CN209767113U - Device is hung with cable in building site - Google Patents

Device is hung with cable in building site Download PDF

Info

Publication number
CN209767113U
CN209767113U CN201920747377.1U CN201920747377U CN209767113U CN 209767113 U CN209767113 U CN 209767113U CN 201920747377 U CN201920747377 U CN 201920747377U CN 209767113 U CN209767113 U CN 209767113U
Authority
CN
China
Prior art keywords
support frame
plate
winding wheel
cable
hanging device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920747377.1U
Other languages
Chinese (zh)
Inventor
殷敏
杨泽清
顾雨童
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Port City Construction And Installation Engineering Co Ltd
Original Assignee
Shanghai Port City Construction And Installation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Port City Construction And Installation Engineering Co Ltd filed Critical Shanghai Port City Construction And Installation Engineering Co Ltd
Priority to CN201920747377.1U priority Critical patent/CN209767113U/en
Application granted granted Critical
Publication of CN209767113U publication Critical patent/CN209767113U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The utility model discloses a device is put with cable to building site string relates to building site infrastructure, and it is including being first support frame and the second support frame that the interval set up, and the upside of first support frame is rotated and is provided with the rolling wheel, is provided with between first support frame and the second support frame and hangs and put the line, and the one end of hanging putting the line is locked on the rolling wheel, hangs the other end locking of putting the line and at the upside of second support frame, still is provided with the fixed subassembly that is used for dismantling fixed connection rolling wheel and first support frame on the first support frame. The utility model has the advantages of can realize hanging the operation of putting to transmission cable, reduce the condition that scattered transmission cable caused the staff to electrocute and take place to promote the suitability to the distance between first support frame and the second support frame.

Description

Device is hung with cable in building site
Technical Field
The utility model relates to a building site infrastructure especially relates to a device is hung with cable in building site.
Background
More temporary electricity utilization exists in a construction site, and power transmission cables need to be arranged. In order to standardize the arrangement of the power transmission cables on the construction site and improve the power utilization safety of the construction site, the national ministry of construction publishes JGJ46-2005 technical Specification for temporary power utilization safety of the construction site, and the power transmission cables on the construction site need to be overhead by more than two meters. Because there is not the dedicated cable frame of building site in the existing market, electrician is for convenience, often drags and drops transmission cable along with the ground, and neither is standard, leads to the condition of staff's electric shock very easily to take place, needs improve urgently.
SUMMERY OF THE UTILITY MODEL
To the technical problem, the utility model aims to provide a device is hung with cable to building site puts with the help of setting up between first support frame and second support frame and hanging and put the line to and set up rolling wheel and fixed subassembly on first support frame, thereby realize hanging the operation of putting to transmission of electricity cable, reduce the condition emergence that scattered transmission of electricity cable caused the staff to electrocute, and promote the suitability to the distance between first support frame and the second support frame.
The above technical purpose of the present invention can be achieved by the following technical solutions:
The utility model provides a device is hung with cable in building site, is including being first support frame and the second support frame that the interval set up, the upside of first support frame is rotated and is provided with the rolling wheel, be provided with between first support frame and the second support frame around the string of establishing transmission cable and put the line, the one end of hanging putting the line is locked on the rolling wheel, hang the other end locking of putting the line at the upside of second support frame, still be provided with the fixed subassembly that is used for dismantling fixed connection rolling wheel and first support frame on the first support frame.
By adopting the technical scheme, in actual application, a worker can perform paying-off operation on the hanging wire through the winding wheel and penetrate the hanging wire into the transmission cable coil; then, the fixing component is fixedly connected with the first support frame and the winding wheel, and a point of the hanging wire far away from the first support frame is locked on the first support frame; then, the worker can install and fix the first support frame and the second support frame at intervals or bury the first support frame and the second support frame in a construction site; when the power transmission cable needs to be pulled, one end of the power transmission cable can be pulled by a worker to slide on the hanging wire, and at the moment, the power transmission cable is spirally wound on the hanging wire. Through this kind of mode, realize hanging the operation of putting to transmission of electricity cable, reduce scattered transmission of electricity cable and cause the condition of staff's electric shock to take place to promote the suitability to distance between first support frame and the second support frame.
The utility model discloses further set up to: the hanging wire is a steel wire rope.
By adopting the technical scheme, the hanging wire is set to be the steel wire rope, the bearing capacity of the hanging wire is guaranteed, and the disconnection of the hanging wire is reduced.
The utility model discloses further set up to: the steel wire rope is sleeved with a rubber sleeve.
Through adopting above-mentioned technical scheme, the gum cover is established to the cover on wire rope, reduces the condition emergence of friction to losing between transmission of electricity cable and the wire rope, prolongs transmission of electricity cable's life.
The utility model discloses further set up to: the fixed mounting panel that is provided with of upside of first support frame, the vertical rotation of mounting panel is provided with the axis of rotation, the rolling wheel can be dismantled and fix the part at the mounting panel upside at the axis of rotation.
Through adopting above-mentioned technical scheme, can dismantle the rolling wheel and fix on the axis of rotation of rotating and establishing on the mounting panel to further realize the rotation operation of rolling wheel on first support frame.
The utility model discloses further set up to: the axis of rotation runs through the mounting panel, the axis of rotation deviates from the fixed handle that rotates that is provided with of one end of rolling wheel at the mounting panel.
Through adopting above-mentioned technical scheme, when needs carry out the rolling operation and unreel the operation to hanging the line, the staff rotates with the help of rotating handle drive rolling wheel to greatly make things convenient for the staff to carry out the rolling operation and unreel the operation to hanging the line.
The utility model discloses further set up to: the rotating shaft is in a hexagonal structure on the cross section of one side of the winding wheel and is provided with an inserting end, one side of the winding wheel, which is close to the mounting plate, is provided with an embedded groove along the axis of the winding wheel, the embedded groove is in a regular hexagon shape, and the inserting end of the rotating shaft penetrates into the embedded groove and is matched with the embedded groove in a sliding mode.
through adopting above-mentioned technical scheme, when this building site hung with the cable and put device idle state, the staff can slide the uninstallation with the rolling wheel from the axis of rotation to hang and put the line rolling on the rolling wheel, and deposit at indoor, thereby reduce to hang and put the line idle state under by the bad condition emergence of the deterioration of sunshine and rainwater erosion, and the extension hangs the life who puts the line.
The utility model discloses further set up to: the fixed subassembly includes articulated slab and grafting short pin, the one end of articulated slab articulates in the axial one side of rolling wheel at first support frame, just the grafting short pin is fixed in the articulated slab and is close to one side of rolling wheel, offer the joint groove that is used for penetrating the grafting short pin on the terminal surface of rolling wheel near articulated slab one side.
Through adopting above-mentioned technical scheme, when needs are fixed to the rolling wheel, the staff can rotate the articulated slab, will peg graft the cotter and penetrate the joint groove to die the rolling wheel lock on first support frame, help guaranteeing the stability of transmission of electricity cable on this building site is hung with the cable and is put the device.
The utility model discloses further set up to: the first support frame is also fixedly provided with a fixed plate, and a lock catch is arranged between one end of the hinged plate, which is far away from the hinged part of the hinged plate and the first support frame, and the fixed plate in a matched manner; when the lock catch is in locking connection with the hinged plate and the fixed plate, the length direction of the hinged plate is vertical to the axial direction of the winding wheel, and the inserting short pin penetrates into the clamping groove.
Through adopting above-mentioned technical scheme, by hasp locking connection articulated slab and fixed plate to the reduction rotates on first support frame to the articulated slab in the rolling wheel is fixed and causes the condition emergence of grafting short pin deviating from the joint groove, helps guaranteeing fixed subassembly to the fixed stability of rolling wheel.
The utility model discloses further set up to: and bases are fixedly arranged on the lower sides of the first support frame and the second support frame.
Through adopting above-mentioned technical scheme, all set up the base at the downside of first support frame and second support frame to greatly make things convenient for the staff to hang the convenience of putting the device installation to this cable for building site.
the utility model discloses further set up to: and the base is provided with ground drilling screws which are in threaded through connection from top to bottom.
through adopting above-mentioned technical scheme, in the actual installation, the staff can be on the base rotary drill ground and fall to the ground for the tip of boring ground screw inserts the earth's surface, thereby promotes the stability of first support frame and second support frame installation.
Compared with the prior art, the beneficial effects of the utility model are as follows:
(1) By arranging the hanging wire between the first support frame and the second support frame and arranging the winding wheel and the fixing assembly on the first support frame, the hanging operation of the power transmission cable is realized, the situation that workers get electric shock due to scattered power transmission cables is reduced, and the applicability of the distance between the first support frame and the second support frame is improved;
(2) The steel wire rope is sleeved with the rubber sleeve, and the winding wheel is matched with the embedded groove through the inserting end of the rotating shaft to realize detachable fixation on the first support frame, so that the service life of the hanging wire is greatly prolonged;
(3) The splicing short pin splicing clamping groove fixed on the hinged plate is comprehensively utilized, and the hinged plate is locked on the fixed plate by virtue of the lock catch, so that the fixed operation of the winding wheel on the first support frame is realized, and the stability of the fixed assembly for fixing the winding wheel is greatly improved.
Drawings
FIG. 1 is an axial view of the present embodiment, which mainly shows the overall structure of the cable hanging device for construction site;
FIG. 2 is a schematic view of the present embodiment mainly showing the structure of the steel wire rope;
Fig. 3 is a schematic view mainly showing a structure of a first support frame in the present embodiment;
Fig. 4 is a schematic view mainly showing the structure of the fixing assembly in this embodiment.
Reference numerals: 1. a first support frame; 11. mounting a plate; 12. a fixing plate; 2. a winding wheel; 21. a groove is embedded; 22. a clamping groove; 3. a fixing assembly; 31. a hinge plate; 32. inserting a short pin; 4. a rotating shaft; 41. a plug end; 42. rotating the handle; 5. locking; 6. a second support frame; 7. a wire rope; 71. a rubber sleeve; 8. a base; 81. an earth-boring screw; 9. an electric power transmission cable.
Detailed Description
The present invention will be described in further detail with reference to the following examples and drawings, but the embodiments of the present invention are not limited thereto.
Example (b):
Referring to fig. 1 and 2, a device is hung with cable in building site, including being first support frame 1 and the second support frame 6 that the interval set up, the upside of first support frame 1 rotates and is provided with rolling wheel 2, be provided with wire rope 7 between first support frame 1 and the second support frame 6, the cover is equipped with gum cover 71 on the wire rope 7, locking can be dismantled on rolling wheel 2 to wire rope 7's one end, locking can be dismantled to wire rope 7's the other end at the upside of second support frame 6, still be provided with the fixed subassembly 3 that is used for fixed connection rolling wheel 2 and first support frame 1 on the first support frame 1.
In practical application, a worker can pay off the steel wire rope 7 through the winding wheel 2 and penetrate the steel wire rope 7 into the transmission cable coil; then, the fixing component 3 is fixedly connected with the first support frame 1 and the winding wheel 2, and one point of the steel wire rope 7 far away from the first support frame 1 is locked on the second support frame 6; subsequently, the worker can mount and fix the first support frame 1 and the second support frame 6 at intervals or bury the first support frame and the second support frame in the construction site; when the power transmission cable 9 needs to be pulled, a worker can pull one end of the power transmission cable 9 to slide on the steel wire rope 7, and at the moment, the power transmission cable 9 is spirally wound on the steel wire rope 7.
Referring to fig. 1, bases 8 are fixedly arranged on the lower sides of the first support frame 1 and the second support frame 6, the bases 8 are in a square structure, and the first support frame 1 and the second support frame 6 are vertically arranged on the bases 8 correspondingly; all from last downward screw thread through connection has the earth boring screw 81 on the base 8, and earth boring screw 81 is provided with one in four contained angle departments of arbitrary base 8. When the worker installs the first support frame 1 and the second support frame 6 on the work site, the worker can rotate the ground drilling screw 81 on the base 8, so that the ground drilling screw 81 is screwed into the ground, which helps to ensure the stability of the installation of the first support frame 1 and the second support frame 6 on the work site.
referring to fig. 3, the upper side of the first support frame 1 is fixedly provided with an installation plate 11, a rotating shaft 4 vertically penetrates through the installation plate 11, the rotating shaft 4 is rotatably installed on the installation plate 11 through a bearing, the cross section of the part of the rotating shaft 4 on the upper side of the installation plate 11 is of a hexagonal structure and is provided with an insertion end 41, one side of the winding wheel 2 close to the installation plate 11 is provided with an embedded groove 21 along the axis of the winding wheel, the embedded groove 21 is of a regular hexagon, and the insertion end 41 of the rotating shaft 4 penetrates into the embedded groove 21 and is matched with the embedded groove 21. And, the one end that the axis of rotation 4 deviates from the winding wheel 2 at mounting panel 11 is fixed and is provided with the turning handle 42. In actual work, a worker drives the winding wheel 2 to rotate by means of the rotating handle 42, and performs winding and unwinding operations on the steel wire rope 7; when this device idle state is hung with cable in building site, the staff can slide winding wheel 2 from axis of rotation 4 and unload to coil wire rope 7 on winding wheel 2, and deposit indoor.
Referring to fig. 4, the fixing assembly 3 includes a hinge plate 31 and a short plug-in pin 32, one end of the hinge plate 31 is hinged to the first support frame 1 at the upper side of the winding wheel 2, the hinge plate 31 is hinged to the first support frame 1 in a spherical manner, the short plug-in pin 32 is fixed to the middle of the hinge plate 31 at the side close to the winding wheel 2, a clamping groove 22 is formed in the end surface of the winding wheel 2 at the side close to the hinge plate 31, and the clamping groove 22 and the short plug-in pin 32 are both in a regular hexagon structure; and, the plug short pin 32 is in clearance fit with the catching groove 22. In order to ensure the stability of the fixing component 3 for fixing the winding wheel 2, a fixing plate 12 is vertically and fixedly arranged on one side of the mounting plate 11 away from the first support frame 1, one end of the hinged plate 31 away from the hinged part with the first support frame 1 is overlapped on the upper side of the fixing plate 12, and a lock catch 5 is arranged between one end of the hinged plate 31 away from the hinged part with the first support frame 1 and the fixing plate 12 in a matched mode. After the wire rope 7 is paid out, the worker can rotate the hinge plate 31, so that the inserting short pin 32 penetrates into the clamping groove 22, and the hinge plate 31 and the fixing plate 12 are locked and connected by the lock catch 5.
the present embodiment is further described below with reference to specific actions: in actual work, in actual application, workers can pay off the steel wire rope 7 through the winding wheel 2 and penetrate the steel wire rope 7 through the transmission cable coil; then, the hinged plate 31 is rotated, so that the inserting short pin 32 penetrates into the clamping groove 22, the hinged plate 31 and the fixed plate 12 are locked and connected by the lock catch 5, and one end of the steel wire rope 7, which is far away from the winding wheel 2, is locked on the second supporting frame 6; subsequently, the worker can fix the first support frame 1 and the second support frame 6 to the ground through the base 8 and the ground drilling screws 81.
when the power transmission cable 9 needs to be pulled, a worker can pull one end of the power transmission cable 9 to slide on the steel wire rope 7, and at the moment, the power transmission cable 9 is spirally wound on the steel wire rope 7. Through this kind of mode, realize hanging the operation of putting to transmission cable 9, reduce scattered transmission cable 9 and cause the condition of staff's electric shock to take place, promote the suitability to distance between first support frame 1 and the second support frame 6, and simple structure, simple to operate.
It is above only the utility model discloses a preferred embodiment, the utility model discloses a scope of protection does not only confine above-mentioned embodiment, the all belongs to the utility model discloses a technical scheme under the thinking all belongs to the utility model discloses a scope of protection. It should be noted that, for those skilled in the art, various modifications and decorations can be made without departing from the principle of the present invention, and these modifications and decorations should also be regarded as the protection scope of the present invention.

Claims (10)

1. The utility model provides a device is put with cable hanging in building site, its characterized in that, is including first support frame (1) and second support frame (6) that are the interval setting, the upside of first support frame (1) is rotated and is provided with wind-up wheel (2), it puts the line to be provided with between first support frame (1) and second support frame (6) to hang, hang the one end locking of putting the line on wind-up wheel (2), hang the upside of the other end locking of putting the line at second support frame (6), still be provided with on first support frame (1) and be used for dismantling fixed connection wind-up wheel (2) and fixed subassembly (3) of first support frame (1).
2. a site-specific cable suspension device according to claim 1, characterized in that the suspension line is a wire rope (7).
3. A site cable hanging device according to claim 2, characterized in that said steel cable (7) is sheathed with a rubber sleeve (71).
4. A cable hanging device for construction sites as claimed in claim 1, characterized in that a mounting plate (11) is fixedly arranged on the upper side of the first supporting frame (1), the mounting plate (11) is vertically and rotatably provided with a rotating shaft (4), and the winding wheel (2) is detachably fixed on the upper side of the mounting plate (11) of the rotating shaft (4).
5. A cable hanging device for construction sites according to claim 4, characterized in that the rotating shaft (4) penetrates through the mounting plate (11), and the rotating shaft (4) is fixedly provided with a rotating handle (42) at one end of the mounting plate (11) departing from the winding wheel (2).
6. The cable hanging device for the construction site as claimed in claim 4, wherein the cross section of the rotating shaft (4) on one side of the winding wheel (2) is of a regular hexagonal structure and is provided with an inserting end (41), an embedding groove (21) is formed in one side, close to the mounting plate (11), of the winding wheel (2) along the axis of the winding wheel, the embedding groove (21) is of a regular hexagon, and the inserting end (41) of the rotating shaft (4) penetrates into the embedding groove (21) and is in sliding fit with the embedding groove (21).
7. The cable hanging device for the construction site according to claim 1, wherein the fixing assembly (3) comprises a hinge plate (31) and a plug short pin (32), one end of the hinge plate (31) is hinged to one side of the first support frame (1) in the axial direction of the winding wheel (2), the plug short pin (32) is fixed to one side of the hinge plate (31) close to the winding wheel (2), and a clamping groove (22) for the plug short pin (32) to penetrate through is formed in the end face of the winding wheel (2) close to one side of the hinge plate (31).
8. The cable hanging device for the construction site according to claim 7, wherein a fixing plate (12) is further fixedly arranged on the first supporting frame (1), and a lock catch (5) is arranged between one end of the hinge plate (31) far away from the hinge joint of the hinge plate and the first supporting frame (1) and the fixing plate (12) in a matched mode;
When the lock catch (5) is in locking connection with the hinged plate (31) and the fixed plate (12), the hinged plate (31) is vertical to the axial direction of the winding wheel (2) in the length direction, and the inserting short pin (32) penetrates into the clamping groove (22).
9. A cable hanging device for construction sites according to claim 1, characterized in that a base (8) is fixedly arranged on the lower side of the first support frame (1) and the lower side of the second support frame (6).
10. A cable hanging device for construction site according to claim 9, characterized in that the base (8) is threaded through with an earth boring screw (81) from top to bottom.
CN201920747377.1U 2019-05-22 2019-05-22 Device is hung with cable in building site Active CN209767113U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920747377.1U CN209767113U (en) 2019-05-22 2019-05-22 Device is hung with cable in building site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920747377.1U CN209767113U (en) 2019-05-22 2019-05-22 Device is hung with cable in building site

Publications (1)

Publication Number Publication Date
CN209767113U true CN209767113U (en) 2019-12-10

Family

ID=68761877

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920747377.1U Active CN209767113U (en) 2019-05-22 2019-05-22 Device is hung with cable in building site

Country Status (1)

Country Link
CN (1) CN209767113U (en)

Similar Documents

Publication Publication Date Title
CN204435979U (en) A kind of protection device for installing of electric power facility
CN201812956U (en) Portable grounding wire clip for line repair
CN209767113U (en) Device is hung with cable in building site
CN113363868B (en) Exempt from to ascend a height grounding box
CN105977870A (en) Power leading-down cable fixing device
CN212175512U (en) Catwalk anchoring system, catwalk and suspension bridge construction device
CN204732808U (en) A kind of cable testing bridge laying apparatu
CN112780074B (en) Gravity rotary-clamping fastening type suspension device and mounting and dismounting method thereof
CN214889372U (en) Tunnel pipeline antidetonation gallows
CN216275765U (en) Slope anchor for municipal building
CN213802638U (en) A hoist device for utility tunnel
CN109256726B (en) Cable laying method for vertically laying pipeline
CN219341563U (en) Winch for cable laying
CN217080297U (en) Power equipment installs ladder
CN217534961U (en) Power equipment mounting stringing construction device
CN220628605U (en) Observe angularly adjustable ammeter case
CN212366747U (en) Cable fixing device for building outer wall
CN213959571U (en) Novel cable tunnel draws out worker's well
CN214697194U (en) Lifting device for power equipment installation
CN219106916U (en) Height-adjustable rod-shaped tool for temporarily erecting cable
CN215055924U (en) A pole setting device for wire pole construction
CN214543326U (en) Cable erecting device
CN220538885U (en) Novel screw thread steel sleeve technology for precast concrete
CN210350616U (en) Wire hook
CN108155598B (en) Auxiliary tool for hanging ground wire on overhead line

Legal Events