Specific embodiment
As shown in Figures 3 to 6, the utility model plastic-coated cable testing bridge includes several unit gantries 10, two adjacent lists
The connection end of first gantry 10 is connected by conduction connection sheet 20, in which: 14 appearance of side wall at 10 connection end of unit gantry
The zinc coat of the exposed zinc coat 15 in face and 14 rest part of side wall is covered by coating layer (not marking in figure), is conducted in connection sheet 20
Side, i.e. two 10 connecting pins of unit gantry towards zinc coat 23 and adjoining on the side of 10 side wall of unit gantry, 14 outer surface
Exposed zinc coat reliable contacts guarantee can to match by fastening bolt 70 after good conductive ground connection bridges on the side wall 14 at head place
It closes nut and realizes the connection conducted between 20 pairs of adjacent two unit gantries 10 of connection sheet.
The utility model uses traditional unit gantry 10, and unit gantry 10 includes steel gantry ontology, gantry ontology
Outer surface is coated with zinc coat, and zinc coat outer surface is coated with coating layer, and coating layer covers zinc coat but 10 connecting pin of unit gantry
The exposed zinc coat 15 in 14 outer surface of side wall at head.
In the present invention, conduction connection sheet 20 includes sheet body 22, in which: the inner surface of sheet body 22 is coated with zinc coat
23;The outer surface of sheet body 22 is coated with zinc coat 24, and 24 outer surface of zinc coat is coated with coating layer 25 and the covering plating of coating layer 25
Zinc layers 24.
Such as Fig. 1, the U-shaped unit gantry 10 in section is made of a slot bottom 13 and two side walls 14, such as unit gantry 10
U-shaped steel is selected to be made, the side wall 14 at 10 connection end of unit gantry is equipped with several pilot holes 11 and an at least ground hole 12
(a usually ground hole 12).
Such as Fig. 4 and Fig. 5, conduct connection sheet 20 and be equipped with several connecting holes 21, each connecting hole 21 with it is each on unit gantry 10
Pilot hole 11 is correspondingly arranged.
In practice, after fastening bolt 70 passes through the pilot hole 11 of the conduction connecting hole 21 of connection sheet 20, unit gantry 10,
Attaching nut (not shown) realizes the connection between conduction 20 pairs of adjacent two unit gantries 10 of connection sheet.
Preferable scheme is that the pilot hole 11 of unit gantry 10, conduct connection sheet 20 connecting hole 21 be both designed as it is oval
Hole and the two direction is vertical, is conducive to be fastenedly connected in this way.
In actual design, the two side walls 14 at two adjacent 10 connection ends of unit gantry are connected by a conduction
Contact pin 20 connects.In addition, the slot bottom 13 of unit gantry 10 is connect by conducting fastening assembly 50 with earthing component 40 referring to Fig. 3.
Such as Fig. 3, since without jumper, the ground hole 12 on unit gantry 10 can save.
Such as Fig. 3, the zinc coat 23 for conducting 20 inside of connection sheet is covered at two adjacent 10 connection ends of unit gantry
Side wall 14 on exposed zinc coat 15.
Further, in order to promote outer perception, conduction connection sheet 20 is typically designed as rectangle, correspondingly, exposed plating
The suitable same design in region 150 that zinc layers 15 are formed is rectangle, and in other words, in actual implementation, conduction connection sheet 20 is length
Rectangular, exposed zinc coat 15 is rectangle on the side wall 14 at two adjacent 10 connection ends of unit gantry, and conducts and connect
23 area of zinc coat of 20 inside of contact pin is greater than plating exposed on the side wall 14 at two adjacent 10 connection ends of unit gantry
15 area of zinc layers.
Such as Fig. 3, label 150 shows exposed zinc-plated on the side wall 14 at two adjacent 10 connection ends of unit gantry
Layer 15 is formed by region, this region is rectangle, and is covered by the zinc coat 23 of 20 inside of conduction connection sheet, also, conduct and connect
Two short sides of contact pin 20 inwardly reduce d1 i.e. two short sides in region thus, conduct the long side above connection sheet 20 and inwardly reduce d2 i.e.
Long side above region thus, and the long side below this region is aligned design, such pole with the long side below conduction connection sheet 20
The outer perception of gantry entirety is improved greatly.
In actual implementation, the size of distance d1, d2 can be rationally designed, without limitations.
The implementable following ground connection of the utility model plastic-coated cable testing bridge bridges processing step:
1) production conduction connection sheet 20;
2) 14 outer surface of side wall at 10 connection end of each unit gantry is enabled to expose zinc coat 15 and side wall 14 its remaining part
The zinc coat divided is covered by coating layer;
3) enable conduction connection sheet 20 inside, i.e., towards on the side of 10 side wall of unit gantry, 14 outer surface zinc coat 23 with
Exposed 15 reliable contacts of zinc coat guarantee good conductive on side wall 14 at two adjacent 10 connection ends of unit gantry
Ground connection bridges, and connects between the two unit gantries 10 that then will abut against conduction connection sheet 20 by 70 attaching nut of fastening bolt
It picks up and;
4) a certain or certain 10 bottoms of unit gantry are connect by conductive conduction fastening assembly 50 with earthing component 40, from
And complete the ground connection bridging treatment process of plastic-coated cable testing bridge.
In the present invention, earthing component 40 be installation on the ground, the component of such as steel material, there is conduction
Performance.
Such as Fig. 2, conducts fastening assembly 50 and generally include 55 (such as tack of bolt being threaded through on the slot bottom 13 of unit gantry 10
Bolt), bolt 55 cooperates nut 51 to fix earthing component 40 and 10 phase of unit gantry, and sets between bolt 55 and slot bottom 13
There is plain cushion 52, spring washer 54, plain cushion 52 and copper lug 53 (a kind of copper tip) are successively arranged between nut 51 and slot bottom 13.
In above-mentioned ground connection bridging processing step, unit gantry 10 includes steel gantry ontology, the outer surface of gantry ontology
It is coated with zinc coat, zinc coat outer surface is coated with coating layer, in which: except the wall outer surface at 10 connection end of unit gantry
Zinc coat 15 is exposed outer, remaining position zinc coat is covered by coating layer.Conducting connection sheet 20 includes sheet body 22, in which: sheet body 22
Inner surface is coated with zinc coat 23;22 outer surface of sheet body is coated with zinc coat 24, and 24 outer surface of zinc coat is coated with coating layer 25,
Coating layer 25 covers zinc coat 24.
In actual implementation, conduct connection sheet 20 production comprising steps of
Sheet body 22 is whole to carry out zinc-plated processing (such as hot dip treatment process), the plating shape on the medial and lateral surface of sheet body 22
At zinc coat 23,24;
Plastic-coated processing is carried out to the zinc coat 24 in 22 outside of sheet body, while keeping the zinc coat 23 of 22 inside of sheet body reliable naked
Dew, the zinc coat 24 in 22 outside of sheet body are sprayed-on the coating layer 25 to be formed and cover.
In actual implementation, the zinc coat 23 of 20 inside of conduction connection sheet preferably covers two adjacent unit gantries 10
Exposed zinc coat 15 on side wall 14 at connection end.
In preferred implement, heat resistant adhesive tape first is pasted on the zinc coat 23 of 22 inside of sheet body, then carries out plastic-coated again
Processing may insure that the zinc coat 23 of 22 inside of sheet body is reliable exposed, in which: the heat resistant adhesive tape of stickup connects without departing from conduction in this way
23 region of zinc coat of 20 inside of contact pin.
From the description above it is found that this ground connection bridging treatment process that the utility model plastic-coated cable testing bridge is implemented can make list
Ground hole 12 on first gantry 10 saves, to simplify the production of unit gantry, eliminates jumper working procedure, and then accelerate
Construction speed, reduces construction cost.
Understand referring to Fig. 3, the utility model plastic-coated cable testing bridge in use, passes through between each unit gantry 10
Conduct connection sheet 20, i.e., it is exposed on the zinc coat 23 of 20 inside of conduction connection sheet and the connection end side wall 14 of unit gantry 10
Direct contact between zinc coat 15, realizes quickly and effectively electrical conduction, the biography connected eventually by 10 bottom of unit gantry
Lead fastening assembly 50, earthing component 40 realizes good earthing effect.And the groove for each unit gantry 10 that head and the tail splice mutually
The channel for being laid with cable is formed, and since fluted external surface is anti-corrosion fireproof coating layer, for the cable of laying
Have effects that prevent fires well.
It should be noted that zinc coat has performances but a conduction such as anti-corrosion, coating layer has performances such as anti-corrosion, fire prevention but not
It is conductive.
The utility model has the advantages that:
The utility model is while guaranteeing that plastic-coated cable testing bridge is reliably connected, it is ensured that good earthing effect, and save
Jumper has been removed, working procedure is simplified, has accelerated construction speed, has reduced construction cost, time saving and energy saving, construction quality has guarantor
Barrier is handled the ground connection bridging of plastic-coated cable testing bridge suitable for rainy humid area.In addition, the utility model is detection zinc coat
Thickness is provided convenience, and testing cost is reduced.
The above is the utility model preferred embodiment and its technical principle used, for those skilled in the art
It is any based on technical solutions of the utility model basis without departing substantially from the spirit and scope of the utility model for member
On equivalent transformation, simple replacement etc. it is obvious change, belong within scope of protection of the utility model.