CN209703861U - A kind of construction drainage pipe exterior wall installation fixed structure - Google Patents

A kind of construction drainage pipe exterior wall installation fixed structure Download PDF

Info

Publication number
CN209703861U
CN209703861U CN201920250588.4U CN201920250588U CN209703861U CN 209703861 U CN209703861 U CN 209703861U CN 201920250588 U CN201920250588 U CN 201920250588U CN 209703861 U CN209703861 U CN 209703861U
Authority
CN
China
Prior art keywords
drainpipe
embedded
pipe clamp
fixed
embedded board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920250588.4U
Other languages
Chinese (zh)
Inventor
周常胜
王春晖
张艺博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Construction Group Co ltd
Qingjian Group Co Ltd
Original Assignee
Qingjian Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingjian Group Co Ltd filed Critical Qingjian Group Co Ltd
Priority to CN201920250588.4U priority Critical patent/CN209703861U/en
Application granted granted Critical
Publication of CN209703861U publication Critical patent/CN209703861U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Building Environments (AREA)

Abstract

The utility model discloses a kind of construction drainage pipe exterior walls to install fixed structure, including external wall (1) and drainpipe (6), it is fitted on the outer surface of external wall (1) insulating layer (2), is fitted with decorative layer (3) on insulating layer (2) outer surface;It is pre-buried in the external wall (1) that there are two pre-buried fixation kits, pre-buried fixation kit includes embedded board (5), the embedded board (5) of two pre-buried fixation kits is arranged in parallel, one end of embedded board (5) is embedded in advance in external wall (1), and the other end of embedded board (5) passes through external wall (1), insulating layer (2), decorative layer (3) and end and protrudes from decorative layer (3) surface;Pipe clamp pipe clamp and drainpipe after be provided with before drainpipe between two embedded boards (5), and drainpipe (6) is set to before drainpipe after pipe clamp and drainpipe between pipe clamp.The utility model has the advantage of it can overcome the disadvantages of the prior art, novelty reasonable in design.

Description

A kind of construction drainage pipe exterior wall installation fixed structure
Technical field
The utility model relates to a kind of construction drainage pipe exterior walls to install fixed structure, belong to building field.
Background technique
China's building construction scale is very huge, is finished a house every year in recent years up to 16 hundred million -20 hundred million square metres.It is so huge Big construction scope is unprecedented in the world;In China's history, this decades is building construction high-tide period.It is existing flat Top building can mount drainpipe on the outside wall of building since roof is easier to accumulate rainwater.Due to present building body segment Can heat preservation requirement, the insulating layer of 12-15 cm thick can be covered on general stair side wall, drainpipe uses one when fixed A annular clip-ring is placed on drainpipe, and annular clip-ring is connect with outer expansion bolt within the walls by single screw rod and realizes drainpipe It is fixed.This fixed form support force is insufficient, and drainpipe is easy to happen shaking by water impact when overboard, and generates larger Noise.
Utility model content
The technical solution of the utility model is for existing in the prior art: " drainpipe uses an annular when fixed Retaining ring is placed on drainpipe, and annular clip-ring connect the fixation for realizing drainpipe by single screw rod with outer expansion bolt within the walls. This fixed form support force is insufficient, and drainpipe is easy to happen shaking by water impact when overboard, and generates biggish make an uproar The deficiency of sound " provides a kind of construction drainage pipe exterior wall installation fixed structure.
In order to solve the above technical problems, the technical scheme adopted by the utility model is that, a kind of construction drainage pipe exterior wall installation Fixed structure, including external wall (1) and drainpipe (6) are fitted with insulating layer (2) on the outer surface of external wall (1), are kept the temperature Layer is fitted with decorative layer (3) on (2) outer surface;It is pre-buried in the external wall (1) that there are two pre-buried fixation kit, pre-buried fixations Component includes embedded board (5), and the embedded board (5) of two pre-buried fixation kits is arranged in parallel, and one end of embedded board (5) is embedded in advance to be built It builds in exterior wall (1), it is prominent that the other end of embedded board (5) passes through external wall (1), insulating layer (2), decorative layer (3) and end In decorative layer (3) surface;It is provided with before drainpipe that pipe clamp, drainpipe (6) are set after pipe clamp and drainpipe between two embedded boards (5) It is placed in front of drainpipe after pipe clamp and drainpipe between pipe clamp, the both ends before drainpipe after the both ends of pipe clamp, drainpipe between pipe clamp It is fixedly connected respectively with two embedded boards (5);Resilient support is provided between pipe clamp and decorative layer (3) surface after the drainpipe It pads (7).
In the technical solution of the application, drainpipe (6) is fixed on two by pipe clamp after pipe clamp before drainpipe and drainpipe Between a embedded board (5), two embedded boards (5) provide support force for the both ends of pipe clamp after pipe clamp, drainpipe before drainpipe, and The end of two embedded boards (5) is embedded in external wall (1) in advance and is fixed, so that pipe clamp after pipe clamp, drainpipe before drainpipe The support force at both ends is higher, and when there is water flow to flow through drainpipe (6), drainpipe (6) can be provided with effective rigid support, drop The shaking of low drainpipe (6) and entire drainpipe exterior wall installation fixed structure.After drainpipe pipe clamp and decorative layer (3) surface it Between be provided with resilient support pad (7), drainpipe (6) vibrate when, resilient support pad (7) be used as energy absorbing component, reduce drainpipe (6) vibration, thereby reduces noise.
Optimization, above-mentioned construction drainage pipe exterior wall installs fixed structure, and pipe clamp is by two splicing components after the drainpipe Composition, splicing component include a rear carrier plate (81), and one end of rear carrier plate (81) is provided with connection bending piece (82), rear carrier plate (81) the other end is provided with segmental arc (83);The connection bending piece (82) of two splicing components fits in two embedded boards respectively (5) on and fixed with embedded board (5), the segmental arcs (83) of two splicing components is to being connected in arc and fit in drainpipe (6) Outer surface;Resilient support pad (7) is set between segmental arc (83) and decorative layer (3) surface;Drainpipe front tube sandwiched is placed in two It is between the connection bending piece (82) of a splicing component and fixed with bending piece (82) are connect;The segmental arc (83) and drainpipe (6) rear portion rubber pad (86) are provided between surface.
In the application, pipe clamp is fitted on embedded board (5) by connecting bending piece (82) after drainpipe, so that after drainpipe Pipe clamp can be bonded fixation with embedded board (5), and two segmental arcs (83) can fit in the surface of drainpipe (6), increase draining The contact area of pipe clamp and drainpipe (6) after pipe, and then fix tightly soundness of the pipe clamp to drainpipe (6) after increase drainpipe.Afterwards Portion's rubber pad (86) can increase the contact friction between drainpipe (6) and segmental arc (83), and rear portion rubber pad (86) energy It is enough used as an energy absorbing component, when drainpipe (6) are shaken, rear portion rubber pad (86) can absorb vibration, reduce the row of being transferred to The vibration of pipe clamp after water pipe, and then the vibration of embedded board (5) is reduced, prevent embedded board (5) from connecting due to vibration with external wall (1) Connect loosening.Resilient support pad (7), rear portion rubber pad (86) can be the energy-absorbing resilient cushion of silicone rubber material.
Optimization, above-mentioned construction drainage pipe exterior wall installs fixed structure, and the end of the segmental arc (83) is connected with L-type Rear support plate (84), the end and segmental arc (83) of rear support plate (84) are fixed, the rear support plate of two splicing components (84) T-type is fitted into and by resilient support pad (7) and decorative layer (3) surface compressive contact.
In the application, the end of segmental arc (83) is provided with the rear support plate (84) of L-type, rear support plate (84) docking To be contacted by resilient support pad (7) with decorative layer (3) surface after T-type, resilient support pad (7) forms pipe clamp and wall after drainpipe Damping between body absorbs influence of the pipe clamp vibration to wall after reducing drainpipe, and pipe clamp is transferred to after reducing drainpipe The noise of wall.
Optimization, above-mentioned construction drainage pipe exterior wall installs fixed structure, the rear carrier plate (81), connection bending piece (82), Segmental arc (83), rear support plate (84) are by metal plate one bending and molding.
In the application, splicing component is made using the metal plate of bending and molding, being capable of the company of reduction relative to the form of welding The internal stress at place is connect, so that the intensity of pipe clamp is higher after splicing component, drainpipe, the service life is longer.
Optimization, above-mentioned construction drainage pipe exterior wall installs fixed structure, is provided with rear end screw thread between two embedded boards (5) Bar (85), the both ends of rear end threaded rod (85) are each passed through an embedded board (5) and are fixed by nut and embedded board (5), after The middle section at end threaded rod (85) passes through two rear support plates (84) and two rear support plates (84) is fitted into T-type, rear end Threaded rod (85) is fixed with rear support plate (84) by nut.
In the application, rear end threaded rod (85) are provided between two embedded boards (5), rear end threaded rod (85) support two A embedded board (5) improves rigidity of two embedded boards (5) close to decorative layer (3) side, and then it is right to improve embedded board (5) Before drainpipe after pipe clamp, drainpipe pipe clamp support.
Optimization, above-mentioned construction drainage pipe exterior wall installs fixed structure, and the drainpipe front tube folder is set in parallel including several The front end fixed link (9) set, the both ends of front end fixed link (9) are each passed through an embedded board (5) and pass through spiral shell with embedded board (5) Mother is fixed;The middle section of the front end fixed link (9) is provided with an arc fold bending (91), the bending opening court of arc fold bending (91) It is contacted to the bending opening of drainpipe (6) and arc fold bending (91) with drainpipe (6) surface.
In the application, by the side of multiple front end fixed link (9) banding drainpipes (6), pass through pipe clamp hoop after drainpipe The other side of close-up water pipe (6), two sides of pipe clamp banding drainpipe (6) and by drainpipe after front end fixed link (9) and drainpipe (6) it is fixed between two embedded boards (5), increases the firm supporting degree of drainpipe (6).Arc fold bending (91) increases front end The contact area of fixed link (9) and drainpipe (6) surface increases fixation of the front end fixed link (9) to drainpipe (6) Degree.Using the form of the relatively whole plate of multiple front end fixed links (9), banding can be carried out to the surface many places of drainpipe (6), Increase the fix tightly soundness to drainpipe (6).
Optimization, above-mentioned construction drainage pipe exterior wall installs fixed structure, and the pre-buried fixation kit further includes two inside Fixed plate (4), internal fixed plate (4) are embedded in advance in external wall (1), and embedded board (5) is arranged simultaneously perpendicular to internal fixed plate (4) And the end of embedded board (5) is fixedly welded in the middle part of internal fixed plate (4).
In the application, embedded board (5) forms the structure of T-type with internal fixed plate (4), and internal fixed plate (4) is pre-buried The end of embedded board (5) and the fix tightly soundness of external wall (1) can be increased in the external wall (1).
Optimization, above-mentioned construction drainage pipe exterior wall installs fixed structure, table in the bending opening of the arc fold bending (91) Front rubber pad (92) are provided between face and drainpipe (6) surface.
In the application, front rubber pad (92) forms a resilient cushion between arc fold bending (91) and drainpipe (6), drop Low drainpipe (6) is transferred to the vibration of arc fold bending (91).And front rubber pad (92) increases arc fold bending (91) and row Frictional force between water pipe (6), and then the firmness of the connection between front end fixed link (9) and drainpipe (6) is improved, before preventing It is moved on drainpipe (6) surface at end fixed link (9).
The utility model has the advantage of it can overcome the disadvantages of the prior art, novelty reasonable in design.The application's In technical solution, drainpipe (6) is fixed between two embedded boards (5) by pipe clamp after pipe clamp before drainpipe and drainpipe, Two embedded boards (5) provide support force for the both ends of pipe clamp after pipe clamp, drainpipe before drainpipe, and two embedded boards (5) End is embedded in external wall (1) in advance and is fixed so that before drainpipe after pipe clamp, drainpipe pipe clamp both ends support force compared with Height can provide effective rigid support to drainpipe (6) when there is water flow to flow through drainpipe (6), reduce drainpipe (6) with And the shaking of entire drainpipe exterior wall installation fixed structure.It is arranged between pipe clamp and decorative layer (3) surface after drainpipe flexible Supporting pad (7), when drainpipe (6) vibrate, resilient support pad (7) is used as energy absorbing component, reduces the vibration of drainpipe (6), into And reduce noise.Compared with the existing technology, the technical solution of the application improves connection of the drainpipe (6) on external wall Firmness carries out effective connection support to drainpipe (6), prevents drainpipe (6) from falling off, and reduce drainpipe (6) transmitting To the shockproofness of drainpipe exterior wall installation fixed structure, external wall, noise is effectively reduced.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the A-A cross-sectional view of Fig. 1;
Fig. 3 is the structural schematic diagram of splicing component in the utility model.
Specific embodiment
The technical characterstic of the utility model is further described with specific embodiment with reference to the accompanying drawing.
As shown, the utility model be a kind of construction drainage pipe exterior wall install fixed structure, including external wall (1) and Drainpipe (6) is fitted with insulating layer (2) on the outer surface of external wall (1), is fitted with decorative layer on insulating layer (2) outer surface (3);Pre-buried there are two pre-buried fixation kit in the external wall (1), pre-buried fixation kit includes embedded board (5), and two pre- The embedded board (5) for burying fixation kit is arranged in parallel, and one end of embedded board (5) is embedded in advance in external wall (1), embedded board (5) The other end passes through external wall (1), insulating layer (2), decorative layer (3) and end and protrudes from decorative layer (3) surface;Two pre-buried It is provided with before drainpipe that pipe clamp, drainpipe (6) are set to pipe clamp and drainpipe before drainpipe after pipe clamp and drainpipe between plate (5) Afterwards between pipe clamp, the both ends before drainpipe after the both ends of pipe clamp, drainpipe between pipe clamp are fixed with two embedded boards (5) respectively to be connected It connects;Resilient support pad (7) is provided with after the drainpipe between pipe clamp and decorative layer (3) surface.
In the technical solution of the application, drainpipe (6) is fixed on two by pipe clamp after pipe clamp before drainpipe and drainpipe Between a embedded board (5), two embedded boards (5) provide support force for the both ends of pipe clamp after pipe clamp, drainpipe before drainpipe, and The end of two embedded boards (5) is embedded in external wall (1) in advance and is fixed, so that pipe clamp after pipe clamp, drainpipe before drainpipe The support force at both ends is higher, and when there is water flow to flow through drainpipe (6), drainpipe (6) can be provided with effective rigid support, drop The shaking of low drainpipe (6) and entire drainpipe exterior wall installation fixed structure.After drainpipe pipe clamp and decorative layer (3) surface it Between be provided with resilient support pad (7), drainpipe (6) vibrate when, resilient support pad (7) be used as energy absorbing component, reduce drainpipe (6) vibration, thereby reduces noise.
Pipe clamp is made of two splicing components after the drainpipe, and splicing component includes a rear carrier plate (81), rear carrier plate (81) one end is provided with connection bending piece (82), and the other end of rear carrier plate (81) is provided with segmental arc (83);Two splicing groups The connection bending piece (82) of part fits on two embedded boards (5) and fixed with embedded board (5), the arc of two splicing components respectively Shape section (83) is to being connected in arc and fit in the outer surfaces of drainpipe (6);Resilient support pad (7) is set to segmental arc (83) and dress It adorns between layer (3) surface;Drainpipe front tube sandwiched is placed between the connection bending piece (82) of two splicing components and rolls over connecting Bending (82) is fixed;Rear portion rubber pad (86) are provided between the segmental arc (83) and drainpipe (6) surface.
In the application, pipe clamp is fitted on embedded board (5) by connecting bending piece (82) after drainpipe, so that after drainpipe Pipe clamp can be bonded fixation with embedded board (5), and two segmental arcs (83) can fit in the surface of drainpipe (6), increase draining The contact area of pipe clamp and drainpipe (6) after pipe, and then fix tightly soundness of the pipe clamp to drainpipe (6) after increase drainpipe.Afterwards Portion's rubber pad (86) can increase the contact friction between drainpipe (6) and segmental arc (83), and rear portion rubber pad (86) energy It is enough used as an energy absorbing component, when drainpipe (6) are shaken, rear portion rubber pad (86) can absorb vibration, reduce the row of being transferred to The vibration of pipe clamp after water pipe, and then the vibration of embedded board (5) is reduced, prevent embedded board (5) from connecting due to vibration with external wall (1) Connect loosening.Resilient support pad (7), rear portion rubber pad (86) can be the energy-absorbing resilient cushion of silicone rubber material.
The end of the segmental arc (83) is connected with the rear support plate (84) of L-type, the end of rear support plate (84) with Segmental arc (83) is fixed, and the rear support plate (84) of two splicing components fits into T-type and by resilient support pad (7) and decoration Layer (3) surface compressive contact.
In the application, the end of segmental arc (83) is provided with the rear support plate (84) of L-type, rear support plate (84) docking To be contacted by resilient support pad (7) with decorative layer (3) surface after T-type, resilient support pad (7) forms pipe clamp and wall after drainpipe Damping between body absorbs influence of the pipe clamp vibration to wall after reducing drainpipe, and pipe clamp is transferred to after reducing drainpipe The noise of wall.
The rear carrier plate (81), connection bending piece (82), segmental arc (83), rear support plate (84) are integrally rolled over by metal plate Roll forming.
In the application, splicing component is made using the metal plate of bending and molding, being capable of the company of reduction relative to the form of welding The internal stress at place is connect, so that the intensity of pipe clamp is higher after splicing component, drainpipe, the service life is longer.
It is provided with rear end threaded rod (85) between two embedded boards (5), the both ends of rear end threaded rod (85) are each passed through one A embedded board (5) is simultaneously fixed by nut and embedded board (5), and the middle section of rear end threaded rod (85) passes through two rear support plates (84) and by two rear support plates (84) T-type is fitted into, rear end threaded rod (85) and rear support plate (84) are solid by nut It is fixed.
In the application, rear end threaded rod (85) are provided between two embedded boards (5), rear end threaded rod (85) support two A embedded board (5) improves rigidity of two embedded boards (5) close to decorative layer (3) side, and then it is right to improve embedded board (5) Before drainpipe after pipe clamp, drainpipe pipe clamp support.
The drainpipe front tube folder includes several front end fixed links (9) disposed in parallel, the both ends point of front end fixed link (9) It an embedded board (5) and Chuan Guo not be fixed with embedded board (5) by nut;The middle section of the front end fixed link (9) is provided with one The bending of a arc fold bending (91), bending opening towards drainpipe (6) and the arc fold bending (91) of arc fold bending (91) is open It is contacted with drainpipe (6) surface.
In the application, by the side of multiple front end fixed link (9) banding drainpipes (6), pass through pipe clamp hoop after drainpipe The other side of close-up water pipe (6), two sides of pipe clamp banding drainpipe (6) and by drainpipe after front end fixed link (9) and drainpipe (6) it is fixed between two embedded boards (5), increases the firm supporting degree of drainpipe (6).Arc fold bending (91) increases front end The contact area of fixed link (9) and drainpipe (6) surface increases fixation of the front end fixed link (9) to drainpipe (6) Degree.Using the form of the relatively whole plate of multiple front end fixed links (9), banding can be carried out to the surface many places of drainpipe (6), Increase the fix tightly soundness to drainpipe (6).
The pre-buried fixation kit further includes two internal fixed plates (4), and internal fixed plate (4) is embedded in external wall in advance (1) in, embedded board (5) is arranged perpendicular to internal fixed plate (4) and the end of embedded board (5) is fixedly welded in internal fixed plate (4) middle part.
In the application, embedded board (5) forms the structure of T-type with internal fixed plate (4), and internal fixed plate (4) is pre-buried The end of embedded board (5) and the fix tightly soundness of external wall (1) can be increased in the external wall (1).
Front rubber pad is provided between the bending opening inner surface of the arc fold bending (91) and drainpipe (6) surface (92)。
In the application, front rubber pad (92) forms a resilient cushion between arc fold bending (91) and drainpipe (6), drop Low drainpipe (6) is transferred to the vibration of arc fold bending (91).And front rubber pad (92) increases arc fold bending (91) and row Frictional force between water pipe (6), and then the firmness of the connection between front end fixed link (9) and drainpipe (6) is improved, before preventing It is moved on drainpipe (6) surface at end fixed link (9).
Certainly, the above description is not intended to limit the present invention, and the utility model is also not limited to the example above, this The those of ordinary skill of technical field, in the essential scope of the utility model, the variations, modifications, additions or substitutions made, all It should belong to the protection scope of the utility model.

Claims (8)

1. a kind of construction drainage pipe exterior wall installs fixed structure, it is characterised in that: including external wall (1) and drainpipe (6), build It builds and is fitted on the outer surface of exterior wall (1) insulating layer (2), be fitted with decorative layer (3) on insulating layer (2) outer surface;The building Pre-buried there are two pre-buried fixation kit in exterior wall (1), pre-buried fixation kit includes embedded board (5), two pre-buried fixation kits Embedded board (5) is arranged in parallel, and one end of embedded board (5) is embedded in advance in external wall (1), and the other end of embedded board (5), which passes through, to be built It builds exterior wall (1), insulating layer (2), decorative layer (3) and end and protrudes from decorative layer (3) surface;It is set between two embedded boards (5) Pipe clamp after pipe clamp and drainpipe is equipped with before drainpipe, drainpipe (6) is set to before drainpipe after pipe clamp and drainpipe between pipe clamp, Both ends before drainpipe after the both ends of pipe clamp, drainpipe between pipe clamp are fixedly connected with two embedded boards (5) respectively;The draining Resilient support pad (7) is provided with after pipe between pipe clamp and decorative layer (3) surface.
2. construction drainage pipe exterior wall according to claim 1 installs fixed structure, it is characterised in that: managed after the drainpipe Folder is made of two splicing components, and splicing component includes a rear carrier plate (81), and one end of rear carrier plate (81) is provided with connection folding Bending (82), the other end of rear carrier plate (81) are provided with segmental arc (83);The connection bending piece (82) of two splicing components is respectively It fits on two embedded boards (5) and fixed with embedded board (5), the segmental arcs (83) of two splicing components is to being connected in arc and paste Together in the outer surface of drainpipe (6);Resilient support pad (7) is set between segmental arc (83) and decorative layer (3) surface;Drainpipe Front tube sandwiched is placed between the connection bending piece (82) of two splicing components and fixes with bending piece (82) are connect;The segmental arc (83) rear portion rubber pad (86) are provided between drainpipe (6) surface.
3. construction drainage pipe exterior wall according to claim 2 installs fixed structure, it is characterised in that: the segmental arc (83) End be connected with the rear support plate (84) of L-type, the end and segmental arc (83) of rear support plate (84) are fixed, two splicings The rear support plate (84) of component fits into T-type and by resilient support pad (7) and decorative layer (3) surface compressive contact.
4. construction drainage pipe exterior wall according to claim 3 installs fixed structure, it is characterised in that: the rear carrier plate (81), bending piece (82), segmental arc (83), rear support plate (84) are connected by metal plate one bending and molding.
5. construction drainage pipe exterior wall according to claim 3 installs fixed structure, it is characterised in that: two embedded boards (5) Between be provided with rear end threaded rod (85), the both ends of rear end threaded rod (85) are each passed through an embedded board (5) and pass through nut Fixed with embedded board (5), the middle section of rear end threaded rod (85) passes through two rear support plates (84) and by two rear support plate (84) T-type is fitted into, rear end threaded rod (85) is fixed with rear support plate (84) by nut.
6. construction drainage pipe exterior wall according to claim 1 installs fixed structure, it is characterised in that: the drainpipe front tube Folder includes several front end fixed links (9) disposed in parallel, and the both ends of front end fixed link (9) are each passed through an embedded board (5) simultaneously It is fixed with embedded board (5) by nut;The middle section of the front end fixed link (9) is provided with an arc fold bending (91), arc folding The bending opening of curved (91) is contacted towards the bending opening of drainpipe (6) and arc fold bending (91) with drainpipe (6) surface.
7. construction drainage pipe exterior wall according to claim 1 installs fixed structure, it is characterised in that: described pre-buried fixed group Part further includes two internal fixed plates (4), and internal fixed plate (4) is embedded in advance in external wall (1), and embedded board (5) is perpendicular to interior The end of portion's fixed plate (4) setting and embedded board (5) is fixedly welded in the middle part of internal fixed plate (4).
8. construction drainage pipe exterior wall according to claim 6 installs fixed structure, it is characterised in that: the arc fold bending (91) bending is open between inner surface and drainpipe (6) surface and is provided with front rubber pad (92).
CN201920250588.4U 2019-02-27 2019-02-27 A kind of construction drainage pipe exterior wall installation fixed structure Expired - Fee Related CN209703861U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920250588.4U CN209703861U (en) 2019-02-27 2019-02-27 A kind of construction drainage pipe exterior wall installation fixed structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920250588.4U CN209703861U (en) 2019-02-27 2019-02-27 A kind of construction drainage pipe exterior wall installation fixed structure

Publications (1)

Publication Number Publication Date
CN209703861U true CN209703861U (en) 2019-11-29

Family

ID=68644457

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920250588.4U Expired - Fee Related CN209703861U (en) 2019-02-27 2019-02-27 A kind of construction drainage pipe exterior wall installation fixed structure

Country Status (1)

Country Link
CN (1) CN209703861U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112503257A (en) * 2020-10-20 2021-03-16 李强 Mounting equipment for building outer wall water pipe

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112503257A (en) * 2020-10-20 2021-03-16 李强 Mounting equipment for building outer wall water pipe

Similar Documents

Publication Publication Date Title
CN209703861U (en) A kind of construction drainage pipe exterior wall installation fixed structure
CN211290506U (en) Air pipe of making an uproar falls in air conditioner
CN212004595U (en) Lateral anti-seismic support and hanger for ventilating duct
CN205742589U (en) A kind of damping-constraining Rotating fields with ribbing
CN207453228U (en) A kind of new steel structure roof
CN207228373U (en) One kind is without installation frame abatvoix
CN104612395A (en) Aluminum alloy formwork device for outer wall heat preservation
CN213837537U (en) Noise-reducing and sound-insulating supporting bearing assembly
CN211714234U (en) Building sound insulation damping wall structure
CN206439508U (en) A kind of pipe clamp of pipeline damping device
CN209760684U (en) be applied to quick installation plank subassembly on house floor
CN206396655U (en) The bottom decoupler of railway metal sound barrier
CN205134725U (en) Take telescopic SIP side fascia of bits formula shock attenuation
CN207864520U (en) A kind of damping noise reduction base unit of auto sound cotton pressing machine
CN210327250U (en) Effectual buncher of shock attenuation
CN219241180U (en) High-strength noise-reduction waterproof floor heating module
CN216446264U (en) Glass curtain wall with waterproof effect
CN104499626B (en) Spatial quadrilateral mesh structure of monolayer latticed shell
CN211423565U (en) Positioning protection device for ventilating duct
CN214305870U (en) Combined type quick-connection type silencing and noise-reducing device applied to air pipe
CN217652063U (en) Interlayer heat-insulating wall
CN211369163U (en) High-sound-insulation-capacity household wall adaptive to curtain wall longitudinal frame
CN215258502U (en) Pipeline vibration/noise reduction structure
CN116065703B (en) Assembled building structure shock mount
CN217264074U (en) Hard protection simple device for elevator shaft

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 266000 4f, development building, 8 Zhongshan Road, Shinan District, Qingdao City, Shandong Province

Patentee after: QINGJIAN GROUP Co.,Ltd.

Patentee after: Qingdao Construction Group Co.,Ltd.

Address before: 266000 4f, development building, 8 Zhongshan Road, Shinan District, Qingdao City, Shandong Province

Patentee before: QINGJIAN GROUP Co.,Ltd.

CP01 Change in the name or title of a patent holder
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191129

CF01 Termination of patent right due to non-payment of annual fee