CN209704045U - A kind of auxiliary system that visualization precast shear wall is accurately installed - Google Patents

A kind of auxiliary system that visualization precast shear wall is accurately installed Download PDF

Info

Publication number
CN209704045U
CN209704045U CN201920142100.6U CN201920142100U CN209704045U CN 209704045 U CN209704045 U CN 209704045U CN 201920142100 U CN201920142100 U CN 201920142100U CN 209704045 U CN209704045 U CN 209704045U
Authority
CN
China
Prior art keywords
host
terminal display
wall body
precast
precast wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920142100.6U
Other languages
Chinese (zh)
Inventor
邢本国
李松岷
郭庆生
李大伟
季文君
朱令钧
姜辉
于雁南
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Corp Ltd
Second Construction Co Ltd of China Construction First Group Co Ltd
Original Assignee
China Construction First Group Corp Ltd
Second Construction Co Ltd of China Construction First Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Corp Ltd, Second Construction Co Ltd of China Construction First Group Co Ltd filed Critical China Construction First Group Corp Ltd
Priority to CN201920142100.6U priority Critical patent/CN209704045U/en
Application granted granted Critical
Publication of CN209704045U publication Critical patent/CN209704045U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of auxiliary system that visualization precast shear wall is accurately installed, includes camera, fixed terminal display, handheld terminal display and host;The camera is mounted on the floor immediately below precast wall body, at the position of connection reinforcing bar;The camera is used to acquire position and the multidate information of precast wall body, and is transmitted separately on fixed terminal display and handheld terminal display by host;The fixed terminal display is mounted in tower crane cab and is connect by host with camera signals;The handheld terminal display is operated by construction personnel and passes through host and connect with camera signals, to assist the installation of precast wall body.Observer be easy to cause commander's mistake, wastes time and technical problem that construction risk is larger when the utility model solves traditional precast wall body installation positioning, the technical problem that also solve in traditional precast wall body installation process that difficulty of construction is big low with installation effectiveness.

Description

A kind of auxiliary system that visualization precast shear wall is accurately installed
Technical field
The utility model relates to building engineering construction field, especially a kind of visualization precast shear wall is accurately installed auxiliary Auxiliary system.
Background technique
Current Domestic assembled is in the initial stage greatly developed, and precast wall body connection is mostly connected as with grout sleeve It is main, and need to carry out accurate sleeve and reinforcing bar contraposition in grout sleeve connection precast wall body installation process, otherwise precast wall body will It can not install;Existing method is the holding plane mirror below precast wall body, and observer, which squats down, observes the alignment situation of sleeve, And it is finely adjusted by intercom conning-tower department.But since the image in mirror is mirror image, observer needs one Differentiation procedure be easy to cause commander's mistake, wastes time, and observer is observation of squatting down, unfavorable to operation safety.
Utility model content
The purpose of the utility model is to provide a kind of auxiliary systems that visualization precast shear wall is accurately installed, and to solve to pass Observer be easy to cause commander's mistake, wastes time and the biggish skill of construction risk when the precast wall body of system installs positioning Art problem, the technical problem that also to solve in traditional precast wall body installation process that difficulty of construction is big low with installation effectiveness.
To achieve the above object, the utility model adopts the following technical solution.
A kind of auxiliary system that visualization precast shear wall is accurately installed, for the accurate fixed of precast wall body to be installed Position;The bottom surface of the precast wall body is equipped at intervals with grout sleeve;On the floor below precast wall body, corresponding precast wall body bottom surface Grout sleeve position at be reserved with connection reinforcing bar;
The auxiliary system further includes having camera, fixed terminal display, handheld terminal display and host;The camera shooting Head is mounted on the floor immediately below precast wall body, at the position of connection reinforcing bar;The camera is for acquiring precast wall body Position and multidate information, and be transmitted separately on fixed terminal display and handheld terminal display by host;It is described Fixed terminal display is mounted in tower crane cab and is connect by host with camera signals;The handheld terminal is shown Device is operated by construction personnel and passes through host and connect with camera signals, to assist the installation of precast wall body.
It preferably, further include having range finding probe;The range finding probe is the range finding probe with warning function, and is mounted on On floor immediately below precast wall body, to measure the height of drop of precast wall body;When precast wall body falls to preset alarm When height, range finding probe issues early warning sound.
Preferably, the range finding probe is connect by data line with host;Wherein, host is mounted on floor and host Interior setting wifi hotspot module;The distance information transmission that the host is measured range finding probe by built-in wifi hotspot module Onto hand-held terminal display and fixed terminal display, to assist the installation of precast wall body.
Preferably, the camera is connect by data line with host;The host passes through built-in wifi hotspot module On the video information transmission to hand-held terminal display and fixed terminal display that camera is acquired, to assist precast wall body Installation.
Preferably, it is connected between the range finding probe and host by wireless signal;Wherein, host be mounted on floor, And wifi hotspot module is set in host;The host is believed by the distance that built-in wifi hotspot module measures range finding probe Breath is transferred on handheld terminal display and fixed terminal display, to assist the installation of precast wall body.
Preferably, it is connected between the camera and host by wireless signal;The host passes through built-in wifi heat It is pre- to assist on the video information transmission that point module acquires camera to hand-held terminal display and fixed terminal display The installation of wall processed.
Preferably, the camera is miniature webcam, and carries out rotation control by wireless remote controller.
The utility model has the characteristics that and beneficial effect compared with prior art.
1, the utility model installs camera on floor, when pass through host in fact the video information of acquisition be transferred to fixation On terminal display and handheld terminal display, pass through the fixed terminal display being mounted in tower crane cab and constructor Handheld terminal display in member's hand is observed in fact when carrying out;Range finding probe is installed simultaneously with camera, when precast wall body is lifted into It up to top certain area, prompts and alarms, the lifting of precast wall body enters the slow play fine tuning stage, and it is aobvious to have stepped through fixed terminal Show that whether face connects reinforcing bar to device with the grout sleeve of handheld terminal display viewing precast wall body bottom, realizes precast wall body Contraposition installation;This design of the utility model, by tower crane driver and the visualized operation of construction personnel, the peace not only ensured The precision of dress, improve precast wall body installation efficiency, and according to distance in place when show in fact, to greatest extent guarantee lifting The safety of operation.
2, the utility model installs range finding probe on the floor below precast wall body;And the range finding probe is with report The range finding probe of alert function;When precast wall body falls to preset alarm height, range finding probe issue early warning sound, for Construction personnel makes prompt, it is ensured that installation exercise safety.
3, in the method for the utility model, after precast wall body lifting, coordinate for precast wall body to be lifted by signalman Camera within sweep of the eye after, continue to coordinate the hoisting prefabricated wall of tower department by signalman to fall, tower department is shown by fixed terminal Show the lifting dynamic that the precast wall body of camera offer is provided in fact when device, after precast wall body arrival floor certain altitude, ranging In fact by range data feedback on fixed terminal display and handheld terminal display when probe, precast wall body arrival floor absolute altitude After upper 200mm ~ 300mm, range finding probe is sounded an alarm, and tower department is aobvious by handheld terminal by fixed terminal display, erector Show device while the installation situation of the grout sleeve of the precast wall body lower part provided by camera being provided, is adjusted, improves in time The installation effectiveness and precision of precast wall body, while also reducing difficulty of construction in precast wall body installation process.
Detailed description of the invention
The utility model is described in more detail with reference to the accompanying drawing.
Fig. 1 is the structural schematic diagram for the auxiliary system that the visualization precast shear wall of the utility model is accurately installed.
Appended drawing reference: 1- camera, 2- host, 3- handheld terminal display, 4- fixed terminal display, 5- are surveyed Away from probe, 6- precast wall body, 7- grout sleeve, 8- connection reinforcing bar, 9- floor, 10- tower crane cab, 11- data line.
Specific embodiment
As shown in Figure 1, the auxiliary system that this visualization precast shear wall is accurately installed, for precast wall body to be installed 6 accurate positioning;The bottom surface of the precast wall body 6 is equipped at intervals with grout sleeve 7;On floor 9 below precast wall body 6, it is right It answers and is reserved with connection reinforcing bar 8 at 7 position of grout sleeve of 6 bottom surface of precast wall body;
The auxiliary system further includes having camera 1, fixed terminal display 4, handheld terminal display 3 and host 2;It is described Camera 1 is mounted on the floor 9 immediately below precast wall body 6, at the position of connection reinforcing bar 8, can directly observe grouting Whether sleeve 7, which hits exactly, covers on connection reinforcing bar 8;The camera 1 is used to acquire position and the multidate information of precast wall body 6, and It is transmitted separately on fixed terminal display 4 and handheld terminal display 3 by host 2;The fixed terminal display 4 is installed It is connect in tower crane cab 10 and through host 2 with 1 signal of camera;The handheld terminal display 3 is grasped by construction personnel Make and pass through host 2 to connect with 1 signal of camera, to assist the installation of precast wall body 6.
It further include having range finding probe 5 in the present embodiment;The range finding probe 5 is the range finding probe with warning function, and It is mounted on the floor 9 immediately below precast wall body 6, to measure the height of drop of precast wall body 6;When precast wall body 6 is fallen to When preset alarm height, range finding probe 5 issues early warning sound.
In the present embodiment, the range finding probe 5 is connect by data line 11 with host 2;Wherein, host 2 is mounted on floor 9 Wifi hotspot module is set in upper and host 2;The host 2 is measured range finding probe 5 by built-in wifi hotspot module On distance information transmission to hand-held terminal display 3 and fixed terminal display 4, to assist the installation of precast wall body 6.
In the present embodiment, the camera 1 is connect by data line 11 with host 2;The host 2 passes through built-in wifi On the video information transmission that hot spot module acquires camera 1 to hand-held terminal display 3 and fixed terminal display 4, to Assist the installation of precast wall body 6.
In the present embodiment, connected between the range finding probe 5 and host 2 by wireless signal;Wherein, host 2 is mounted on Wifi hotspot module is set on floor 9 and in host 2;The host 2 is by built-in wifi hotspot module by range finding probe 5 On the distance information transmission measured to hand-held terminal display 3 and fixed terminal display 4, to assist the peace of precast wall body 6 Dress.
In the present embodiment, connected between the camera 1 and host 2 by wireless signal;The host 2 passes through built-in On the video information transmission that wifi hotspot module acquires camera 1 to hand-held terminal display 3 and fixed terminal display 4, To assist the installation of precast wall body 6.
In the present embodiment, the camera 1 is miniature webcam, and construction personnel is turned by wireless remote controller Dynamic control.
The construction method for the auxiliary system that this visualization precast shear wall is accurately installed, including steps are as follows.
Camera 1 and range finding probe 5 are mounted on precast wall body 6 to be lifted before the lifting of precast wall body 6 by step 1 On the floor 9 of underface.
Precast wall body 6 is lifted to the surface of design installation site by step 2.
Step 3, gradually whereabouts precast wall body 6, when 6 bottom surface of precast wall body apart from floor 9 be 300mm~1000mm when, open Dynamic range finding probe 5;Range finding probe 5 by received distance signal transmission to host 2, then by host 2 by distance signal be converted into away from From data, and by distance data transmission to hand-held terminal display 3 and fixed terminal display 4, handheld terminal display 3 and solid The data determined on terminal display 4 are gradually changed also with the whereabouts of precast wall body 6.
Step 4 starts camera 1, vision signal is transmitted to host by camera 1 when range finding probe 5 sounds an alarm 2;Video data is converted by vision signal by host 2 again, and video data transmission to hand-held terminal display 3 and is fixed eventually It holds on display 4, shows the grout sleeve of 6 bottom of precast wall body when on handheld terminal display 3 and fixed terminal display 4 in fact 7 location information and the location information of connection reinforcing bar 8.
Step 5, construction personnel pass through the location information of observation handheld terminal display 3 and fixed terminal display 4 and match It closes and coordinates, gradually fall to control precast wall body 6.
Step 6 stops prefabricated when the grout sleeve 7 of 6 bottom of precast wall body, which all corresponds to, to be set on connection reinforcing bar 8 Camera 1 and range finding probe 5 are taken out in the whereabouts of wall 6.
Step 7, whereabouts precast wall body 6 is in place, installs bearing diagonal and adjusts the verticality of precast wall body 6.
Step 8 repeats the process of step 1 to step 8, until all constructions of precast wall body 6 to be installed finish.
In the present embodiment, in step 1, before range finding probe 5 is installed, range finding probe 5 is set as when precast wall body 6 Bottom surface apart from floor 9 be 200mm~300mm when, range finding probe 5 sounds an alarm.
In the present embodiment, after precast wall body 6 lifts by crane, coordinate the view that precast wall body 6 is lifted into camera 1 by signalman After in wild range, continue to be fallen by signalman's coordination hoisting prefabricated wall 6 of tower department, tower department passes through real when fixed terminal display 4 The lifting dynamic for observing the precast wall body 6 that camera 1 provides, after 6 arrival floor certain altitude of precast wall body, range finding probe 5 When in fact by range data feedback on fixed terminal display 4 and handheld terminal display 3,6 arrival floor absolute altitude of precast wall body After upper 200mm, range finding probe 5 is sounded an alarm, and tower department passes through handheld terminal display 3 by fixed terminal display 4, erector The installation situation for observing the grout sleeve 7 of 6 lower part of precast wall body simultaneously, is adjusted in time.
In the present embodiment, the camera lens of the camera 1 upward, when pass through host 2 in fact for the video information special delivery of acquisition extremely On fixed terminal display 4 and handheld terminal display 3, pass through the fixed terminal display 4 being mounted in tower crane cab 10 And handheld terminal display 3 in construction personnel's hand is observed in fact when carrying out;Range finding probe 5 is installed simultaneously with camera 1, when pre- The lifting of wall 6 processed reaches top certain area, prompts and alarms, and the lifting of precast wall body 6 enters the slow play fine tuning stage, and gradually By fixed terminal display 4, whether face is connected with the grout sleeve 7 of the viewing of handheld terminal display 36 bottom of precast wall body Reinforcing bar 8 realizes the contraposition installation of precast wall body 6;The present embodiment is by tower crane driver and the visualized operation of construction personnel, not only The precision of the installation ensured, then while improve efficiency, ensure that the safety of installation, there is preferable benefit.
Above-described embodiment is not the exhaustion of specific embodiment, can also there is other embodiments, and above-described embodiment purpose exists In illustrating the utility model, rather than the protection scope of the utility model is limited, it is all from the utility model simple change Using all falling in the protection scope of the utility model.

Claims (7)

1. a kind of auxiliary system that visualization precast shear wall is accurately installed, for the accurate fixed of precast wall body (6) to be installed Position;It is characterized by: the bottom surface of the precast wall body (6) is equipped at intervals with grout sleeve (7);Building below precast wall body (6) Connection reinforcing bar (8) is reserved on plate (9), at grout sleeve (7) position of corresponding precast wall body (6) bottom surface;
The auxiliary system further includes having camera (1), fixed terminal display (4), handheld terminal display (3) and host (2); The camera (1) is mounted on the floor (9) immediately below precast wall body (6), at the position of connection reinforcing bar (8);This is taken the photograph As head (1) is transmitted separately to fixed terminal for acquiring position and the multidate information of precast wall body (6), and by host (2) On display (4) and handheld terminal display (3);The fixed terminal display (4) is mounted in tower crane cab (10), simultaneously It is connect by host (2) with camera (1) signal;The handheld terminal display (3) is operated by construction personnel and passes through host (2) it is connect with camera (1) signal, to assist the installation of precast wall body (6).
2. the auxiliary system that visualization precast shear wall according to claim 1 is accurately installed, it is characterised in that: further include There are range finding probe (5);The range finding probe (5) is the range finding probe with warning function, and under being mounted on precast wall body (6) just On the floor (9) of side, to measure the height of drop of precast wall body (6);When precast wall body (6) falls to preset alarm height When, range finding probe (5) issues early warning sound.
3. the auxiliary system that visualization precast shear wall according to claim 2 is accurately installed, it is characterised in that: the survey It is connect by data line (11) with host (2) away from probe (5);Wherein, host (2) is mounted on floor (9) and in host (2) Wifi hotspot module is set;The range information that the host (2) is measured range finding probe (5) by built-in wifi hotspot module It is transferred on handheld terminal display (3) and fixed terminal display (4), to assist the installation of precast wall body (6).
4. the auxiliary system that visualization precast shear wall according to claim 3 is accurately installed, it is characterised in that: described to take the photograph As head (1) is connect by data line (11) with host (2);The host (2) is by built-in wifi hotspot module by camera (1) on the video information transmission to hand-held terminal display (3) and fixed terminal display (4) acquired, to assist dry wall The installation of body (6).
5. the auxiliary system that visualization precast shear wall according to claim 2 is accurately installed, it is characterised in that: the survey Away from being connect between probe (5) and host (2) by wireless signal;Wherein, host (2) is mounted on floor (9) and host (2) Interior setting wifi hotspot module;The host (2) is believed by the distance that built-in wifi hotspot module measures range finding probe (5) Breath is transferred on handheld terminal display (3) and fixed terminal display (4), to assist the installation of precast wall body (6).
6. the auxiliary system that visualization precast shear wall according to claim 5 is accurately installed, it is characterised in that: described to take the photograph As being connect between head (1) and host (2) by wireless signal;The host (2) will be imaged by built-in wifi hotspot module It is prefabricated to assist on the video information transmission to hand-held terminal display (3) and fixed terminal display (4) of head (1) acquisition The installation of wall (6).
7. the auxiliary system that visualization precast shear wall according to claim 1 is accurately installed, it is characterised in that: described to take the photograph Picture head (1) is miniature webcam, and carries out rotation control by wireless remote controller.
CN201920142100.6U 2019-01-28 2019-01-28 A kind of auxiliary system that visualization precast shear wall is accurately installed Active CN209704045U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920142100.6U CN209704045U (en) 2019-01-28 2019-01-28 A kind of auxiliary system that visualization precast shear wall is accurately installed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920142100.6U CN209704045U (en) 2019-01-28 2019-01-28 A kind of auxiliary system that visualization precast shear wall is accurately installed

Publications (1)

Publication Number Publication Date
CN209704045U true CN209704045U (en) 2019-11-29

Family

ID=68640589

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920142100.6U Active CN209704045U (en) 2019-01-28 2019-01-28 A kind of auxiliary system that visualization precast shear wall is accurately installed

Country Status (1)

Country Link
CN (1) CN209704045U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109797974A (en) * 2019-01-28 2019-05-24 中建一局集团第二建筑有限公司 A kind of auxiliary system and its construction method that visualization precast shear wall is accurately installed
CN111779275A (en) * 2020-07-14 2020-10-16 武汉合创炬盛科技有限公司 Edge sealing construction pretreatment method for prefabricated concrete building communicating cavity
CN113187247A (en) * 2021-04-06 2021-07-30 湖北省工业建筑集团有限公司 Construction method of cast-in-situ cup-mouth foundation steel structure
CN115126267A (en) * 2022-07-25 2022-09-30 中建八局第三建设有限公司 Optical positioning control system and method applied to concrete member embedded joint bar alignment
CN116498153A (en) * 2023-06-28 2023-07-28 中铁城建集团第一工程有限公司 Component hoisting guiding device for accurately positioning embedded dowel bars of prefabricated wall body

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109797974A (en) * 2019-01-28 2019-05-24 中建一局集团第二建筑有限公司 A kind of auxiliary system and its construction method that visualization precast shear wall is accurately installed
CN111779275A (en) * 2020-07-14 2020-10-16 武汉合创炬盛科技有限公司 Edge sealing construction pretreatment method for prefabricated concrete building communicating cavity
CN113187247A (en) * 2021-04-06 2021-07-30 湖北省工业建筑集团有限公司 Construction method of cast-in-situ cup-mouth foundation steel structure
CN115126267A (en) * 2022-07-25 2022-09-30 中建八局第三建设有限公司 Optical positioning control system and method applied to concrete member embedded joint bar alignment
CN116498153A (en) * 2023-06-28 2023-07-28 中铁城建集团第一工程有限公司 Component hoisting guiding device for accurately positioning embedded dowel bars of prefabricated wall body
CN116498153B (en) * 2023-06-28 2023-08-29 中铁城建集团第一工程有限公司 Component hoisting guiding device for accurately positioning embedded dowel bars of prefabricated wall body

Similar Documents

Publication Publication Date Title
CN209704045U (en) A kind of auxiliary system that visualization precast shear wall is accurately installed
CN210108984U (en) Building facade detection device based on unmanned aerial vehicle
CN109797974A (en) A kind of auxiliary system and its construction method that visualization precast shear wall is accurately installed
CN107320885A (en) A kind of portable fire fighting device and its method of work based on unmanned plane
CN207390860U (en) Building tower crane intelligent assistance system
CN102505711A (en) System and method for monitoring displacement of foundation construction pipeline section of immersed tunnel
CN200973140Y (en) Laser target image transmission device for positioning
CN203740898U (en) Tower crane lifting hook visual control device with weight and height monitoring function
CN113653107B (en) Foundation pit monitoring method and system based on 5G + informatization
CN107728135A (en) Laser distance instruction device
CN109940570A (en) A kind of gate robot for overhauling
CN110327156A (en) A kind of Multifunctional pre-warning, emergency guide rod device
CN112281935B (en) Dynamic monitoring system and method for fan foundation ring
CN112265912A (en) Integrated operation system and method of lorry-mounted crane
CN111377360A (en) Tower crane unmanned system
CN115503787A (en) Rail transit car coupler coupling detection device and method
CN108801235A (en) Integral steel platform climbs guide post absolute altitude real-time monitoring system and its application method
CN205634710U (en) Tower crane remote control unit
CN114368690A (en) Gantry crane control method and system based on video real-time adjustment
CN109589586B (en) Novel automatic range finding score of javelin target device
CN218858430U (en) Railway shunting operation distance prompt system
CN207938194U (en) A kind of road berth lock
CN110453578A (en) A kind of urban road detection robot system
CN210862549U (en) Automatic leveling, centering and height measuring system for point positions