CN209717131U - Auxiliary mould is used in a kind of production of students' dormitory bedstead - Google Patents

Auxiliary mould is used in a kind of production of students' dormitory bedstead Download PDF

Info

Publication number
CN209717131U
CN209717131U CN201920312324.7U CN201920312324U CN209717131U CN 209717131 U CN209717131 U CN 209717131U CN 201920312324 U CN201920312324 U CN 201920312324U CN 209717131 U CN209717131 U CN 209717131U
Authority
CN
China
Prior art keywords
baffle
fixedly installed
several
mounting base
drilling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920312324.7U
Other languages
Chinese (zh)
Inventor
虞国强
韩世河
马海洋
张增渠
李海庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Weifang Vocational College
Original Assignee
Weifang Vocational College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Weifang Vocational College filed Critical Weifang Vocational College
Priority to CN201920312324.7U priority Critical patent/CN209717131U/en
Application granted granted Critical
Publication of CN209717131U publication Critical patent/CN209717131U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

The utility model belongs to machining equipment technical field, provides a kind of students' dormitory bedstead production auxiliary mould, including cutting stock tooling and incising pipes support frame;Cutting stock tooling includes installation chassis and postive stop baffle, one end of installation chassis offers the first mounting hole, several limited blocks are fixedly installed on installation chassis, several limited blocks are correspondingly arranged respectively at two upper sides of installation chassis, and have spacing compatible with positioning baffle thickness between ipsilateral adjacent two limited block;Incising pipes support frame includes support underframe, one end of support underframe offers the second mounting hole, and the other end offers third mounting hole, several mounting plates are fixedly installed on support underframe, several mounting plates are correspondingly arranged, and are rotatably equipped with roller bearing between corresponding two mounting plate.The utility model improves the machining accuracy of cutting stock and drilling, it is ensured that welding quality, while substantially increasing the processing efficiency of tubing cutting, drilling and pipe fitting welding.

Description

Auxiliary mould is used in a kind of production of students' dormitory bedstead
Technical field
The utility model relates to machining equipment technical field more particularly to a kind of students' dormitory bedstead production auxiliary Tooling.
Background technique
Student's bed is the general name of the bed used in school dormitory, is generally divided into two kinds according to pattern, and one is common upper Under make the bed, another kind be with function combination student dormitory bed;Wherein, bunk bed is commonplace, by iron bedstead and wooden Bed board composition, wherein iron bedstead is as shown in Fig. 1, mainly by upper berth 1, lower berth 2 and be located at both ends bed head frame 3 four it is big Part be composed, be above covered with guardrail, there is ladder in side front, and stull angle bar is arranged at bed head frame bottom, have save space, buying at This low advantage, usually to realize upper berth 1, lower berth 2 and bed respectively first with pipe fitting convenient for production and in installing in school dormitory This four most welding of head frame 3 after then each section being welded is transported in school dormitory, carries out each portion using bolt That divides is connected and fixed, to realize the assembling of whole bedstead.
Currently, the production of two-berth bedstead still cannot achieve automated production, rely primarily on and be accomplished manually, one common Two-berth bedstead need to be by kinds of processes programs such as tubing cutting, drilling, opening, welding, assemblings, need to be different by size Steel-pipe welding assemble, hand-made, not only production efficiency is low, at high cost, and cuts and the mismachining tolerance of drilling is big, difficult To guarantee that the precision of tubing Cutting Length and bore position, the precision of cutting stock do not reach requirement, then the welding of lower step can be given Process brings difficulty, and borehole accuracy does not reach requirement, then can bring difficulty to subsequent assembling procedure, cause each section that can not match It is combined dress, in addition, need to ensure that each materials in the tube placement position is straight when welding, just can ensure that the assembly quality of welding is met the requirements, and Tube wall thickness used in bedstead is relatively thin, if put when tubing cutting accuracy is not high and the welding of each materials in the tube it is not straight due to cause A possibility that weld interval gap is excessive, then can greatly increase burn-through not only influences welding quality, and influences the work effect of welding Rate.
Therefore, a kind of students' dormitory bedstead production auxiliary mould is developed, not only there is urgent researching value, it may have Good economic benefit and commercial application potentiality, this is exactly where the power that the utility model is accomplished and basis.
Utility model content
In order to overcome the defect of the prior art as indicated above, the present inventor has made intensive studies this, is paying After a large amount of creative works, so as to complete the utility model.
Specifically, the technical problem to be solved by the utility model is to provide a kind of students' dormitory bedsteads to make of auxiliary Assistant engineer's dress, to improve the machining accuracy of cutting stock and drilling, it is ensured that welding quality, while greatly improving tubing cutting, drilling And the processing efficiency of pipe fitting welding, and then realize the high quality of bedstead, high efficiency production.
In order to solve the above technical problems, the technical solution of the utility model is:
A kind of production of students' dormitory bedstead auxiliary mould, including cutting stock tooling and incising pipes support frame;
The cutting stock tooling includes installation chassis and postive stop baffle, and one end of the installation chassis is offered to reality Show its first mounting hole connecting with cutting machine, is fixedly installed with several limited blocks, several limits on the installation chassis Block is correspondingly arranged respectively at two upper sides of the installation chassis, and is had and the positioning between ipsilateral adjacent two limited block The compatible spacing of Weir Plate Thickness;
The incising pipes support frame includes support underframe, and one end of the support underframe is offered to realize it and cut Second mounting hole of cutting mill connection, the other end of the support underframe are offered to realize the fixed third installation of its installation Hole is fixedly installed with several mounting plates on the support underframe, and several mounting plates are respectively at the two sides of the support underframe Top is correspondingly arranged, and roller bearing is rotatably equipped between corresponding two mounting plate, and several roller bearings are arranged with height.
As an improvement technical solution, which further includes auxiliary bore hole work Dress, the auxiliary bore hole tooling include drilling chassis, are offered on the drilling chassis to realize that it is solid in installing on drilling machine The 4th fixed mounting hole is also provided on the drilling chassis and accommodates the jack that wears of drilling machine drill, and the one of the drilling chassis End is fixedly installed with first end first speed plate, and the side of the drilling chassis is fixedly installed with the first side baffle.
As an improvement technical solution, it is described drilling chassis the other end be also fixedly installed with the first nut, it is described First nut thread is equipped with locking screw, and the locking screw is correspondingly arranged with the first end first speed plate, and the locking Screw rod is fixedly installed with grip block close to one end of the first end first speed plate, has between the grip block and the drilling chassis For the gap of grip block rotation.
As a kind of further improved technical solution, the grip block is circular slab, and the grip block is coaxially fixed It is installed in the locking screw.
As an improvement technical solution, which further includes two-berth Welder Dress, the two-berth welding tooling include the first mounting base, and the side of first mounting base is fixedly installed with second side Baffle, the other side of first mounting base are fixedly installed with the second nut, and second nut thread is equipped with the first lock Tight bolt, the both ends of first mounting base are fixedly installed with the second end first speed plate being correspondingly arranged, the second end respectively First speed plate is between second side baffle and second nut, and respectively close to second side baffle and described second Nut is arranged, and is fixedly installed with several support rod baffles, several support pole spacings on the one side of first mounting base Plate is in pairs along the evenly distributed setting of length direction of first mounting base.
As an improvement technical solution, which further includes bed head frame Welder Dress, the bed head frame welding tooling include the second mounting base, and the side of second mounting base is fixedly installed with third side Baffle, the other side of second mounting base are fixedly installed with third nut, and the third nut thread is equipped with the second lock Tight bolt, the both ends of second mounting base are fixedly installed with the third end baffle being correspondingly arranged, the third end respectively First speed plate is between the third side baffle and the third nut, and respectively close to the third side baffle and the third Nut setting, the one side of second mounting base are equipped with two groups of limits to realize bed head frame stull and short tube limit Baffle group, and two groups of postive stop baffle groups are arranged respectively close to the both ends of second mounting base, every group of limiting block board group includes Several stull baffles and several short tube baffles being fixedly installed on second mounting base, several stull baffles are opposite Setting, and there are spacing compatible with stub length, several short tube baffle positions between the stull baffle being oppositely arranged Between the stull baffle being oppositely arranged, and along the evenly distributed setting of width direction of the second installation baffle.
After above-mentioned technical proposal, the beneficial effects of the utility model are:
(1) the cutting stock tooling and incising pipes support frame being equipped with, are installed on cutting machine in use, respectively corresponding Two sides, between needing the length of incising pipes that postive stop baffle is placed in the locating slot that adjacent two limited block is formed, to make The spacing obtained between postive stop baffle and the cutter of cutting machine is identical as pipe length to be cut, when cutting to tubing, by tubing It is placed on the roller bearing of incising pipes support frame, one end can carry out the cutting of tubing, can effectively ensure against postive stop baffle The length of incising pipes is consistent, fully meets the required precision of cutting stock, greatly reduces cutting error, between subsequent pipe fitting Welding provide reliable guarantee, and due to the measurement work without carrying out tubing, so that the cutting processing efficiency of tubing The incising pipes support frame for greatly improving, and being equipped with is while realizing tubing supporting role, convenient for realizing that tubing is long when cutting The charging spent on direction is mobile, and a people can operate completion, convenient and strength-saving.
(2) auxiliary bore hole tooling being equipped with, in use, the pipe fitting for needing to drill after cutting is placed into drilling chassis On, it is ensured that one end is against first end first speed plate, and side is after the first side baffle, rotation lock screw rod, so that grip block supports After the other end of pipe fitting hole to be drilled, the drilling processing of pipe fitting can be carried out, it is easy to use, pass through the auxiliary bore hole tooling The drilling processing for carrying out tubing just realizes the effective position of bore position while realizing that tubing self poisoning is placed, because This substantially increases drilling accuracy and drilling efficiency to tubing, provides reliable guarantee for the assembling of subsequent bedstead.
(3) the two-berth welding tooling and bed head frame welding tooling being equipped with realize pipe fitting in installation bottom by each baffle Limit on plate is placed, and is carried out whole limit by clamping screw and fastened, and can effectively ensure each pipe fitting placement position week Just, and pipe fitting appearance position in welding is prevented to deviate, provided convenience for the welding of pipe fitting so that welding quality with Welding efficiency greatly improves.
In conclusion realizing the secondary process of different processes in bedstead manufacturing process by each tooling, improve under cutting Material and the machining accuracy of drilling, it is ensured that welding quality, while substantially increasing tubing cutting, drilling and the processing of pipe fitting welding Efficiency compares traditional hand-made mode, by the students' dormitory bedstead production auxiliary mould, realizes the high-quality of bedstead Amount, high efficiency production, and the labor intensity of worker is reduced to a certain extent, it is convenient and practical.
Detailed description of the invention
It, below will be right in order to illustrate more clearly of specific embodiment of the present invention or technical solution in the prior art Specific embodiment or attached drawing needed to be used in the description of the prior art are briefly described.In all the appended drawings, similar Element or part are generally identified by similar appended drawing reference.In attached drawing, each element or part might not be according to actual ratios It draws.
Fig. 1 is the structural schematic diagram of students' dormitory bedstead;
Fig. 2 is the structural schematic diagram of the utility model cutting stock tooling;
Fig. 3 is the structural schematic diagram of the utility model incising pipes support frame;
Fig. 4 is that the utility model cutting stock tooling, incising pipes support frame and cutting machine are coupled structural representation Figure;
Fig. 5 is the vertical view knot of the utility model cutting stock tooling, incising pipes support frame and cutting machine being coupled Structure schematic diagram;
Fig. 6 is the structural schematic diagram of the utility model auxiliary bore hole tooling;
Fig. 7 is the structural schematic diagram of the utility model two-berth welding tooling;
Fig. 8 be the utility model upper berth, under be laid on welded condition structural schematic diagram on the welding tooling of two-berth;
Fig. 9 is the structural schematic diagram of the utility model bed head frame welding tooling;
Figure 10 is the utility model bed head frame in the welded condition structural schematic diagram on bed head frame welding tooling;
Appended drawing reference: the upper berth 1-;The lower berth 2-;3- bed head frame;4- installs chassis;The first mounting hole of 401-;5- postive stop baffle; 6- limited block;7- support underframe;The second mounting hole of 701-;702- third mounting hole;8- mounting plate;9- roller bearing;10- cutting machine; 11- drilling chassis;The 4th mounting hole of 1101-;1102- jack;12- first end first speed plate;The first side baffle of 13-;The first spiral shell of 14- It is female;15- locking screw;16- grip block;The first mounting base of 17-;The second side baffle of 18-;The second nut of 19-;20- first locks Tight bolt;21- second end first speed plate;22- support rod baffle;The second mounting base of 23-;24- third side baffle;25- third spiral shell It is female;The second clamping screw of 26-;27- third end baffle;28- stull baffle;29- short tube baffle.
Specific embodiment
Below with reference to specific embodiment, the present invention will be further described.But the purposes of these exemplary embodiments Only it is used to enumerate the utility model with purpose, any type of any limit not is constituted to the real protection scope of the utility model It is fixed, it is more non-that the protection scope of the utility model is confined to this.
Present embodiments provide a kind of students' dormitory bedstead production auxiliary mould, including cutting stock tooling and cutting pipe Material support frame, in use, respectively corresponding the two sides for being installed on cutting machine 10.
As shown in Fig. 2, cutting stock tooling includes installation chassis 4 and postive stop baffle 5, one end of installation chassis 4 is offered Realizing its first mounting hole 401 connecting with cutting machine 10, installs and be fixedly installed with several limited blocks 6 on chassis 4, it is several Limited block 6 is correspondingly arranged respectively at two upper sides of installation chassis 4, and is had between ipsilateral adjacent two limited block 6 and positioning baffle The compatible spacing of thickness, postive stop baffle 5 can be placed between two adjacent limited blocks 6 of different location according to use demand, thus It is adjusted at a distance from realizing postive stop baffle 5 between cutting machine 10.
In the present embodiment, installation chassis 4 is the frame structure made of pipe fitting welding, and intensity is big and light weight, limit Block 6 using welding manner be fixedly installed in installation chassis 4 on, installation 4 one end of chassis the first mounting hole 401 open up there are two, And it is arranged respectively at the two sides of installation chassis 4, the spacing of two the first mounting holes 401 and the connection pitch of holes phase on cutting machine 10 Unanimously, the secured connection of installation chassis 4 and cutting machine 10 can be realized by the first mounting hole 401 for offering and using bolt, The cutting stock tooling is connected to the side of cutting machine 10 so that the cutting stock tooling and cutting machine 10 be connected as one it is whole Body.
As shown in figure 3, incising pipes support frame includes support underframe 7, one end of support underframe 7 is offered to realize it The second mounting hole 701 connecting with cutting machine 10, the other end of support underframe 7 are offered to realize the fixed third of its installation Mounting hole 702 is fixedly installed with several mounting plates 8 on support underframe 7, and several mounting plates 8 are respectively on the two sides of support underframe 7 Side is correspondingly arranged, and roller bearing 9 is rotatably equipped between corresponding two mounting plate 8, and several roller bearings 9 are arranged with height.
In the present embodiment, the second mounting hole 701 offered on support underframe 7 can be used to realize the connection with cutting machine 10 The incising pipes support frame, is connected to the other side of cutting machine 10 by installation, is connected as an entirety with cutting machine 10, is supported bottom The third mounting hole 702 offered on frame 7 can utilize expansion bolt after the incising pipes support frame is connect with cutting machine 10 It is fixed on the ground, to realize the firm installation of the incising pipes support frame.
The cutting stock tooling and incising pipes support frame being equipped with, in use, as Fig. 4 and Fig. 5 is jointly shown, it is right respectively The two sides of cutting machine 10 should be installed on, foundation needs the length of incising pipes that postive stop baffle 5 is placed in adjacent two limited blocks, 6 shape At locating slot between so that spacing between postive stop baffle 5 and the cutter of cutting machine 10 and pipe length phase to be cut Together, when being cut to tubing, tubing is placed on the roller bearing 9 of incising pipes support frame, one end is against postive stop baffle 5, Bian Kejin The cutting of row tubing can effectively ensure that the length of incising pipes is consistent, fully meets the required precision of cutting stock, drops significantly Low cutting error, the welding between subsequent pipe fitting provide reliable guarantee, and due to the measurement work without carrying out tubing Make, so that the incising pipes support frame that the cutting processing efficiency of tubing is greatly improved, and is equipped with is realizing tubing supporting role Meanwhile convenient for realizing that the charging on pipe length direction is mobile when cutting, a people can operate completion, convenient and strength-saving, work as needs When cutting the tubing of different length, the placement location of postive stop baffle 5 is only moved.
As shown in fig. 6, the students' dormitory bedstead production auxiliary mould further includes auxiliary bore hole tooling, auxiliary bore hole tooling Including the chassis 11 that drills, offered on the chassis 11 that drills to realize its in installing the 4th fixed mounting hole 1101 on drilling machine, It is also provided on drilling chassis 11 and accommodates the jack 1102 that drilling machine drill is worn, one end of drilling chassis 11 is fixedly installed with first The side of end baffle 12, drilling chassis 11 is fixedly installed with the first side baffle 13.
In the present embodiment, drilling chassis 11 is that square tube and positioning iron plate are welded, and positioning iron plate is fixedly welded on square tube Bottom, and be located at square tube middle position, the 4th mounting hole 1101 in positioning iron plate on open up, in the workbench of drilling machine Upper location and installation, end baffle are fixedly installed in one end of square tube, and the first side baffle 13 is fixedly installed in the side of square tube, jack 1102 open up according to the bore position of pipe fitting hole to be drilled and its spacing between the baffle of end in the upper surface of square tube.
The other end of drilling chassis 11 is also fixedly installed with the first nut 14, and 14 screw thread of the first nut is equipped with locking screw 15, locking screw 15 is correspondingly arranged with first end first speed plate 12, and locking screw 15 is solid close to one end of first end first speed plate 12 Dingan County is equipped with grip block 16, has the gap rotated for grip block 16 between grip block 16 and drilling chassis 11.
In the present embodiment, grip block 16 is circular slab, and grip block 16 is coaxially fixedly installed in locking screw 15.
The auxiliary bore hole tooling being equipped with, in use, the pipe fitting for needing to drill after cutting is placed on drilling chassis 11, Ensure one end against first end first speed plate 12, side is after the first side baffle 13, rotation lock screw rod 15, so that grip block 16 after the other end of pipe fitting hole to be drilled, can carry out the drilling processing of pipe fitting, easy to use, passes through the auxiliary bore hole Tooling carries out the drilling processing of tubing, while realizing that tubing self poisoning is placed, just realizes the effective fixed of bore position Position, therefore drilling accuracy and the drilling efficiency to tubing are substantially increased, reliable guarantee is provided for the assembling of subsequent bedstead.
As shown in fig. 7, the students' dormitory bedstead production auxiliary mould further includes two-berth welding tooling, two-berth welding Tooling includes the first mounting base 17, and the side of the first mounting base 17 is fixedly installed with the second side baffle 18, the first installation bottom The other side of plate 17 is fixedly installed with the second nut 19, and 19 screw thread of the second nut is equipped with the first clamping screw 20, the first installation The both ends of bottom plate 17 are fixedly installed with the second end first speed plate 21 being correspondingly arranged respectively, and second end first speed plate 21 is located at the second side block Between plate 18 and the second nut 19, and it is arranged respectively close to the second side baffle 18 and the second nut 19, the first mounting base 17 Several support rod baffles 22 are fixedly installed on one side, several support rod baffles 22 are in pairs along the first mounting base 17 The evenly distributed setting of length direction.
Using the two-berth welding tooling realize upper berth 1,2 assembly welding of lower berth when, will wherein a long tube be placed in it is corresponding Two second end first speed plates 21 between, then will be to realize the support rod point of bed board support and against the second side baffle 18 Not against support rod baffle 22 place, then by another root long pipe be placed in the corresponding two second end first speeds plate 21 of another set it Between, finally rotate the first clamping screw 20, other root long tube top is tight, can realize upper berth 1 or each weld-end fittings in lower berth 2 in Firm placement on the two-berth welding tooling, as shown in figure 8, the welding of each component coupling end is then carried out, operation letter Folk prescription just, provide convenience by the two-berth welding for high efficiency, high quality, after the completion of welding, unclamps the first clamping screw 20, just The two-berth being welded can be removed.
As shown in figure 9, the students' dormitory bedstead production auxiliary mould further includes bed head frame welding tooling, bed head frame welding Tooling includes the second mounting base 23, and the side of the second mounting base 23 is fixedly installed with third side baffle 24, the second installation bottom The other side of plate 23 is fixedly installed with third nut 25, and 25 screw thread of third nut is equipped with the second clamping screw 26, the second installation The both ends of bottom plate 23 are fixedly installed with the third end baffle 27 being correspondingly arranged respectively, and third end baffle 27 is located at third side block Between plate 24 and third nut 25, and it is arranged respectively close to third side baffle 24 and third nut 25, the second mounting base 23 One side is equipped with two groups of 5 groups of postive stop baffle to realize 3 stull of bed head frame and short tube limit, and two groups 5 groups of postive stop baffle Respectively close to the both ends setting of the second mounting base 23, every group 5 groups of postive stop baffle include being fixedly installed in the second mounting base 23 On several stull baffles 28 and several short tube baffles 29, several stull baffles 28 are oppositely arranged, and the stull gear being oppositely arranged There is spacing compatible with stub length between plate 28, several short tube baffles 29 are located between the stull baffle 28 being oppositely arranged, And along the evenly distributed setting of width direction of the second installation baffle.
When realizing 3 assembly welding of bed head frame using the bed head frame welding tooling, wherein it will be placed in corresponding two by a long tube Between a third end baffle 27, and against third side baffle 24, stull is then born against into stull baffle 28 and is placed, it will be short Pipe is placed between two adjacent stulls, and bears against the placement of short tube baffle 29, then another root long pipe is placed in another set Between corresponding two third ends baffle 27, the second clamping screw 26 is finally rotated, other root long tube top is tight, Realize that each weld-end fittings of bed head frame 3 in the firm placement on the bed head frame welding tooling, as shown in Figure 10, then carries out each pipe fitting The welding of connecting pin, simple to operate, the welding of bed head frame 3 for high efficiency, high quality is provided convenience, and welding is completed Afterwards, the second clamping screw 26 is unclamped, the bed head frame 3 being welded can be removed.
The two-berth welding tooling and bed head frame welding tooling being equipped with realize pipe fitting on mounting base by each baffle Limit place, and carry out whole limit fastening by clamping screw, can effectively ensure that each pipe fitting placement position is straight, and It prevents pipe fitting appearance position in welding to deviate, provides convenience for the welding of pipe fitting, so that welding quality is with welding Efficiency greatly improves.
The students' dormitory bedstead production auxiliary mould based on above structure realizes bedstead manufacturing process by each tooling The secondary process of middle difference process, improves the machining accuracy of cutting stock and drilling, it is ensured that welding quality, while mentioning significantly The high processing efficiency of tubing cutting, drilling and pipe fitting welding, compares traditional hand-made mode, passes through the student dormitory bed Frame production auxiliary mould realizes high quality, the high efficiency production of bedstead, and the labour for reducing worker to a certain extent is strong Degree, it is convenient and practical.
It should be appreciated that the purposes of these embodiments is merely to illustrate the utility model and is not intended to limitation the utility model Protection scope.In addition, it should also be understood that, those skilled in the art can be right after having read the technology contents of the utility model The utility model makees various change, modification and/or variation, all these equivalent forms equally fall within right appended by the application and want Seek book within the limits of the protection.

Claims (6)

1. a kind of students' dormitory bedstead production auxiliary mould, it is characterised in that: including cutting stock tooling and incising pipes branch Support;
The cutting stock tooling includes installation chassis and postive stop baffle, and one end of the installation chassis is offered to realize it The first mounting hole connecting with cutting machine is fixedly installed with several limited blocks, several limited blocks point on the installation chassis It is not correspondingly arranged in two upper sides of the installation chassis, and has and the positioning baffle between ipsilateral adjacent two limited block The compatible spacing of thickness;
The incising pipes support frame includes support underframe, and one end of the support underframe is offered to realize itself and cutting machine Second mounting hole of connection, the other end of the support underframe are offered to realize the fixed third mounting hole of its installation, institute It states and is fixedly installed with several mounting plates on support underframe, two upper sides pair of several mounting plates respectively at the support underframe It should be arranged, roller bearing is rotatably equipped between corresponding two mounting plate, several roller bearings are arranged with height.
2. a kind of students' dormitory bedstead production auxiliary mould as described in claim 1, it is characterised in that: further include auxiliary drill Hole tool, the auxiliary bore hole tooling include drilling chassis, are offered on the drilling chassis to realize it in pacifying on drilling machine The 4th fixed mounting hole is filled, is also provided on the drilling chassis and accommodates the jack that drilling machine drill is worn, the drilling chassis One end be fixedly installed with first end first speed plate, the side of the drilling chassis is fixedly installed with the first side baffle.
3. a kind of students' dormitory bedstead production auxiliary mould as claimed in claim 2, it is characterised in that: the drilling chassis The other end be also fixedly installed with the first nut, first nut thread is equipped with locking screw, the locking screw and institute It states first end first speed plate to be correspondingly arranged, and the locking screw is fixedly installed with clamping close to one end of the first end first speed plate Plate has the gap for grip block rotation between the grip block and the drilling chassis.
4. a kind of students' dormitory bedstead production auxiliary mould as claimed in claim 3, it is characterised in that: the grip block is Circular slab, and the grip block is coaxially fixedly installed in the locking screw.
5. a kind of students' dormitory bedstead production auxiliary mould as described in claim 1, it is characterised in that: further include two-berth Welding tooling, the two-berth welding tooling include the first mounting base, and the side of first mounting base is fixedly installed with Second side baffle, the other side of first mounting base are fixedly installed with the second nut, and second nut thread is equipped with First clamping screw, the both ends of first mounting base are fixedly installed with the second end first speed plate being correspondingly arranged respectively, described Second end first speed plate is between second side baffle and second nut, and respectively close to second side baffle and institute The setting of the second nut is stated, is fixedly installed with several support rod baffles, several branch on the one side of first mounting base Strut baffle is in pairs along the evenly distributed setting of length direction of first mounting base.
6. a kind of students' dormitory bedstead production auxiliary mould as described in claim 1, it is characterised in that: further include bed head frame Welding tooling, the bed head frame welding tooling include the second mounting base, and the side of second mounting base is fixedly installed with Third side baffle, the other side of second mounting base are fixedly installed with third nut, and the third nut thread is equipped with Second clamping screw, the both ends of second mounting base are fixedly installed with the third end baffle being correspondingly arranged respectively, described Third end baffle is between the third side baffle and the third nut, and respectively close to the third side baffle and institute The setting of third nut is stated, the one side of second mounting base is equipped with two groups to realize bed head frame stull and short tube limit Limiting block board group, and two groups of postive stop baffle groups respectively close to second mounting base both ends be arranged, every group of postive stop baffle Group includes several stull baffles and several short tube baffles being fixedly installed on second mounting base, several stull gears Plate is oppositely arranged, and has spacing compatible with stub length, several short tubes between the stull baffle being oppositely arranged Baffle is located between the stull baffle that is oppositely arranged, and sets along the width direction of the second installation baffle is evenly distributed It sets.
CN201920312324.7U 2019-03-12 2019-03-12 Auxiliary mould is used in a kind of production of students' dormitory bedstead Expired - Fee Related CN209717131U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920312324.7U CN209717131U (en) 2019-03-12 2019-03-12 Auxiliary mould is used in a kind of production of students' dormitory bedstead

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920312324.7U CN209717131U (en) 2019-03-12 2019-03-12 Auxiliary mould is used in a kind of production of students' dormitory bedstead

Publications (1)

Publication Number Publication Date
CN209717131U true CN209717131U (en) 2019-12-03

Family

ID=68686185

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920312324.7U Expired - Fee Related CN209717131U (en) 2019-03-12 2019-03-12 Auxiliary mould is used in a kind of production of students' dormitory bedstead

Country Status (1)

Country Link
CN (1) CN209717131U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115054083A (en) * 2022-07-06 2022-09-16 绍兴荣善钢木家具有限公司 Combined double-layer apartment bed

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115054083A (en) * 2022-07-06 2022-09-16 绍兴荣善钢木家具有限公司 Combined double-layer apartment bed

Similar Documents

Publication Publication Date Title
CN102581536B (en) Single boom section molding tool for crane booms and single boom section production technology
CN209717131U (en) Auxiliary mould is used in a kind of production of students' dormitory bedstead
CN104325168B (en) Method for boring of rotating hinge water seal seat through rotating hinge water seal seat boring device
CN211438817U (en) Positioning assembly device for flange and saddle opening
CN109317911A (en) A kind of cross column welding production line
CN207564024U (en) A kind of fixing tool for subtracting mounting platform welding for unmanned helicopter master
CN205904632U (en) Convertible plane anchor clamps
CN211218797U (en) Disk middle punching device for gear machining
CN207358450U (en) A kind of manual press-loading spindle nose frock clamp assembly
CN212743383U (en) Template assembly auxiliary device
CN203471199U (en) Locating tool for welding of vertical column
CN202726365U (en) Connecting lug installing and welding device for rack section of derrick
CN206305491U (en) A kind of porous series chord member process equipment
CN204094178U (en) A kind of hinged water stop seat boring device
CN205927577U (en) Welding operation platform
CN206768220U (en) One kind is used for flashboard for sluice valve laser melting coating clamping device
CN203223485U (en) Coaxiality adjusting tool for large double bearing inner ring
CN105904121A (en) Screw welding method for flat steel chair plate
CN206029131U (en) Magnetic medium box welding jig
CN206029197U (en) Passenger door assembly jig
CN212552523U (en) Pipe welding support
CN211638786U (en) Welding fixture with scale
CN205111179U (en) Axle, key are fixed a position box entirely and are welded clamping utensil
CN204873621U (en) Adjustable tower crane attaches wall connecting rod
CN206647611U (en) A kind of pipeline assembling device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191203

CF01 Termination of patent right due to non-payment of annual fee