CN209707085U - A kind of rupture disk type approval test testboard - Google Patents

A kind of rupture disk type approval test testboard Download PDF

Info

Publication number
CN209707085U
CN209707085U CN201920409295.6U CN201920409295U CN209707085U CN 209707085 U CN209707085 U CN 209707085U CN 201920409295 U CN201920409295 U CN 201920409295U CN 209707085 U CN209707085 U CN 209707085U
Authority
CN
China
Prior art keywords
pipeline
valve
gas
pressure
explosion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920409295.6U
Other languages
Chinese (zh)
Inventor
舒远
张曼
刘成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou Is Safety Installation Co Ltd From All Directions
Original Assignee
Xuzhou Is Safety Installation Co Ltd From All Directions
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuzhou Is Safety Installation Co Ltd From All Directions filed Critical Xuzhou Is Safety Installation Co Ltd From All Directions
Priority to CN201920409295.6U priority Critical patent/CN209707085U/en
Application granted granted Critical
Publication of CN209707085U publication Critical patent/CN209707085U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of rupture disk type approval test testboards of process industrial superpressure explosion protection technical field, including gas source pipeline, automatic-explosion tests pipeline, testing fatigue pipeline, pipeline is tested in manual explosion, test tank body, pressure adaptive monitors system, personnel's station, the utility model measurement method high degree of automation, test method establishing criteria, solve the problems, such as that under lower pressure, (0-0.5MPa) accurate measurement rupture disk explosion is difficult to measure with tired situation, it being capable of accurate control to pressure medium, effectively increase the safety of type approval test, domestic leading firm is increased to the interest of exploitation novel explosion flake products.

Description

A kind of rupture disk type approval test testboard
Technical field
The utility model relates to process industrial superpressure explosion protection technical field, specially a kind of rupture disk type approval test is surveyed Test stand.
Background technique
The technique with high temperature, high-pressure property is widely present as the process industrial of primary operational medium using fluid and powder Material and product.Process industrial equipment is band press operation under normal conditions, and is stored using pressure vessel or press Or production related process material.Once the fault of fluctuation or manual operation by external environment, process device are easy to out The security risk of existing over-pressure over-temperature;Even after pressure reaches the limit values, irreversible deformation damage occurs for equipment, seriously It will cause violent explosion.Therefore, the controllability under the safety and fortuitous event to guarantee production process.Industrially usually adopt Pressure in equipment can be limited to peace using the technology of releasing by the main means for taking overpressure relief to damage as prevention apparatus superpressure In gamut.In a variety of pressure relief devices, the advantages that rupture disk is big with pressure release area, high sensitivity, No leakage, it has also become The pressure relief device being most widely used.
In general, according to the difference of rupture disk mechanical structure, rupture disk is divided into: flat rupture disk, antiarch shape are quick-fried Fragmentation, three kinds of positive arch rupture disk.Most of rupture disk may not have an opportunity to act from being installed to scrap, and only occur After accident, just can be evaluated whether it reliable, just can confirm whether it prevents the generation of accident or expansion.
China proposes the type approval test method of oneself on the basis of correlative study, with GB567.4-2012 " rupture disk The 4th part of safety device: type approval test " and two regulations of TSGZF003-2011 " blasting piece device safety and technical supervision regulation " For standard, main experiment process includes: surface quality inspection, burst pressure tests, fatigue test, lets out in type approval test High-volume test, flow resistance coefficient test 5 parts, and wherein burst pressure tests and fatigue test are the weights in entire type approval test In weight, it can directly determine under the conditions of identical pressure loading rupture disk whether can triggered as normal work response (i.e. Explosion occurs).However there is no special test equipments to be tested accordingly for main production firm domestic at present, when new Product needs to carry out type approval test when determining working performance, can only purchase a set of equipment again and exclusively carry out test or outer It wraps to external professional test mechanism or manufacturer and carries out;Biggish sample can not be established during sampling observation by also resulting in product. Objectively directly contributing domestic leading firm, to developing, novel explosion flake products interest is low, and there are biggish for product quality for this Loophole in turn results in middle and lower reaches of the China in manufacture chain in passive security Protection Product, lacks competitiveness, for this purpose, I Propose a kind of rupture disk type approval test testboard.
Utility model content
The purpose of this utility model is to provide a kind of rupture disk type approval test testboards, to solve in above-mentioned background technique The problem of proposition.
To achieve the above object, the utility model provides the following technical solutions: a kind of rupture disk type approval test testboard, packet Include gas source pipeline, automatic-explosion test pipeline, testing fatigue pipeline, manual explosion test pipeline, test tank body, pressure adaptive Monitoring system, personnel's station, the gas source pipeline includes gas source, filter, main valve, bleed pressure table, and filter passes through Pipeline is connected with the gas vent of gas source, and main valve gas feed is connected by the gas vent of pipe-and-filter, the gas of main valve Body egress form should be a root canal road and is directly connected to as the gas vent of main line and main valve, uses in the main line other side Reducing cross separates three branch pipeline interfaces, this three branch pipeline interface diameters are consistent, and bleed pressure table is mounted on the gas of main valve Body exports side, and the automatic-explosion test pipeline includes pressure reducing valve, ratio adjusting valve, intake solenoid valve, unloads pressure electromagnetic valve, subtracts The gas access of pressure valve should use pipeline to be connected to one in three branch pipelines of the gas source line end, proportion adjustment Valve is connected to the exit portion of pressure reducing valve using pipeline, and intake solenoid valve is connected to the outlet portion of ratio adjusting valve using pipeline Point, pipeline threeway is set in the outlet of intake solenoid valve, the gas access of pressure electromagnetic valve is unloaded in one of interface connection, described tired It includes boosting throttle valve, boosting solenoid valve, decompression throttle valve, decompression solenoid valve, throttle valve gas access of boosting that labor, which tests pipeline, By one in piping connection to three branch pipelines of the gas source line end, solenoid valve gas access of boosting is connected to liter Throttle valve gas vent is pressed, and pipeline threeway, one of interface connection decompression throttling are set in boosting electromagnetic valve outlet part The gas access of valve, the outlet for being depressured throttle valve are connect with the gas access of decompression solenoid valve, and pipeline is tested in the manual explosion Including manual intake valve, pressure-relief valve, manual intake valve gas access is by piping connection to described three points of gas source line end One in pipeline, pipeline threeway is arranged in the gas exit port of manual intake valve, and one of interface connects pressure-relief valve, institute Stating test tank body includes gas buffer tank, rupture disk safety device to be measured, mechanical compression table, and gas buffer tank meets GB150- 2011 " pressure vessel " prescribed requirements, and gas inlet line and gas outlet tube are drawn in tank body aperture according to relevant regulations Road, two pipelines are respectively provided with pipeline four-way, and wherein the three of gas inlet line four-way interface is separately connected the automatic-explosion and surveys Another discharge coupling of the end threeway of pipeline, rupture disk peace to be measured are tested in test tube road, testing fatigue pipeline and manual explosion Full device can take the fixed form that flange is tightened or press compresses, and be connected on gas buffer tank by pipeline, wherein managing Road size is greater than blasting piece device specification to be measured, and mechanical compression table is duplicate, is connected to gas by pipeline threeway One in the pipeline four-way that surge tank is drawn, the pressure adaptive monitoring system includes host computer, programmable controller (PLC), pressure transmitter device low pressure gear, pressure transmitter device high pressure gear, temperature transmitter, host computer pass through PPI cable connection Programmable controller (PLC), pressure transmitter device low pressure gear and pressure transmitter device high pressure gear are connected to using copper core On the analog acquisition mouth of programmable controller (PLC), pressure transmitter device low pressure gear is passed through automatically controlled using low pressure transmitter Valve is connected in one of outlet of gas buffer tank gas exit line four-way, and pressure transmitter device high pressure gear uses high pressure Pressure transmitter is connected in one of outlet of gas buffer tank gas exit line four-way by electrically-controlled valve, temperature pick-up Device is connected on the analog acquisition mouth of programmable controller (PLC) by copper core, and collection head is connected by pressing device On gas buffer tank, personnel's station include: work light, start-stop button, automatic-explosion testing button, manually it is quick-fried Broken testing button, testing fatigue button, work light, start-stop button, automatic-explosion testing button, manual explosion test are pressed Button, testing fatigue button are connected on the input interface of switching value module of programmable controller (PLC) using copper core.
Compared with prior art, the utility model has the beneficial effects that the utility model measurement method high degree of automation, Test method establishing criteria solves under lower pressure (0-0.5MPa) accurate measurement rupture disk explosion and is difficult to tired situation The problem of measurement, to pressure medium can accurate control, effectively increase the safety of type approval test, increase domestic main factory Interest of the quotient to exploitation novel explosion flake products.
Detailed description of the invention
Fig. 1 is the utility model principle figure;
Fig. 2 is the utility model electric circuit diagram;
Fig. 3 is that the utility model sensor installs schematic diagram.
In figure: 1 gas source, 2 filters, 3 main valves, 4 bleed pressure tables, 5 pressure reducing valves, 6 ratio adjusting valves, 7 air inlet electromagnetism Pressure electromagnetic valve, 9 boosting throttle valves, 10 boosting solenoid valves, 11 decompression throttle valves, 12 decompression solenoid valves, 13 manual air inlets are unloaded in valve, 8 Valve, 14 pressure-relief valves, 15 gas buffer tanks, 16 rupture disk safety devices to be measured, 17 mechanical compression tables, 18 host computers, 19 can compile Cyclelog (PLC), 20 pressure transmitter device low pressure gear, 21 pressure transmitter device high pressures gear, 22 temperature transmitters, 23 work Indicator light, 24 start-stop buttons, 25 automatic-explosion testing buttons, 26 manual explosion testing buttons, 27 testing fatigue buttons.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1-3 is please referred to, the utility model provides a kind of technical solution: a kind of rupture disk type approval test testboard, including Gas source pipeline, automatic-explosion test pipeline, testing fatigue pipeline, manual explosion test pipeline, test tank body, pressure adaptive prison Examining system, personnel's station.
Wherein, the gas source pipeline includes gas source 1, filter 2, main valve 3, bleed pressure table 4, and gas source 1 is in ordinary circumstance The lower compressed air for selecting room temperature cleaning according to relevant criterion or nitrogen are as working media;When the plenum system of gas source 1 selects It, should be in compressor outlet part setting >=40L pressure stabilizing gas tank, to guarantee pressure in the case of the mode directly supplied for compressor Fluctuation meets testing standard requirement, and filter 2 is connected by pipeline with the gas vent of gas source 1, and 3 gas feed of main valve passes through The gas vent of pipe-and-filter 2 connects, and the gas vent form of main valve 3 should be a root canal road as main line and main valve 3 gas vent is directly connected to, and separates three branch pipeline interfaces using reducing cross in the main line other side, this three branch pipelines Interface diameter is consistent, and bleed pressure table 4 is mounted on the gas vent side of main valve 3;
The automatic-explosion test pipeline includes pressure reducing valve 5, ratio adjusting valve 6, intake solenoid valve 7, unloads pressure electromagnetic valve 8, The gas access of pressure reducing valve 5 should use pipeline to be connected to one in three branch pipelines of the gas source line end, ratio Regulating valve 6 is connected to the exit portion of pressure reducing valve 5 using pipeline, and intake solenoid valve 7 is connected to ratio adjusting valve 6 using pipeline Pipeline threeway is arranged in the outlet of intake solenoid valve 7 in exit portion, and the gas that pressure electromagnetic valve 8 is unloaded in one of interface connection enters Mouthful;
The testing fatigue pipeline includes boosting throttle valve 9, boosting solenoid valve 10, decompression throttle valve 11, decompression solenoid valve 12, boosting 9 gas access of throttle valve passes through one in piping connection to three branch pipelines of the gas source line end, boosting 10 gas access of solenoid valve is connected to boosting 9 gas vent of throttle valve, and pipeline three is arranged in boosting 10 exit portion of solenoid valve Logical, the gas access of one of interface connection decompression throttle valve 11 is depressured outlet and the gas of decompression solenoid valve 12 of throttle valve The connection of body entrance;
The manual explosion test pipeline includes manual intake valve 13, pressure-relief valve 14, and manual 13 gas access of intake valve is logical Cross one in piping connection to three branch pipelines of the gas source line end, the gas exit port of manual intake valve 13 Pipeline threeway is set, and one of interface connects pressure-relief valve 14;
The test tank body includes gas buffer tank 15, rupture disk safety device 16 to be measured, mechanical compression table 17, gas Body surge tank 15 meets GB150-2011 " pressure vessel " prescribed requirement, and draws gas in tank body aperture according to relevant regulations Entrance pipe and gas exit line, two pipelines are respectively provided with pipeline four-way, wherein the three of gas inlet line four-way interface point Another for not connecting the end threeway of automatic-explosion test pipeline, testing fatigue pipeline and manual explosion test pipeline goes out Mouth interface, rupture disk safety device 16 to be measured can take the fixed form that flange is tightened or press compresses, and pass through pipeline and connect On gas buffer tank 15, wherein line size is greater than blasting piece device specification to be measured, 17 1 formula two of mechanical compression table Part, one is connected in the pipeline four-way of the extraction of gas buffer tank 15 by pipeline threeway;
The pressure adaptive monitoring system includes host computer 18, programmable controller (PLC) 19, pressure transmitter device Low pressure gear 20, pressure transmitter device high pressure keep off 21, temperature transmitter 22, and host computer 18 passes through the programmable control of PPI cable connection Device (PLC) 19 processed, pressure transmitter device low pressure gear 20 and pressure transmitter device high pressure gear 21 are connected to using copper core and can be compiled On the analog acquisition mouth of cyclelog (PLC) 19, pressure transmitter device low pressure gear 20 is passed through automatically controlled using low pressure transmitter Valve is connected in one of outlet of 15 gas exit line four-way of gas buffer tank, and pressure transmitter device high pressure gear 21 uses High-pressure transmitter is connected in one of outlet of 15 gas exit line four-way of gas buffer tank by electrically-controlled valve, temperature Degree transmitter 22 is connected on the analog acquisition mouth of programmable logic controller (PLC) 19 by copper core, and collection head is logical Pressing device is crossed to be connected on gas buffer tank 15;
Personnel's station include: work light 23, start-stop button 24, automatic-explosion testing button 25, manually it is quick-fried Broken testing button 26, testing fatigue button 27, it is work light 23, start-stop button 24, automatic-explosion testing button 25, quick-fried manually Broken testing button 26, testing fatigue button 27 are connected to the switching value mould of programmable controller (PLC) 19 using copper core On the input interface of block, work light 23 can show host computer 18, programmable controller (PLC) 19, pipe valve Working condition, start-stop button 24 can control the start and stop of host computer 18, programmable controller (PLC) 19, pipe valve.
Working principle: it is divided into following steps when utility model works:
S1: leak detection operation should be carried out before the relevant regulations use of foundation GB567-2012 " rupture disk safety device ".It is first The blind plate without blast action first is placed in rupture disk safety device 16 to be measured, and compresses blind plate using pressing device and reaches defined Sealed pressure, open main valve 3, pressure reducing valve 5, ratio adjusting valve 6, intake solenoid valve 7, boosting throttle valve 9, boosting solenoid valve 10, Manual intake valve 13, closes remaining valve, is the pressurization of gas buffer tank 15 by gas source 1, presses when mechanical compression table 17 is shown After power reaches designated value, suds, and pressure maintaining 5 minutes are smeared in the part of all devices connector, are leakage point at bubbling.Such as Have a leakage, must be tightened again after release, can above steps may be repeated multiple times, until No leakage;
S2: confirming that work light 22, start-stop button 23 are in close state on personnel's station, opens main valve 3, And confirm that pressure reducing valve 5, manual intake valve 13, boosting throttle valve 9 are in close state, number shown by bleed pressure table 4 at this time Value is the pressure of gas source 1;
S3: opening the host computer 18 in the pressure adaptive monitoring system, starts testing system software, and phase is clicked in selection Button (inquiry is tested, other) is answered, and clicks confirming button and enters respective page;
S4: according to test needs, search condition is filled in selection, and selects to click the corresponding button (test is inspected by random samples, other), And it clicks confirming button and enters respective page.This page can retract higher level;
S5: determining data acquisition system needed for meeting experiment using this system lot number query function first, all to meet condition Data be uniformly shown in a table, and it is printable;
S6: after completing lot number query function, model inquiry can be carried out as needed, all models for meeting condition are unified aobvious Show in a table, and clicks the corresponding button and enter the corresponding data form of every kind of model, and the printable phase for meeting condition File (sampling observation record sheet, rupture disk quality certificate, pressure temperature curve figure) is closed, selection clicks the corresponding button and enters file, And it can print;
S7: terminate model inquiry after, fill in the page into parameter and fill in parameter, and select click the corresponding button (test, Inspect by random samples, other), and click confirming button and enter respective page.This page is directly entered test page;
S8: after prompting equipment to be ready to complete in personnel's station or host computer 18, start button is clicked, tests burst pressure After power occurs, and the 5s system that is delayed can be automatically stopped or artificially click conclusion button and be stopped, and the page should show test at this time Data, and can be automatically saved in final data table.Test or return parameters incoming page next time can be clicked to enter if needed Face can also click the corresponding button output data table;
S9: output data table can be used directly host computer 18 and be printed.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (1)

1. a kind of rupture disk type approval test testboard, it is characterised in that: test pipeline, fatigue including gas source pipeline, automatic-explosion It tests pipeline, manual explosion test pipeline, test tank body, pressure adaptive and monitors system, personnel's station, the gas source pipeline It is connected by pipeline with the gas vent of gas source including gas source, filter, main valve, bleed pressure table, and filter, main valve gas Import is connected by the gas vent of pipe-and-filter, and the gas vent form of main valve should be a root canal road as main line It is directly connected to the gas vent of main valve, separates three branch pipeline interfaces using reducing cross in the main line other side, this three Branch pipeline interface diameter is consistent, and bleed pressure table is mounted on the gas vent side of main valve, and the automatic-explosion tests pipeline packet It includes pressure reducing valve, ratio adjusting valve, intake solenoid valve, unload pressure electromagnetic valve, the gas access of pressure reducing valve should be connected to using pipeline One in three branch pipelines of the gas source line end, ratio adjusting valve is connected to the outlet portion of pressure reducing valve using pipeline Point, intake solenoid valve is connected to the exit portion of ratio adjusting valve using pipeline, and pipeline three is arranged in the outlet of intake solenoid valve Logical, the gas access of pressure electromagnetic valve is unloaded in one of interface connection, and the testing fatigue pipeline includes boosting throttle valve, boosting electricity Magnet valve, decompression throttle valve, decompression solenoid valve, boosting throttle valve gas access passes through piping connection to the gas source line end three One in a branch pipeline, boosting solenoid valve gas access is connected to boosting throttle valve gas vent, and in boosting solenoid valve Exit portion is arranged pipeline threeway, the gas access of one of interface connection decompression throttle valve, be depressured the outlet of throttle valve with It is depressured the gas access connection of solenoid valve, the manual explosion test pipeline includes manual intake valve, pressure-relief valve, manual intake valve By one in piping connection to three branch pipelines of the gas source line end, the gas of manual intake valve goes out for gas access Oral area, which sets up separately, sets pipeline threeway, and one of interface connects pressure-relief valve, and the test tank body includes gas buffer tank, explosion to be measured Piece safety device, mechanical compression table, gas buffer tank meet GB150-2011 " pressure vessel " prescribed requirement, and according to correlation Regulation draws gas inlet line and gas exit line, two pipelines is respectively provided with pipeline four-way, wherein gas enters in tank body aperture Three interfaces of mouth pipeline four-way are separately connected the automatic-explosion test pipeline, testing fatigue pipeline and manual explosion testing tube Another discharge coupling of the end threeway on road, rupture disk safety device to be measured can take the fixation that flange is tightened or press compresses Mode, and be connected on gas buffer tank by pipeline, wherein line size is greater than blasting piece device specification to be measured, mechanical Formula pressure gauge is duplicate, is connected in the pipeline four-way of gas buffer tank extraction one by pipeline threeway, the pressure Adaptive monitoring system includes host computer, programmable controller (PLC), pressure transmitter device low pressure gear, pressure transmitter device High pressure gear, temperature transmitter, host computer pass through PPI cable connection programmable controller (PLC), pressure transmitter device low pressure gear It is connected on the analog acquisition mouth of programmable controller (PLC), is pressed using copper core with pressure transmitter device high pressure gear Power pick-up device low pressure keeps off its for using low pressure transmitter to be connected to gas buffer tank gas exit line four-way by electrically-controlled valve In middle one outlet, pressure transmitter device high pressure gear is connected to gas buffer tank gas by electrically-controlled valve using high-pressure transmitter In one of outlet of body export pipeline four-way, temperature transmitter is connected to programmable controller (PLC) by copper core Analog acquisition mouth on, collection head is connected on gas buffer tank by pressing device, and personnel's station includes: work Indicator light, start-stop button, automatic-explosion testing button, manual explosion testing button, testing fatigue button, work light open Stop button, automatic-explosion testing button, manual explosion testing button, testing fatigue button be connected to using copper core it is programmable On the input interface of the switching value module of sequence controller (PLC).
CN201920409295.6U 2019-03-28 2019-03-28 A kind of rupture disk type approval test testboard Active CN209707085U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920409295.6U CN209707085U (en) 2019-03-28 2019-03-28 A kind of rupture disk type approval test testboard

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920409295.6U CN209707085U (en) 2019-03-28 2019-03-28 A kind of rupture disk type approval test testboard

Publications (1)

Publication Number Publication Date
CN209707085U true CN209707085U (en) 2019-11-29

Family

ID=68646050

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920409295.6U Active CN209707085U (en) 2019-03-28 2019-03-28 A kind of rupture disk type approval test testboard

Country Status (1)

Country Link
CN (1) CN209707085U (en)

Similar Documents

Publication Publication Date Title
CN201190820Y (en) Checkout platform for pressure release valve
CN205719497U (en) A kind of relief valve performance test and on-line testing instrument calibration equipment
CN105699068B (en) Safety valve performance test and on-line testing instrument calibration equipment
CN107421728A (en) A kind of safety valve and quick action emergency valve comprehensive calibration device and its method of calibration
CN203011773U (en) Vehicle hose pressure durability testing device
CN103791985A (en) Static state standard cubic meter calibration device and calibration method of static state standard cubic meter calibration device
CN100585359C (en) Gas pressure regulator test device
CN209707085U (en) A kind of rupture disk type approval test testboard
CN110160773B (en) Pressure relief valve detection device and detection method thereof
CN105571794B (en) A kind of method of safe detection high-pressure solenoid valve
CN110726547A (en) Portable comprehensive checking device for pressure protection device
CN204050762U (en) Fire product hydraulic pressure testing device and explosion testing arrangement
CN106482936A (en) A kind of synthetic determination method of nuclear power apparatus EH system sealing circle failure cause
CN210141986U (en) Portable transformer pressure relief valve field calibration system
CN210571758U (en) Air pressure circulation test device
CN107340104A (en) Finned heat exchanger high pressure leak test plant
CN114088382A (en) Gas self-closing valve under-pressure and over-pressure measuring tool and measuring method thereof
CN106932158A (en) A kind of gas check
WO2020015482A2 (en) High-pressure loading and unloading hose strength testing apparatus
CN209764524U (en) timing and quantitative acquisition device and quantitative collecting cylinder for natural gas component detection
CN203893999U (en) Leak-detection test bed
CN109443663B (en) Gate valve online pressing system
CN205483573U (en) Full -automatic air compressor's lift -launch test device
CN215065031U (en) Fire extinguisher pressure gauge calibration equipment
CN205483398U (en) Electronic pressure calibrator

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant