CN209756828U - Intelligent charging stake easy to assemble - Google Patents

Intelligent charging stake easy to assemble Download PDF

Info

Publication number
CN209756828U
CN209756828U CN201920359243.2U CN201920359243U CN209756828U CN 209756828 U CN209756828 U CN 209756828U CN 201920359243 U CN201920359243 U CN 201920359243U CN 209756828 U CN209756828 U CN 209756828U
Authority
CN
China
Prior art keywords
charging pile
groove
mounting groove
fixed
fixed inserting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920359243.2U
Other languages
Chinese (zh)
Inventor
穆晓东
陈学全
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Shanghe Electric Co Ltd
Original Assignee
Tianjin Shanghe Electric Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Shanghe Electric Co Ltd filed Critical Tianjin Shanghe Electric Co Ltd
Priority to CN201920359243.2U priority Critical patent/CN209756828U/en
Application granted granted Critical
Publication of CN209756828U publication Critical patent/CN209756828U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/70Energy storage systems for electromobility, e.g. batteries
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T10/00Road transport of goods or passengers
    • Y02T10/60Other road transportation technologies with climate change mitigation effect
    • Y02T10/7072Electromobility specific charging systems or methods for batteries, ultracapacitors, supercapacitors or double-layer capacitors
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02TCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
    • Y02T90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02T90/10Technologies relating to charging of electric vehicles
    • Y02T90/12Electric charging stations

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to an intelligent charging pile convenient to install, comprising a charging pile body, a connecting part and a prefabricated base station, wherein the surface of the prefabricated base station is provided with a mounting groove, fixed inserting plates are symmetrically arranged in the mounting groove and are connected with the inner wall of the mounting groove through a first spring, a fixed inserting groove is symmetrically arranged on the connecting plate, a groove releasing mechanism is connected between the two fixed inserting plates, the connecting part moves in the mounting groove during installation, the fixed inserting plate in the mounting groove extends into and is fixed in the fixed inserting groove to complete the installation of the charging pile body, the two fixed inserting plates move outwards by driving the groove releasing mechanism during disassembly, so that the fixed inserting plate and the fixed inserting groove are separated from a matching relation, the design can ensure that the charging pile can complete the installation and, and then improve installer's work efficiency, in addition, can also effectively avoid rag bolt to expose the potential safety hazard that causes of easy corrosion outside.

Description

Intelligent charging stake easy to assemble
Technical Field
The utility model relates to a fill electric pile technical field, especially relate to an intelligent charging stake easy to assemble.
Background
The energy of the electric automobile is mainly provided by a charging pile, the function of the charging pile is similar to that of an oiling machine in a gas station, the charging pile can be fixed on the ground or on the wall, the charging pile is installed in a parking lot or a charging station of a public building or a residential quarter, the electric automobiles of various models can be charged according to different voltage grades, the input end of the charging pile is directly connected with an alternating current power grid, and the output end of the charging pile is provided with a charging plug for charging the electric automobile. The existing charging pile is generally installed on a prefabricated base station on the ground through foundation bolts, the installation process is very troublesome in the actual installation process, time and labor are wasted, certain inconvenience is brought to installation personnel, and the work efficiency is reduced; in addition, fill electric pile usually outdoor, the wind-blown drenches, and rag bolt corrodes easily, appears becoming flexible, causes the potential safety hazard.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problem that overcome exist among the prior art not enough, provide an intelligent charging stake easy to assemble.
The utility model discloses a realize through following technical scheme:
The utility model provides an intelligent charging stake easy to assemble, its characterized in that, including filling electric pile body, rigid coupling in the connecting portion of filling electric pile body below and locating the prefabricated base station in the connecting portion outside, connecting portion peg graft in prefabricated base station, prefabricated base station surface is opened there is the mounting groove, the upper portion symmetry is equipped with fixed picture peg in the mounting groove, fixed picture peg and mounting groove inner wall are through a spring coupling, the position symmetry of connecting portion relatively fixed picture peg is opened has fixed slot with fixed picture peg shape matched with, two be connected with between the fixed picture peg and take off the groove mechanism.
According to the above technical scheme, preferably, the installation groove lower part is located to the groove mechanism that takes off, the groove mechanism that takes off is including locating the cam of connecting portion below, the driven gear of cam both sides, locating the baffle of being connected and locating the connecting plate between baffle and the fixed picture peg with driven gear middle part rotation, driven gear meshes mutually with the cam, two be connected through locating component between the baffle.
According to the above technical solution, preferably, the positioning assembly includes positioning posts symmetrically disposed on the two guide plates and a second spring disposed between the two positioning posts.
According to the technical scheme, preferably, the prefabricated base station upper surface symmetry is equipped with the closing plate, the closing plate with fill electric pile body lateral surface zonulae occludens, the closing plate with fill the coating of the junction of electric pile body with waterproof glue.
The utility model has the advantages that:
During installation, the connecting part moves into the installation groove, the fixed inserting plates in the installation groove extend into and are fixed in the fixed inserting grooves, installation of the charging pile body is completed, the two fixed inserting plates move outwards by driving the groove release mechanism during disassembly, and the fixed inserting plates and the fixed inserting grooves are separated from a matching relation, so that the charging pile can be conveniently and quickly installed and disassembled, time is saved, and the working efficiency of an installer is improved; besides, potential safety hazards caused by the fact that the foundation bolts are exposed to the outside and are easily corroded can be effectively avoided.
Drawings
fig. 1 is a schematic view of the structure of the present invention.
Fig. 2 is a schematic front view of the groove releasing mechanism of the present invention.
Fig. 3 is a schematic connection diagram of the matching relationship between the cam and the driven gear according to the present invention.
Fig. 4 is a schematic top view of the sealing plate of the present invention.
In the figure: 1. a charging pile body; 2. a sealing plate; 3. a connecting portion; 4. a first spring; 5. fixing the inserting plate; 6. a connecting plate; 7. a guide plate; 8. a second spring; 9. a cam; 10. a positioning column; 11. mounting grooves; 12. prefabricating a base platform; 13. a driven gear; 14. and (3) waterproof glue.
Detailed Description
In order to make those skilled in the art better understand the technical solution of the present invention, the present invention will be further described in detail with reference to the accompanying drawings and preferred embodiments.
As shown in the figure, the utility model comprises a charging pile body 1, a connecting part 3 fixedly connected below the charging pile body 1 and a prefabricated base station 12 arranged outside the connecting part 3, the connecting part 3 is inserted into a prefabricated base platform 12, the surface of the prefabricated base platform 12 is provided with a mounting groove 11, the upper part in the installation groove 11 is symmetrically provided with the fixed inserting plates 5, the contact surface of the fixed inserting plates 5 and the connecting part 3 is arranged in a cambered surface in the embodiment, so that the fixed inserting plates 5 can move towards the inner wall of the installation groove 11 when contacting with the connecting part 3, fixed picture peg 5 is connected through first spring 4 with the 11 inner walls of mounting groove, the position symmetry of 6 relative fixed picture pegs of connecting plate 5 is opened has with fixed picture peg 5 shape matched with fixed slot, two be connected with out of stock mechanism between the fixed picture peg 5, and after the installation was accomplished, fixed picture peg 5 received the effort of first spring 4 and pegs graft in fixed slot. During installation, the connecting part 3 moves into the installation groove 11, the fixed inserting plates 5 in the installation groove 11 extend into and are fixed in the fixed inserting grooves, installation of the charging pile body 1 is completed, the two fixed inserting plates 5 move outwards by driving the groove release mechanism during disassembly, and the fixed inserting plates 5 are separated from the fixed inserting grooves in a matching relationship, so that the charging pile can be conveniently and quickly installed and disassembled, time is saved, and the working efficiency of an installer is improved; besides, potential safety hazards caused by the fact that the foundation bolts are exposed to the outside and are easily corroded can be effectively avoided.
According to the above embodiment, preferably, the groove taking-off mechanism is located 11 lower parts of mounting groove, the groove taking-off mechanism is including locating cam 9, the symmetry of connecting portion 3 below locate cam 9 both sides driven gear 13, with driven gear 13 middle part rotate the baffle 7 of being connected and locate baffle 7 and fixed picture peg 5 between connecting plate 6, driven gear 13 meshes mutually with cam 9, two be connected through locating component between the baffle 7, cam 9 middle part perpendicular outside rigid coupling has the bull stick in this example, when dismantling and fill electric pile body 1, drives cam 9 through instrument drive bull stick and rotates, makes two driven gear 13 with it meshing outwards promote baffle 7 for break away from the fit relation between two fixed picture pegs 5 that are connected through connecting plate 6 with baffle 7 and the fixed slot, make and fill electric pile convenient to dismantle more, improve work efficiency.
According to the above embodiment, preferably, the positioning assembly includes positioning posts 10 symmetrically disposed on the two guide plates 7 and a second spring 8 disposed between the two positioning posts 10, and the second spring 8 is disposed between the two guide plates 7, so that the two driven gears 13 in the groove releasing mechanism are tightly engaged with the cam 9, thereby facilitating the operation of each component in the groove releasing mechanism.
According to the embodiment, preferably, the sealing plates 2 are symmetrically arranged on the upper surface of the prefabricated base station 12, the sealing plates 2 are tightly connected with the outer side surface of the charging pile body 1, waterproof glue 14 is coated on the joint of the sealing plates 2 and the charging pile body 1, in the embodiment, the two sealing plates 2 are mutually inserted on the outer side surface of the charging pile body 1, the waterproof glue 14 is also coated between the two sealing plates 2, and the arrangement of the sealing plates 2 can prevent rainwater from permeating into the prefabricated base station 12 in rainy days and effectively prevent each part in the mounting groove 11 from being corroded and loosened; simultaneously can increase the installation stability who fills electric pile body 1, be difficult for empting.
During installation, the connecting part 3 moves into the installation groove 11, the fixed inserting plates 5 in the installation groove 11 extend into and are fixed in the fixed inserting grooves, installation of the charging pile body 1 is completed, the two fixed inserting plates 5 move outwards by driving the groove release mechanism during disassembly, and the fixed inserting plates 5 are separated from the fixed inserting grooves in a matching relationship, so that the charging pile can be conveniently and quickly installed and disassembled, time is saved, and the working efficiency of an installer is improved; besides, potential safety hazards caused by the fact that the foundation bolts are exposed to the outside and are easily corroded can be effectively avoided.
The foregoing is only a preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, a plurality of modifications and decorations can be made without departing from the principle of the present invention, and these modifications and decorations should also be regarded as the protection scope of the present invention.

Claims (4)

1. The utility model provides an intelligent charging stake easy to assemble, its characterized in that, including filling electric pile body, rigid coupling in the connecting portion of filling electric pile body below and locating the prefabricated base station in the connecting portion outside, connecting portion peg graft in prefabricated base station, prefabricated base station surface is opened there is the mounting groove, the upper portion symmetry is equipped with fixed picture peg in the mounting groove, fixed picture peg and mounting groove inner wall are through a spring coupling, the position symmetry of connecting portion relatively fixed picture peg is opened has fixed slot with fixed picture peg shape matched with, two be connected with between the fixed picture peg and take off the groove mechanism.
2. The intelligent charging pile convenient to install according to claim 1, wherein the groove releasing mechanism is arranged at the lower part of the mounting groove and comprises a cam arranged below the connecting part, driven gears symmetrically arranged at two sides of the cam, guide plates rotatably connected with the middle parts of the driven gears and a connecting plate arranged between the guide plates and the fixed inserting plate, the driven gears are meshed with the cam, and the two guide plates are connected through a positioning component.
3. The intelligent charging pile convenient to install according to claim 2, wherein the positioning assembly comprises positioning columns symmetrically arranged on the two guide plates and a second spring arranged between the two positioning columns.
4. The intelligent charging pile convenient to install according to any one of claims 1 to 3, wherein sealing plates are symmetrically arranged on the upper surface of the prefabricated base platform, the sealing plates are tightly connected with the outer side surface of the charging pile body, and waterproof glue is coated on the joints of the sealing plates and the charging pile body.
CN201920359243.2U 2019-03-18 2019-03-18 Intelligent charging stake easy to assemble Expired - Fee Related CN209756828U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920359243.2U CN209756828U (en) 2019-03-18 2019-03-18 Intelligent charging stake easy to assemble

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920359243.2U CN209756828U (en) 2019-03-18 2019-03-18 Intelligent charging stake easy to assemble

Publications (1)

Publication Number Publication Date
CN209756828U true CN209756828U (en) 2019-12-10

Family

ID=68755750

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920359243.2U Expired - Fee Related CN209756828U (en) 2019-03-18 2019-03-18 Intelligent charging stake easy to assemble

Country Status (1)

Country Link
CN (1) CN209756828U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111845408A (en) * 2020-07-25 2020-10-30 刘群英 Fill electric pile convenient to installation is dismantled
CN111976523A (en) * 2020-08-22 2020-11-24 罗桃艳 Electric pile is filled to new energy automobile convenient to dismantle

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111845408A (en) * 2020-07-25 2020-10-30 刘群英 Fill electric pile convenient to installation is dismantled
CN111976523A (en) * 2020-08-22 2020-11-24 罗桃艳 Electric pile is filled to new energy automobile convenient to dismantle

Similar Documents

Publication Publication Date Title
CN209756828U (en) Intelligent charging stake easy to assemble
CN108556656A (en) A kind of new-energy automobile charging pile
CN111088817A (en) Prefabricated assembled cable well and construction method thereof
CN210562673U (en) High efficiency assembly type crossbeam structure for building
CN219838450U (en) Auxiliary sealing mechanism of charging head
CN205111655U (en) Frock is dismantled in union installation
CN207140846U (en) A kind of rainshed charging device of electric automobile
CN213806886U (en) Sectional type steel combination column capable of being installed rapidly
CN204927485U (en) Pole communication device is embraced to roof counter weight formula
CN211765042U (en) Fill electric pile module equipment type and fill electric pile structure
CN212979930U (en) New energy automobile's direct current fills electric pile
CN110984402B (en) Built-in steel plate embedded combined type occlusion member for prefabricated concrete building
CN221162323U (en) Multifunctional vertical charging pile
CN113718947A (en) Bolted assembled concrete frame top corner joint trunk connection structure
CN219115267U (en) Top-mounted new energy automobile fills electric pile
CN218759118U (en) Assembled flag platform
CN2361746Y (en) Combined pseudo-classic style pavilion
CN220953521U (en) Prefabricated assembled distribution box foundation
CN215669875U (en) Energy-saving water supply system for high-rise building construction
CN215663003U (en) Intelligent charging stake waterproof construction
CN218085148U (en) Environment-friendly solar charging stake
CN216276541U (en) Architectural design roof eaves mouth watertight fittings
CN217863787U (en) Fill electric pile convenient to dismantle
CN212022380U (en) Position-adjustable charging pile
CN221437763U (en) Fill electric pile convenient to installation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191210

CF01 Termination of patent right due to non-payment of annual fee