CN209779671U - Steel structure foundation bolt pre-embedded positioning plate - Google Patents

Steel structure foundation bolt pre-embedded positioning plate Download PDF

Info

Publication number
CN209779671U
CN209779671U CN201920329494.6U CN201920329494U CN209779671U CN 209779671 U CN209779671 U CN 209779671U CN 201920329494 U CN201920329494 U CN 201920329494U CN 209779671 U CN209779671 U CN 209779671U
Authority
CN
China
Prior art keywords
positioning plate
positioning
plate body
vertical part
steel structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920329494.6U
Other languages
Chinese (zh)
Inventor
郭应军
汤德芸
田子剑
龚潇鉴
胡贺祥
石文伯
陈志鹏
王世华
何怀文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China State Construction Engineering Corp Ltd CSCEC
China Construction First Group Corp Ltd
China Construction First Group the Fifth Construction Co Ltd
Original Assignee
China State Construction Engineering Corp Ltd CSCEC
China Construction First Group Corp Ltd
China Construction First Group the Fifth Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China State Construction Engineering Corp Ltd CSCEC, China Construction First Group Corp Ltd, China Construction First Group the Fifth Construction Co Ltd filed Critical China State Construction Engineering Corp Ltd CSCEC
Priority to CN201920329494.6U priority Critical patent/CN209779671U/en
Application granted granted Critical
Publication of CN209779671U publication Critical patent/CN209779671U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a steel structure foundation bolt pre-buried locating plate, including rectangle locating plate body and reference column, the edge position of locating plate body all around is provided with U type groove in the annular, and locating plate body central point puts and has seted up the first locating hole of reserving, and four bights of locating plate body have seted up the second locating hole of reserving; a positioning column is arranged between every two adjacent second reserved positioning holes and comprises a vertical part with a mantle fiber and a circular hanging ring welded at the top end of the vertical part; the bottom end of the vertical part is welded and fixed with the positioning plate body. The utility model discloses can fix the post dowel bar well and target in place to be provided with four piece at least reference columns on the locating plate. The positioning column comprises a vertical part with a mantle fiber and a circular hanging ring welded at the top end of the vertical part. The vertical part is pre-wound with steel wires or hemp ropes to facilitate fixing the adjacent steel bars, and the hanging ring can be hoisted when being used conveniently. The disturbance problem to the reinforcing bar when reducing concrete placement, guarantee to pour going on smoothly of construction and the accurate installation of steel construction.

Description

Steel structure foundation bolt pre-embedded positioning plate
Technical Field
The utility model relates to a steel construction location construction field, especially the pre-buried locating plate of steel construction rag bolt.
Background
Steel construction rag bolt is pre-buried usually adopts to place the upright frame in the foundation slab, and rag bolt fixes through the upright frame that erects, and after foundation slab concrete placement accomplished, rag bolt is difficult for taking place the off normal, but need consume steel construction materials such as a large amount of angle steel, channel-section steel in the rag bolt pre-buried construction.
If the foundation bolt is directly embedded and fixed through the column dowel, the phenomenon of deviation is easily caused after concrete pouring is finished, and the installation quality of a steel structure is seriously influenced.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a pre-buried locating plate of steel construction rag bolt, when solving the post dowel bar fixed, technical problem that the off normal appears after concrete placement is accomplished easily in inaccurate, the positioning accuracy of reinforcing bar location, follow-up structure construction quality is poor, the reinforcing bar.
In order to achieve the above purpose, the utility model adopts the following technical scheme: the utility model provides a steel structure foundation bolt pre-buried locating plate, including rectangle locating plate body and reference column, the edge position all around of locating plate body is provided with U type groove in the annular, and locating plate body central point puts and has seted up first reservation locating hole, and locating plate body four bights have seted up second reservation locating hole; a positioning column is arranged between every two adjacent second reserved positioning holes and comprises a vertical part with a mantle fiber and a circular hanging ring welded at the top end of the vertical part; the bottom end of the vertical part is welded and fixed with the positioning plate body.
Further, the diameter of the vertical part is 10mm-20 mm.
Furthermore, a steel wire rope or a hemp rope is wound on the positioning column.
Further, the diameter of the first reserved positioning hole is larger than that of the second reserved positioning hole.
Further, the diameter of the first reserved positioning hole is 200 mm.
Furthermore, the depth of the U-shaped groove is the same.
Further, the U-shaped groove comprises a first U-shaped groove and a second U-shaped groove; the first U-shaped groove and the second U-shaped groove are arranged at intervals.
Further, the depth of the first U-shaped groove is larger than that of the second U-shaped groove.
Furthermore, the number of the U-shaped grooves on one side edge of the positioning plate body is 3-6.
Further, the thickness of locating plate body is 10 mm.
The beneficial effects of the utility model are embodied in:
1, the utility model provides a pre-buried locating plate of steel construction rag bolt, simple structure, it is with low costs, locating plate intensity is big, is difficult for taking place to warp. The method is suitable for pre-embedding construction of the steel structure column base bolt. The operation is simple, and the installation precision is greatly improved. The pouring device can be used for transferring practical cost, and can also be directly poured together with concrete, so that the pouring quality of finished products is improved.
2, the utility model provides a pre-buried locating plate of steel construction rag bolt can fix the post dowel well in place. And at least four positioning columns are arranged on the positioning plate. The positioning column comprises a vertical part with a mantle fiber and a circular hanging ring welded at the top end of the vertical part. The vertical part is pre-wound with steel wires or hemp ropes to facilitate fixing the adjacent steel bars, and the hanging ring can be hoisted when being used conveniently.
3, the disturbance problem to the reinforcing bar when can effectual reduction concrete placement guarantees going on smoothly of pouring the construction and the accurate installation of steel construction. And guarantees the flatness and the verticality of component installation.
Additional features and advantages of the invention will be set forth in the description which follows, and in part will be obvious from the description, or may be learned by the practice of the invention. The primary objects and other advantages of the invention may be realized and attained by the structure particularly pointed out in the written description and claims hereof.
Drawings
The present invention will be described in further detail with reference to the accompanying drawings.
Fig. 1 is a top view of a first embodiment of the present invention.
Fig. 2 is a plan view of a second embodiment of the present invention.
Fig. 3 is a side view of the first embodiment of the present invention.
Reference numerals: 1-a positioning plate body, 2-a positioning column, 21-a vertical part, 22-a hanging ring, 3-U-shaped grooves, 4-a first reserved positioning hole and 5-a second reserved positioning hole.
Detailed Description
the technical solutions of the present invention are described in detail below by way of examples, which are only exemplary and can be used only for explaining and explaining the technical solutions of the present invention, but not for explaining the limitations of the technical solutions of the present invention.
Example 1
As shown in fig. 1, the utility model provides a pre-buried locating plate of steel construction rag bolt, simple structure, locating plate intensity is big, is difficult for taking place to warp. Including thickness for 10 mm's rectangle locating plate body 1 and reference column 2, locating plate body 1 all around edge position annular is provided with U type groove 3 to the degree of depth in U type groove 3 is the same. The number of the U-shaped grooves 3 on one side edge of the positioning plate body 1 is 3-6. The first locating hole 4 of reserving is seted up to locating plate body 1 central point, and locating plate body 1 four bights are seted up the second and are reserved locating hole 5. The diameter of the first reserved positioning hole 4 is 200 mm. The diameter of the first reserved positioning hole 4 is larger than that of the second reserved positioning hole 5.
As shown in fig. 3, a positioning column 2 is arranged between two adjacent second reserved positioning holes 5, and the positioning column 2 includes a vertical portion 21 with a mantle fiber and a circular hanging ring 22 welded to the top end of the vertical portion 21; the bottom end of the vertical part 21 is welded and fixed with the positioning plate body 1. The diameter of the vertical part 21 is 10mm-20 mm. And a steel wire rope or a hemp rope is wound on the positioning column 2. The column dowel bars can be well fixed in place. And at least four positioning columns 2 are arranged on the positioning plate. The positioning column 2 comprises a vertical part 21 with a mantle fiber and a circular hanging ring 22 welded at the top end of the vertical part 21. The vertical part 21 is pre-wound with steel wires or hemp ropes to fix adjacent steel bars conveniently, and the hanging ring 22 can be hoisted conveniently in use.
The pre-buried work progress of above-mentioned locating plate:
Firstly, according to the cross section size of the column, a steel plate with the thickness of 10mm is adopted to process a square plate with the same cross section size as the inner diameter cross section of the column rib.
Secondly, the center of the positioning plate body 1 is provided with a first reserved positioning hole 4 with the diameter of 200 mm.
Thirdly, the four corners of the positioning plate body 1 are provided with second reserved positioning holes 5, and the diameter of each second reserved positioning hole 5 is larger than 1mm of the bolt.
Fourthly, a U-shaped groove 3 is arranged.
Fifthly, binding of the foundation slab reinforcing steel bars and the column longitudinal steel bars is finished and the binding is qualified through inspection and acceptance.
Sixthly, the locating plate body 1 is placed to the muscle inboard is indulged to the post, and the muscle setting is indulged in the U type groove 3 of locating plate body 1's all around edge to with U type groove 3 spot welding, fix temporarily.
Seventhly, embedding foundation bolts, wherein the foundation bolts penetrate through the first reserved positioning holes 4 and the second reserved positioning holes 5 and are positioned by the aid of the positioning plate body 1.
Eighthly, unwinding the steel wire rope wound on the positioning column 2 and further winding the steel wire rope on the bolt; the positions of the longitudinal ribs of the front check column, the positioning plate body 1 and the foundation bolts are checked.
Ninth, in the concrete pouring process of the foundation slab, the position of the cross axis of the column base bolt is monitored by using a theodolite.
The pre-buried work progress of locating plate can effectually reduce the disturbance problem to the reinforcing bar when concrete placement, guarantees to pour going on smoothly of construction and the accurate installation of steel construction. And guarantees the flatness and the verticality of component installation.
Embodiment 2, the pre-buried locating plate of steel construction rag bolt is the same with embodiment 1, the difference lies in: the U-shaped groove 3 comprises a first U-shaped groove and a second U-shaped groove; the first U-shaped groove and the second U-shaped groove are arranged at intervals. The depth of the first U-shaped groove is larger than that of the second U-shaped groove. The depth of the U-shaped groove 3 can be selected according to actual construction conditions. As shown in fig. 2.
The utility model provides a pre-buried locating plate of steel construction rag bolt, simple structure, locating plate intensity is big, is difficult for taking place to warp. The method is suitable for pre-embedding construction of the steel structure column base bolt. The operation is simple, and the installation precision is greatly improved. The pouring device can be used for transferring practical cost, and can also be directly poured together with concrete, so that the pouring quality of finished products is improved.
The above description is only for the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any changes or substitutions that can be considered by those skilled in the art within the technical scope of the present invention should be covered by the protection scope of the present invention.

Claims (10)

1. Pre-buried locating plate of steel construction rag bolt, its characterized in that: the positioning plate comprises a rectangular positioning plate body (1) and positioning columns (2), wherein U-shaped grooves (3) are annularly formed in the edge positions of the periphery of the positioning plate body (1), a first reserved positioning hole (4) is formed in the center of the positioning plate body (1), and second reserved positioning holes (5) are formed in the four corners of the positioning plate body (1); a positioning column (2) is arranged between every two adjacent second reserved positioning holes (5), and each positioning column (2) comprises a vertical part (21) with a mantle fiber and a circular hanging ring (22) welded to the top end of the vertical part (21); the bottom end of the vertical part (21) is welded and fixed with the positioning plate body (1).
2. The steel structure anchor bolt embedded positioning plate according to claim 1, wherein the diameter of the vertical part (21) is 10mm-20 mm.
3. The steel structure foundation bolt embedded positioning plate as claimed in claim 1, wherein a steel wire rope or a hemp rope is wound on the positioning column (2).
4. The steel structure anchor bolt pre-buried positioning plate of claim 1, characterized in that the diameter of the first reserved positioning hole (4) is larger than the diameter of the second reserved positioning hole (5).
5. The steel structure anchor bolt pre-buried positioning plate of claim 1, characterized in that the diameter of the first reserved positioning hole (4) is 200 mm.
6. The steel structure foundation bolt embedded positioning plate as claimed in claim 1, wherein the depth of the U-shaped grooves (3) is the same.
7. The steel structure foundation bolt embedded positioning plate as claimed in claim 1, wherein the U-shaped groove (3) comprises a first U-shaped groove and a second U-shaped groove; the first U-shaped groove and the second U-shaped groove are arranged at intervals.
8. The steel structure anchor bolt embedded positioning plate as claimed in claim 7, wherein the depth of the first U-shaped groove is greater than that of the second U-shaped groove.
9. The steel structure foundation bolt embedded positioning plate according to claim 1, wherein the number of the U-shaped grooves (3) on one side edge of the positioning plate body (1) is 3-6.
10. The steel structure foundation bolt embedded positioning plate according to claim 1, wherein the thickness of the positioning plate body (1) is 10 mm.
CN201920329494.6U 2019-03-15 2019-03-15 Steel structure foundation bolt pre-embedded positioning plate Active CN209779671U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920329494.6U CN209779671U (en) 2019-03-15 2019-03-15 Steel structure foundation bolt pre-embedded positioning plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920329494.6U CN209779671U (en) 2019-03-15 2019-03-15 Steel structure foundation bolt pre-embedded positioning plate

Publications (1)

Publication Number Publication Date
CN209779671U true CN209779671U (en) 2019-12-13

Family

ID=68797910

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920329494.6U Active CN209779671U (en) 2019-03-15 2019-03-15 Steel structure foundation bolt pre-embedded positioning plate

Country Status (1)

Country Link
CN (1) CN209779671U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113756594A (en) * 2021-09-30 2021-12-07 浙江钢泰钢结构(集团)有限公司 Concrete embedded fastener and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113756594A (en) * 2021-09-30 2021-12-07 浙江钢泰钢结构(集团)有限公司 Concrete embedded fastener and construction method thereof

Similar Documents

Publication Publication Date Title
CN108035554B (en) Construction method of section steel column support frame of super high-rise building frame column
US3219308A (en) Form locator
CN206127746U (en) Isolation bearing handles accurate location structure of pre -buried steel sheet in back
CN209099382U (en) A kind of pier foundation embedding anchor bolts auxiliary device and pier foundation
CN110586815A (en) Size-adjustable multi-layer steel bar net high-precision machining jig frame and using method
CN209779671U (en) Steel structure foundation bolt pre-embedded positioning plate
CN114182880B (en) Lightning protection bridging construction method for prefabricated column
CN213741552U (en) Roof rooting suspender suspension type multilayer air corridor
CN109853569A (en) A kind of method and device of Soft Clay pouring pile hole steel pile casting anti-settling deviation
CN103388398A (en) Novel casing pipe fixator capable of being easily assembled and disassembled and fixing method
CN112458905A (en) Splicing adjustment method for prefabricated capping beam and prefabricated stand column
CN214883824U (en) Pre-leveling tower foundation
CN111021343A (en) Construction method of upright post pile
CN212689623U (en) Pre-buried locating rack of steel construction rag bolt
CN113293790B (en) Pre-leveling tower foundation and leveling construction method thereof
CN211665788U (en) Pre-buried fixing device of cylinder component basis
CN111395179B (en) Construction method of hollow bridge pier column and bearing platform
CN207597587U (en) Column muscle location structure when one kind connects precast beam for PC building cast-in-situ columns
CN108385710B (en) Reusable tower foundation and installation method thereof
CN110747875A (en) Construction method for building scaffold for open caisson construction of cyclone tank
CN215211161U (en) Positioner and positioning mechanism for steel pipe column
CN214738814U (en) Corner-cutting polygonal column base
CN213234308U (en) Cloth machine suitable for assembly type building concrete construction
CN210263120U (en) Line tower base embedded screw fixing device
CN218373356U (en) Quick accurate positioner of bridge anticollision wall built-in fitting

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant