CN209697979U - Pinpoint plug atmospheric feeder construction - Google Patents

Pinpoint plug atmospheric feeder construction Download PDF

Info

Publication number
CN209697979U
CN209697979U CN201920356953.XU CN201920356953U CN209697979U CN 209697979 U CN209697979 U CN 209697979U CN 201920356953 U CN201920356953 U CN 201920356953U CN 209697979 U CN209697979 U CN 209697979U
Authority
CN
China
Prior art keywords
heat preservation
type chamber
material type
preservation material
thermal insulation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920356953.XU
Other languages
Chinese (zh)
Inventor
代保华
张采新
王肖肖
徐风云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Zhongshe Huajin Casting Co Ltd
Original Assignee
Shanxi Zhongshe Huajin Casting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Zhongshe Huajin Casting Co Ltd filed Critical Shanxi Zhongshe Huajin Casting Co Ltd
Priority to CN201920356953.XU priority Critical patent/CN209697979U/en
Application granted granted Critical
Publication of CN209697979U publication Critical patent/CN209697979U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Molds, Cores, And Manufacturing Methods Thereof (AREA)

Abstract

The utility model relates to a kind of casting device, specially a kind of fixed point plug atmospheric feeder construction.It is existing excessively high using riser in the process to solve the broken wearing piece circular cone liner plate of casting, the low problem of feeding efficiency, including by feeding part, heat preservation material type chamber, thermal insulation material lid, the feeding part connects heat preservation material type chamber, heat preservation material type is intracavitary to be equipped with molten steel, fixed point plug hole is equipped in heat preservation material type chamber side, fixed point is inserted with ventilation rods core in plug hole, the ventilation rods core innermost end is located at heat preservation material type chamber center, ventilation rods in-core is equipped with breather cord, heat preservation material type chamber is equipped with thermal insulation material lid, thermal insulation material lid is equipped with gas vent.Improve the feeding efficiency of riser.

Description

Pinpoint plug atmospheric feeder construction
Technical field
The utility model relates to a kind of casting device, specially a kind of fixed point plug atmospheric feeder construction.
Background technique
During casting broken wearing piece circular cone liner plate, it has been found that due to special and working face point of casting structure Cloth, initial technological design is very conservative in terms of feeding a casting, and riser height is very high, and product yield is low.Riser height means Sandbox must be increased, and molten steel amount increases, and it includes labour cost, the electricity charge, alloy loss, export license, steel scrap etc. a system that this is intermediate The waste of the manpower and material resources of column.
Summary of the invention
Existing use riser is excessively high in the process in order to solve to cast broken wearing piece circular cone liner plate for the utility model, feeding The problem of low efficiency, provides a kind of fixed point plug atmospheric feeder construction.
The technical solution of the utility model is a kind of fixed point plug atmospheric feeder construction, including by feeding part, fever Thermal insulation material type chamber, thermal insulation material lid, the feeding part connect heat preservation material type chamber, and heat preservation material type is intracavitary Equipped with molten steel, it is equipped with fixed point plug hole in heat preservation material type chamber side, pinpoints in plug hole and is inserted with ventilation rods core, it is described Ventilation rods core innermost end is located at heat preservation material type chamber center, and ventilation rods in-core is equipped with breather cord, heat preservation material Type chamber is equipped with thermal insulation material lid, and thermal insulation material lid is equipped with gas vent.
One end of plug is placed on riser position by device described in the utility model, i.e. heat preservation material type chamber Center and the final solidified most thermal potential of molten steel are set, and the other end is communicated with the atmosphere by ventilative plug, using atmospheric pressure by riser It is intracavitary that the molten steel of centre heat is pressed into type.To improve the feeding efficiency of riser.Ventilative plug had been not used in the past Under state, riser has cooled down crust around this period, although there are also hot molten steel at riser center, is in vacuum state It cannot achieve feeding.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
In figure: 1- heat preservation material type chamber, 2- gas vent, 3- feeding part, 4- breather cord, 5- ventilation rods core, 6- fixed point Plug hole, 7- thermal insulation material lid, 8- molten steel.
Specific embodiment
As schematically shown in Figure 1, a kind of fixed point plug atmospheric feeder construction, including by feeding part 3, heat preservation material type Chamber 1, thermal insulation material lid 7, the feeding part 3 connect heat preservation material type chamber 1, are equipped in heat preservation material type chamber 1 Molten steel 8 is equipped with fixed point plug hole 6 in 1 side of heat preservation material type chamber, pinpoints in plug hole 6 and be inserted with ventilation rods core 5, described 5 innermost end of ventilation rods core be located at 1 center of heat preservation material type chamber, be embedded with breather cord 4 in ventilation rods core 5, generate heat Thermal insulation material type chamber 1 is equipped with thermal insulation material lid 7, and thermal insulation material lid 7 is equipped with gas vent 2.
The bottom of the breather cord 4 is located inside ventilation rods core 5, and 4 requirement of breather cord cannot penetrate through ventilation rods core 5.
Using preceding preparation, fixed point plug hole 6 is first beaten on heat preservation material type chamber 1, position will meet the requirements;It will A kind of ready straw rope of breather cord 4() it protrudes into the hole for burying ventilation rods core 5.Ventilation rods core 5 is internal made of casting model powder There is the material of a large amount of holes.In operating process, ventilation rods core 5 is inserted into fixed point plug hole 6, notices that ventilation rods core 5 is inserted into Length want moderate and meet the requirements, finally cover thermal insulation material lid 7.After casting, breather cord 4 is burnt nearly at a high temperature of molten steel To the greatest extent, occurs air duct inside ventilation rods core 5, extraneous atmospheric pressure, which enters thermal insulation material center portion by ventilation rods core 5, to be made Molten steel 8 is pressed by feeding part 3 by internal and external pressure balance.
It is exactly intuitively most that molten steel amount is saved, original process molten steel is 2015Kg, using fixed using this Feeding Molten steel is 1820 Kg after the ventilative plug atmospheric feeder construction of point, and molten steel amount saves 195Kg, and product yield is by original 67.7% come is increased to 73.6%, improves 5.9 percentage points.The expense difference that thermal insulation material Level Change generates is 27 yuan/part, That is every can save 27 yuan compared with original process on thermal insulation material.Labor hour, the original process used time about 35 ~ 40 minutes, Atmospheric pressure pinpoints ventilative about 20 ~ 25 minutes plug used times, and worker shortens in working hour.In addition, thermal insulation material Level Change, top box Height reduce, sand using amount (by calculating after mixed) saves about 104 yuan compared with original process.As above it calculates, uses fixed point porous core Stick atmospheric feeder technology saves 861 yuan compared with original process.

Claims (2)

1. a kind of fixed point plug atmospheric feeder construction, it is characterised in that: including by feeding part (3), heat preservation material type Chamber (1), thermal insulation material lid (7), the feeding part (3) connect heat preservation material type chamber (1), heat preservation material type chamber (1) molten steel (8) are equipped in, fixed point plug hole (6) is equipped in heat preservation material type chamber (1) side, pinpoints plug hole (6) interpolation Have ventilation rods core (5), ventilation rods core (5) innermost end is located at heat preservation material type chamber (1) center, ventilation rods core (5) it is embedded with breather cord (4) in, heat preservation material type chamber (1) is equipped with thermal insulation material lid (7), thermal insulation material lid (7) It is equipped with gas vent (2).
2. fixed point plug atmospheric feeder construction according to claim 1, it is characterised in that: the breather cord (4) To be located at ventilation rods core (5) internal for bottom.
CN201920356953.XU 2019-03-20 2019-03-20 Pinpoint plug atmospheric feeder construction Active CN209697979U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920356953.XU CN209697979U (en) 2019-03-20 2019-03-20 Pinpoint plug atmospheric feeder construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920356953.XU CN209697979U (en) 2019-03-20 2019-03-20 Pinpoint plug atmospheric feeder construction

Publications (1)

Publication Number Publication Date
CN209697979U true CN209697979U (en) 2019-11-29

Family

ID=68647101

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920356953.XU Active CN209697979U (en) 2019-03-20 2019-03-20 Pinpoint plug atmospheric feeder construction

Country Status (1)

Country Link
CN (1) CN209697979U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113732245A (en) * 2021-07-27 2021-12-03 石钢京诚装备技术有限公司 Production method of large hydroelectric thrust block

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113732245A (en) * 2021-07-27 2021-12-03 石钢京诚装备技术有限公司 Production method of large hydroelectric thrust block

Similar Documents

Publication Publication Date Title
US8096346B2 (en) Method for casting high-power wind turbine base with ductile iron
CN209697979U (en) Pinpoint plug atmospheric feeder construction
CN103894550B (en) Contiuum type copper alloy propeller hub Casting Equipment and special method thereof
CN108356234A (en) The plane vertical pouring shell structure of thick big high-Ni-Cr cast iron volute
CN211438012U (en) Pressure casting mould of large-scale steel ingot
CN106424571B (en) The cavity structure of the middle case of wind power generating set, the method for preparing middle case using the structure
CN102019351B (en) Method for producing spheroidal graphite iron casting with high strength and thick and uniform wall
CN108339945B (en) Casting mold and casting method for large disc type complex structure parts
CN207746383U (en) A kind of lost foam casting sandbox
CN104226922B (en) A kind of horizontal parting Iron Mould Coated Sand moulding system
CN202934103U (en) Casting mould of pressure-resistant cast aluminum cover plate used for high-voltage switch
CN109719241A (en) A kind of short-flow casting forging integral process of steel
CN212884845U (en) Sand outlet hopper with air cooling function of sand warehouse for lost foam casting
CN207806533U (en) A kind of device for improving large-scale open riser molten steel Utilization rate and reducing molten steel amount
CN201931047U (en) Excavator bucket tooth manufacturing device
CN100506427C (en) Method for producing milling-ball by vacuum sealing and its shaped mould
CN209773392U (en) Ventilation device for local ventilation of iron mold during pouring of molten iron in sand-lined iron mold casting
CN211248282U (en) Quick cooling system in casting mold of super-thick large nodular cast iron storage and transportation container
CN2808359Y (en) Multifunctional heat-preservation box for ingot mold
CN202591584U (en) Die capable of improving mechanical property of aluminium wheel rim
CN207914571U (en) A kind of differential pressure furnaceman dress
CN212857627U (en) Lost foam casting is with air cooling device that goes out sand fill
CN209647569U (en) A kind of low pressure casting die with fibrous filter net
CN209094491U (en) Automobile die evaporative pattern casting device
CN209077735U (en) A kind of aluminium ingot casting environment-friendly type mold

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant