CN209731837U - City integrated piping lane acquisition control equipment and system - Google Patents
City integrated piping lane acquisition control equipment and system Download PDFInfo
- Publication number
- CN209731837U CN209731837U CN201821600636.XU CN201821600636U CN209731837U CN 209731837 U CN209731837 U CN 209731837U CN 201821600636 U CN201821600636 U CN 201821600636U CN 209731837 U CN209731837 U CN 209731837U
- Authority
- CN
- China
- Prior art keywords
- acquisition control
- subcard
- piping lane
- bottom plate
- integrated piping
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
This application involves a kind of city integrated piping lane acquisition control equipment and systems, and wherein equipment includes shell and the circuit board for being set to enclosure interior, wherein circuit board includes: bottom plate;Multiple subcard positions, are set on bottom plate;Subcard, be set on bottom plate it is corresponding with subcard position, and with bottom plate be electrically connected;Power supply terminal is set on shell and connects the bottom plate of enclosure interior, for powering for the subcard on bottom plate.The application on bottom plate by being arranged multiple subcard positions, so as to realize flexible allocation, and integrated level with higher in the different types of subcard of multiple subcard positions flexible setting.
Description
Technical field
This application involves city integrated piping lane fields, more particularly to a kind of city integrated piping lane acquisition control equipment and are
System.
Background technique
With the development of urban construction, pipe gallery using more and more extensive, pipe gallery is exactly underground urban duct
Comprehensive corridor.A tunnel space is built in Urban Underground, by electric power, communication, the various engineerings such as combustion gas, heat supply, plumbing
Pipeline is integrated in one, and is equipped with special access hole, hoisting port and monitoring system, implements unified planning, Uniting, unified construction
And management, it is the important infrastructure and " lifeline " for ensureing city operations.Underground pipe gallery system not only solves city friendship
Logical congestion problems, also greatly facilitate the maintenance and maintenance of the urban operating mechanisms such as electric power, communication, combustion gas, water supply and sewage.
But due to often there are multiple sensors and control device in pipe gallery, this requires acquisition control equipment
With acquisition as much as possible and control channel, but for different tunnel environments, the requirement to device integration is past
Past is uncertain.Such as when sensor in pipe gallery and control device reach certain amount, according to single acquisition control
Control equipment then underintegration will cause equipment waste according to multiple acquisition control equipment again.Therefore, at present in pipe gallery
The integrated level of acquisition control equipment lacks certain flexibility.
Utility model content
Based on this, it is necessary to be asked for the technology of the integrated level shortage flexibility of acquisition control equipment in above-mentioned pipe gallery
Topic provides a kind of higher city integrated piping lane acquisition control equipment of integrated flexibility ratio and system.
A kind of city integrated piping lane acquisition control equipment including shell and is set to the circuit board of enclosure interior, wherein
Circuit board includes:
Bottom plate;
Multiple subcard positions, are set on bottom plate;
Subcard, be set on bottom plate it is corresponding with subcard position, and with bottom plate be electrically connected;
Power supply terminal is set on shell and connects the bottom plate of enclosure interior, for powering for the subcard on bottom plate.
Power supply terminal includes: in one of the embodiments,
Power supply access terminal, is set on shell, is used for input power;
It for electrical output terminal, is set on shell, is used for out-put supply.
Equipment in one of the embodiments, further include:
Connection terminal is set on bottom plate on corresponding subcard position, for the route and subcard electrical property by base plate interior
Connection.
Equipment in one of the embodiments, further include:
Network interface is set on shell and connects the bottom plate of enclosure interior, is used for networking.
Network interface includes: in one of the embodiments,
Network insertion interface, is set on shell, for accessing network;
Networking interface is set on shell, for networking of connecting.
Multiple Wiring ports are provided on subcard in one of the embodiments, for connecting different data signal lines.
The quantity of Wiring port is 4 in one of the embodiments, for setting according to corresponding data signal line is external
It is standby.
The quantity of subcard position is 4 in one of the embodiments, for accommodating different types of subcard.
A kind of city integrated piping lane acquisition control system is set including multiple city integrated piping lane acquisition controls being arranged in series
It is standby, wherein an equipment in two neighboring city integrated piping lane acquisition control equipment is another by connecting for electrical output terminal
The power supply of a equipment accesses terminal.
An equipment in two neighboring city integrated piping lane acquisition control equipment passes through group in one of the embodiments,
Network interface connects the network insertion interface of another equipment.
Above-mentioned city integrated piping lane acquisition control equipment and system, by the way that multiple subcard positions are arranged on bottom plate, so as to
To realize flexible allocation, and integrated level with higher in the different types of subcard of multiple subcard positions flexible setting.
Detailed description of the invention
Figure 1A is the schematic diagram of internal structure of city integrated piping lane acquisition control equipment in one embodiment;
Figure 1B is the structural schematic diagram of city integrated piping lane acquisition control equipment in one embodiment;
Fig. 2 is the structural schematic diagram of city integrated piping lane acquisition control system in one embodiment.
Specific embodiment
It is with reference to the accompanying drawings and embodiments, right in order to which the objects, technical solutions and advantages of the application are more clearly understood
The application is further elaborated.It should be appreciated that specific embodiment described herein is only used to explain the application, not
For limiting the application.
The embodiment of the present application provides a kind of city integrated piping lane acquisition control equipment, as shown in Figure 1A, Figure 1B, the city
Pipe gallery acquisition control equipment 10 has shell 100, and is set to the circuit board inside shell 100, wherein circuit board packet
Include: bottom plate 110 and subcard 120 are provided with multiple subcard positions 130 in the present embodiment on bottom plate 110, subcard 120 is then set to
It is on bottom plate 110 and corresponding with subcard position 130, and subcard 120 and bottom plate 110 are electrically connected;Power supply is additionally provided on shell 100
Terminal 140, the power supply terminal 140 are electrically connected the bottom plate of enclosure interior, for external power supply and are the son in internal backplane 110
120 power supply of card.
Specifically, in the present embodiment, bottom plate 110 can be printed circuit board (Printed Circuit Board, letter
Claim PCB), it is fixed on the inner sidewall of shell.Subcard 120 then have multiple types, as digital quantity input, analog input,
Digital output, RS485 subcard, thermometric subcard etc..The quantity of subcard position 130 specifically can be 4, so as to accommodate difference
The subcard of type.Suitable any subcard can be specifically selected according to actual needs, and passes through the modes such as grafting, clamping or welding
It is fixed on corresponding subcard position 130, is not limited this in the present embodiment, as long as making the inner wire of subcard 120 Yu bottom plate 110
Realize conducting in road.
Above-mentioned city integrated piping lane acquisition control equipment, by the way that multiple subcard positions are arranged on bottom plate, so as to more
A sub- different types of subcard of detent flexible setting realizes flexible allocation, and integrated level with higher.
In one embodiment, which further includes connection terminal 150, specifically, should
Connection terminal 150 is set on bottom plate 110 on corresponding subcard position 130, for by route inside bottom plate 110 with it is corresponding
Subcard 120 is electrically connected.So as to which subcard 120 is fixed on corresponding subcard position 130 by the connection terminal 150, and
Bottom plate 110 is also the subcard power supply corresponded on subcard position by each connection terminal 150.
In one embodiment, above-mentioned power supply terminal 140 further includes power supply access terminal 141 and for electrical output terminal 142,
Wherein, power supply access terminal 141 is used to access power supply from outside, is each subcard power supply on bottom plate, then for electrical output terminal 142
For out-put supply, power for external equipment.To be acquired under the premise of guarantee power supply itself works normally to external other
Control equipment is powered, and for acquisition control equipment apart from each other, then does not need that power supply unit is locally configured, thus
Reduce power supply unit.For the acquisition control equipment being closer, then electricity can be directly taken in this way, thus
The loss for reducing power supply wire rod, thereby reduces cost.
In one embodiment, which further includes the network being set on shell 100
Interface 160, to be used for networking.Specifically, the network interface 160 includes network insertion interface 161 and networking interface 162,
In, network insertion interface 161 is for accessing network, and the acquisition control equipment that networking interface 162 then is used to connect external is with networking.
Specifically can be by optical fiber or network cable transmission, not only long transmission distance, reliable and stable, and flexibility is high, reduces others
Networking equipment, and it is conducive to the installation scheduling and the extension of later period system at scene.
In one embodiment, multiple Wiring port (not shown)s are provided on above-mentioned subcard 120, for connecting not
Same data signal line, and according to data-signal line traffic control external equipment.For example, the quantity of Wiring port can be 4,
To the channel with 4 tunnels control external equipment.It will be appreciated by those skilled in the art that specifically can be according to actual needs
The quantity of Wiring port is designed, the application is without limitation.
The embodiment of the present application also provides a kind of city integrated piping lane acquisition control systems, as shown in Fig. 2, including multiple strings
The city integrated piping lane acquisition control equipment 10 as shown in Figure 1 of connection setting and management control multiple city integrated piping lane and adopt
The management and control equipment 20 of collection control equipment 10, wherein one in two neighboring city integrated piping lane acquisition control equipment 10
Equipment accesses terminal 141 by connecting the power supply of another equipment for electrical output terminal 142.Therefore, an equipment is in receiving
While one equipment power supply, by exporting power supply to next equipment for electrical output terminal 142, to realize " hand in hand "
Formula is not only easy to connect flexibly and to reduce power supply unit for electrical connection, conducive to the installation scheduling and later period system at scene
Extension, is greatly saved cost.
In one embodiment, an equipment in two neighboring city integrated piping lane acquisition control equipment is connect by networking
Mouth 162 connects the network insertion interface 161 of another equipment.It is not only easy to connect to realize communication connection " hand in hand "
Flexibly, and reduce networking equipment, the installation conducive to scene is dispatched and the extension of later period system, is greatly saved cost.
Specific restriction about city integrated piping lane acquisition control equipment may refer to comprehensive for city in above and Fig. 1
The restriction of piping lane acquisition control equipment is closed, details are not described herein.
Specifically, in the present embodiment, it can be random on the bottom plate in each city integrated piping lane acquisition control equipment
Any one or more subcard is applied in combination, therefore, the type of acquisition control equipment can be determined by the type of subcard.And city
City's pipe gallery acquisition control system can then connect multiple acquisition control equipment, the quantity of specific series devices and single
Combined in equipment the quantity of subcard all can flexible allocation according to actual needs, or freely selected according to varying environment demand, it is clever
Activity is higher, and integrated level with higher.
Since the construction of pipe gallery avoids frequently excavating road and to traffic and residence due to laying and repairing underground utilities
People's trip is impacted and is interfered, to keep the appearance of a street complete and beauty.Reduce the expense and engineering pipe that road surface is repeatedly overhauled
The maintenance cost of line, maintains the integrality on road surface and the durability of all kinds of pipelines, and the laying convenient for various pipelines, increase and decrease,
Maintenance and daily management.
In addition, the city integrated piping lane acquisition control system gut line compact and reasonable arrangement in the application, is effectively utilized
Urban land has been saved in space under road, and reduces the roofbolt of road and inspection shaft, the room of various pipelines etc., graceful
The landscape in city, and there is certain protection against and mitigation of earthquake disasters effect.
Each technical characteristic of above embodiments can be combined arbitrarily, for simplicity of description, not to above-described embodiment
In each technical characteristic it is all possible combination be all described, as long as however, the combination of these technical characteristics be not present lance
Shield all should be considered as described in this specification.
The several embodiments of the application above described embodiment only expresses, the description thereof is more specific and detailed, but simultaneously
The limitation to utility model patent range therefore cannot be interpreted as.It should be pointed out that for the ordinary skill people of this field
For member, without departing from the concept of this application, various modifications and improvements can be made, these belong to the application's
Protection scope.Therefore, the scope of protection shall be subject to the appended claims for the application patent.
Claims (10)
1. a kind of city integrated piping lane acquisition control equipment, which is characterized in that including shell and be set to the enclosure interior
Circuit board, the circuit board includes:
Bottom plate;
Multiple subcard positions, are set on the bottom plate;
Subcard, be set on the bottom plate it is corresponding with the subcard position, and with the bottom plate be electrically connected;
Power supply terminal is set on the shell and connects the bottom plate of the enclosure interior, for for the subcard on the bottom plate
Power supply.
2. city integrated piping lane acquisition control equipment according to claim 1, which is characterized in that the feeder ear attached bag
It includes:
Power supply access terminal, is set on the shell, is used for input power;
It for electrical output terminal, is set on the shell, is used for out-put supply.
3. city integrated piping lane acquisition control equipment according to claim 1, which is characterized in that the equipment further include:
Connection terminal is set on the bottom plate on corresponding subcard position, for by the route of the base plate interior with it is described
Subcard is electrically connected.
4. city integrated piping lane acquisition control equipment according to claim 1, which is characterized in that the equipment further include:
Network interface is set on the shell and connects the bottom plate of the enclosure interior, is used for networking.
5. city integrated piping lane acquisition control equipment according to claim 4, which is characterized in that the network interface packet
It includes:
Network insertion interface is set on the shell, for accessing network;
Networking interface is set on the shell, for networking of connecting.
6. described in any item city integrated piping lane acquisition control equipment according to claim 1~5, which is characterized in that the son
Multiple Wiring ports are provided on card, for connecting different data signal lines.
7. city integrated piping lane acquisition control equipment according to claim 6, which is characterized in that the number of the Wiring port
Amount is 4, for according to corresponding data signal line external equipment.
8. described in any item city integrated piping lane acquisition control equipment according to claim 1~5, which is characterized in that the son
The quantity of detent is 4, for accommodating different types of subcard.
9. a kind of city integrated piping lane acquisition control system, which is characterized in that including it is multiple be arranged in series as claim 1~
8 described in any item city integrated piping lane acquisition control equipment, in the two neighboring city integrated piping lane acquisition control equipment
An equipment by connected for electrical output terminal another equipment power supply access terminal.
10. city integrated piping lane acquisition control system according to claim 9, which is characterized in that the two neighboring city
An equipment in city's pipe gallery acquisition control equipment connects the network insertion interface of another equipment by networking interface.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821600636.XU CN209731837U (en) | 2018-09-29 | 2018-09-29 | City integrated piping lane acquisition control equipment and system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201821600636.XU CN209731837U (en) | 2018-09-29 | 2018-09-29 | City integrated piping lane acquisition control equipment and system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209731837U true CN209731837U (en) | 2019-12-03 |
Family
ID=68658147
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201821600636.XU Active CN209731837U (en) | 2018-09-29 | 2018-09-29 | City integrated piping lane acquisition control equipment and system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209731837U (en) |
-
2018
- 2018-09-29 CN CN201821600636.XU patent/CN209731837U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206077444U (en) | Urban Underground pipe gallery environmental safety monitor and control system based on GIS | |
WO2013100274A1 (en) | Apparatus and method for gathering underground facilities data | |
CN107566521A (en) | A kind of intelligent power distribution room environmental monitoring wireless sensing system based on LoRa | |
CN105719471A (en) | Concentrator GPRS (general packet radio service) signal extender | |
US8295702B2 (en) | Optical media converter system | |
CN206903693U (en) | A kind of tunnel O&M health monitoring systems based on intelligent tunnel duct piece | |
CN209044858U (en) | GPRS signal extender, power information acquisition terminal and its system of power information acquisition terminal based on plastic optical fiber | |
CN209731837U (en) | City integrated piping lane acquisition control equipment and system | |
CN201413463Y (en) | Distributed safe monitoring system of geotechnical engineering | |
WO2021172892A1 (en) | Smart onsite control panel for underground facility measurement | |
CN201281766Y (en) | Monitoring system for unlocking pipeline well lid | |
CN217902062U (en) | Intelligent internet-of-things electric energy meter | |
CN110517474A (en) | A kind of power distribution room things-internet gateway | |
CN205610944U (en) | System for colliery is wireless access basic station in pit | |
CN213338425U (en) | City utility tunnel fortune dimension device | |
CN211181047U (en) | Data acquisition and transmission device | |
CN211790672U (en) | Visual cable pit waterproof cover plate | |
CN208806817U (en) | Underground Pipeline Data gateway with pluggable 4G module | |
CN209517792U (en) | A kind of configurable industry spot multifunctional data acquiring and control hardware platform | |
CN211043969U (en) | Cable trench monitoring system | |
CN209570834U (en) | A kind of data acquisition control device based on Zigbee wireless communication | |
RU2178909C1 (en) | Automatic supervisory control system for building engineering systems | |
CN221553704U (en) | Multifunctional concentrator | |
CN216210608U (en) | Piping lane monitored control system | |
CN207752359U (en) | Underground pipe gallery zone controller |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: 215123 3C, 3D, Aoyang Shunchang building, 270 Dongping street, Suzhou Industrial Park, Suzhou City, Jiangsu Province Patentee after: Suzhou Guangge Technology Co.,Ltd. Address before: 215123 room 3D, 3rd floor, Aoyang Shunchang building, 270 Dongping street, Suzhou Industrial Park, Suzhou City, Jiangsu Province Patentee before: SUZHOU GUANGGE EQUIPMENT Co.,Ltd. |