CN209760739U - Scaffold for building construction - Google Patents

Scaffold for building construction Download PDF

Info

Publication number
CN209760739U
CN209760739U CN201920162099.3U CN201920162099U CN209760739U CN 209760739 U CN209760739 U CN 209760739U CN 201920162099 U CN201920162099 U CN 201920162099U CN 209760739 U CN209760739 U CN 209760739U
Authority
CN
China
Prior art keywords
vertical pipe
connecting rod
riser
scaffold
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920162099.3U
Other languages
Chinese (zh)
Inventor
蔡国喜
刘峤梅
蔡国元
蔡国明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Kechuang Construction Technology Co., Ltd
Original Assignee
Jiaxing Kechuang Electric Power Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiaxing Kechuang Electric Power Construction Co Ltd filed Critical Jiaxing Kechuang Electric Power Construction Co Ltd
Priority to CN201920162099.3U priority Critical patent/CN209760739U/en
Application granted granted Critical
Publication of CN209760739U publication Critical patent/CN209760739U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ladders (AREA)

Abstract

The utility model provides a scaffold frame for construction, includes first riser, first riser is provided with the root, the inboard welding of first riser has first mount, the back of first riser all is provided with the second riser, the welding has the head rod between second riser and the first riser, the top of head rod is provided with the second connecting rod, the inboard of head rod is provided with first flat board, the equal fixed mounting in both ends of first flat board has first shackle, first shackle is connected with the head rod, the bottom of first riser and the bottom of second riser are all inserted and are equipped with the universal wheel. The utility model discloses stable fixing on ground, easy operation, convenient to use strengthens constructor's protectiveness, promotes the practicality of scaffold frame, avoids the second flat board to appear turning on one's side or toppling over, strengthens the security.

Description

Scaffold for building construction
Technical Field
The utility model relates to a construction technical field specifically is a scaffold frame for construction.
Background
Scaffold frame often need be used in the construction process, current scaffold frame simple structure, it is convenient in order to remove, the bottom of scaffold frame has all been pegged graft and has been had the universal wheel, when fixed, need take out the universal wheel and separate, troublesome poeration, and cause the universal wheel to lose easily, current scaffold frame does not set up protector, it is not enough to constructor's safety protection, the second flat board prizes easily and tumbles even when current scaffold frame uses, it is unstable to connect between the second flat board and the second connecting rod.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a scaffold frame for construction to it is big to put forward the fixed degree of difficulty of current scaffold frame in solving above-mentioned background art, does not set up protector, is connected unstable problem between the dull and stereotyped and the second connecting rod of second.
The utility model discloses an one of the purpose adopts following technical scheme to realize: a scaffold for building construction comprises a first vertical pipe, wherein 2 vertical pipes are arranged, a first fixing frame is welded on the inner side of the first vertical pipe, a second vertical pipe is arranged on the back of the first vertical pipe, a first connecting rod is welded between the second vertical pipe and the first vertical pipe, a second connecting rod is arranged at the top end of the first connecting rod, a first flat plate is arranged on the inner side of the first connecting rod, first hook sleeves are fixedly arranged at two ends of the first flat plate and connected with the first connecting rod, universal wheels are inserted into the bottom end of the first vertical pipe and the bottom end of the second vertical pipe, connecting pieces are sleeved on the outer wall of the bottom end of the first vertical pipe and the outer wall of the bottom end of the second vertical pipe, a selector frame is installed on the left side of the connecting pieces through a torsion rotating shaft, a pressing plate is welded on the upper surface of the selector frame, a lower bottom plate is welded at the bottom end of the selector frame, the bottom of lower plate evenly is provided with the spike tooth, the lower surface of lower plate is inlayed and is had the rubber pad, the welding has the second mount between the second riser inboard.
preferably, a clamping groove is formed in the outer wall of the second connecting rod, a second hook sleeve is clamped inside the clamping groove, a second flat plate is welded on the inner side of the second hook sleeve, an inserting cavity penetrates through the inside of the second hook sleeve, an inserting rod is welded at the top end of the clamping groove, and the inserting rod penetrates through the inserting cavity.
Preferably, the inboard on second riser top is provided with the adapter sleeve, the adapter sleeve is inside to be inlayed and to have the spliced pole, the top welding of spliced pole has the third connecting rod, the cutting ferrule has been cup jointed to the outer wall of third connecting rod, the net is hung and is equipped with to the inboard of third connecting rod.
Preferably, the climbing frame is welded on the back surface of the first vertical pipe and the front surface of the second vertical pipe.
Preferably, the shape of the second fixing frame is the same as that of the first fixing frame, and the shape of the first fixing frame is an 'X' shape.
Preferably, the stepping plate is in a V shape.
Compared with the prior art, the beneficial effects of the utility model are that: this scaffold frame for construction is provided with connection piece, torsion pivot, optional frame, bottom plate, rubber pad and spike tooth, through rotating the optional frame for bottom plate and ground contact increase the holding surface, and rubber pad and spike tooth can increase the frictional force with ground, make stable the fixing on ground of scaffold frame, easy operation, convenient to use.
Be provided with the connecting rod and hang the net, when using the second dull and stereotyped, the protection to constructor can be strengthened to connecting rod and string net, strengthens the protectiveness to constructor, promotes the practicality of scaffold frame.
be provided with draw-in groove, inserted bar and second hook housing, realize that the two-way each other between draw-in groove and the second connecting rod inserts fixedly, satisfy the second flat board detachable simultaneously, avoid the second flat board to appear turning on one's side or toppling over, strengthen the security.
Drawings
FIG. 1 is a schematic front view of the structure of the present invention;
FIG. 2 is a schematic side view of the structure of the present invention;
Fig. 3 is a schematic structural front sectional view of a second connecting rod, a second flat plate and a second hook sleeve of the present invention;
Fig. 4 is a schematic top view of the first vertical pipe, the second vertical pipe and the second fixing frame of the present invention.
In the figure: 1. a first riser; 2. a first fixing frame; 3. a first connecting rod; 4. a second connecting rod; 5. a first plate; 6. a first hook cover; 7. a card slot; 8. inserting a rod; 9. a second plate; 10. a second hook sleeve; 11. inserting a cavity; 12. climbing a frame; 13. a universal wheel; 14. connecting sheets; 15. a torsion shaft; 16. selecting a frame; 17. stepping on the pressing plate; 18. a lower base plate; 19. a rubber pad; 20. nailing teeth; 21. connecting sleeves; 22. connecting columns; 23. a card sleeve; 24. a third connecting rod; 25. hanging a net; 26. a second riser; 27. a second fixing frame.
Detailed Description
The present invention will be further described with reference to the accompanying drawings and the detailed description, and it should be noted that the embodiments or technical features described below can be arbitrarily combined to form a new embodiment without conflict.
It will be understood that when an element is referred to as being "secured to" another element, it can be directly on the other element or intervening elements may also be present. When a component is referred to as being "connected" to another component, it can be directly connected to the other component or intervening components may also be present. When a component is referred to as being "disposed on" another component, it can be directly on the other component or intervening components may also be present. The terms "vertical," "horizontal," "left," "right," and the like as used herein are for illustrative purposes only.
Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs. The terminology used in the description of the invention herein is for the purpose of describing particular embodiments only and is not intended to be limiting of the invention. As used herein, the term "and/or" includes any and all combinations of one or more of the associated listed items.
Referring to fig. 1 to 4, the present invention provides an embodiment: a scaffold for building construction comprises a first vertical pipe 1, wherein 2 vertical pipes 1 are arranged, a first fixing frame 2 is welded on the inner side of each first vertical pipe 1, a second vertical pipe 26 is arranged on the back of each first vertical pipe 1, a first connecting rod 3 is welded between each second vertical pipe 26 and each first vertical pipe 1, a second connecting rod 4 is arranged at the top end of each first connecting rod 3, a clamping groove 7 is formed in the outer wall of each second connecting rod 4, a second hook sleeve 10 is clamped inside each clamping groove 7, a second flat plate 9 is welded on the inner side of each second hook sleeve 10, an insertion cavity 11 penetrates through the inner side of each second hook sleeve 10, an insertion rod 8 is welded at the top end of each clamping groove 7, the insertion rod 8 penetrates through the insertion cavity 11, the second hook sleeves 10 at two ends of each second flat plate 9 are correspondingly arranged on the corresponding second connecting rods 4, the second hook sleeves 10 are clamped inside the clamping grooves 7, the insertion rods 8 penetrate through the insertion cavities 11 while the second hook sleeves 10 are inserted into the clamping grooves 7, and the second hook sleeves 10 and the second connecting, the foot is stepped on the second flat plate 9, and when the second flat plate 9 is detachable, the second flat plate 9 is prevented from being turned on one side or toppled over, and safety is enhanced.
The inner side of the first connecting rod 3 is provided with a first flat plate 5, two ends of the first flat plate 5 are fixedly provided with first hook sleeves 6, the first hook sleeves 6 are connected with the first connecting rod 3, the back surface of the first vertical pipe 1 and the front surface of the second vertical pipe 26 are both welded with climbing frames 12, so that constructors can conveniently climb on a scaffold, universal wheels 13 are inserted at the bottom end of the first vertical pipe 1 and the bottom end of the second vertical pipe 26, the outer wall of the bottom end of the first vertical pipe 1 and the outer wall of the bottom end of the second vertical pipe 26 are both sleeved with connecting pieces 14, a selector frame 16 is arranged at the left side of the connecting pieces 14 through a torsion rotating shaft 15, a treading plate 17 is welded on the upper surface of the selector frame 16, the treading plate 17 is in a V shape, when the treading plate 17 is rotated, a lower base plate 18 at the bottom end of the treading plate 17 is contacted with the ground, a lower base plate 18 is welded at the bottom end of the selector frame 16, the second fixing frame 27 is welded between the inner sides of the second vertical pipes 26, the shape of the second fixing frame 27 is the same as that of the first fixing frame 2, the first fixing frame 2 is in an X shape, and the first fixing frame 2 and the first vertical pipes 1 are welded to form a triangular structure, so that the stability is enhanced, and the scaffold is firmer.
The inboard on 26 tops of second riser is provided with adapter sleeve 21, adapter sleeve 21 is inside to be inlayed and to have spliced pole 22, the top welding of spliced pole 22 has third connecting rod 24, cutting ferrule 23 has been cup jointed to the outer wall of third connecting rod 24, cutting ferrule 23 plays and stops the effect, strengthen the stability that adapter sleeve 21 and spliced pole 22 were pegged graft, the internal side of third connecting rod 24 is hung and is equipped with the hanging net 25, it inserts second riser 26 tops inside to correspond the spliced pole 22 of 24 bottoms of third connecting rod, make spliced pole 22 peg graft with adapter sleeve 21, hang hanging net 25 between third connecting rod 24 after that, protection to constructor can be strengthened to third connecting rod 24 and hanging net 25, strengthen the protectiveness to constructor, promote the practicality of scaffold.
The working principle is as follows: before using, at first, push the scaffold frame and remove to suitable position, step on with the foot and step on clamp plate 17 after that, make select frame 16 and torsion pivot 15 to rotate as the fulcrum, make 18 lower floor surfaces of lower plate and ground contact, make scaffold frame and ground area of contact increase, lower floor 18, torsion pivot 15 and connection piece 14 provide certain bearing capacity, when contacting with cement ground, inlay rubber pad 19 in 18 bottom surfaces of lower plate, strengthen the friction to cement ground, ensure that the scaffold frame will be installed fixedly, when fixed with earth storefront, the earth's surface is pricked to 20 supports of spike, strengthen the fixed effect of scaffold frame, make stable fixing on ground of scaffold frame, and the operation is simple, and convenient to use, need not to dismantle universal wheel 13, and the operation is simple.
When the height of the first flat plate 5 is not enough, the second flat plate 9 is taken out, the second hook sleeves 10 at two ends of the second flat plate 9 are correspondingly installed on the second connecting rod 4, the second hook sleeves 10 are clamped into the clamping grooves 7, the second hook sleeves 10 are inserted into the clamping grooves 7, the inserting rods 8 penetrate through the inserting cavities 11, the second hook sleeves 10 and the second connecting rod 4 form mutually-inserted fixing, feet are stepped on the second flat plate 9, the second flat plate 9 is prevented from turning over or toppling over when the second flat plate 9 is detachable, and safety is enhanced.
When using second flat board 9, the people is higher from ground, and it is inside to correspond the spliced pole 22 of third connecting rod 24 bottom and insert 26 tops of second riser for spliced pole 22 pegs graft with adapter sleeve 21, hangs the suspended net 25 between third connecting rod 24 after that, and protection to constructor can be strengthened to third connecting rod 24 and suspended net 25, strengthens the protectiveness to constructor, promotes the practicality of scaffold frame.
The above embodiments are only preferred embodiments of the present invention, and the protection scope of the present invention cannot be limited thereby, and any insubstantial changes and substitutions made by those skilled in the art based on the present invention are all within the protection scope of the present invention.

Claims (6)

1. A scaffold for building construction, includes first riser (1), its characterized in that: the device comprises a first vertical pipe (1), a first fixing frame (2) welded on the inner side of the first vertical pipe (1), a second vertical pipe (26) arranged on the back of the first vertical pipe (1), a first connecting rod (3) welded between the second vertical pipe (26) and the first vertical pipe (1), a second connecting rod (4) arranged on the top end of the first connecting rod (3), a first flat plate (5) arranged on the inner side of the first connecting rod (3), first hook sleeves (6) fixedly arranged on two ends of the first flat plate (5), the first hook sleeves (6) connected with the first connecting rod (3), universal wheels (13) inserted on the bottom end of the first vertical pipe (1) and the bottom end of the second vertical pipe (26), and connecting pieces (14) sleeved on the outer wall of the bottom end of the first vertical pipe (1) and the outer wall of the bottom end of the second vertical pipe (26), select frame (16) is installed through torsion pivot (15) in the left side of connection piece (14), the last skin weld of select frame (16) has and steps on clamp plate (17), the bottom weld of select frame (16) has lower plate (18), the bottom of lower plate (18) evenly is provided with spike tooth (20), the lower surface mosaic of lower plate (18) has rubber pad (19), the welding has second mount (27) between second riser (26) inboard.
2. A scaffold for construction according to claim 1, wherein: draw-in groove (7) have been seted up to second connecting rod (4) outer wall, the inside block of draw-in groove (7) has second hook cover (10), the inboard welding of second hook cover (10) has second flat board (9), the inside of second hook cover (10) runs through has inserted chamber (11), the top welding of draw-in groove (7) has inserted bar (8), inserted bar (8) run through and insert chamber (11).
3. A scaffold for construction according to claim 1, wherein: the inboard on second riser (26) top is provided with adapter sleeve (21), adapter sleeve (21) inside is inlayed and is had spliced pole (22), the top welding of spliced pole (22) has third connecting rod (24), cutting ferrule (23) have been cup jointed to the outer wall of third connecting rod (24), the inboard of third connecting rod (24) is hung and is equipped with string net (25).
4. A scaffold for construction according to claim 1, wherein: the climbing frame (12) is welded on the back of the first vertical pipe (1) and the front of the second vertical pipe (26).
5. A scaffold for construction according to claim 1, wherein: the shape of the second fixing frame (27) is the same as that of the first fixing frame (2), and the shape of the first fixing frame (2) is X-shaped.
6. A scaffold for construction according to claim 1, wherein: the stepping plate (17) is V-shaped.
CN201920162099.3U 2019-01-30 2019-01-30 Scaffold for building construction Active CN209760739U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920162099.3U CN209760739U (en) 2019-01-30 2019-01-30 Scaffold for building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920162099.3U CN209760739U (en) 2019-01-30 2019-01-30 Scaffold for building construction

Publications (1)

Publication Number Publication Date
CN209760739U true CN209760739U (en) 2019-12-10

Family

ID=68750968

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920162099.3U Active CN209760739U (en) 2019-01-30 2019-01-30 Scaffold for building construction

Country Status (1)

Country Link
CN (1) CN209760739U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111827145A (en) * 2020-08-07 2020-10-27 胡令江 Bridge reinforcing device with shock insulation function

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111827145A (en) * 2020-08-07 2020-10-27 胡令江 Bridge reinforcing device with shock insulation function
CN111827145B (en) * 2020-08-07 2022-01-18 李朝辉 Bridge reinforcing device with shock insulation function

Similar Documents

Publication Publication Date Title
CN209760739U (en) Scaffold for building construction
CN210643469U (en) Display platform for automatic equipment sales
CN211421662U (en) Architectural decoration guardrail
CN211171996U (en) High-strength supporting foundation
CN217126855U (en) Tower crane attaching and detaching platform
CN206233535U (en) Lifting scaffold
CN212002991U (en) Embedded multifunctional field rescue ladder
CN208486256U (en) A kind of highway subgrade broken stone pile
CN210086777U (en) High scaffold frame of security for interior decoration
CN212866832U (en) Pedal of scaffold
CN213654177U (en) Construction scaffold is built in room
CN207575112U (en) Put mechanism and dust catcher
CN213418457U (en) Hanging ladder for building scaffold
CN216446831U (en) Sectional type detachable safety ladder stand
CN210383166U (en) Bookshelf convenient to equipment
CN210263851U (en) Better scaffold frame of stability
CN210766028U (en) Convenient concatenation just prevents wood clothes hanger that falls
CN213683919U (en) Ladder fixing structure is hung in electric power construction
CN210978187U (en) Connecting rod bulb with wide applicability
CN219509106U (en) Building engineering building climbing frame
CN214532764U (en) Municipal drainage well structure
CN217033138U (en) Farmland irrigation water detection sampler
CN215371885U (en) Fixing device for VR equipment
CN217051462U (en) Double-pump hydraulic jack capable of buffering
CN211736248U (en) Hydraulic drive-based material distribution device for composite exterior wall cladding

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 314000 No. 198, Huayun Road, Jiaxing Economic and Technological Development Zone, Zhejiang Province

Patentee after: Zhejiang Kechuang Construction Technology Co., Ltd

Address before: 314000 No. 198, Huayun Road, Jiaxing Economic and Technological Development Zone, Zhejiang Province

Patentee before: Jiaxing Kechuang Electric Power Construction Co., Ltd.