CN209703770U - Modularization partition wall installation system - Google Patents

Modularization partition wall installation system Download PDF

Info

Publication number
CN209703770U
CN209703770U CN201821958688.4U CN201821958688U CN209703770U CN 209703770 U CN209703770 U CN 209703770U CN 201821958688 U CN201821958688 U CN 201821958688U CN 209703770 U CN209703770 U CN 209703770U
Authority
CN
China
Prior art keywords
sliding slot
partition wall
installation system
metope
wall installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821958688.4U
Other languages
Chinese (zh)
Inventor
张瑞军
陈法
许雄
刘焱伟
赵伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Xinhan Construction Co Ltd
Original Assignee
Hunan Xinhan Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Xinhan Construction Co Ltd filed Critical Hunan Xinhan Construction Co Ltd
Priority to CN201821958688.4U priority Critical patent/CN209703770U/en
Application granted granted Critical
Publication of CN209703770U publication Critical patent/CN209703770U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model provides a kind of modularization partition wall installation system.The modularization partition wall installation system includes top sliding slot, bottom sliding slot, multi-disc metope, the top sliding slot, the bottom sliding slot are individually fixed in the ceiling of existing building, bottom, the metope is set between the two, distinguish in insertion groove at both ends, the height of the metope and the top sliding slot, the distance between the slot bottom of the bottom sliding slot are consistent, and the sum of width of metope described in multi-disc is equal to the width of position to be installed.The partition wall construction efficiency that the modularization partition wall installation system provided by the utility model solves the prior art is low, does not have the technical issues of versatility.

Description

Modularization partition wall installation system
Technical field
The utility model relates to interior decoration fields, and in particular to a kind of modularization partition wall installation system.
Background technique
Partition wall is widely used in the space segmentation of architecture indoor, needs a room being divided into several according to different Small space, substantially increases space utilization rate.At present in interior architecture Decorating Project frequently with partition wall installation Generally first installation keel add basal plate to mode, are installed on basal plate by decoration panel, then paint fireproof coating, decoration again Coating etc..Fixation is largely realized using various types of nails, bolt and adhesive during the installation process, leads to entirely mistake Journey construction efficiency is low, environmental-protecting performance is poor, and does not have versatility, and different size walls need individually designed.
Utility model content
For solve the prior art partition wall construction efficiency it is low, do not have the technical issues of versatility, the utility model mentions For a kind of modularization partition wall installation system to solve the above problems.
A kind of modularization partition wall installation system, including top sliding slot, bottom sliding slot, multi-disc metope, the top sliding slot, institute It states bottom sliding slot and is individually fixed in the ceiling of existing building, bottom, the metope is set to therebetween, and insertion groove is distinguished at both ends It is interior, consistent, the metope described in multi-disc of the distance between slot bottom of the height of the metope and the top sliding slot, the bottom sliding slot The sum of width be equal to the width of position to be installed;
The side of the same end of the top sliding slot and/or the bottom sliding slot is equipped with opening, the width of the opening More than or equal to the width of the metope, be highly equal to the depth of the top sliding slot or the bottom sliding slot, the opening with Dismountable structure is equipped with locating part.
It further include edge band in a kind of preferred embodiment of modularization partition wall installation system provided by the utility model, The edge band is set between top sliding slot, the bottom sliding slot, the end positioned at the two far from the opening, patch Close existing building wall setting.
In a kind of preferred embodiment of modularization partition wall installation system provided by the utility model, the thickness of the edge band It spends consistent with the sidewall thickness of the top sliding slot, the bottom sliding slot.
In a kind of preferred embodiment of modularization partition wall installation system provided by the utility model, the two of the edge band End is equipped with bolt, and the top sliding slot, the bottom sliding slot, the locating part are equipped with the pin hole mutually chimeric with the bolt.
In a kind of preferred embodiment of modularization partition wall installation system provided by the utility model, the top sliding slot, The bottom sliding slot is abutted by multistage sliding slot head and the tail and is put together.
In a kind of preferred embodiment of modularization partition wall installation system provided by the utility model, the adjacent metope it Between the position that fits, be respectively equipped with compatible groove, raised line.
In a kind of preferred embodiment of modularization partition wall installation system provided by the utility model, the locating part is ruler The very little and consistent profile of the opening size, and it is equipped with multiple step-like mounting holes, the top sliding slot, the bottom sliding slot Multiple positions and the consistent bolt hole of the bolt hole are equipped in the position of the opening.
Compared to the prior art, the structure of the modularization partition wall installation system provided by the utility model is greatly simplified, It simplifies as four kinds of parts.It is greatly simplified using bolt plus the structure of splicing, installation process, construction efficiency is high.Meanwhile components Modularization but also when installing various sizes of metope, it is only necessary to control number of parts, be not necessarily to planning and designing again, apply Work efficiency rate greatly improves.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of modularization partition wall installation system provided by the utility model;
Fig. 2 is the partial enlarged view of Fig. 1;
Fig. 3 is the explosive view of modularization partition wall installation system provided by the utility model.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describing, it is clear that described embodiment is only a part of the embodiment of the utility model, rather than whole Embodiment.
It is that the structure of modularization partition wall installation system 1 provided by the utility model is shown respectively please refer to Fig. 1 to Fig. 3 Intention and its partial enlarged view, explosive view.
The modularization partition wall installation system 1 includes three sections of top sliding slot 2, three sections of bottom sliding slots 3, ten a piece of metopes 4, two 5, four edge bands 6 of a limit film.
Successively head and the tail abut the sliding slot for forming strip to three sections of top sliding slots 2.Multiple bolts hole 21 are equipped in slot bottom, Ceiling is fixed on by expansion bolt respectively.Three sections of bottom sliding slots 3 with identical symmetrical configuration be fixed on it just under The floor of side.
The two is equipped with one section of opening in the same side of the same end.The height of the opening and the height of chute wall are consistent, To expose the slot bottom of sliding slot;The equivalent width of the width of the opening and the metope 4.The top sliding slot 2, the bottom Portion's sliding slot 3 is additionally provided with five caging bolt holes 22 in the position of the opening, to the fixation limit film 5.
The height of the metope 4 and the top sliding slot 2, the bottom sliding slot 3 slot bottom between interval it is consistent, in institute It states opening successively to install to slot, is booked whole spaces.The left side of the metope 4 is equipped with a protrusion 41 along its length, Right side is equipped with a corresponding recess 42.It is mutually twisted both when in installation to slot.
The size of the limit film 5 is consistent with the size of the opening, if there are five run through the limit in vertical direction The caging bolt stepped hole 51 of piece 5 is connected to the caging bolt hole 22.By the fixed limit film 5 of setting bolt, by institute Metope 4 is stated to be limited in slot.
Due to raised 41 setting, leading to metope edge, there are gaps, therefore continue that the screening of edge band 6 is arranged Gear.6 both ends of edge band with the top sliding slot 2,3 grafting of bottom sliding slot, are set to its end and are bonded existing wall respectively Block gap in face.The thickness of the edge band 6 also consistency of thickness with the side wall of the two.
The both ends of the edge band 6 are respectively equipped with two bolts 61, the side wall of the top sliding slot 2, the bottom sliding slot 3 Equipped with corresponding pin hole 62.The edge band 6 is slightly bent when installation, and the bolt 61 at both ends is inserted into the pin hole Installation is completed in 62.
It may thereafter continue to carry out painting powder of lacquer putty for use on, or paste the wall decorations such as wallpaper construction.
Compared to the prior art, the structure of the modularization partition wall installation system 1 provided by the utility model is greatly simplified, It simplifies as four kinds of parts.It is greatly simplified using bolt plus the structure of splicing, installation process, construction efficiency is high.Meanwhile components Modularization but also when installing various sizes of metope, it is only necessary to control number of parts, be not necessarily to planning and designing again, apply Work efficiency rate greatly improves.
The above description is only the embodiments of the present invention, and therefore it does not limit the scope of the patent of the utility model, all Using equivalent structure or equivalent flow shift made by the utility model description, it is applied directly or indirectly in other phases The technical field of pass similarly includes within the scope of patent protection of the utility model.

Claims (7)

1. a kind of modularization partition wall installation system, it is characterised in that: including top sliding slot, bottom sliding slot, multi-disc metope, the top Portion's sliding slot, the bottom sliding slot are individually fixed in the ceiling of existing building, bottom, and the metope is set to therebetween, both ends Respectively in insertion groove, the height of the metope and the top sliding slot, the distance between the slot bottom of the bottom sliding slot are consistent, more The sum of width of metope described in piece is equal to the width of position to be installed;
The side of the same end of the top sliding slot and/or the bottom sliding slot is equipped with opening, and the width of the opening is greater than Equal to the width of the metope, highly it is equal to the depth of the top sliding slot or the bottom sliding slot, the opening is with removable The structure unloaded is equipped with locating part.
2. modularization partition wall installation system according to claim 1, it is characterised in that: it further include edge band, the edge sealing Item is set between the top sliding slot, the bottom sliding slot, and the end positioned at the two far from the opening is bonded existing building Wall setting.
3. modularization partition wall installation system according to claim 2, it is characterised in that: the thickness of the edge band with it is described Top sliding slot, the sidewall thickness of the bottom sliding slot are consistent.
4. modularization partition wall installation system according to claim 2, it is characterised in that: the both ends of the edge band, which are equipped with, inserts Pin, the top sliding slot, the bottom sliding slot, the locating part are equipped with the pin hole mutually chimeric with the bolt.
5. modularization partition wall installation system according to claim 1, it is characterised in that: the top sliding slot, the bottom Sliding slot is abutted by multistage sliding slot head and the tail and is put together.
6. modularization partition wall installation system according to claim 1, it is characterised in that: fit between the adjacent metope Position, be respectively equipped with compatible groove, raised line.
7. modularization partition wall installation system according to claim 1, it is characterised in that: the locating part be size with it is described The consistent profile of opening size, and multiple step-like mounting holes are equipped with, the top sliding slot, the bottom sliding slot are opened described The position of mouth is equipped with multiple positions and the consistent bolt hole of the mounting hole.
CN201821958688.4U 2018-11-27 2018-11-27 Modularization partition wall installation system Expired - Fee Related CN209703770U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821958688.4U CN209703770U (en) 2018-11-27 2018-11-27 Modularization partition wall installation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821958688.4U CN209703770U (en) 2018-11-27 2018-11-27 Modularization partition wall installation system

Publications (1)

Publication Number Publication Date
CN209703770U true CN209703770U (en) 2019-11-29

Family

ID=68635651

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821958688.4U Expired - Fee Related CN209703770U (en) 2018-11-27 2018-11-27 Modularization partition wall installation system

Country Status (1)

Country Link
CN (1) CN209703770U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112709357A (en) * 2020-12-31 2021-04-27 深圳中天精装股份有限公司 Assembled decorates integrative sound insulation fire wall body design structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112709357A (en) * 2020-12-31 2021-04-27 深圳中天精装股份有限公司 Assembled decorates integrative sound insulation fire wall body design structure

Similar Documents

Publication Publication Date Title
CN108301536A (en) Partition wall and its installation method
CN209703770U (en) Modularization partition wall installation system
CN108316518A (en) Partition wall and its installation method
CN108316520A (en) Partition wall side mounting assembly and partition wall
CN108316519A (en) Partition wall and partition wall mounting assembly
CN215889033U (en) Assembled wall system with cartridge wall top binding off structure
CN209082883U (en) Decorative panel assembly fixed structure and wall body structure
CN108086541A (en) Partition wall adapter assembly and via-wall part
CN109577541A (en) Light trough and its installation method
CN208280390U (en) Partition wall
CN207988230U (en) Partition wall
US10227815B2 (en) Window jamb extender for new or replacement window
US10125532B2 (en) Replacement window jamb extender
KR20200050182A (en) Fire-resistant partition assembly type
CN215670695U (en) Shingle nail butt joint structure suitable for ceramic tile composite wall board
CN207974284U (en) Partition wall side mounting assembly and partition wall
CN209261108U (en) A kind of aluminium alloy furred ceiling that one end is hanging
CN207974282U (en) Partition wall and partition wall mounting assembly
CN210264320U (en) Hidden auxiliary sleeve section bar and hidden auxiliary sleeve
CN113250406A (en) Shingle nail butt joint structure suitable for ceramic tile composite wall board
CN113137023A (en) Assembly type wall system and installation method thereof
CN211817326U (en) Integrated decorative suspended ceiling
CN220620822U (en) External corner hanging structure for assembled wallboard
CN209975957U (en) Internal corner closing line
CN212837397U (en) Assembled timber connection structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191129

Termination date: 20211127