CN209742462U - Pole frame is embraced to basic station civil engineering computer lab antenna - Google Patents

Pole frame is embraced to basic station civil engineering computer lab antenna Download PDF

Info

Publication number
CN209742462U
CN209742462U CN201920242668.5U CN201920242668U CN209742462U CN 209742462 U CN209742462 U CN 209742462U CN 201920242668 U CN201920242668 U CN 201920242668U CN 209742462 U CN209742462 U CN 209742462U
Authority
CN
China
Prior art keywords
civil engineering
base station
pole
side wall
station civil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920242668.5U
Other languages
Chinese (zh)
Inventor
郭晖
易冰
罗菊
李雯静
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHONGQING XINKE DESIGN Co Ltd
Original Assignee
CHONGQING XINKE DESIGN Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHONGQING XINKE DESIGN Co Ltd filed Critical CHONGQING XINKE DESIGN Co Ltd
Priority to CN201920242668.5U priority Critical patent/CN209742462U/en
Application granted granted Critical
Publication of CN209742462U publication Critical patent/CN209742462U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

the utility model discloses a pole holding frame for a base station civil engineering machine room antenna, which relates to the field of base station structures and mainly comprises a lightning rod, a pole holding frame, a supporting table and a hoop; the supporting table is arranged on the side wall of the base station civil engineering and comprises a fixing plate and a supporting plate, the fixing plate is attached to the outer wall of the base station civil engineering, the supporting plate is horizontally fixed with the fixing plate, a ribbed plate is arranged below the supporting plate and connected with the fixing plate, and the lower end part of the holding rod is connected with the supporting plate through a fastening bolt; the side wall of the lower part of the holding pole is attached to the side wall of the base station civil engineering, the hoop is arranged around the side wall of the holding pole, and two ends of the hoop are fixed to the side wall of the base station civil engineering through long bolts respectively; the lightning rod set up in the upper end of holding the pole, rational utilization basic station civil engineering, the security improves greatly, and technology is simpler, and the cost is lower, and the reliability is high, when satisfying the cover function, has improved the station site sharing rate.

Description

pole frame is embraced to basic station civil engineering computer lab antenna
Technical Field
The utility model relates to a pole frame is embraced to basic station civil engineering computer lab antenna mainly relates to basic station structure field.
Background
with the rapid development of the communication industry in China, more and more mobile communication base station construction projects are required. Independent tower mast facilities matched with a traditional base station civil engineering machine room are as follows: angle steel tower, tee pipe tower, H pole, simple and easy steel pipe tower etc. and the investment is expensive, and construction cycle is longer, and in case hang full antenna, all be difficult to the dilatation scheduling problem in bearing and position extension.
SUMMERY OF THE UTILITY MODEL
not enough to above prior art, the utility model provides a pole frame is embraced to basic station civil engineering computer lab antenna, rational utilization basic station civil engineering, the security improves greatly, and technology is simpler, and the cost is lower, and the reliability is high, when satisfying the cover function, has improved the station site sharing rate.
In order to achieve the above purpose, the technical scheme of the utility model is that: the lightning rod type pole holding device comprises a lightning rod, a holding pole, a supporting platform and a hoop; the supporting table is arranged on the side wall of the base station civil engineering and comprises a fixing plate and a supporting plate, the fixing plate is attached to the outer wall of the base station civil engineering, the supporting plate is horizontally fixed with the fixing plate, a ribbed plate is arranged below the supporting plate and connected with the fixing plate, and the lower end part of the holding rod is connected with the supporting plate through a fastening bolt; the side wall of the lower part of the holding pole is attached to the side wall of the base station civil engineering, the hoop is arranged around the side wall of the holding pole, and two ends of the hoop are fixed to the side wall of the base station civil engineering through long bolts respectively; the lightning rod is arranged at the upper end of the holding pole.
The technical principle and the beneficial effects of the utility model are as follows:
This scheme can fix the lateral wall at basic station civil engineering fast with embracing the pole through setting up brace table and staple bolt, makes the antenna set up in the upper end of embracing the pole, and rational utilization basic station civil engineering, the security improves greatly, and technology is simpler, and the cost is lower, and the reliability is high, when satisfying the cover function, has improved the station site sharing rate.
Furthermore, correspond the inner wall subsides of the basic station civil engineering of staple bolt are equipped with the reinforcing plate, the inner of stay bolt connect in the reinforcing plate, through setting up the reinforcing plate, can be so that the staple bolt is more stable firm with being connected between the basic station civil engineering.
Further, the inner wall subsides of the basic station civil engineering that correspond the fixed plate also are equipped with the reinforcing plate, the fixed plate with the reinforcing plate through stay bolt locking lock in the lateral wall of basic station civil engineering, through setting up the reinforcing plate, can be so that the fixed plate is more stable firm with being connected between the basic station civil engineering.
Furthermore, the holding pole comprises a plurality of sub-poles, the sub-poles are connected through flange plates, the corresponding flange plates are locked through bolts, and the inner side and the outer side of each flange plate are all welded in a girth mode. The length of the holding rod can be adjusted according to actual needs, and then the height of the antenna is changed.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for the description of the embodiments will be briefly introduced below, and it is obvious that the drawings in the following description are only six of the embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to these drawings without creative efforts.
Fig. 1 is a front view of an embodiment of the present invention;
fig. 2 is a left side view of an embodiment of the present invention;
Fig. 3 is a schematic view of a support table according to an embodiment of the present invention;
Fig. 4 is a right side view of a support table according to an embodiment of the present invention;
Fig. 5 is a schematic view of the hoop according to the embodiment of the present invention;
Fig. 6 is a schematic view of a lightning rod according to an embodiment of the present invention;
Fig. 7 is an overall effect diagram of the embodiment of the present invention.
Embrace pole 1, lightning rod 2, ring flange 3, basic station civil engineering 4, staple bolt 5, backup pad 6, fixed plate 7, reinforcing plate 8, stay bolt 9, floor 10.
Detailed Description
The technical solutions of the present invention will be described clearly and completely with reference to the accompanying drawings, and it is to be understood that the described embodiments are merely preferred embodiments of the present invention, rather than all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
examples
As shown in fig. 1-7, the embodiment of the present invention includes a lightning rod 2, a holding pole 1, a supporting platform and a hoop 5; the holding pole 1 comprises a plurality of sub-poles, the sub-poles are connected through flange plates 3 and are locked through bolts corresponding to the flange plates 3, and the flange plates 3 are all welded inside and outside in a circumferential welding mode. The supporting table is arranged on the side wall of the base station civil engineering 4 and comprises a fixing plate 7 and a supporting plate 6, the fixing plate 7 is attached to the outer wall of the base station civil engineering 4, the supporting plate 6 is horizontally fixed with the fixing plate 7, a ribbed plate 10 is arranged below the supporting plate 6 and connected with the fixing plate 7, the ribbed plate 10 and the fixing plate 7 are galvanized copper plates, and the lower end part of the holding pole 1 is connected with the supporting plate 6 through a fastening bolt; the side wall of the lower part of the holding pole 1 is attached to the side wall of the base station civil engineering 4, the hoop 5 is arranged around the side wall of the holding pole 1, and two ends of the hoop 5 are respectively fixed on the side wall of the base station civil engineering 4 through long bolts 9; the lightning rod 2 is arranged at the upper end of the holding pole 1. A reinforcing plate 8 is attached to the inner wall of the base station civil engineering 4 corresponding to the hoop 5, and a reinforcing plate 8 is also attached to the inner wall of the base station civil engineering 4 corresponding to the fixing plate 7. The fixing plate 7 and the reinforcing plate 8 are locked and locked on the side wall of the base station civil engineering 4 through the long bolt 9, and the fixing plate 7, the hoop 5 and the base station civil engineering 4 can be connected more stably and firmly through the reinforcing plate 8.
The utility model discloses the accessible is newly-built or reforms transform traditional basic station civil engineering computer lab top surface, reaches the problem of solving the antenna erection fast and covering. Not only reduced and built a station and operation cost, shortened construction period (this practical installation only needs 1 day time) to the demand of each operator new-added antenna of satisfying that can be timely quick reaches quick delivery and has hired, produces the profit. Compared with the traditional tower mast newly-added holding pole, the safety is greatly improved, the process is simpler, the reliability is high, the coverage function is met, and the station site sharing rate is improved.
This practical application condition: civil engineering computer lab, the position is higher, satisfies the antenna and hangs high requirement, obviously does not have the website of sheltering from on every side, can carry out the new-built or the transformation that antenna erection according to the above-mentioned the utility model discloses innovative design.
This practicality is suitable for the scene: and civil engineering machine room stations with severe environments, such as suburbs, rural areas, mountains, scenic spots and the like.
This practical investment contrastive analysis:
if the newly-built iron tower needs 133000 yuan of investment, the construction cost is high, the newly-added annual rent is about 21600 yuan, the expected bearing value of a client is exceeded, and meanwhile, the investment recovery period is long. The utility model has 9200 yuan investment, 4800 yuan annual rent increment, short investment recovery period and high investment return rate.
The above description is only a preferred embodiment of the present invention, and should not be taken as limiting the invention, and any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (4)

1. the antenna pole holding frame for the civil engineering machine room of the base station is characterized by comprising a lightning rod, a pole, a supporting platform and a hoop;
The supporting table is arranged on the side wall of the base station civil engineering and comprises a fixing plate and a supporting plate, the fixing plate is attached to the outer wall of the base station civil engineering, the supporting plate is horizontally fixed with the fixing plate, a ribbed plate is arranged below the supporting plate and connected with the fixing plate, and the lower end part of the holding rod is connected with the supporting plate through a fastening bolt;
The side wall of the lower part of the holding pole is attached to the side wall of the base station civil engineering, the hoop is arranged around the side wall of the holding pole, and two ends of the hoop are fixed to the side wall of the base station civil engineering through long bolts respectively;
The lightning rod is arranged at the upper end of the holding pole.
2. The pole holding frame for the base station civil engineering machine room antenna, according to claim 1, is characterized in that: the inner wall of the base station civil engineering corresponding to the hoop is provided with a reinforcing plate in an attaching mode, and the inner end of the long bolt is connected to the reinforcing plate.
3. the pole holding frame for the base station civil engineering machine room antenna, according to claim 1, is characterized in that: the inner wall of the base station civil engineering corresponding to the fixing plate is also provided with a reinforcing plate, and the fixing plate and the reinforcing plate are locked and locked on the side wall of the base station civil engineering through a long bolt.
4. The pole holding frame for the base station civil engineering machine room antenna, according to claim 1, is characterized in that: the holding pole comprises a plurality of sub-poles, the sub-poles are connected through flanges, the flanges are locked correspondingly through bolts, and the flanges are all welded inside and outside.
CN201920242668.5U 2019-02-26 2019-02-26 Pole frame is embraced to basic station civil engineering computer lab antenna Active CN209742462U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920242668.5U CN209742462U (en) 2019-02-26 2019-02-26 Pole frame is embraced to basic station civil engineering computer lab antenna

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920242668.5U CN209742462U (en) 2019-02-26 2019-02-26 Pole frame is embraced to basic station civil engineering computer lab antenna

Publications (1)

Publication Number Publication Date
CN209742462U true CN209742462U (en) 2019-12-06

Family

ID=68708104

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920242668.5U Active CN209742462U (en) 2019-02-26 2019-02-26 Pole frame is embraced to basic station civil engineering computer lab antenna

Country Status (1)

Country Link
CN (1) CN209742462U (en)

Similar Documents

Publication Publication Date Title
CN206309129U (en) A kind of novel portable safety warning fence for ocean engineering
CN209742462U (en) Pole frame is embraced to basic station civil engineering computer lab antenna
CN204516881U (en) Telescopic T-shaped arm communication tower platform
CN202785387U (en) Indoor cantilever crane
CN204960456U (en) Roofing counter weight communication tower structure
CN107795133B (en) Integral protective frame platform and construction method thereof
CN204571321U (en) A kind of integrated form steel bar meter booth structure
CN202248995U (en) Rapid integration communication device suitable for mountainous regions
CN206116598U (en) Lever apparatus is embraced to height -adjustable mobile antenna
CN206753087U (en) A kind of lighting roof operating platform structure
CN215443391U (en) Transmission line and 5G communication sharing steel pipe pole
CN206144051U (en) Photovoltaic module pacifies assembly component
CN214615029U (en) Bolting assembled lattice type steel support for electrified railway
CN201635470U (en) Steel-structured communication tower
CN204662926U (en) A kind of operating platform for steel pipe column top construction operation
CN209099862U (en) A kind of integrated communication single-pipe tower
CN110566028A (en) novel wireless 40-meter single-pipe tower
CN209195084U (en) A kind of reusable steel bar meter protective device
CN208604911U (en) A kind of novel suspention beam bracket
CN220889211U (en) Antenna structure is beautified to floor
CN211455922U (en) Adjustable short pole holding support for floor antenna
CN211818319U (en) Machine cabinet with communication holding pole
CN218324204U (en) Communication pole holding device
CN104265022A (en) Co-building and sharing integrated base station
CN211691734U (en) High-strength steel structure tower

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant