶部,且和对应的所述立杆22固定。One end of the tie rod 60 is vertically attached and fixed on the outer surface of the protective wall 30, and the other end of the tie rod 60 is horizontally bent and arranged on the top of the protective wall 30, and is connected to the corresponding The upright 22 is fixed.
作为本实用新型屋面上人孔施工用的上下通道架的一较佳实施方式,As a preferred embodiment of the upper and lower aisle frames for manhole construction on the roof of the utility model,
位于顶部和底部的所述防护框23形成有缺口;缺口处供人出入。The protective frame 23 at the top and bottom is formed with gaps; the gaps are for people to enter and exit.
位于中部的所述防护框23为闭合框。The protective frame 23 located in the middle is a closed frame.
在本实施例中,屋面上人孔为矩形。立杆的顶部贴设于屋面上人孔的内壁,从而能够利用屋面结构限位支撑立杆。同时利用拉结杆60的一端竖向贴设固定于所述防护墙30的外侧面,所述拉结杆60的另一端横向弯折设于所述防护墙30的顶部,且和对应的所述立杆22固定。将爬架的相对两侧面和对应的防护墙拉结连接,受力平衡,从而能够防止立杆的位置移动。In this embodiment, the manhole on the roof is rectangular. The top of the pole is attached to the inner wall of the manhole on the roof, so that the pole can be supported by the limit of the roof structure. At the same time, one end of the tie rod 60 is vertically pasted and fixed on the outer surface of the protective wall 30, and the other end of the tie rod 60 is horizontally bent and arranged on the top of the protective wall 30, and is connected with the corresponding The upright 22 is fixed. The opposite sides of the climbing frame are connected with the corresponding protective wall by tie knots, and the force is balanced, so that the position of the pole can be prevented from moving.
在本实施例中,立杆22,踏杆21为由工地常见的48.3mm×3.6mm的钢管。钢管之间通过扣件搭设固定。将立杆22的底端竖向固定于楼板,具体的,在施工楼板时,在楼板内预埋顶面凸伸出楼板的多个钢板,将立杆22立设于对应的钢板,并焊接固定。或者在立杆22的底部的侧壁固定L型耳板,通过螺栓将L型耳板和钢板固定连接,方便安装和拆卸。In this embodiment, the upright bar 22 and the running bar 21 are common steel pipes of 48.3mm×3.6mm in construction sites. The steel pipes are set and fixed by fasteners. Vertically fix the bottom end of the pole 22 to the floor. Specifically, when constructing the floor, pre-embed a plurality of steel plates protruding from the top surface of the floor in the floor, erect the pole 22 on the corresponding steel plate, and weld fixed. Or fix the L-shaped ear plate on the side wall of the bottom of the vertical rod 22, and fix the L-shaped ear plate and the steel plate through bolts, which is convenient for installation and disassembly.
爬架20的顶部高于屋面上人孔约1000mm。具体可根据实际需要而定。The top of the climbing frame 20 is about 1000mm higher than the manhole on the roof. The details can be determined according to actual needs.
爬架20内侧四周悬挂密目安全网40,保证施工作业人员上下通行安全及防止高空坠物。密目安全网40和对应的踏杆21立杆22固定连接。Dense mesh safety net 40 is suspended around climbing frame 20 inboards, guarantees construction workers to pass safety up and down and prevents falling objects from height. The dense mesh safety net 40 is fixedly connected with the corresponding step bar 21 and the upright bar 22 .
爬架20的上部固定防坠吊索50,施工人员上下爬架20时,可将防坠吊索50挂于安全带上,增加施工作业人员上下安全性。The top of climbing frame 20 is fixed anti-falling sling 50, and when construction personnel climbs up and down frame 20, anti-falling sling 50 can be hung on the safety belt, increases the safety of construction workers up and down.
本实用新型屋面上人孔施工用的上下通道架的有益效果为:The beneficial effects of the upper and lower channel frame used for manhole construction on the roof of the utility model are:
本实用新型通过采用爬架立设于楼板且顶部凸伸出上人孔,所述爬架内部形成有上下贯穿的供人通过的空间,且所述爬架间隔固定有横向的踏杆,从而施工人员可通过踏杆在爬架内部的空间上升,通过上人孔进入到屋顶。屋面形成有围设于所述上人孔四周且相互连接的多个防护墙,防护墙可起到围护上人孔的作用。将爬架的四周和对应的防护墙通过拉结杆拉结固定,爬架的相对两侧受力平衡,以保证爬架的稳定性。围设于所述爬架的四周的密目安全网可将立杆之间的缝隙进行围挡,保证施工作业人员上下通行安全及防止高空坠物。通过固定于所述爬架的顶部的防坠吊索,施工人员上下爬架时,可将防坠吊索挂于安全带上,增加施工作业人员上下安全性。本实用新型解决了现有技术中当结构施工完成后且无施工升降机时,且因施工原因将外脚手架拆除,则会导致施工作业人员无法到屋面上进行施工作业的问题。In the utility model, the climbing frame is erected on the floor and the top protrudes out of the upper manhole. The inside of the climbing frame is formed with a space for people to pass through up and down, and the climbing frame is fixed with horizontal step bars at intervals, so that Construction personnel can ascend in the space inside the climbing frame through the step bars, and enter the roof through the manhole. The roof is formed with a plurality of protective walls surrounding the upper manhole and connected to each other, and the protective walls can play a role in protecting the upper manhole. The surroundings of the climbing frame and the corresponding protective walls are fixed by tie rods, and the forces on the opposite sides of the climbing frame are balanced to ensure the stability of the climbing frame. The dense mesh safety nets surrounding the climbing frame can block the gaps between the vertical poles to ensure the safety of construction workers going up and down and prevent objects from falling from height. Through the anti-fall sling fixed on the top of the climbing frame, when the construction personnel climb up and down the climbing frame, the anti-fall sling can be hung on the safety belt, which increases the safety of the construction workers going up and down. The utility model solves the problem in the prior art that when the construction of the structure is completed and there is no construction elevator, and the external scaffolding is removed due to construction reasons, construction workers cannot go to the roof to carry out construction work.
以上结合附图实施例对本实用新型进行了详细说明,本领域中普通技术人员可根据上述说明对本实用新型做出种种变化例。因而,实施例中的某些细节不应构成对本实用新型的限定,本实用新型将以所附权利要求书界定的范围作为本实用新型的保护范围。The utility model has been described in detail above in conjunction with the embodiments of the accompanying drawings, and those skilled in the art can make various changes to the utility model according to the above description. Therefore, some details in the embodiments should not constitute a limitation to the utility model, and the utility model shall take the scope defined by the appended claims as the protection scope of the utility model.
Claims (4)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201920442145.5U CN209780175U (en) | 2019-04-03 | 2019-04-03 | Upper and lower passage frames for manhole construction on the roof |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201920442145.5U CN209780175U (en) | 2019-04-03 | 2019-04-03 | Upper and lower passage frames for manhole construction on the roof |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN209780175U true CN209780175U (en) | 2019-12-13 |
Family
ID=68800902
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201920442145.5U Expired - Fee Related CN209780175U (en) | 2019-04-03 | 2019-04-03 | Upper and lower passage frames for manhole construction on the roof |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN209780175U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113815776A (en) * | 2021-07-02 | 2021-12-21 | 上海外高桥造船有限公司 | Upper and lower passageway protective rail with handle function in cabin for ship |
-
2019
- 2019-04-03 CN CN201920442145.5U patent/CN209780175U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113815776A (en) * | 2021-07-02 | 2021-12-21 | 上海外高桥造船有限公司 | Upper and lower passageway protective rail with handle function in cabin for ship |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103276886B (en) | Overhanging frame at position of high-rise building sloping roof outer eave window and construction method thereof | |
| CN209780175U (en) | Upper and lower passage frames for manhole construction on the roof | |
| CN208039787U (en) | High-altitude edge-facing operation assembly operation platform | |
| CN218881677U (en) | Vertical surface protection device for steel structure building construction | |
| CN212295608U (en) | System for stabilizing climbing scaffold | |
| CN104278830A (en) | Integral combined scaffold | |
| CN205591521U (en) | Rock climbing formula robot protective screen | |
| CN214423943U (en) | Can be convenient in high-rise building construction through climbing frame of attaching wall spare | |
| CN212295577U (en) | Externally-hung operating platform for building | |
| CN214462394U (en) | High-altitude overhanging scaffold | |
| JP2004232366A (en) | Hanging scaffold | |
| CN215670887U (en) | Outdoor protection type stair | |
| CN212740512U (en) | Climb frame attached tower crane safety passage | |
| CN212642081U (en) | Special-shaped multifunctional scaffold | |
| CN117027352A (en) | Large-span high altitude vestibule curtain wall construction operation platform | |
| CN212078621U (en) | A safety construction frame for civil engineering | |
| CN208280567U (en) | The changeable alien invasion of super high-rise building once climbs outrigger system | |
| CN220036560U (en) | Suspension type cage ladder | |
| CN218406416U (en) | Anti-climbing vertical safety channel structure | |
| CN214195513U (en) | A protective net frame and a climbing frame protective net | |
| CN217998853U (en) | Scaffold convenient for indoor construction | |
| CN220150833U (en) | Anti-falling hanging basket for constructional engineering | |
| CN222296125U (en) | Functional foot rest for building engineering management | |
| CN216616754U (en) | A kind of scaffolding for construction engineering | |
| CN223675776U (en) | High-altitude steel bar binding platform |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20191213 |