CN209725486U - A kind of mounting bracket for steel building vertical pipe - Google Patents
A kind of mounting bracket for steel building vertical pipe Download PDFInfo
- Publication number
- CN209725486U CN209725486U CN201920140938.1U CN201920140938U CN209725486U CN 209725486 U CN209725486 U CN 209725486U CN 201920140938 U CN201920140938 U CN 201920140938U CN 209725486 U CN209725486 U CN 209725486U
- Authority
- CN
- China
- Prior art keywords
- steel
- light
- duty
- building
- steel column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model discloses a kind of mounting brackets for steel building vertical pipe, the light-duty steel column (2) including being located at building steel column (1) side;Light section top end and bottom end are respectively equipped with angle cleat (3), and two planes of angle cleat are equipped with mounting hole (4);One mounting hole is connect through bolt (5) with light-duty steel column, and the expanded bolt of another mounting hole (6) is connect with the top floor (7) of building or bottom floor (8);Light-duty steel column is equipped with one group of pipeline fixing device (9), and pipeline fixing device is fixedly connected with vertical pipe (10).The utility model structure is simple, it is easy production, solve the problems, such as that steel building electromechanics installation vertical pipeline fixed point is insufficient for code requirement, solve the problems, such as that electromechanical pipeline installation need to be in steel building main body large area welding, reduce influence of the electromechanical pipeline installation to steel construction subjectivity property, improves the service life and safety of steel building indirectly.
Description
Technical field
The utility model relates to a kind of mounting brackets for steel building vertical pipe, belong to steel building pipeline
Mounting technique field.
Background technique
For steel building compares traditional concrete construction, with steel plate or fashioned iron instead of armored concrete, intensity
Higher, shock resistance is more preferable.And since component can be made with batch production, in-site installation, thus greatly reduce the duration.Due to steel
It is reusable, building waste can be greatly reduced, it is more environmentally protective, thus be widely used by countries in the world, apply
In industrial building and civil buildings.
But all production of promising technique or building function demand and the various pipelines that are arranged in industrial premises, such as: it gives
The various vertical pipes such as draining, fire-fighting, heat supply, steam, ventilation, air-conditioning and production technology.In the peace of these pipelines
During dress, it is required to setting bracket.Existing reinforced concrete structure bracket is all easy to installation of taking root on beam, column, plate,
Generally it is able to satisfy the installation pitch requirements of pipeline.But for steel building, due to being restricted by building structure,
Pipeline only leans on the support of the bracket on top plate or bottom plate to fix, and tends not to meet support of pipelines installation pitch requirements.As support
The steel column of building does not allow large area welding usually, therefore can only be supported using other methods to vertical pipe.
Utility model content
The purpose of this utility model is to provide a kind of mounting brackets for steel building vertical pipe, with disposable
It solves the problems, such as that steel building electromechanical pipeline bracket spacing is unable to satisfy code requirement, improves making for building body and electromechanical pipeline
With safety, thus overcome the deficiencies in the prior art.
To achieve the above objectives, the present invention adopts the following technical solutions:
A kind of mounting bracket for steel building vertical pipe of the utility model, including it is located at building steel column side
Light-duty steel column;Light section top end and bottom end are respectively equipped with angle cleat, and two planes of angle cleat are equipped with mounting hole;One
Mounting hole is connect through bolt with light-duty steel column, and the top floor or bottom floor of the expanded bolt of another mounting hole and building connect
It connects;Light-duty steel column is equipped with one group of pipeline fixing device, and pipeline fixing device is fixedly connected with vertical pipe.
In aforementioned mounting bracket, the light-duty steel column is made of the light-duty square steel of 100 × 60mm;The length of light-duty steel column
Equal to the distance between top soffit to bottom floor top surface;Light section column top and bottom, which are equipped with, to be used for;It is fixed to connect
Connect the mounting hole of angle steel;Mounting hole aperture is 12mm.
In aforementioned mounting bracket, the angle cleat is made of 50 × 50 × 5mm Zinc-coated angle steel;The two of angle cleat are flat
The center in face is equipped with mounting hole;Mounting hole aperture is 12mm.
In aforementioned mounting bracket, the pipeline fixing device includes support of pipelines;Support of pipelines includes rectangle casing, rectangle
The rectangular opening of casing is slightly larger than the outer rectangular dimension of light-duty steel column, and rectangle casing is equipped with top wire hole;Rectangle casing it is opposite two
Side is welded with support angle steel;Support angle steel is equipped with mounting hole;Mounting hole is connect through bolt with pipe collar.
By adopting the above-described technical solution, the utility model is compared with prior art, the utility model structure is simple, holds
It is easy to manufacture, it solves the problems, such as that steel building electromechanics installs vertical pipeline fixed point and is insufficient for code requirement, solves
Electromechanical pipeline installation need to reduce electromechanical pipeline installation to steel construction main body the steel building main body large area welding the problem of
The influence of performance improves the service life and safety of steel building indirectly.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is light-duty steel column structure schematic diagram;
Fig. 3 is pipeline fixing device structural schematic diagram;
Fig. 4 is pipeline support structure schematic diagram;
Fig. 5 is pipe hoop structure schematic diagram;
Fig. 6 is angle cleat structural schematic diagram.
The label in accompanying drawing is: 1- building steel column, the light-duty steel column of 2-, 3- angle cleat, 4- mounting hole, 5- bolt, 6- are swollen
Floor, the bottom 8- floor, 9- pipeline fixing device, 10- vertical pipe, 11- rectangle casing, 12- jackscrew at the top of swollen bolt, 7-
Hole, 13- support angle steel, 14- pipe collar, 15- jackscrew.
Specific embodiment
The utility model is described in further detail with reference to the accompanying drawings and examples.
A kind of mounting bracket for steel building vertical pipe of the utility model, as shown in Figure 1, including being located to build
Build the light-duty steel column 2 of 1 side of steel column;Light-duty 2 top of steel column and bottom end are respectively equipped with angle cleat 3, two planes of angle cleat 3
Equipped with mounting hole 4;One mounting hole 4 is connect through bolt 5 with light-duty steel column 2, another expanded bolt 6 of mounting hole 4 and building
Top floor 7 or bottom floor 8 connect;Light-duty steel column 2 be equipped with one group of pipeline fixing device 9, pipeline fixing device 9 and hang down
Straight pipeline 10 is fixedly connected.As shown in Fig. 2, light-duty steel column 2 is made of the light-duty square steel of 100 × 60mm;The length of light-duty steel column 2
Degree is equal to the distance between 7 bottom surface of top floor to 8 top surface of bottom floor;It is equipped with and is used at the top and bottom of light-duty steel column 2;Gu
Determine the mounting hole 4 of angle cleat 3;4 aperture of mounting hole is 12mm.As shown in fig. 6, angle cleat 3 is zinc-plated using 50 × 50 × 5mm
Angle steel production;The center of two planes of angle cleat 3 is equipped with mounting hole 4;4 aperture of mounting hole is 12mm.As shown in figure 3, pipeline
Fixed device 9 includes support of pipelines;Support of pipelines is as shown in figure 4, include rectangle casing 11, the rectangular opening of rectangle casing 11 is bigger
In the outer rectangular dimension of light-duty steel column 2, rectangle casing 11 is equipped with top wire hole 12;The opposite two sides of rectangle casing 11 are welded with branch
Support angle steel 13;Support angle steel 13 is equipped with mounting hole 4;Mounting hole 4 is connect through bolt 5 with pipe collar 14.
A kind of construction method for above-mentioned the utility model mounting bracket is as follows, with reference to FIG. 1 to FIG. 6, this method press with
Lower step construction:
1., the light-duty steel column 2 of production;The light-duty square steel of 100 × 60mm is cut into the column of story height;In light-duty steel column
100 × 50mm rectangle is drawn at 2 both ends, and bores 12 mounting holes 4 in rectangular centre point;
2., production angle cleat 3;50 × 50 × 5mm Zinc-coated angle steel is cut into 4 sections of 100 mm long;And at every with 50
× 50 × 5mm angle steel is cut into 100mm, and it is spare to bore 12 mounting holes 4 in two planar centrals of every angle cleat 3;
3., production support of pipelines;Support of pipelines includes rectangle casing 11;The rectangular opening of rectangle casing 11 is slightly larger than light section
The outer rectangular dimension of column 2, in 11 1 sidetracking top wire hole 12 of rectangle casing, top wire hole 12 is M10 threaded hole;And in rectangle casing 11
Weld support angle steel 13 in opposite two sides;It is spare that 12 mounting holes 4 are bored in support angle steel 13;
4., production pipe collar 14;Pipe collar 14 is formed using 50 × 5mm Flat steel bending;And 12 mounting holes are bored on pipe collar 14
4 is spare;
5., mounting bracket;It is first with M10 bolt that the angle cleat 3 of light-duty 2 bottom end of steel column is fixed at the construction field (site);Again will
One group 11 sets of rectangle casing on light-duty steel column 2, are then again fixed the angle cleat 3 on light-duty 2 top of steel column with M10 bolt;
Light-duty 2 top of steel column is finally fixed on by top floor 7 using M10 expansion bolt, bottom building is fixed in light-duty 2 bottom end of steel column
Plate 8;
6., installation vertical pipe;By 14 clamping of pipe collar of vertical pipe 10, with bolt 5 by pipe collar 14 and support angle steel 13
On mounting hole 4 be fixedly connected;Then with jackscrew 15 that rectangle casing 11 and light-duty steel column 2 is fixed.
When aforementioned 2 height of light-duty steel column is more than 5 meters, fixed bracket, bracket and building steel column are added among light-duty steel column 2
1 is connected and fixed using carbon-dioxide arc welding, to guarantee that steel structure column minor structure performance is unaffected.
Embodiment
This example is as shown in Fig. 1, and the utility model is to be close to shape on building 1 side of steel column using 100 × 60 zinc-plated square steels
At the light-duty steel column 2 of perforation, light-duty 2 upper and lower ends of steel column are equipped with angle cleat 3, and angle cleat 3 is fixed on by expansion bolt 6
Between bottom floor 8 and top floor 7.When light-duty 2 height of steel column is more than 5 meters, then need to increase among light-duty steel column 2 one it is solid
Fixed rack, fixed bracket are welded and fixed with building steel column 1, to reach fixing intensity and reduce the mesh in welding for steel structure operation
, disposably solve the problems, such as that bracket impetus, angle cleat 3 and the pipeline fixing device 9 for fixed vertical pipeline 10 are fixed
On light-duty steel column 2, light-duty steel column 2 and vertical pipe 10 are hidden in pillar back to passageway side, to solve Pipe installing as far as possible
Influence to building overall aesthetic degree.Light-duty 2 both ends of steel column are equipped with angle cleat 3, and angle cleat 3 and light-duty steel column 2 use M12
It is bolted fixation, angle cleat 3 is connected and fixed with floor using M10 expansion bolt.
When it is implemented, constructing according to the following steps:
1, light-duty steel column 2 is made.The column of story height is cut/is welded into using 100 × No. 60 zinc-plated square steels.From beginning to end two
Bore 12 circular holes in end.100 × 50 rectangles are drawn at steel column head and the tail both ends, central point is taken to determine the center of circle of drilling.
2, lifting lug is made.It is cut into 100mm with 50 × 50 × 5 angle steel, it is spare that the central point in each face bores 12 circular holes.
3, it assembles.Angle cleat 3 is fixed on to M10 bolt the head and the tail both ends of light-duty steel column 2 at the construction field (site), is used
Light-duty steel column 2 is fixed on top plate and bottom plate by M10 expansion bolt.
In order to ensure the intensity of light-duty steel column, if height need to increase a fixation more than 5 meters among light-duty steel column 2
Bracket (is not drawn into) in figure, and fixed bracket is welded and fixed with building steel column 1;Welding uses carbon-dioxide arc welding, to guarantee steel
Structural post structural behaviour is unaffected.
The utility model structure is simple, is easy production, solves steel building electromechanics and installs vertical pipeline fixed point not
The problem of being sufficient for code requirement, solve the problems, such as electromechanical pipeline installation need in steel building main body large area welding,
Reduce influence of the electromechanical pipeline installation to steel construction subjectivity property, improves the service life and safety of steel building indirectly
Property.
Claims (4)
1. a kind of mounting bracket for steel building vertical pipe, the light-duty steel column including being located at building steel column (1) side
(2);It is characterized by: light-duty steel column (2) top and bottom end are respectively equipped with angle cleat (3), two planes of angle cleat (3) are set
There are mounting hole (4);One mounting hole (4) connect through bolt (5) with light-duty steel column (2), another mounting hole (4) expanded bolt
(6) it is connect with the top floor (7) of building or bottom floor (8);Light-duty steel column (2) is equipped with one group of pipeline fixing device (9),
Pipeline fixing device (9) is fixedly connected with vertical pipe (10).
2. being used for the mounting bracket of steel building vertical pipe according to claim 1, it is characterised in that: the light section
Column (2) is made of the light-duty square steel of 100 × 60mm;The length of light-duty steel column (2) is equal to top floor (7) bottom surface to bottom building
The distance between plate (8) top surface;It is equipped with and is used at the top and bottom of light-duty steel column (2);It is fixedly connected with the mounting hole of angle steel (3)
(4);Mounting hole (4) aperture is 12mm.
3. being used for the mounting bracket of steel building vertical pipe according to claim 1, it is characterised in that: the joint angle
Steel (3) is made of 50 × 50 × 5mm Zinc-coated angle steel;The center of two planes of angle cleat (3) is equipped with mounting hole (4);Installation
Hole (4) aperture is 12mm.
4. being used for the mounting bracket of steel building vertical pipe according to claim 1, it is characterised in that: the pipeline is solid
Determining device (9) includes support of pipelines;Support of pipelines includes rectangle casing (11), and the rectangular opening of rectangle casing (11) is slightly larger than light-duty
The outer rectangular dimension of steel column (2), rectangle casing (11) are equipped with top wire hole (12);The opposite two sides of rectangle casing (11) are welded with
Support angle steel (13);Support angle steel (13) is equipped with mounting hole (4);Mounting hole (4) is connect through bolt (5) with pipe collar (14).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920140938.1U CN209725486U (en) | 2019-01-25 | 2019-01-25 | A kind of mounting bracket for steel building vertical pipe |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920140938.1U CN209725486U (en) | 2019-01-25 | 2019-01-25 | A kind of mounting bracket for steel building vertical pipe |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209725486U true CN209725486U (en) | 2019-12-03 |
Family
ID=68681458
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920140938.1U Active CN209725486U (en) | 2019-01-25 | 2019-01-25 | A kind of mounting bracket for steel building vertical pipe |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209725486U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109931439A (en) * | 2019-01-25 | 2019-06-25 | 中建四局安装工程有限公司 | Mounting bracket and construction method for steel building vertical pipe |
-
2019
- 2019-01-25 CN CN201920140938.1U patent/CN209725486U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109931439A (en) * | 2019-01-25 | 2019-06-25 | 中建四局安装工程有限公司 | Mounting bracket and construction method for steel building vertical pipe |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209725486U (en) | A kind of mounting bracket for steel building vertical pipe | |
CN209839352U (en) | Horizontal mounting bracket for heavy pipeline of steel structure building | |
CN109931439A (en) | Mounting bracket and construction method for steel building vertical pipe | |
CN104179362A (en) | Building site guardrail fast to mount and demount | |
CN102767644A (en) | Assembly type heavy pipeline hanger | |
CN103104034B (en) | End plate type H profile steel beam and rectangular conduit split bolt connected node | |
CN110469130B (en) | Pipe truss girder and pipe truss column flange plate mounting die and mounting method | |
CN212667017U (en) | Rockery special-shaped steel structure jig frame | |
CN210827837U (en) | Beam column connecting structure | |
CN211849413U (en) | Multifunctional steel pipe pile cap structure | |
CN201221143Y (en) | Metal thin case frame connecting components | |
CN210421443U (en) | Non-welding flat plate fixing embedded part | |
CN102777703A (en) | Assembly type light pipeline hanger | |
CN111434965A (en) | Double-station three-in-one hanging clamp for auxiliary beam air pipe | |
CN109931438A (en) | It is a kind of to be horizontally mounted bracket for steel building heavy type pipeline | |
CN206658039U (en) | A kind of lighting proof strip device being easily installed | |
CN206873970U (en) | A kind of adjustable BIPV project constructions roofing edge protection device | |
CN215469153U (en) | Shear force wall location ladder muscle welding mould | |
CN214884778U (en) | Ceiling modeling installation structure of steel structure truss | |
CN110805189A (en) | Method for mounting steel structure of daylighting roof | |
CN218580831U (en) | Support structure of support frame in bay window | |
CN212837023U (en) | Detachable buckling support mounting and positioning device | |
CN216480615U (en) | Hanging bracket | |
CN217924802U (en) | Can dismantle setpoint fixing device on shaped steel cantilever beam | |
CN113802703B (en) | Outer insulation board connecting piece and mounting method and structure of outer insulation board |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |