CN209723098U - A kind of double water route three-level laminating water supply equipments - Google Patents
A kind of double water route three-level laminating water supply equipments Download PDFInfo
- Publication number
- CN209723098U CN209723098U CN201920150149.6U CN201920150149U CN209723098U CN 209723098 U CN209723098 U CN 209723098U CN 201920150149 U CN201920150149 U CN 201920150149U CN 209723098 U CN209723098 U CN 209723098U
- Authority
- CN
- China
- Prior art keywords
- water
- inlet end
- fixedly connected
- water outlet
- water inlet
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
The utility model discloses a kind of double water route three-level laminating water supply equipments, it is related to supply equipment technical field, double water route three-level laminating water supply equipments, including water tank and equipment chassis, the water outlet of the water tank is fixedly connected by the first control valve with the water inlet end of low area's pressurized equipment, the water outlet of low area's pressurized equipment is fixedly connected by the first communicating pipe with the water inlet end of middle area's pressurized equipment, the water outlet of middle area's pressurized equipment is fixedly connected by the second communicating pipe with the water inlet end of pressurizing for high building equipment, low area's pressurized equipment, middle area's pressurized equipment and pressurizing for high building equipment are separately mounted in respective equipment chassis.The utility model solves the problems, such as to need the larger instantaneous insufficient water in the area Qie Zhonggao of energy consumption of the common consumption of laminating apparatus step by step used in the water supply building of secondary pressurized at present by the way that low area's pressurized equipment, middle area's pressurized equipment, pressurizing for high building equipment, pressure sensor and the first communicating pipe is arranged.
Description
Technical field
The utility model relates to supply equipment technical field, specially a kind of double water route three-level laminating water supply equipments.
Background technique
With the continuous improvement of living standards, resident, also come higher, is also constantly increased to the quality requirement of water with the amount of water
Add, for some skyscrapers, for pressure needed for meeting normal water supply, generally can all be sent to water respectively by secondary pressurized
Layer.
Need at present the water supply of secondary pressurized build used in common laminating apparatus step by step, middle area and high area's water pump
Pressurizeing, lift is larger, therefore corresponding power is larger, and energy consumption is higher, and the user in middle area and high area is with Shui Shizhonggao area's wink
When insufficient water the case where.
Utility model content
(1) the technical issues of solving
In view of the deficiencies of the prior art, the utility model provides a kind of double water route three-level laminating water supply equipments, solves
The larger area Qie Zhonggao of energy consumption of the common consumption of laminating apparatus step by step used in the water supply building of secondary pressurized is needed instantaneously to supply at present
Hydropenic problem.
(2) technical solution
To achieve the above object, the utility model provides the following technical solutions: a kind of double water route three-level laminating water supply equipments,
Including water tank and equipment chassis, the water outlet of the water tank is fixed by the first control valve and the water inlet end of low area's pressurized equipment
Connection, the water outlet of low area's pressurized equipment are fixedly connected by the first communicating pipe with the water inlet end of middle area's pressurized equipment, institute
The water outlet of the area Shu Zhong pressurized equipment is fixedly connected by the second communicating pipe with the water inlet end of pressurizing for high building equipment, and the low area adds
Pressure equipment, middle area's pressurized equipment and pressurizing for high building equipment are separately mounted in respective equipment chassis, low area's pressurized equipment
Water outlet be fixedly connected with the first bend pipe, the water outlet of first bend pipe passes sequentially through the second control valve and the first non-return
Valve is fixedly connected with the water inlet end of quadrature tube, and the water outlet of the quadrature tube is fixedly connected with the water inlet end of middle area's pressurized equipment,
Another water outlet of the quadrature tube passes sequentially through third control valve door and second check-valve and the water inlet end of the second bend pipe is fixed
Connection, the water outlet of second bend pipe are fixedly connected with the water inlet end of pressurizing for high building equipment, low area's pressurized equipment, middle area
Pressurized equipment and pressurizing for high building equipment are respectively arranged with pressure sensor and damper.
Preferably, low area's pressurized equipment includes the first distributor, first pressure pumps and the first concentrator, and described first
The water inlet end of distributor is fixedly connected with the water outlet of the first control valve, and the water outlet of first distributor and first is concentrated
The water inlet end of device is fixedly connected with the water inlet end of first pressure pump and water outlet respectively, the water inlet end and first of first bend pipe
The water outlet of concentrator is fixedly connected, and the water inlet end of first communicating pipe is fixedly connected with the water outlet of the first concentrator, and
Pressure sensor and damper are arranged on the first concentrator.
Preferably, middle area's pressurized equipment includes the first steady-flow tank, the second distributor, second pressure pump and the second concentration
The water outlet of device, first communicating pipe is fixedly connected with the water inlet end of the first steady-flow tank, the water outlet of first steady-flow tank
Be fixedly connected by connecting tube with the water inlet end of the second distributor, the water outlet of second distributor and the second concentrator into
Water end (W.E.) is fixedly connected with the water inlet end of second pressure pump and water outlet respectively, the water outlet of the quadrature tube and the second concentrator
Water inlet end is fixedly connected, and the water inlet end of second communicating pipe is fixedly connected with the water outlet of the second concentrator, and middle area's pressure
Sensor and damper are arranged on the second concentrator.
Preferably, the pressurizing for high building equipment includes that the second steady-flow tank, third distributor, third pressure pump and third are concentrated
The water outlet of device, second communicating pipe is fixedly connected with the water inlet end of the second steady-flow tank, the water outlet of second steady-flow tank
It is fixedly connected by straight tube with the water inlet end of third distributor, the water outlet of the third distributor and the water inlet of third concentrator
End is fixedly connected with the water inlet end of third pressure pump and water outlet respectively, water outlet and the third concentrator of second bend pipe
Water inlet end is fixedly connected, and high area's pressure sensor and damper are arranged on third concentrator.
Preferably, second control valve and first check-valve are disposed adjacent, and the third control valve door and second stops
Valve is returned to be disposed adjacent.
(3) beneficial effect
The utility model provides a kind of double water route three-level laminating water supply equipments, have it is following the utility model has the advantages that
The utility model by be arranged low area's pressurized equipment, middle area's pressurized equipment, pressurizing for high building equipment, pressure sensor and
First communicating pipe, water tank water outlet are divided into three tunnels after the pressurization of low area's pressurized equipment, manage all the way towards the user of low area's pressurized equipment
Net leads to the first steady-flow tank of middle area's pressurized equipment all the way, during another way is led to through the second control valve and first check-valve
Second concentrator of area's pressurized equipment is also classified into three tunnels after the water inlet pressurization of middle area's pressurized equipment, leads to the pressurization of middle area all the way and sets
Standby user's pipe network, leads to the second steady-flow tank of pressurizing for high building equipment all the way, and another way is stopped through third control valve door and second
The third concentrator that valve leads to pressurizing for high building equipment is returned, so that realize three-level laminates water supply step by step, three-level laminates water supply step by step
Along with unidirectional moisturizing is led directly to, so that Zhong Qu and the pressurization lift in high area reduce and water supply is sufficient, so the flow of water pump
Lift and power reduce, and energy consumption reduces by 15% or more than common laminating apparatus step by step, have achieved the effect that reduce energy consumption, solve
Need the energy consumption larger area Qie Zhonggao of the common consumption of laminating apparatus step by step used in the water supply building of secondary pressurized instantaneous at present
The problem of insufficient water.
Detailed description of the invention
Fig. 1 is the utility model overall structure diagram.
In figure: 1, water tank;2, equipment chassis;3, the first control valve;4, low area's pressurized equipment;401, the first distributor;
402, first pressure pumps;403, the first concentrator;5, the first communicating pipe;6, middle area's pressurized equipment;601, the first steady-flow tank;602,
Second distributor;603, second pressure pumps;604, the second concentrator;7, the second communicating pipe;8, pressurizing for high building equipment;801, second
Steady-flow tank;802, third distributor;803, third pressure pump;804, third concentrator;9, the first bend pipe;10, the second control valve
Door;11, first check-valve;12, quadrature tube;13, third control valve door;14, second check-valve;15, the second bend pipe;16, pressure
Sensor;17, damper.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
As shown in Figure 1, the utility model provides a kind of technical solution: a kind of double water route three-level laminating water supply equipments, including
Water tank 1 and equipment chassis 2, water tank 1 mainly storage water, can be pond, equipment chassis 2 be used to install low area's pressurized equipment 4, in
Area's pressurized equipment 6 and pressurizing for high building equipment 8, the water outlet of water tank 1 by the first control valve 3 and low area's pressurized equipment 4 into
Water end (W.E.) is fixedly connected, and the water outlet of low area's pressurized equipment 4 is fixed by the first communicating pipe 5 and the water inlet end of middle area's pressurized equipment 6
Connection, the water outlet of middle area's pressurized equipment 6 are fixedly connected by the second communicating pipe 7 with the water inlet end of pressurizing for high building equipment 8, low area
Pressurized equipment 4, middle area's pressurized equipment 6 and pressurizing for high building equipment 8 are separately mounted in respective equipment chassis 2, and low area's pressurization is set
Standby 4 water outlet is fixedly connected with the first bend pipe 9, and the water outlet of the first bend pipe 9 passes sequentially through the second control valve 10 and first
Check-valves 11 is fixedly connected with the water inlet end of quadrature tube 12, and the water inlet end of the water outlet of quadrature tube 12 and middle area's pressurized equipment 6 is solid
Fixed connection, another water outlet of quadrature tube 12 pass sequentially through third control valve door 13 and second check-valve 14 and the second bend pipe 15
Water inlet end is fixedly connected, and the water outlet of the second bend pipe 15 is fixedly connected with the water inlet end of pressurizing for high building equipment 8, low area's pressurized equipment
4, middle area's pressurized equipment 6 and pressurizing for high building equipment 8 are respectively arranged with pressure sensor 16 and damper 17, can detecte the first collection
The pressure of 804 internal water of middle device 403, the second concentrator 604 and third concentrator.
As a kind of technical optimization scheme of the utility model, low area's pressurized equipment 4 includes the first distributor 401, first
The water outlet of pressure pump 402 and the first concentrator 403, the water inlet end of the first distributor 401 and the first control valve 3 is fixed to be connected
Connect, the water inlet end of the water outlet of the first distributor 401 and the first concentrator 403 respectively with first pressure pump 402 water inlet end and
Water outlet is fixedly connected, and first pressure pump 402 can be one or more, the water inlet end and the first concentrator of the first bend pipe 9
403 water outlet is fixedly connected, and the water inlet end of the first communicating pipe 5 is fixedly connected with the water outlet of the first concentrator 403, and pressure
Sensor 16 and damper 17 are arranged on the first concentrator 403.
As a kind of technical optimization scheme of the utility model, middle area's pressurized equipment 6 includes the first steady-flow tank 601, second
Distributor 602, second pressure pump 603 and the second concentrator 604, second pressure pump 603 can be one or more, and first connects
The water outlet of siphunculus 5 is fixedly connected with the water inlet end of the first steady-flow tank 601, the first steady-flow tank 601 can for it is horizontal be also it is vertical,
It is mainly used to stablize the pressure of water, the water outlet of the first steady-flow tank 601 is solid by the water inlet end of connecting tube and the second distributor 602
The water inlet with second pressure pump 603 respectively of the water inlet end of fixed connection, the water outlet of the second distributor 602 and the second concentrator 604
End is fixedly connected with water outlet, and the water outlet of quadrature tube 12 is fixedly connected with the water inlet end of the second concentrator 604, the second communicating pipe
7 water inlet end is fixedly connected with the water outlet of the second concentrator 604, and middle area's pressure sensor 16 and the setting of damper 17 are the
On two concentrators 604.
As a kind of technical optimization scheme of the utility model, pressurizing for high building equipment 8 includes the second steady-flow tank 801, third
Distributor 802, third pressure pump 803 and third concentrator 804, third pressure pump 803 can be one or more, and second connects
The water outlet of siphunculus 7 is fixedly connected with the water inlet end of the second steady-flow tank 801, the second steady-flow tank 801 can for it is horizontal be also it is vertical,
It is mainly used to stablize the pressure of water, the water outlet of the second steady-flow tank 801 is fixed by the water inlet end of straight tube and third distributor 802
The water inlet end of connection, the water outlet of third distributor 802 and third concentrator 804 water inlet end with third pressure pump 803 respectively
It is fixedly connected with water outlet, the water outlet of the second bend pipe 15 is fixedly connected with the water inlet end of third concentrator 804, and high area's pressure
Sensor 16 and damper 17 are arranged on third concentrator 804.
As a kind of technical optimization scheme of the utility model, the second control valve 10 and first check-valve 11 is adjacent sets
It sets, third control valve door 13 and second check-valve 14 are disposed adjacent.
When in use, water tank 1 is discharged the first distributor 401 through low area's pressurized equipment 4, by 402 pressurization of first pressure pump
After be divided into three tunnels, all the way lead to low area's pressurized equipment 4 user's pipe network, all the way through the first communicating pipe 5 and lead to middle area pressurization set
Standby 6 the first steady-flow tank 601, another way lead to middle area's pressurized equipment 6 through the second control valve 10 and first check-valve 11
Second concentrator 604, the water that middle area's pressurized equipment 6 pressurizeed is by being also classified into three tunnels after 603 pressurization of second pressure pump, all the way
Towards user's pipe network of middle area's pressurized equipment 6, all the way through the second communicating pipe 7 and lead to pressurizing for high building equipment 8 the second steady-flow tank
801, another way leads to the third concentrator 804 of pressurizing for high building equipment 8 through third control valve door 13 and second check-valve 14, and
Towards user's pipe network of pressurizing for high building equipment 8, so that realize three-level laminates water supply step by step, three-level laminates water supply step by step and adds
First concentrator 403, the second concentrator 604 and third concentrator 804 are passed directly into the unidirectional moisturizing of user's pipe network, so that in
The pressurization lift in the area He Gao, area reduces and water supply is sufficient, therefore the flow lift of water pump and power reduce, and energy consumption is than general
Logical laminating apparatus step by step reduces by 15% or more, has achieved the effect that reduce energy consumption, low area's pressurized equipment 4, middle area's pressurized equipment 6 with
And pressurizing for high building equipment 8 works independently and realizes constant pressure water-supply, first pressure pump 402, second pressure pump 603 and third pressure pump
803 are made of units such as main pump, auxiliary pump, valve and check-valves, and mutual backup does not influence whole even if somewhere goes wrong
Body supplies water;Because there is straight-through other water route moisturizing with pressure, even if the entire control system of middle area or high area's equipment goes wrong,
The also useful water supply of middle area and high area, not will cause and cuts off the water supply completely, in the first concentrator 403, the second concentrator 604 and the
Be respectively arranged with pressure sensor 16 on three concentrators 804, and cooperate damper 17 carry out using.
Can to sum up obtain, the utility model by be arranged low area's pressurized equipment 4, middle area's pressurized equipment 6, pressurizing for high building equipment 8,
Pressure sensor 16 and the first communicating pipe 5, solving needs commonly to laminate step by step used in the water supply building of secondary pressurized at present
The problem of instantaneous insufficient water in the larger area Qie Zhonggao of energy consumption of equipment consumption.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality
Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation
In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to
Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those
Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment
Intrinsic element.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired
Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.
Claims (5)
1. a kind of double water route three-level laminating water supply equipments, including water tank (1) and equipment chassis (2), it is characterised in that: the water tank
(1) water outlet is fixedly connected by the first control valve (3) with the water inlet end of low area's pressurized equipment (4), low area's pressurization
The water outlet of equipment (4) is fixedly connected by the first communicating pipe (5) with the water inlet end of middle area's pressurized equipment (6), and the middle area adds
The water outlet of pressure equipment (6) is fixedly connected by the second communicating pipe (7) with the water inlet end of pressurizing for high building equipment (8), the low area
Pressurized equipment (4), middle area's pressurized equipment (6) and pressurizing for high building equipment (8) are separately mounted on respective equipment chassis (2), institute
The water outlet of the area Shu Di pressurized equipment (4) is fixedly connected with the first bend pipe (9), and the water outlet of first bend pipe (9) successively leads to
It crosses the second control valve (10) and first check-valve (11) is fixedly connected with the water inlet end of quadrature tube (12), the quadrature tube (12)
Water outlet be fixedly connected with the water inlet end of middle area's pressurized equipment (6), another water outlet of the quadrature tube (12) passes sequentially through
Third control valve door (13) and second check-valve (14) are fixedly connected with the water inlet end of the second bend pipe (15), second bend pipe
(15) water outlet is fixedly connected with the water inlet end of pressurizing for high building equipment (8), and low area's pressurized equipment (4), the pressurization of middle area are set
Standby (6) and pressurizing for high building equipment (8) are respectively arranged with pressure sensor (16) and damper (17).
2. a kind of double water route three-level laminating water supply equipments according to claim 1, it is characterised in that: low area's pressurization is set
Standby (4) include the first distributor (401), first pressure pump (402) and the first concentrator (403), first distributor (401)
Water inlet end be fixedly connected with the water outlet of the first control valve (3), the water outlet of first distributor (401) and first collection
The water inlet end of middle device (403) is fixedly connected with the water inlet end of first pressure pump (402) and water outlet respectively, first bend pipe
(9) water inlet end is fixedly connected with the water outlet of the first concentrator (403), the water inlet end and first of first communicating pipe (5)
The water outlet of concentrator (403) is fixedly connected, and pressure sensor (16) and damper (17) are arranged in the first concentrator (403)
On.
3. a kind of double water route three-level laminating water supply equipments according to claim 1, it is characterised in that: middle area's pressurization is set
Standby (6) include the first steady-flow tank (601), the second distributor (602), second pressure pump (603) and the second concentrator (604), institute
The water outlet for stating the first communicating pipe (5) is fixedly connected with the water inlet end of the first steady-flow tank (601), first steady-flow tank (601)
Water outlet be fixedly connected by connecting tube with the water inlet end of the second distributor (602), the water outlet of second distributor (602)
The water inlet end of end and the second concentrator (604) is fixedly connected with the water inlet end of second pressure pump (603) and water outlet respectively, described
The water outlet of quadrature tube (12) is fixedly connected with the water inlet end of the second concentrator (604), the water inlet end of second communicating pipe (7)
It is fixedly connected with the water outlet of the second concentrator (604), and middle area's pressure sensor (16) and damper (17) are arranged second
On concentrator (604).
4. a kind of double water route three-level laminating water supply equipments according to claim 1, it is characterised in that: the pressurizing for high building is set
Standby (8) include the second steady-flow tank (801), third distributor (802), third pressure pump (803) and third concentrator (804), institute
The water outlet for stating the second communicating pipe (7) is fixedly connected with the water inlet end of the second steady-flow tank (801), second steady-flow tank (801)
Water outlet be fixedly connected by straight tube with the water inlet end of third distributor (802), the water outlet of the third distributor (802)
It is fixedly connected respectively with the water inlet end of third pressure pump (803) and water outlet with the water inlet end of third concentrator (804), described
The water outlet of two bend pipes (15) is fixedly connected with the water inlet end of third concentrator (804), and high area's pressure sensor (16) and is subtracted
Device (17) are shaken to be arranged on third concentrator (804).
5. a kind of double water route three-level laminating water supply equipments according to claim 1, it is characterised in that: second control valve
Door (10) and first check-valve (11) are disposed adjacent, and the third control valve door (13) and second check-valve (14) are disposed adjacent.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920150149.6U CN209723098U (en) | 2019-01-29 | 2019-01-29 | A kind of double water route three-level laminating water supply equipments |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920150149.6U CN209723098U (en) | 2019-01-29 | 2019-01-29 | A kind of double water route three-level laminating water supply equipments |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209723098U true CN209723098U (en) | 2019-12-03 |
Family
ID=68681702
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920150149.6U Active CN209723098U (en) | 2019-01-29 | 2019-01-29 | A kind of double water route three-level laminating water supply equipments |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209723098U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113529848A (en) * | 2021-08-25 | 2021-10-22 | 上海伺水科技有限公司 | Numerical control pressure-superposed compensation type integrated non-negative pressure water supply equipment |
CN114892763A (en) * | 2022-05-09 | 2022-08-12 | 天津中怡建筑规划设计有限公司 | Water supply equipment concentrates super high-rise building high pressure water supply system who locates low-order pump house |
-
2019
- 2019-01-29 CN CN201920150149.6U patent/CN209723098U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113529848A (en) * | 2021-08-25 | 2021-10-22 | 上海伺水科技有限公司 | Numerical control pressure-superposed compensation type integrated non-negative pressure water supply equipment |
CN114892763A (en) * | 2022-05-09 | 2022-08-12 | 天津中怡建筑规划设计有限公司 | Water supply equipment concentrates super high-rise building high pressure water supply system who locates low-order pump house |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209723098U (en) | A kind of double water route three-level laminating water supply equipments | |
CN206902825U (en) | A kind of pipe network laminated press frequency conversion water system | |
CN102979138A (en) | Intelligent water supply equipment | |
CN201326194Y (en) | Non-negative-pressure pipe direct drinking water supply system | |
CN201198580Y (en) | Multiple-zone series frequency conversion water supply energy-saving system | |
CN107100225A (en) | A kind of municipal tap water is without negative pressure pipe network pressurized watering device | |
CN207392309U (en) | Water pump series-parallel connection combines multi-region water supply installation | |
CN206956854U (en) | A kind of totally-enclosed variable frequency non-negative pressure water | |
CN205725651U (en) | A kind of cooling system of photovoltaic electrification component | |
CN206752576U (en) | A kind of plural serial stage tandem type laminating water supply equipment step by step | |
CN202745115U (en) | Water-taking head system of surface water source heat pump | |
CN210288549U (en) | Integrated pump room water supply device | |
CN200971524Y (en) | Two-way water inlet no-negative water supply device | |
CN206902827U (en) | A kind of energy-saving laminating water supply equipments step by step of three-level KYC | |
CN201010927Y (en) | Totally-enclosed energy-saving pump station | |
CN208280225U (en) | A kind of vector converter pipe network pressurizing water work | |
CN207749576U (en) | Without negative pressure water hammer-resistant supply equipment | |
CN106149797A (en) | A kind of high building superposition pressure current stabilization water supply installation | |
CN206635856U (en) | A kind of tap water water treatment facilities | |
CN202430774U (en) | Full-automatic pressure-compensating zone pressure-superposed water supply equipment | |
CN207129990U (en) | Nanofiltration membrane device is used in a kind of industrial strong brine processing | |
CN201334374Y (en) | Constant pressure water replenishing degassing machine unit | |
CN203798244U (en) | Modular integrated unit | |
CN201071521Y (en) | Non-negative pressure water supply equipment for standby waterhead of self-drilled well | |
CN209538282U (en) | A kind of energy-saving water supply system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |