CN209758127U - Building rubbish pond - Google Patents
Building rubbish pond Download PDFInfo
- Publication number
- CN209758127U CN209758127U CN201920479788.7U CN201920479788U CN209758127U CN 209758127 U CN209758127 U CN 209758127U CN 201920479788 U CN201920479788 U CN 201920479788U CN 209758127 U CN209758127 U CN 209758127U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- waste pool
- motor
- hydraulic push
- pool body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Refuse Receptacles (AREA)
Abstract
The utility model discloses a building rubbish pond, including rubbish pond body, the top of rubbish pond body is rotated and is connected with a plurality of apron, a plurality of baffles of inside wall fixedly connected with of rubbish pond body, rubbish pond body is connected with a plurality of push pedals through a plurality of electronic hydraulic push rods, the inside wall of rubbish pond body is equipped with the mounting groove that corresponds with electronic hydraulic push rod. In the utility model, through the cooperation of the electric hydraulic push rod, the push plate and the partition plate, the effect of starting the electric hydraulic push rod to move so as to drive the push plate to move in the garbage pool body is achieved, the function of pushing the construction garbage in the garbage pool body out of the garbage pool body by the electric hydraulic push rod is realized, and the construction garbage in the garbage pool body can be conveniently taken out; through the cooperation of door plant, motor, dwang, rotation post, first gear, second gear and chain, reached the motor and rotated the effect that drives rotation post pivoted, realized that the motor motion drives door plant pivoted function.
Description
Technical Field
The utility model relates to a construction technical field especially relates to a building rubbish pond.
Background
The construction waste refers to residue soil, waste material, residual mud and other wastes generated in the process of construction, laying or dismantling and repairing of various buildings, structures, pipe networks and the like of construction units or personal teams. In the construction process of building engineering, part of construction waste is inevitably generated, so a special waste pool must be arranged at a construction site, the construction waste is integrally cleaned and transported when the construction waste is stored to a certain amount, the waste pool is often designed to be open, namely, the top of the waste pool is not covered, a certain amount of construction waste is often accumulated in the waste pool before the rated storage amount of the waste pool is reached, when the construction waste is influenced by severe weather such as strong wind, the waste in the waste pool is easily blown to any part outside the waste pool, the site civilized construction and dust raising damage are caused, and the environment is polluted, so the construction waste pool is usually designed to be sealed with an upper cover at present.
Present construction rubbish is through the inside of placing the building rubbish pond of classification, when certain degree is piled up to the inside building rubbish in building rubbish pond, need clear up the inside building rubbish in building rubbish pond, and present building rubbish pond all can have a storage space of sinking into usually, when clearing up the inside building rubbish in building rubbish pond, only can the top clear up the inside building rubbish in building rubbish pond, building rubbish's weight ratio is heavier, be difficult for clearing up, the efficiency ratio of clearing up the inside building rubbish in building rubbish pond is lower simultaneously.
To this end, we propose a construction waste pool to solve the above problems.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving and having present building rubbish pond among the prior art and all can have a storage space of sinking into usually, when clearing up the inside building rubbish in building rubbish pond, only can clear up the inside building rubbish in building rubbish pond in the top, building rubbish's weight ratio is heavier, is difficult for clearing up, the efficiency ratio lower problem of clearing up the inside building rubbish in building rubbish pond simultaneously, and the building rubbish pond of proposing.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
The utility model provides a construction waste pool, includes the rubbish pond body, the top of rubbish pond body is rotated and is connected with a plurality of apron, a plurality of baffles of inside wall fixedly connected with of rubbish pond body, the rubbish pond body is connected with a plurality of push pedals through a plurality of electronic hydraulic push rod, the inside wall of rubbish pond body is equipped with the mounting groove that corresponds with electronic hydraulic push rod, be equipped with a plurality of discharge ports on the rubbish pond body, one side lateral wall that electronic hydraulic push rod was kept away from to the rubbish pond body rotates and is connected with the rotation post, the bottom fixedly connected with door plant of rotation post, the lateral wall of door plant offsets with the lateral wall of rubbish pond body, the lateral wall fixedly connected with backup pad of rubbish pond body, the top fixedly connected with motor of backup pad, the motor passes through coupling mechanism and rotates the column connection.
Preferably, the top fixedly connected with two first fixed blocks of rubbish pond body, two first fixed blocks pass through the fixed column and connect, and is a plurality of the apron all rotates to cup joint on the lateral wall of fixed column.
Preferably, two second fixed blocks of one side top fixedly connected with that the electronic hydraulic push rod was kept away from to rubbish pond body, it is connected with two second fixed blocks through two bearings to rotate the post, be equipped with the installing port that corresponds with the bearing on the rotation post.
Preferably, coupling mechanism includes the dwang of fixed connection at the motor output, the first gear of one end fixedly connected with of motor is kept away from to the dwang, the one end of rotation post runs through second fixed block and fixedly connected with second gear, first gear passes through the chain and is connected with the second gear.
Preferably, the top fixedly connected with of backup pad matches the buckler that sets up with the motor, be equipped with the movable mouthful that corresponds with the chain on the buckler.
The embodiment of the utility model provides a technical scheme can include following beneficial effect:
1. through the matching effect of the electric hydraulic push rod, the push plate and the partition plate, the effect of starting the electric hydraulic push rod to move to drive the push plate to move in the garbage pool body is achieved, the function that the electric hydraulic push rod pushes the construction garbage in the garbage pool body out of the garbage pool body is achieved, and the construction garbage in the garbage pool body can be conveniently taken out;
2. through the cooperation of door plant, motor, dwang, rotation post, first gear, second gear and chain, reached the motor and rotated the effect that drives rotation post pivoted, realized that the motor motion drives door plant pivoted function.
Drawings
Fig. 1 is a schematic structural view of a construction waste pool provided by the present invention;
Fig. 2 is a schematic top view of a construction waste pool according to the present invention;
FIG. 3 is a schematic view of the structure at A in FIG. 2;
FIG. 4 is a schematic view of the connection structure of the discharge port, the push plate, the electro-hydraulic push rod, the partition plate and the garbage can body in the construction garbage can provided by the present invention;
Fig. 5 is the utility model provides a connection structure sketch map of electronic hydraulic rod and push pedal in building rubbish pond.
In the figure: 1 rubbish pond body, 2 first fixed block, 3 fixed columns, 4 apron, 5 baffles, 6 push pedals, 7 electronic hydraulic push rods, 8 backup pads, 9 motors, 10 dwang, 11 first gear, 12 chains, 13 second gear, 14 rotation columns, 15 second fixed blocks, 16 door plant, 17 bearing, 18 discharge ports, 19 manipulators, 20 buckler.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1-5, a construction waste pond, including rubbish pond body 1, the top of rubbish pond body 1 is rotated and is connected with a plurality of apron 4, two first fixed blocks 2 of top fixedly connected with of rubbish pond body 1, two first fixed blocks 2 are connected through fixed column 3, a plurality of apron 4 all rotate and cup joint on the lateral wall of fixed column 3, the effect of apron 4 is convenient for cover rubbish pond body 1, when preventing to scrape strong wind, the construction waste of rubbish pond body 1 is blown out rubbish pond body 1, pollute the environment on every side.
the garbage can comprises a garbage can body 1, a plurality of partition plates 5 are fixedly connected to the inner side wall of the garbage can body 1, the garbage can body 1 is connected with a plurality of push plates 6 through a plurality of electric hydraulic push rods 7, a mounting groove corresponding to the electric hydraulic push rods 7 is formed in the inner side wall of the garbage can body 1, a plurality of discharge ports 18 are formed in the garbage can body 1, two second fixed blocks 15 are fixedly connected to the top of one side, away from the electric hydraulic push rods 7, of the garbage can body 1, a rotating column 14 is connected with the two second fixed blocks 15 through two bearings 17, a mounting port corresponding to the bearing 17 is formed in the rotating column 14, the partition plates 5 divide the interior of the garbage can body 1 into a plurality of placing bins, so that different types of construction garbage can be conveniently placed, the width of the push plates 6 is matched with the width of the placing bins, the bottom of the push plates 6 is contacted with, The power supply technology of the electric hydraulic push rod 7 and the control technology of the electric hydraulic push rod 7 are the prior art, and are not described too much, the electric hydraulic push rod 7 is started to move to push the push plate 6 to move, the push plate 6 discharges the construction waste inside the garbage pool body 1 from the discharge port 18 to the garbage pool body 1, and the construction waste inside the garbage pool body 1 is convenient to clean.
Wherein, the outer side wall of one side of the garbage pool body 1 far away from the electric hydraulic push rod 7 is rotatably connected with a rotating column 14, the bottom of the rotating column 14 is fixedly connected with a door plate 16, the outer side wall of the door plate 16 is abutted against the outer side wall of the garbage pool body 1, the outer side wall of the garbage pool body 1 is fixedly connected with a supporting plate 8, the top of the supporting plate 8 is fixedly connected with a motor 9, the motor 9 is connected with the rotating column 14 through a connecting mechanism, the top of one side of the garbage pool body 1 far away from the electric hydraulic push rod 7 is fixedly connected with two second fixed blocks 15, the rotating column 14 is connected with the two second fixed blocks 15 through two bearings 17, the connecting mechanism comprises a rotating rod 10 fixedly connected with the output end of the motor 9, one end of the rotating rod 10 far away from the motor 9 is fixedly connected with a first gear 11, one end of the rotating column 14 penetrates through the second fixed, door plant 16 blocks up a plurality of discharge ports 18, when preventing not clearing up the inside building rubbish of rubbish pond body 1, building rubbish flows to rubbish pond body 1's outside from discharge port 18, cause the pollution to the environment, rubbish pond body 1's lateral wall fixedly connected with operation ware 19, it needs to explain, operation ware 19's power supply technique, operation ware 19's waterproof technique, motor 9's power supply technique, operation ware 19 control motor 9's technique and operation ware 19 control electric hydraulic push rod 7's technique are prior art, do not do too much the description here, motor 9 rotates and drives door plant 16 and rotate, be convenient for open door plant 16 and wash the inside rubbish of rubbish pond body 1.
wherein, the top fixedly connected with of backup pad 8 matches the buckler 20 that sets up with motor 9, is equipped with the movable mouthful that corresponds with chain 12 on the buckler 20, and the effect of buckler 20 is the motor 9 of preventing rainwater corruption.
The utility model discloses in, when building rubbish is placed to needs toward rubbish pond body 1's inside, classify according to building rubbish's difference, place the difference with building rubbish and place in the storehouse, then cover plate 4, prevent that strong wind from blowing off the inside building rubbish of rubbish pond body 1 and polluting environment on every side, when needs are cleared up the inside building rubbish of rubbish pond body 1, starter motor 9 drives door plant 16 and rotates, start electronic hydraulic push rod 7 and drive push pedal 6 motion, release the inside building rubbish of rubbish pond body 1 from discharge port 18 on rubbish pond body 1, be convenient for clear up the inside building rubbish of rubbish pond body 1, push pedal 6 resets after the clearance finishes, motor 9 drives door plant 16 and plugs up discharge port 18.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (5)
1. A construction waste pool comprises a waste pool body (1) and is characterized in that the top of the waste pool body (1) is rotatably connected with a plurality of cover plates (4), the inner side wall of the waste pool body (1) is fixedly connected with a plurality of partition plates (5), the waste pool body (1) is connected with a plurality of push plates (6) through a plurality of electric hydraulic push rods (7), the inner side wall of the waste pool body (1) is provided with mounting grooves corresponding to the electric hydraulic push rods (7), the waste pool body (1) is provided with a plurality of discharge ports (18), the outer side wall of one side, away from the electric hydraulic push rods (7), of the waste pool body (1) is rotatably connected with a rotating column (14), the bottom of the rotating column (14) is fixedly connected with a door plate (16), and the outer side wall of the door plate (16) is abutted against the outer side wall of the waste pool body (, the garbage can is characterized in that a supporting plate (8) is fixedly connected to the outer side wall of the garbage can body (1), a motor (9) is fixedly connected to the top of the supporting plate (8), and the motor (9) is connected with a rotating column (14) through a connecting mechanism.
2. The construction waste pool according to claim 1, wherein two first fixing blocks (2) are fixedly connected to the top of the waste pool body (1), the two first fixing blocks (2) are connected through fixing columns (3), and the cover plates (4) are rotatably sleeved on the outer side walls of the fixing columns (3).
3. The construction waste pool according to claim 1, characterized in that two second fixing blocks (15) are fixedly connected to the top of one side of the waste pool body (1) away from the electric hydraulic push rod (7), the rotating column (14) is connected with the two second fixing blocks (15) through two bearings (17), and a mounting opening corresponding to the bearing (17) is formed in the rotating column (14).
4. The construction waste pool according to claim 3, wherein the connecting mechanism comprises a rotating rod (10) fixedly connected to the output end of the motor (9), one end of the rotating rod (10) far away from the motor (9) is fixedly connected with a first gear (11), one end of the rotating column (14) penetrates through a second fixing block (15) and is fixedly connected with a second gear (13), and the first gear (11) is connected with the second gear (13) through a chain (12).
5. the construction waste pool according to claim 4, wherein a waterproof cover (20) matched with the motor (9) is fixedly connected to the top of the support plate (8), and a movable opening corresponding to the chain (12) is formed in the waterproof cover (20).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920479788.7U CN209758127U (en) | 2019-04-10 | 2019-04-10 | Building rubbish pond |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920479788.7U CN209758127U (en) | 2019-04-10 | 2019-04-10 | Building rubbish pond |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209758127U true CN209758127U (en) | 2019-12-10 |
Family
ID=68758671
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920479788.7U Expired - Fee Related CN209758127U (en) | 2019-04-10 | 2019-04-10 | Building rubbish pond |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209758127U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111330840A (en) * | 2020-02-12 | 2020-06-26 | 葛飞月 | Construction site garbage pool |
-
2019
- 2019-04-10 CN CN201920479788.7U patent/CN209758127U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111330840A (en) * | 2020-02-12 | 2020-06-26 | 葛飞月 | Construction site garbage pool |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104646407A (en) | Cleaning system for contaminated building clinkers in contaminated sites and cleaning method thereof | |
CN209758127U (en) | Building rubbish pond | |
CN214320822U (en) | Be used for prosthetic dust collector of soil | |
CN101279773A (en) | Mobile grid sewage-removing machine | |
CN110847174B (en) | Single-ring porous construction device for integrally cutting off unset concrete pile head | |
CN204531298U (en) | A kind of building solid Waste sorting recycle treatment system | |
CN214116416U (en) | Construction engineering environmental protection desilting device | |
CN116633252B (en) | Photovoltaic module container | |
CN211395231U (en) | Stifled desilting device is prevented to town road engineering | |
CN109440707B (en) | New-type municipal administration is with street earth cleaning device | |
CN201305473Y (en) | Mobile grille dirt separator | |
CN214515154U (en) | Movable coal ash pretreatment station | |
CN113492457B (en) | Blank overturning machine and blank cutting line | |
CN209941647U (en) | Energy-concerving and environment-protective type surface of water robot of decontaminating | |
CN208790416U (en) | A kind of horizontal garbage compression station compression box of environment-friendly type | |
CN201825487U (en) | Garbage compressor | |
CN210150040U (en) | Garbage clearing device for building construction | |
CN112742082A (en) | Recycling device for building wastewater and building garbage and using method thereof | |
CN112742083A (en) | Recycling device for building wastewater and building garbage | |
CN212882671U (en) | Civil engineering's waste treatment device | |
CN213922498U (en) | House building engineering construction refuse treatment device | |
CN220365127U (en) | Municipal administration pipeline dredging device | |
CN212835589U (en) | Water conservancy construction dredging device for improving drought-resisting drainage efficiency | |
CN213386046U (en) | Garbage recycling station with loading and unloading functions | |
CN213327006U (en) | High-efficient sewage discharge device for green building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20191210 Termination date: 20210410 |