CN209760980U - Fence for building construction safety management - Google Patents

Fence for building construction safety management Download PDF

Info

Publication number
CN209760980U
CN209760980U CN201920398198.1U CN201920398198U CN209760980U CN 209760980 U CN209760980 U CN 209760980U CN 201920398198 U CN201920398198 U CN 201920398198U CN 209760980 U CN209760980 U CN 209760980U
Authority
CN
China
Prior art keywords
cross rod
vertical
construction safety
pole
building construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920398198.1U
Other languages
Chinese (zh)
Inventor
李世铁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201920398198.1U priority Critical patent/CN209760980U/en
Application granted granted Critical
Publication of CN209760980U publication Critical patent/CN209760980U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Emergency Alarm Devices (AREA)

Abstract

The utility model discloses a rail for construction safety control in rail technical field, including the vertical pole that the interval set up, adjacent two sets of the relative terminal surface from the top down of vertical pole is evenly spaced and is provided with three mounting grooves of group, the inside clamping fixing device that is provided with of mounting groove, adjacent two sets of from the top down has set gradually the last horizontal pole between the vertical pole, well horizontal pole and sheer pole, go up the horizontal pole, in the three mounting grooves of from the top down between adjacent two sets of vertical poles are all corresponded the setting in both ends about well horizontal pole and sheer pole, the baffle has been pegged graft in the flat rectangular hole, the top of going up the horizontal pole is provided with the toper thorn, vertical pole top is provided with the mount pad, three groups from left to right the interval installation warning light, camera and loudspeaker are installed at the mount pad top, and this rail is convenient to be dismantled, and occupation space is few, The camera and the loudspeaker can play a role in safety warning and supervision on constructors and passersby.

Description

Fence for building construction safety management
Technical Field
the utility model relates to a rail technical field specifically is a rail for construction safety control.
Background
Because when building the building, have certain danger at the building construction place, usually not allow external personnel to pass in and out the building construction place at will, in order to prevent the incident, install the guardrail usually in the periphery of construction, the guardrail can block pedestrian's vehicle and too be close to the construction region, can reduce the dust escape to the outside of construction region simultaneously, influence the city appearance, current rail installation dismantlement step is loaded down with trivial details, influence the efficiency of construction, and the baffle receives collision or other exogenic actions to be used as, very easily warp and collapses, be unfavorable for protection and dustproof effect, the supervisory equipment of its setting exposes outside completely, dust and rainwater enter and can cause the damage, still inconvenient clearance operation that carries out. Therefore, the fence for building construction safety management is provided.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a rail for construction safety control to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a rail for building construction safety control, includes the vertical pole that the interval set up, adjacent two sets of the relative terminal surface from the top down of vertical pole is even the interval and is provided with three mounting grooves of group, the inside tight fixing device that presss from both sides that is provided with of mounting groove, adjacent two sets of from the top down has set gradually between the vertical pole and has gone up horizontal pole, well horizontal pole and sheer pole, go up horizontal pole, well horizontal pole and sheer pole and control both ends and all correspond the setting in three mounting grooves from the top down between adjacent two sets of vertical poles, just go up horizontal pole, well horizontal pole and sheer pole and control both ends and press from both sides tight fixed with the tight fixing device of clamp, flat rectangular hole has been seted up at well horizontal pole top, the baffle has been pegged graft in the flat rectangular hole, the top of going up the horizontal pole is provided with toper thorn, the vertical pole top, Camera and loudspeaker.
Further, press from both sides tight fixing device and collude the board including rotating, it is connected through vertical axis of rotation and the inner wall rotation about mounting groove to rotate to collude board middle part, the mounting groove transversely runs through and is provided with about two sets of telescopic links, the telescopic link outer wall is provided with compression spring, telescopic link outer wall middle part is provided with the spring collar, the telescopic link leans on the near-end all to peg graft in fixed cover, fixed sleeve bottom is through connecting plate and mounting groove below inner wall fixed connection, the rear side that colludes the board rotates is provided with the waist hole, the telescopic link outer wall is provided with the complex quarter butt of pegging graft with the waist.
Furthermore, both ends all are provided with the rectangular connection piece about last horizontal pole, well horizontal pole and sheer pole, the rectangular connection piece other end is provided with the semicircle fixture block, the cooperation chucking of semicircle fixture block and rotation collude the board.
Further, the bottom of the upper cross rod and the top of the lower cross rod are both provided with strip-shaped clamping grooves matched with the baffle.
Further, transparent protective covers are arranged outside the alarm lamp and the camera.
Further, warning signs are posted to the outside of baffle.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the device is characterized in that an elastic clamping structure is formed by combining a rotary hook plate, a compression spring and a telescopic rod, an upper cross rod, a middle cross rod and a lower cross rod are inserted into a mounting groove, and semicircular fixture blocks at two ends and the rotary hook plate are matched and clamped tightly under the elastic resetting and extrusion action of the telescopic rod and the compression spring, so that two groups of vertical rods are stably connected and are not easy to fall off, and the device is more convenient and faster to mount and dismount compared with screw connection;
2. The baffle is inserted into the device through a flat rectangular hole formed in the middle cross rod, and the top and the bottom of the baffle are correspondingly clamped into the bottom of the upper cross rod and the strip-shaped clamping grooves at the top of the lower cross rod, so that the baffle is convenient to disassemble and assemble, and the integral stability and deformation of the baffle are guaranteed;
3. Set up warning light, camera and loudspeaker, can be timely warn the supervision to workman and passerby, make things convenient for management construction safety, the outside of warning light and camera sets up transparent protection casing, transparent protection casing can dustproof and waterproof, the clearance only need clean transparent protection casing when guaranteeing the life of warning light and camera can, it is more convenient.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a left side view of the vertical rod structure of the present invention;
FIG. 3 is a schematic structural view of the clamping and fixing device of the present invention;
fig. 4 is a schematic view of the structure of the middle cross bar of the present invention.
in the figure: the device comprises a vertical rod 1, a mounting groove 101, a clamping and fixing device 2, a 201 rotating hook plate, a 202 telescopic rod, a 203 compression spring, a 204 fixing sleeve, an upper cross rod 3, a middle cross rod 4, a 401 flat rectangular hole, a 402 rectangular connecting block, a 403 semicircular clamping block, a 5 lower cross rod, a 6 baffle, a 7 conical spine, an 8 mounting seat, a 9 alarm lamp, a 10 camera, an 11 loudspeaker and a 12 transparent protective cover.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
referring to fig. 1-4, the present invention provides a technical solution: a fence for building construction safety management comprises vertical rods 1 arranged at intervals, three groups of mounting grooves 101 are uniformly arranged at intervals from top to bottom on opposite end faces of every two adjacent groups of vertical rods 1, clamping and fixing devices 2 are arranged in the mounting grooves 101, upper cross rods 3, middle cross rods 4 and lower cross rods 5 are sequentially arranged between every two adjacent groups of vertical rods 1 from top to bottom, the left ends and the right ends of the upper cross rods 3, the middle cross rods 4 and the lower cross rods 5 are correspondingly arranged in the three groups of mounting grooves 101 between every two adjacent groups of vertical rods 1 from top to bottom, the left ends and the right ends of the upper cross rods 3, the middle cross rods 4 and the lower cross rods 5 are clamped and fixed with the clamping and fixing devices 2, flat rectangular holes 401 are formed in the tops of the top of the middle cross rods 4, baffle plates 6 are inserted in the flat rectangular holes 401, tapered spines 7 are arranged at the tops of the upper cross rods 3, the, alarm lamps 9, cameras 10 and loudspeakers 11 are installed at the tops of the three groups of installation seats 8 from left to right at intervals (the installation quantity and the installation intervals of the alarm lamps 9, the cameras 10 and the loudspeakers 11 are installed according to actual requirements, and are connected with control equipment corresponding to a monitoring room).
As shown in fig. 3, the clamping and fixing device 2 includes a rotating hook plate 201, the middle of the rotating hook plate 201 is rotatably connected with the upper and lower inner walls of the mounting groove 101 through a vertical rotating shaft, the mounting groove 101 is transversely provided with a left and a right groups of telescopic rods 202 in a penetrating manner, the outer wall of each telescopic rod 202 is provided with a compression spring 203, the middle of the outer wall of each telescopic rod 202 is provided with a spring retainer ring, the telescopic rods 202 are all inserted into the fixing sleeves 204 near the proximal ends, the bottoms of the fixing sleeves 204 are fixedly connected with the inner walls below the mounting groove 101 through connecting plates, the rear side of the rotating hook plate 201 is provided with a waist hole, the outer wall of each telescopic rod 202 is provided with a short rod which is inserted into the waist hole to be matched with the waist hole, an elastic clamping structure is formed by;
As shown in fig. 3 and 4, the left and right ends of the upper cross bar 3, the middle cross bar 4 and the lower cross bar 5 are respectively provided with a rectangular connecting block 402, the other end of the rectangular connecting block 402 is provided with a semicircular clamping block 403, and the semicircular clamping block 403 and the rotary hook plate 201 are matched and clamped tightly under the elastic resetting and extrusion action of the telescopic rod 202 and the compression spring 203, so that the overall stability is ensured;
The bottom of the upper cross rod 3 and the top of the lower cross rod 5 are both provided with strip-shaped clamping grooves matched with the baffle 6, so that the baffle 6 is ensured to be stably fixed up and down, and deformation is avoided;
As shown in fig. 1, a transparent shield 12 is arranged outside the warning lamp 9 and the camera 10, and the transparent shield 12 can prevent dust and water and is more convenient to wipe;
as shown in fig. 1, a warning sign is attached to the outside of the barrier 6.
Example (b): when the device is used, the vertical rod 1 is fixedly placed on the ground, the two groups of mounting grooves 101 below the vertical rod are respectively inserted into the middle cross rod 4 and the lower cross rod 5, the baffle 6 is inserted into the flat rectangular hole 401, the upper cross rod 3 is inserted into the top mounting groove 101, the semicircular fixture blocks 403 and the rotary hook plate 201 are matched and clamped under the elastic action of the telescopic rods 202 and the compression springs 203, the right vertical rod 1 is mounted, the upper cross rod 3, the right ends of the middle cross rod 4 and the lower cross rod 5 and the mounting groove 101 of the right vertical rod 1 are mounted in a manner similar to the above manner, the whole fence mounting is completed by analogy, then the mounting seats 8 are arranged at the top of the vertical rod 1, the alarm lamps 9, the cameras 10 and the loudspeakers 11 are arranged at intervals according to actual needs, when the mounting seats 8 and the alarm lamps 9, the cameras 10 and the loudspeakers 11 are dismounted, the end parts of the two groups of telescopic rods 202, the upper cross bar 3, the middle cross bar 4 and the lower cross bar 5 are separated from the vertical bar 1, and the baffle 6 is drawn out from the flat rectangular hole 401, so that the disassembly is completed.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a rail for building construction safety control, includes vertical pole (1) that the interval set up, its characterized in that: three groups of mounting grooves (101) are uniformly arranged on the opposite end faces of two adjacent groups of vertical rods (1) from top to bottom at intervals, clamping and fixing devices (2) are arranged in the mounting grooves (101), an upper cross rod (3), a middle cross rod (4) and a lower cross rod (5) are sequentially arranged between the two adjacent groups of vertical rods (1) from top to bottom, the left end and the right end of the upper cross rod (3), the middle cross rod (4) and the lower cross rod (5) are correspondingly arranged in the three groups of mounting grooves (101) between the two adjacent groups of vertical rods (1) from top to bottom, the left end and the right end of the upper cross rod (3), the middle cross rod (4) and the lower cross rod (5) are clamped and fixed with the clamping and fixing devices (2), a flat rectangular hole (401) is formed in the top of the middle cross rod (4), a baffle (6) is inserted in the flat rectangular hole (401), and a conical spine (7), the top of the vertical rod (1) is provided with a mounting seat (8), and the tops of the mounting seats (8) are provided with alarm lamps (9), cameras (10) and loudspeakers (11) at intervals from left to right.
2. The fence for building construction safety management according to claim 1, wherein: the clamping and fixing device (2) comprises a rotary hook plate (201), the middle of the rotary hook plate (201) is rotatably connected with the upper inner wall and the lower inner wall of a mounting groove (101) through a vertical rotating shaft, the mounting groove (101) is transversely provided with a left telescopic rod and a right telescopic rod (202) in a penetrating mode, the outer wall of each telescopic rod (202) is provided with a compression spring (203), the middle of the outer wall of each telescopic rod (202) is provided with a spring retainer ring, the telescopic rods (202) are all inserted into a fixing sleeve (204) through the near ends, the bottom of the fixing sleeve (204) is fixedly connected with the inner wall below the mounting groove (101) through a connecting plate, waist holes are formed in the rear side of the rotary hook plate (201), and short rods matched with the.
3. the fence for building construction safety management according to claim 1 or 2, characterized in that: the left end and the right end of the upper cross rod (3), the middle cross rod (4) and the lower cross rod (5) are respectively provided with a rectangular connecting block (402), the other end of each rectangular connecting block (402) is provided with a semicircular clamping block (403), and the semicircular clamping blocks (403) are matched and clamped with the rotary hook plate (201).
4. The fence for building construction safety management according to claim 1, wherein: the bottom of the upper cross rod (3) and the top of the lower cross rod (5) are both provided with strip-shaped clamping grooves matched with the baffle (6).
5. the fence for building construction safety management according to claim 1, wherein: and transparent protective covers (12) are arranged outside the alarm lamp (9) and the camera (10).
6. The fence for building construction safety management according to claim 1, wherein: and warning signs are pasted on the outer sides of the baffles (6).
CN201920398198.1U 2019-03-27 2019-03-27 Fence for building construction safety management Expired - Fee Related CN209760980U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920398198.1U CN209760980U (en) 2019-03-27 2019-03-27 Fence for building construction safety management

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920398198.1U CN209760980U (en) 2019-03-27 2019-03-27 Fence for building construction safety management

Publications (1)

Publication Number Publication Date
CN209760980U true CN209760980U (en) 2019-12-10

Family

ID=68756574

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920398198.1U Expired - Fee Related CN209760980U (en) 2019-03-27 2019-03-27 Fence for building construction safety management

Country Status (1)

Country Link
CN (1) CN209760980U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111576996A (en) * 2020-05-22 2020-08-25 张玉婷 Rail guard is used in civil engineering construction

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111576996A (en) * 2020-05-22 2020-08-25 张玉婷 Rail guard is used in civil engineering construction

Similar Documents

Publication Publication Date Title
CN105681635A (en) Omnibearing adjustable monitoring camera
CN209760980U (en) Fence for building construction safety management
CN207965595U (en) A kind of monitoring of the wisdom building convenient for safeguarding
CN208832294U (en) A kind of LED street lamp being convenient to clean lampshade
CN214306805U (en) Eye-protection classroom lamp convenient to install
CN210421877U (en) Climbing frame convenient to disassemble and assemble for building
CN210424765U (en) Single-arm lamp pole with waterproof effect on base
CN216431411U (en) Cantilever arm for mounting wall lamp
CN211481370U (en) 5 cun ball shells of camera
CN215407845U (en) Security fence for building construction management
CN111275958B (en) Antifog type zebra crossing pedestrian lamp based on thing networking
CN217149982U (en) Protector for construction
CN215174701U (en) Multifunctional light energy street lamp using lamp post to install light energy plate
CN210567993U (en) Novel structure and better street lamp of steadiness
CN212957736U (en) Road and bridge construction equipment
CN209054525U (en) A kind of LED light driving device
CN211429317U (en) Video fusion emergency broadcasting system
CN212869236U (en) Intelligent building monitoring device
CN214243980U (en) Rainwater collection device with rainwater scrubbing sterilization structure
CN215808210U (en) Energy-saving lamp pole convenient to maintain and street lamp thereof
CN209893335U (en) Fixed mounting assembly of street lamp
CN211551288U (en) LED light projecting lamp group
CN215450748U (en) LED display screen module that outdoor water-proof effects is good
CN211239246U (en) Strain clamp convenient to change
CN108413341A (en) A kind of photovoltaic energy-saving lighting lamp

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191210