CN209704045U - A kind of auxiliary system that visualization precast shear wall is accurately installed - Google Patents
A kind of auxiliary system that visualization precast shear wall is accurately installed Download PDFInfo
- Publication number
- CN209704045U CN209704045U CN201920142100.6U CN201920142100U CN209704045U CN 209704045 U CN209704045 U CN 209704045U CN 201920142100 U CN201920142100 U CN 201920142100U CN 209704045 U CN209704045 U CN 209704045U
- Authority
- CN
- China
- Prior art keywords
- host
- terminal display
- wall body
- precast
- precast wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
A kind of auxiliary system that visualization precast shear wall is accurately installed, includes camera, fixed terminal display, handheld terminal display and host;The camera is mounted on the floor immediately below precast wall body, at the position of connection reinforcing bar;The camera is used to acquire position and the multidate information of precast wall body, and is transmitted separately on fixed terminal display and handheld terminal display by host;The fixed terminal display is mounted in tower crane cab and is connect by host with camera signals;The handheld terminal display is operated by construction personnel and passes through host and connect with camera signals, to assist the installation of precast wall body.Observer be easy to cause commander's mistake, wastes time and technical problem that construction risk is larger when the utility model solves traditional precast wall body installation positioning, the technical problem that also solve in traditional precast wall body installation process that difficulty of construction is big low with installation effectiveness.
Description
Technical field
The utility model relates to building engineering construction field, especially a kind of visualization precast shear wall is accurately installed auxiliary
Auxiliary system.
Background technique
Current Domestic assembled is in the initial stage greatly developed, and precast wall body connection is mostly connected as with grout sleeve
It is main, and need to carry out accurate sleeve and reinforcing bar contraposition in grout sleeve connection precast wall body installation process, otherwise precast wall body will
It can not install;Existing method is the holding plane mirror below precast wall body, and observer, which squats down, observes the alignment situation of sleeve,
And it is finely adjusted by intercom conning-tower department.But since the image in mirror is mirror image, observer needs one
Differentiation procedure be easy to cause commander's mistake, wastes time, and observer is observation of squatting down, unfavorable to operation safety.
Utility model content
The purpose of the utility model is to provide a kind of auxiliary systems that visualization precast shear wall is accurately installed, and to solve to pass
Observer be easy to cause commander's mistake, wastes time and the biggish skill of construction risk when the precast wall body of system installs positioning
Art problem, the technical problem that also to solve in traditional precast wall body installation process that difficulty of construction is big low with installation effectiveness.
To achieve the above object, the utility model adopts the following technical solution.
A kind of auxiliary system that visualization precast shear wall is accurately installed, for the accurate fixed of precast wall body to be installed
Position;The bottom surface of the precast wall body is equipped at intervals with grout sleeve;On the floor below precast wall body, corresponding precast wall body bottom surface
Grout sleeve position at be reserved with connection reinforcing bar;
The auxiliary system further includes having camera, fixed terminal display, handheld terminal display and host;The camera shooting
Head is mounted on the floor immediately below precast wall body, at the position of connection reinforcing bar;The camera is for acquiring precast wall body
Position and multidate information, and be transmitted separately on fixed terminal display and handheld terminal display by host;It is described
Fixed terminal display is mounted in tower crane cab and is connect by host with camera signals;The handheld terminal is shown
Device is operated by construction personnel and passes through host and connect with camera signals, to assist the installation of precast wall body.
It preferably, further include having range finding probe;The range finding probe is the range finding probe with warning function, and is mounted on
On floor immediately below precast wall body, to measure the height of drop of precast wall body;When precast wall body falls to preset alarm
When height, range finding probe issues early warning sound.
Preferably, the range finding probe is connect by data line with host;Wherein, host is mounted on floor and host
Interior setting wifi hotspot module;The distance information transmission that the host is measured range finding probe by built-in wifi hotspot module
Onto hand-held terminal display and fixed terminal display, to assist the installation of precast wall body.
Preferably, the camera is connect by data line with host;The host passes through built-in wifi hotspot module
On the video information transmission to hand-held terminal display and fixed terminal display that camera is acquired, to assist precast wall body
Installation.
Preferably, it is connected between the range finding probe and host by wireless signal;Wherein, host be mounted on floor,
And wifi hotspot module is set in host;The host is believed by the distance that built-in wifi hotspot module measures range finding probe
Breath is transferred on handheld terminal display and fixed terminal display, to assist the installation of precast wall body.
Preferably, it is connected between the camera and host by wireless signal;The host passes through built-in wifi heat
It is pre- to assist on the video information transmission that point module acquires camera to hand-held terminal display and fixed terminal display
The installation of wall processed.
Preferably, the camera is miniature webcam, and carries out rotation control by wireless remote controller.
The utility model has the characteristics that and beneficial effect compared with prior art.
1, the utility model installs camera on floor, when pass through host in fact the video information of acquisition be transferred to fixation
On terminal display and handheld terminal display, pass through the fixed terminal display being mounted in tower crane cab and constructor
Handheld terminal display in member's hand is observed in fact when carrying out;Range finding probe is installed simultaneously with camera, when precast wall body is lifted into
It up to top certain area, prompts and alarms, the lifting of precast wall body enters the slow play fine tuning stage, and it is aobvious to have stepped through fixed terminal
Show that whether face connects reinforcing bar to device with the grout sleeve of handheld terminal display viewing precast wall body bottom, realizes precast wall body
Contraposition installation;This design of the utility model, by tower crane driver and the visualized operation of construction personnel, the peace not only ensured
The precision of dress, improve precast wall body installation efficiency, and according to distance in place when show in fact, to greatest extent guarantee lifting
The safety of operation.
2, the utility model installs range finding probe on the floor below precast wall body;And the range finding probe is with report
The range finding probe of alert function;When precast wall body falls to preset alarm height, range finding probe issue early warning sound, for
Construction personnel makes prompt, it is ensured that installation exercise safety.
3, in the method for the utility model, after precast wall body lifting, coordinate for precast wall body to be lifted by signalman
Camera within sweep of the eye after, continue to coordinate the hoisting prefabricated wall of tower department by signalman to fall, tower department is shown by fixed terminal
Show the lifting dynamic that the precast wall body of camera offer is provided in fact when device, after precast wall body arrival floor certain altitude, ranging
In fact by range data feedback on fixed terminal display and handheld terminal display when probe, precast wall body arrival floor absolute altitude
After upper 200mm ~ 300mm, range finding probe is sounded an alarm, and tower department is aobvious by handheld terminal by fixed terminal display, erector
Show device while the installation situation of the grout sleeve of the precast wall body lower part provided by camera being provided, is adjusted, improves in time
The installation effectiveness and precision of precast wall body, while also reducing difficulty of construction in precast wall body installation process.
Detailed description of the invention
The utility model is described in more detail with reference to the accompanying drawing.
Fig. 1 is the structural schematic diagram for the auxiliary system that the visualization precast shear wall of the utility model is accurately installed.
Appended drawing reference: 1- camera, 2- host, 3- handheld terminal display, 4- fixed terminal display, 5- are surveyed
Away from probe, 6- precast wall body, 7- grout sleeve, 8- connection reinforcing bar, 9- floor, 10- tower crane cab, 11- data line.
Specific embodiment
As shown in Figure 1, the auxiliary system that this visualization precast shear wall is accurately installed, for precast wall body to be installed
6 accurate positioning;The bottom surface of the precast wall body 6 is equipped at intervals with grout sleeve 7;On floor 9 below precast wall body 6, it is right
It answers and is reserved with connection reinforcing bar 8 at 7 position of grout sleeve of 6 bottom surface of precast wall body;
The auxiliary system further includes having camera 1, fixed terminal display 4, handheld terminal display 3 and host 2;It is described
Camera 1 is mounted on the floor 9 immediately below precast wall body 6, at the position of connection reinforcing bar 8, can directly observe grouting
Whether sleeve 7, which hits exactly, covers on connection reinforcing bar 8;The camera 1 is used to acquire position and the multidate information of precast wall body 6, and
It is transmitted separately on fixed terminal display 4 and handheld terminal display 3 by host 2;The fixed terminal display 4 is installed
It is connect in tower crane cab 10 and through host 2 with 1 signal of camera;The handheld terminal display 3 is grasped by construction personnel
Make and pass through host 2 to connect with 1 signal of camera, to assist the installation of precast wall body 6.
It further include having range finding probe 5 in the present embodiment;The range finding probe 5 is the range finding probe with warning function, and
It is mounted on the floor 9 immediately below precast wall body 6, to measure the height of drop of precast wall body 6;When precast wall body 6 is fallen to
When preset alarm height, range finding probe 5 issues early warning sound.
In the present embodiment, the range finding probe 5 is connect by data line 11 with host 2;Wherein, host 2 is mounted on floor 9
Wifi hotspot module is set in upper and host 2;The host 2 is measured range finding probe 5 by built-in wifi hotspot module
On distance information transmission to hand-held terminal display 3 and fixed terminal display 4, to assist the installation of precast wall body 6.
In the present embodiment, the camera 1 is connect by data line 11 with host 2;The host 2 passes through built-in wifi
On the video information transmission that hot spot module acquires camera 1 to hand-held terminal display 3 and fixed terminal display 4, to
Assist the installation of precast wall body 6.
In the present embodiment, connected between the range finding probe 5 and host 2 by wireless signal;Wherein, host 2 is mounted on
Wifi hotspot module is set on floor 9 and in host 2;The host 2 is by built-in wifi hotspot module by range finding probe 5
On the distance information transmission measured to hand-held terminal display 3 and fixed terminal display 4, to assist the peace of precast wall body 6
Dress.
In the present embodiment, connected between the camera 1 and host 2 by wireless signal;The host 2 passes through built-in
On the video information transmission that wifi hotspot module acquires camera 1 to hand-held terminal display 3 and fixed terminal display 4,
To assist the installation of precast wall body 6.
In the present embodiment, the camera 1 is miniature webcam, and construction personnel is turned by wireless remote controller
Dynamic control.
The construction method for the auxiliary system that this visualization precast shear wall is accurately installed, including steps are as follows.
Camera 1 and range finding probe 5 are mounted on precast wall body 6 to be lifted before the lifting of precast wall body 6 by step 1
On the floor 9 of underface.
Precast wall body 6 is lifted to the surface of design installation site by step 2.
Step 3, gradually whereabouts precast wall body 6, when 6 bottom surface of precast wall body apart from floor 9 be 300mm~1000mm when, open
Dynamic range finding probe 5;Range finding probe 5 by received distance signal transmission to host 2, then by host 2 by distance signal be converted into away from
From data, and by distance data transmission to hand-held terminal display 3 and fixed terminal display 4, handheld terminal display 3 and solid
The data determined on terminal display 4 are gradually changed also with the whereabouts of precast wall body 6.
Step 4 starts camera 1, vision signal is transmitted to host by camera 1 when range finding probe 5 sounds an alarm
2;Video data is converted by vision signal by host 2 again, and video data transmission to hand-held terminal display 3 and is fixed eventually
It holds on display 4, shows the grout sleeve of 6 bottom of precast wall body when on handheld terminal display 3 and fixed terminal display 4 in fact
7 location information and the location information of connection reinforcing bar 8.
Step 5, construction personnel pass through the location information of observation handheld terminal display 3 and fixed terminal display 4 and match
It closes and coordinates, gradually fall to control precast wall body 6.
Step 6 stops prefabricated when the grout sleeve 7 of 6 bottom of precast wall body, which all corresponds to, to be set on connection reinforcing bar 8
Camera 1 and range finding probe 5 are taken out in the whereabouts of wall 6.
Step 7, whereabouts precast wall body 6 is in place, installs bearing diagonal and adjusts the verticality of precast wall body 6.
Step 8 repeats the process of step 1 to step 8, until all constructions of precast wall body 6 to be installed finish.
In the present embodiment, in step 1, before range finding probe 5 is installed, range finding probe 5 is set as when precast wall body 6
Bottom surface apart from floor 9 be 200mm~300mm when, range finding probe 5 sounds an alarm.
In the present embodiment, after precast wall body 6 lifts by crane, coordinate the view that precast wall body 6 is lifted into camera 1 by signalman
After in wild range, continue to be fallen by signalman's coordination hoisting prefabricated wall 6 of tower department, tower department passes through real when fixed terminal display 4
The lifting dynamic for observing the precast wall body 6 that camera 1 provides, after 6 arrival floor certain altitude of precast wall body, range finding probe 5
When in fact by range data feedback on fixed terminal display 4 and handheld terminal display 3,6 arrival floor absolute altitude of precast wall body
After upper 200mm, range finding probe 5 is sounded an alarm, and tower department passes through handheld terminal display 3 by fixed terminal display 4, erector
The installation situation for observing the grout sleeve 7 of 6 lower part of precast wall body simultaneously, is adjusted in time.
In the present embodiment, the camera lens of the camera 1 upward, when pass through host 2 in fact for the video information special delivery of acquisition extremely
On fixed terminal display 4 and handheld terminal display 3, pass through the fixed terminal display 4 being mounted in tower crane cab 10
And handheld terminal display 3 in construction personnel's hand is observed in fact when carrying out;Range finding probe 5 is installed simultaneously with camera 1, when pre-
The lifting of wall 6 processed reaches top certain area, prompts and alarms, and the lifting of precast wall body 6 enters the slow play fine tuning stage, and gradually
By fixed terminal display 4, whether face is connected with the grout sleeve 7 of the viewing of handheld terminal display 36 bottom of precast wall body
Reinforcing bar 8 realizes the contraposition installation of precast wall body 6;The present embodiment is by tower crane driver and the visualized operation of construction personnel, not only
The precision of the installation ensured, then while improve efficiency, ensure that the safety of installation, there is preferable benefit.
Above-described embodiment is not the exhaustion of specific embodiment, can also there is other embodiments, and above-described embodiment purpose exists
In illustrating the utility model, rather than the protection scope of the utility model is limited, it is all from the utility model simple change
Using all falling in the protection scope of the utility model.
Claims (7)
1. a kind of auxiliary system that visualization precast shear wall is accurately installed, for the accurate fixed of precast wall body (6) to be installed
Position;It is characterized by: the bottom surface of the precast wall body (6) is equipped at intervals with grout sleeve (7);Building below precast wall body (6)
Connection reinforcing bar (8) is reserved on plate (9), at grout sleeve (7) position of corresponding precast wall body (6) bottom surface;
The auxiliary system further includes having camera (1), fixed terminal display (4), handheld terminal display (3) and host (2);
The camera (1) is mounted on the floor (9) immediately below precast wall body (6), at the position of connection reinforcing bar (8);This is taken the photograph
As head (1) is transmitted separately to fixed terminal for acquiring position and the multidate information of precast wall body (6), and by host (2)
On display (4) and handheld terminal display (3);The fixed terminal display (4) is mounted in tower crane cab (10), simultaneously
It is connect by host (2) with camera (1) signal;The handheld terminal display (3) is operated by construction personnel and passes through host
(2) it is connect with camera (1) signal, to assist the installation of precast wall body (6).
2. the auxiliary system that visualization precast shear wall according to claim 1 is accurately installed, it is characterised in that: further include
There are range finding probe (5);The range finding probe (5) is the range finding probe with warning function, and under being mounted on precast wall body (6) just
On the floor (9) of side, to measure the height of drop of precast wall body (6);When precast wall body (6) falls to preset alarm height
When, range finding probe (5) issues early warning sound.
3. the auxiliary system that visualization precast shear wall according to claim 2 is accurately installed, it is characterised in that: the survey
It is connect by data line (11) with host (2) away from probe (5);Wherein, host (2) is mounted on floor (9) and in host (2)
Wifi hotspot module is set;The range information that the host (2) is measured range finding probe (5) by built-in wifi hotspot module
It is transferred on handheld terminal display (3) and fixed terminal display (4), to assist the installation of precast wall body (6).
4. the auxiliary system that visualization precast shear wall according to claim 3 is accurately installed, it is characterised in that: described to take the photograph
As head (1) is connect by data line (11) with host (2);The host (2) is by built-in wifi hotspot module by camera
(1) on the video information transmission to hand-held terminal display (3) and fixed terminal display (4) acquired, to assist dry wall
The installation of body (6).
5. the auxiliary system that visualization precast shear wall according to claim 2 is accurately installed, it is characterised in that: the survey
Away from being connect between probe (5) and host (2) by wireless signal;Wherein, host (2) is mounted on floor (9) and host (2)
Interior setting wifi hotspot module;The host (2) is believed by the distance that built-in wifi hotspot module measures range finding probe (5)
Breath is transferred on handheld terminal display (3) and fixed terminal display (4), to assist the installation of precast wall body (6).
6. the auxiliary system that visualization precast shear wall according to claim 5 is accurately installed, it is characterised in that: described to take the photograph
As being connect between head (1) and host (2) by wireless signal;The host (2) will be imaged by built-in wifi hotspot module
It is prefabricated to assist on the video information transmission to hand-held terminal display (3) and fixed terminal display (4) of head (1) acquisition
The installation of wall (6).
7. the auxiliary system that visualization precast shear wall according to claim 1 is accurately installed, it is characterised in that: described to take the photograph
Picture head (1) is miniature webcam, and carries out rotation control by wireless remote controller.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920142100.6U CN209704045U (en) | 2019-01-28 | 2019-01-28 | A kind of auxiliary system that visualization precast shear wall is accurately installed |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920142100.6U CN209704045U (en) | 2019-01-28 | 2019-01-28 | A kind of auxiliary system that visualization precast shear wall is accurately installed |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209704045U true CN209704045U (en) | 2019-11-29 |
Family
ID=68640589
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920142100.6U Active CN209704045U (en) | 2019-01-28 | 2019-01-28 | A kind of auxiliary system that visualization precast shear wall is accurately installed |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209704045U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109797974A (en) * | 2019-01-28 | 2019-05-24 | 中建一局集团第二建筑有限公司 | A kind of auxiliary system and its construction method that visualization precast shear wall is accurately installed |
CN111779275A (en) * | 2020-07-14 | 2020-10-16 | 武汉合创炬盛科技有限公司 | Edge sealing construction pretreatment method for prefabricated concrete building communicating cavity |
CN113187247A (en) * | 2021-04-06 | 2021-07-30 | 湖北省工业建筑集团有限公司 | Construction method of cast-in-situ cup-mouth foundation steel structure |
CN115126267A (en) * | 2022-07-25 | 2022-09-30 | 中建八局第三建设有限公司 | Optical positioning control system and method applied to concrete member embedded joint bar alignment |
CN116498153A (en) * | 2023-06-28 | 2023-07-28 | 中铁城建集团第一工程有限公司 | Component hoisting guiding device for accurately positioning embedded dowel bars of prefabricated wall body |
-
2019
- 2019-01-28 CN CN201920142100.6U patent/CN209704045U/en active Active
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109797974A (en) * | 2019-01-28 | 2019-05-24 | 中建一局集团第二建筑有限公司 | A kind of auxiliary system and its construction method that visualization precast shear wall is accurately installed |
CN111779275A (en) * | 2020-07-14 | 2020-10-16 | 武汉合创炬盛科技有限公司 | Edge sealing construction pretreatment method for prefabricated concrete building communicating cavity |
CN113187247A (en) * | 2021-04-06 | 2021-07-30 | 湖北省工业建筑集团有限公司 | Construction method of cast-in-situ cup-mouth foundation steel structure |
CN115126267A (en) * | 2022-07-25 | 2022-09-30 | 中建八局第三建设有限公司 | Optical positioning control system and method applied to concrete member embedded joint bar alignment |
CN116498153A (en) * | 2023-06-28 | 2023-07-28 | 中铁城建集团第一工程有限公司 | Component hoisting guiding device for accurately positioning embedded dowel bars of prefabricated wall body |
CN116498153B (en) * | 2023-06-28 | 2023-08-29 | 中铁城建集团第一工程有限公司 | Component hoisting guiding device for accurately positioning embedded dowel bars of prefabricated wall body |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209704045U (en) | A kind of auxiliary system that visualization precast shear wall is accurately installed | |
CN210108984U (en) | Building facade detection device based on unmanned aerial vehicle | |
CN109797974A (en) | A kind of auxiliary system and its construction method that visualization precast shear wall is accurately installed | |
CN107320885A (en) | A kind of portable fire fighting device and its method of work based on unmanned plane | |
CN207390860U (en) | Building tower crane intelligent assistance system | |
CN102505711A (en) | System and method for monitoring displacement of foundation construction pipeline section of immersed tunnel | |
CN200973140Y (en) | Laser target image transmission device for positioning | |
CN203740898U (en) | Tower crane lifting hook visual control device with weight and height monitoring function | |
CN113653107B (en) | Foundation pit monitoring method and system based on 5G + informatization | |
CN107728135A (en) | Laser distance instruction device | |
CN109940570A (en) | A kind of gate robot for overhauling | |
CN110327156A (en) | A kind of Multifunctional pre-warning, emergency guide rod device | |
CN112281935B (en) | Dynamic monitoring system and method for fan foundation ring | |
CN112265912A (en) | Integrated operation system and method of lorry-mounted crane | |
CN111377360A (en) | Tower crane unmanned system | |
CN115503787A (en) | Rail transit car coupler coupling detection device and method | |
CN108801235A (en) | Integral steel platform climbs guide post absolute altitude real-time monitoring system and its application method | |
CN205634710U (en) | Tower crane remote control unit | |
CN114368690A (en) | Gantry crane control method and system based on video real-time adjustment | |
CN109589586B (en) | Novel automatic range finding score of javelin target device | |
CN218858430U (en) | Railway shunting operation distance prompt system | |
CN207938194U (en) | A kind of road berth lock | |
CN110453578A (en) | A kind of urban road detection robot system | |
CN210862549U (en) | Automatic leveling, centering and height measuring system for point positions | |
CN214372380U (en) | Intelligent device capable of detecting perpendicularity of high pier column template in real time |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |