CN209758923U CN201920524026.4U CN201920524026U CN209758923U CN 209758923 U CN209758923 U CN 209758923U CN 201920524026 U CN201920524026 U CN 201920524026U CN 209758923 U CN209758923 U CN 209758923U
Authority
CN
China
Prior art keywords
hoist
hanger plate
steel band
mounting panel
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920524026.4U
Other languages
Chinese (zh)
Inventor
何欣
罗忠秋
陈林
汪彪
胡绍全
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinbei electric (Chengdu) Co.,Ltd.
Original Assignee
Gold Tower Cable Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gold Tower Cable Co Ltd filed Critical Gold Tower Cable Co Ltd
Priority to CN201920524026.4U priority Critical patent/CN209758923U/en
Application granted granted Critical
Publication of CN209758923U publication Critical patent/CN209758923U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model discloses a hoisting tool for armoring machine steel band, including crane, hoist and mount frock and steel band circle, hang on the crane and install hoist and mount frock, hoist and mount frock is gone up and is hoisted there is the steel band circle, steel band circle middle part processing has the mounting hole, and steel band circles and processes there are a plurality of positioning hole, hoist and mount frock includes hanger plate, rings and the mounting panel of vertical setting, and rings are installed on hanger plate upper portion, and the bottom of hanger plate is equipped with the mounting panel with hanger plate integrated into one piece, is equipped with two locating pins on the lateral wall of mounting panel, and mounting panel bottom surface middle part processing has the arc breach with mounting hole matched with, and processing has vertical spout on the hanger plate between rings and the mounting panel, is equipped with gliding driving lever circle from top to bottom in the spout, is equipped with the driving lever that prevents the steel. The utility model discloses a set up two locating pins, can remove the unsettled step of steel band dish from, improved the security of changing the steel band dish.

Description

Hoisting tool for steel belt of armoring machine
Technical Field
the utility model relates to a cable production technical field especially relates to a hoisting tool for armoring machine steel band.
background
the armoring machine is a special device for steel belt armoring of a power cable, and when the armoring machine is used, a steel belt is wound on the surface of a cable semi-finished product by the armoring machine to form an armoring layer, so that the performance of the cable is improved, and the application range of the cable is enlarged. The steel belt used by the armoring machine is a steel belt disc formed by winding a steel belt ring, the middle part of the steel belt ring is provided with a mounting hole, and the end surface of the steel belt ring is provided with a plurality of positioning through holes; the weight of a single steel tape reel is about 300kg, and the steel tape reel is heavy and difficult to lift manually, so the steel tape reel needs to be lifted and installed through a crane. The gallows of current hoist and mount steel band dish mainly includes shadoof, trailing arm, rings, shelves pole, extension spring and block tongue, puts the steel band dish earlier on the rolling prevention frame during the use, makes the steel band dish unsettled through the rolling prevention frame, then puts the trailing arm of gallows in steel band dish below to block the steel band dish through the block tongue on the gallows, in order to prevent that the steel band dish from empting, then lifts up the shadoof through the crane, is used for lifting up the steel band dish. However, when the hanger is used, at least two to three workers are needed to operate, the cost of the workers is increased, and meanwhile, the steel belt is suspended through the anti-rolling frame, so that the steel belt disc needs to stay in the air, the risk of replacing the steel belt disc is increased, and more time is increased.
Disclosure of Invention
an object of the utility model is to provide a low in production cost, operation safety and change fast for armoring machine steel band hoist and mount frock.
The utility model aims at realizing through the following technical scheme:
A hoisting tool for steel strips of an armoring machine comprises a crane, a hoisting tool and a steel strip ring, wherein the hoisting tool is mounted on the crane in a hanging manner, the steel strip ring is hoisted on the hoisting tool, a mounting hole is formed in the middle of the steel strip ring, a plurality of positioning through holes which are uniformly distributed along the axis of the mounting hole are formed in the end face of the steel strip ring, the hoisting tool comprises a vertically arranged hanging plate, a hanging ring and a mounting plate, the upper part of the hanging plate is provided with the hoisting hole, the hanging ring connected with the crane is mounted in the hoisting hole, the bottom of the hanging plate is provided with the mounting plate which is integrally formed with the hanging plate, two positioning pins which can be inserted into the adjacent positioning through holes are arranged on the side wall on one side of the mounting plate, the two positioning pins are symmetrically mounted on the two sides of the mounting plate along the hanging plate, the side wall of the, a vertical sliding groove is processed on the hanging plate between the hanging ring and the mounting plate, a shifting rod ring capable of sliding up and down is arranged in the sliding groove, and a shifting rod for preventing the steel belt from inclining is arranged on the side wall of the shifting rod ring, which is close to one side of the positioning pin.
One end of the shifting lever, which is far away from the shifting lever ring, is provided with a limiting block protruding downwards, and the thickness of the steel belt disc is equal to the distance from the limiting block to the hanging plate.
The length dimension of the hanger plate is larger than the radius dimension of the steel belt disc.
The crane is hung with an electric hoist and a lifting switch for controlling the electric hoist, and the electric hoist is provided with a hook connected with a lifting ring.
The utility model discloses has following effect:
(1) By arranging two positioning pins with the same distance with the adjacent positioning through holes, on one hand, the step of suspending the steel tape reel can be omitted, the safety of replacing the steel tape reel is improved, on the other hand, the installation time of the steel tape reel is shortened, meanwhile, the number of workers for replacing the steel tape reel can be reduced, and the production cost is saved;
(2) The arc-shaped notch is processed on the mounting plate, so that the mounting hole on the steel belt disc can be avoided, and the operation of replacing the steel belt disc is more convenient;
(3) The shifting rod ring capable of sliding up and down is arranged, and the shifting rod for preventing the steel belt from inclining is arranged on the shifting rod ring, so that the steel belt disc can be prevented from inclining when being hoisted, the hoisting stability of the steel belt disc is improved, and meanwhile, the shifting rod ring can slide up and down in the chute, so that the thickness of the steel belt disc does not need to be considered, and the application range of the hoisting tool is improved;
(4) Small volume, simple structure, convenient installation and high safety factor.
Drawings
Fig. 1 is a schematic structural diagram of the present invention.
Fig. 2 is a front view of the present invention.
Fig. 3 is a side view of the present invention.
Figure 4 is the utility model discloses the installation schematic diagram of hoist and mount frock.
Fig. 5 is a schematic view of the usage state of the present invention.
Reference numerals: 1. a crane; 11. an electric hoist; 12. a lifting switch; 13. hooking; 2. a steel band ring; 21. mounting holes; 22. positioning the through hole; 3. a steel tape reel; 4. hoisting a tool; 41. a hanger plate; 42. a hoisting ring; 43. mounting a plate; 44. positioning pins; 45. an arc-shaped notch; 46. a chute; 47. a deflector rod ring; 48. a deflector rod; 49. a limiting block; 5. provided is a armoring machine.
Detailed Description
Examples
as shown in fig. 1 to 3, the hoisting tool for the steel strip of the armoring machine provided by this embodiment includes a crane 1, a steel strip ring 2, a steel strip disc 3 and a hoisting tool 4, an electric hoist 11 and a lifting switch 12 for controlling the electric hoist 11 are suspended on the crane 1, a hook 13 connected to the hoisting tool 4 is provided on the electric hoist 11, a mounting hole 21 is formed in the middle of the steel strip ring 2, a plurality of positioning through holes 22 uniformly distributed along the axis of the mounting hole 21 are formed on the end surface of the steel strip ring 2, the steel strip is wound on the ring surface of the steel strip ring 2 to form the steel strip disc 3, the hoisting tool 4 includes a vertically arranged hanger plate 41, a hanging ring 42 and a mounting plate 43, the length of the hanger plate 41 is greater than the radius of the steel strip disc 3, a hoisting hole is formed in the upper portion of the hanger plate 41, the hanging ring 42 connected to the hook 13 is installed in the hanging hole, the mounting plate 41 is provided with a mounting plate 43, be equipped with two locating pins 44 that can insert in the adjacent positioning hole 22 on the mounting panel 43 lateral wall, two locating pins 44 are installed in mounting panel 43 both sides along hanger plate 41 symmetry, the mounting panel 43 lateral wall of installing locating pin 44 is located the coplanar with hanger plate 41's lateral wall, mounting panel 43 bottom surface middle part processing has the arc breach 45 with mounting hole 21 matched with, processing has vertical spout 46 on hanger plate 41 between rings 42 and the mounting panel 43, be equipped with gliding driving lever circle 47 from top to bottom in the spout 46, be equipped with the driving lever 48 that prevents the steel band slope on the lateral wall that driving lever circle 47 is close to locating pin 44 one side, the one end that driving lever 48 kept away from driving lever circle 47 is equipped with convex stopper 49 downwards, and the thickness of steel band dish 3 equals with the distance between stopper 49 and hanger plate.
The utility model discloses a use method is:
As shown in fig. 4 and 5, the hanging ring 42 is installed on the hook 13 of the electric hoist 11, then the shifting rod ring 47 is moved to slide to the top of the sliding groove 46, then the positioning pin 44 on the installation plate 43 is inserted into the positioning through hole 22, and the shifting rod ring 47 slides downwards, so that the shifting rod 48 is in contact with the top of the steel belt disc 3, at the moment, the limiting block 49 on the shifting rod 48 locks the steel belt disc 3 to prevent the steel belt disc 3 from shaking, then the lifting switch 12 is used for controlling the electric hoist 11 to lift the lifting tool 4 for installing the steel belt disc 3 on the armoring machine 5, and after the steel belt disc 3 is installed, the shifting rod ring 47 slides upwards, and the positioning pin 44 is pulled out of the positioning through hole 22 on the. This scheme just can conveniently change steel band dish 3 through one or two workman, has reduced and has installed steel band dish 3 and has stagnated empty step on the anti-roll frame, can avoid steel band dish 3 to stagnate empty and cause the injury to the workman, has shortened the change time, makes steel band dish 3's change more convenient.
The above description is only a preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any modification and replacement based on the technical solution and inventive concept provided by the present invention should be covered within the protection scope of the present invention.

Claims (4)

1. The utility model provides a hoisting tool for armoring machine steel band, includes crane, hoist and mount frock and steel band circle, hangs on the crane and installs the hoist and mount frock, and hoist and mount frock is gone up and is hoisted and have the steel band circle, steel band circle middle part processing has the mounting hole, and processing has a plurality of positioning hole along mounting hole axis evenly distributed on the terminal surface of steel band circle, its characterized in that: the hoist and mount frock includes the hanger plate of vertical setting, rings and mounting panel, hanger plate upper portion processing has the hole for hoist, install the rings of being connected with the crane in the hole for hoist, the bottom of hanger plate is equipped with the mounting panel with hanger plate integrated into one piece, be equipped with two locating pins that can insert in the adjacent location through-hole on the lateral wall of mounting panel one side, two locating pins are installed in the mounting panel both sides along the hanger plate symmetry, the mounting panel lateral wall of installing the locating pin is located same working face with the lateral wall of hanger plate, mounting panel bottom surface middle part processing has the arc breach with mounting hole matched with, processing has vertical spout on the hanger plate between rings and the mounting panel, be equipped with gliding driving lever circle from top to bottom in the spout, be equipped with the driving lever that prevents.
2. The hoisting tool for the steel strip of the armoring machine as claimed in claim 1, wherein: one end of the shifting lever, which is far away from the shifting lever ring, is provided with a limiting block protruding downwards, and the thickness of the steel belt disc is equal to the distance from the limiting block to the hanging plate.
3. The hoisting tool for the steel strip of the armoring machine as claimed in claim 1, wherein: the length dimension of the hanger plate is larger than the radius dimension of the steel belt disc.
4. The hoisting tool for the steel strip of the armoring machine as claimed in claim 1, wherein: the crane is hung with an electric hoist and a lifting switch for controlling the electric hoist, and the electric hoist is provided with a hook connected with a lifting ring.
CN201920524026.4U 2019-04-17 2019-04-17 Hoisting tool for steel belt of armoring machine Active CN209758923U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920524026.4U CN209758923U (en) 2019-04-17 2019-04-17 Hoisting tool for steel belt of armoring machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920524026.4U CN209758923U (en) 2019-04-17 2019-04-17 Hoisting tool for steel belt of armoring machine

Publications (1)

Publication Number Publication Date
CN209758923U true CN209758923U (en) 2019-12-10

Family

ID=68759777

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920524026.4U Active CN209758923U (en) 2019-04-17 2019-04-17 Hoisting tool for steel belt of armoring machine

Country Status (1)

Country Link
CN (1) CN209758923U (en)

Similar Documents

Publication Publication Date Title
CN209009974U (en) A kind of self-balancing hanger
CN209758923U (en) Hoisting tool for steel belt of armoring machine
CN103863972A (en) Forklift hoisting tool and hoisting method thereof
CN212425112U (en) Mobilizable electric precipitation hoist device for anode plate
CN206553061U (en) Self-balancing magnetic-type steel plate sling system
CN211110829U (en) Novel anti-falling device of elevator
CN211444694U (en) Mobile hoisting device for target processing
CN210286473U (en) Novel four-wheel lifting hook device
CN210885011U (en) Multifunctional crane assembled on forklift
CN211733697U (en) Horizontal type suspender driving machine for simultaneously lifting single winding drum and multiple ropes of performance stage
CN208732434U (en) Hoisting tool for mill housing
CN217650758U (en) Rope disorder and rope falling prevention system of crane
CN221235119U (en) Material transportation crane for port construction
CN217264389U (en) Lifting device for electromechanical device installation
CN211393557U (en) Wire rod reinforcing bar lifting device
CN217387926U (en) Power distribution cabinet convenient to hoist
CN219860160U (en) Device for realizing automatic unhooking of box-type stiff column during hoisting based on electromagnetic relay
CN220283266U (en) Lifting appliance for crane maintenance
CN112476388B (en) Gantry hook combined storage device and using method
CN219950210U (en) Self-adaptive hoisting mechanism
CN212269198U (en) American case becomes convenient to lift by crane
CN212769418U (en) Large-size product lifting device for chemical vapor deposition furnace with upper charging
CN216105577U (en) Lifting appliance capable of adjusting space between grapples
CN215249170U (en) Automatic change mechanical equipment hoisting accessory
CN212740388U (en) Hanging beam

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: No.39 Jintai Road, East Industrial District, Xindu District, Chengdu, Sichuan 610000

Patentee after: Jinbei electric (Chengdu) Co.,Ltd.

Address before: No.39 Jintai Road, East Industrial District, Xindu District, Chengdu, Sichuan 610000

Patentee before: JINBEI TA PAI CABLES CO.,LTD.