CN209697493U - A kind of halved belt sorter climbing track - Google Patents

A kind of halved belt sorter climbing track Download PDF

Info

Publication number
CN209697493U
CN209697493U CN201920140813.9U CN201920140813U CN209697493U CN 209697493 U CN209697493 U CN 209697493U CN 201920140813 U CN201920140813 U CN 201920140813U CN 209697493 U CN209697493 U CN 209697493U
Authority
CN
China
Prior art keywords
web
track
wing plate
rack
interconnecting piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920140813.9U
Other languages
Chinese (zh)
Inventor
王同旭
白振成
蒋坤
王家飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Dema Logistics Technology Co Ltd
Damon Technology Group Corp Ltd
Original Assignee
SHANGHAI DAMON LOGISTICS TECHNOLOGY CO LTD
Zhejiang Damon Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI DAMON LOGISTICS TECHNOLOGY CO LTD, Zhejiang Damon Technology Co Ltd filed Critical SHANGHAI DAMON LOGISTICS TECHNOLOGY CO LTD
Priority to CN201920140813.9U priority Critical patent/CN209697493U/en
Application granted granted Critical
Publication of CN209697493U publication Critical patent/CN209697493U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

The utility model belongs to logistics technology, and in particular to a kind of halved belt sorter climbing track applied to logistics delivery sorting system.Two track frames including passing through transverse connection lateral connection, it is characterised in that: the track frame includes rack web, the rack wing plate equipped with wing plate interconnecting piece equipped with web interconnecting piece;The rack web includes the web segmental arc for being used to form climbing track grade, and the web interconnecting piece and the wing plate interconnecting piece are welded to connect.In above-mentioned technical proposal, track frame is welded and is formed by mutually independent rack web and rack wing plate.Curved arc needed for the mode that independent rack web directlys adopt cutting directly forms climbing track, ensure that the stability of curved arc precision and curved arc structure.

Description

A kind of halved belt sorter climbing track
Technical field
The utility model belongs to logistics technology, and in particular to a kind of halved belt applied to logistics delivery sorting system Sorter climbing track.
Background technique
With the continuous development of internet economy, logistic industry is going into the fast-developing phase.Correspondingly, to the fast of package Speed, accurate sorting become one basic requirement of logistic industry.Existing materials-sorting system is usually in a logistics warehouse Plane is arranged a plurality of head and the tail and is closed the sorting track circularized, is equipped at intervals with multiple corresponding different addresses in the side of sorting track Sorting port, sort and be positioned apart from several sorting trolleies on track, sorting trolley, which is equipped with, drives it in sorting track uplink The movable motor walked and by sorting motor-driven easing gear, trolley is equipped with below walking dolly, is sorted on trolley Equipped with corresponding current-collector, to provide power supply for sorting trolley.It, can when sorting trolley and being located at the initial position for sorting track Bar code scan first is carried out to package, package is then put into the small car of sorting, the address information scanned, which correspondingly inputs, divides Pick the controller of trolley.Then sorting trolley can fast move corresponding to sorting track side according to the address information of input Then sorting port position sorts the unloading mechanism action of the sorting motor driven sorting trolley on trolley, makes package from side face Into sorting port, to realize the automatic sorting of package.Sorting trolley then raps around to initial position along sorting track, under waiting Primary sorting.For example, the utility model patent in Authorization Notice No. CN204280583U authorized announcement date on April 22nd, 2015 is public A kind of halved belt sorter is opened.Sorting track in existing materials-sorting system generally uses horizontal layout, so that Sorting track or sorting branch take up a large area.In order to adapt to site requirements, such as avoiding obstacles or sufficient height is reserved Channel, need halved belt sorter Cable loop height at different locations different.Therefore, it is necessary to track of climbing (including Upward slope track and descending track) it is connected the horizontal rail in different height.
At present there are two types of halved belt sorter track structure forms: section aluminum guide rail and metal plate bending welding structure.Aluminium profiles The climbing section track of material guide rail needs to carry out curved arc processing to aluminum profile, curved to aluminum profile to guarantee track morpheme size precision Arc requirement is very high, and domestic manufacturers are it is difficult to ensure that its curved arc precision.For metal plate bending welding structure, need to roll over sheet metal component The curved cross sectional shape to form needs, then curved arc processing is carried out to form the gradient of climbing section to the sheet metal component of bending, equally deposit It is big in difficulty of processing, the high problem of processing cost.Even if meet required curved arc precision climbing track can successfully with other Track completes assembling, in the use process of halved belt sorter, the long-term stress of track or due to rushing under special circumstances It hits under power effect and is easily deformed.And the climbing track of two kinds of structure types is all in molded rail material (for example, molded Aluminum profile or bending sheet metal component) on the basis of carry out secondary operation (curved arc processing), track presence can not after curved arc The torsional deformation of control influences the smooth operation of halved belt sorting trolley.In addition, the angle of curved arc is easy to act in long-term pressure Generate deformation under lower or special impact force action, not can guarantee original curved arc precision then gently, the heavy then track of deformation and Other tracks of two sides, which disconnect, causes production accident.
Utility model content
In order to solve the above-mentioned technical problem the application, proposes a kind of halved belt sorter climbing track, including pass through cross To two track frames of connector lateral connection, it is characterised in that:
The track frame includes rack web, the rack wing plate equipped with wing plate interconnecting piece equipped with web interconnecting piece;
The rack web include be used to form climbing track grade web segmental arc, the web interconnecting piece with it is described Wing plate interconnecting piece is welded to connect.
In above-mentioned technical proposal, track frame is welded and is formed by mutually independent rack web and rack wing plate.It is independent Curved arc needed for the mode that rack web directlys adopt cutting forms climbing track, ensure that the steady of curved arc precision and curved arc structure It is qualitative.
Preferably, the web interconnecting piece, which is equipped with web, welds location structure;The wing plate interconnecting piece is welded equipped with wing plate Connect location structure;The web welding location structure is mutually matched with wing plate welding location structure.
Preferably, web welding location structure has multiple, and at least one described web welding positioning knot Structure is set to the web segmental arc;Wing plate welding location structure has multiple, and at least one described wing plate welding is fixed Bit architecture is corresponding with the web welding location structure of the web segmental arc is set to.
Preferably, the rack web further includes set on the straight Butt Section of the end of the web segmental arc.
Preferably, the web segmental arc is arc-shaped, and the arc radius of the web segmental arc is 13000- 17000mm。
Preferably, the web segmental arc is arc-shaped, and the angle of the web segmental arc is not more than 15 °.
Preferably, the rack web, opposite with web interconnecting piece side be equipped with web reinforcement part.
Preferably, the rack wing plate, opposite with wing plate interconnecting piece side be equipped with wing plate reinforcement part.
Preferably, the transverse connection, supports the rack including bottom and at the both ends of the bottom upwards The support portion of wing plate;The rack web is set on the inside of the support portion.
Preferably, the track frame further includes the gantry base of the bottom outside set on the transverse connection.
The application have it is following the utility model has the advantages that
1. track frame is welded and is formed by mutually independent rack web and rack wing plate.Independent rack web is directly adopted Curved arc needed for directly forming climbing track with the mode of cutting, ensure that the stability of curved arc precision and curved arc structure.
2. the mutual progress that rack web and rack wing plate weld location structure and wing plate welding location structure by web Welding is positioned, so that welding procedure is more easier to operate and ensure that the curved arc form and dimensional precision of climbing track, is reduced Cost of manufacture.
3. being equipped with straight Butt Section in segmental arc end to dock with remaining track (horizontal rail or climbing track etc.), with side Just and guarantee track splicing assembling, avoid arc section and straightway from splicing and orbital plane dislocation occur.
4. the support portion of transverse connection supports the rack wing plate for being used to form track loading end upwards, rack web is being propped up It is arranged on the inside of support part by support portion.Due to the support of support portion, in halved belt sorter use process, as the main stress of track The power that the rack wing plate of object is subject to is not easy at the welding position for being applied to rack wing plate and rack web, and track structure is more steady Fixed, the service life is longer.
Detailed description of the invention
The sectional view of the climbing track of Fig. 1 the embodiments of the present invention one.
The side view of the climbing track of Fig. 2 the embodiments of the present invention one.
The shaft side figure one of the climbing track of Fig. 3 the embodiments of the present invention one.
The shaft side figure two of the climbing track of Fig. 4 the embodiments of the present invention one.
The track schematic diagram of the climbing track of Fig. 5 application the utility model.
Specific embodiment
Term used herein is used only for the purpose of describing specific embodiments, and is not intended to limit the utility model.Unless In addition it defines, otherwise all terms used herein have and are generally understood with the utility model those of ordinary skill in the art Identical meaning.It will be further appreciated that essential term should be interpreted as having and it is in related fields and the disclosure The consistent meaning of meaning in content.The disclosure will be considered as the example of the utility model, and be not intended to this is practical new Type is restricted to specific embodiment.
Embodiment one
A kind of halved belt sorter climbing track as shown in Figs 1-4, can be used for building the upper of halved belt sorter track Slope section or lower slope section, to be connected other tracks in different height.The track frame 1 of every side is divided into upper and lower two Point, the track frame 1 of two sides is connected by 2 transverse weld of transverse connection.Specifically, the upper part of track frame 1 includes setting Rack web 11, the rack wing plate 12 equipped with wing plate interconnecting piece 121 for having web interconnecting piece 111.Wherein, rack web 11 includes The web segmental arc 112 formed is cut, the shape of web segmental arc 112 is corresponding with the slope section matching of climbing track, is used to form The gradient of climbing track.For example, if the radius 15000mm of the curved arc part of climbing track, angle are 10 °, web arc The arc section that section 112 also mutually should be radius 15000mm, angle is 10 °.The web interconnecting piece 111 and the rack wing of rack web 11 The wing plate interconnecting piece 121 of plate 12 is mutually matched, as the welding portion for being welded to connect rack web and rack wing plate.Such as Fig. 3 It is shown, specifically in the present embodiment, by the side where rack web 11 wherein a web segmental arc (if it is outer protruding rail Road is then the side where the shorter web segmental arc of arc length, is then the longer web segmental arc institute of arc length if it is indent track Side) be used as web interconnecting piece 111, using the side of rack wing plate 12 along its length as wing plate interconnecting piece 121. As shown in Fig. 2, welding positioning component (the web weldering being mutually matched can be arranged in web interconnecting piece 111 and wing plate interconnecting piece 121 Connect location structure 113, wing plate welding location structure 122), carry out matching in welding of secondary web 11 and rack wing plate 12 and fixed Position.It can be the positioning convex platform that 111 edge of web interconnecting piece is arranged in that web, which welds location structure 113, correspondingly, wing plate welding Location structure 122 is the positioning groove that 121 edge of wing plate interconnecting piece is arranged in;Web welding location structure 113 may be to set The positioning groove at 111 edge of web interconnecting piece is set, correspondingly, wing plate, which welds location structure 122, can connect for setting in wing plate The positioning convex platform at 121 edge of socket part.Alternatively, web welding location structure 113 can also be that determining for web interconnecting piece 111 is arranged in Position hole, correspondingly, it is the positioning column that wing plate interconnecting piece 121 is arranged in that wing plate, which welds location structure 122,;Web welds location structure 113 and wing plate welding location structure 122 can also also be separately positioned on the buckle of web interconnecting piece 111 and wing plate interconnecting piece 112 Component etc..Preferably, web welding location structure 113 and wing plate welding location structure 122 correspond, and all have more It is a.These webs weld location structure 113 and connect respectively along web interconnecting piece 111 with wing plate with wing plate welding location structure 122 The length direction in portion 121 is distributed, and at least one web welding location structure is set to web segmental arc, to guarantee rack web 11 web segmental arc 112 is preferably bonded welding with the corresponding portion of rack wing plate 12.As shown in Figure 1, rack web 11, The side opposite with web interconnecting piece 111 is equipped with web reinforcement part 114.It is rack wing plate 12, opposite with wing plate interconnecting piece 121 Side is equipped with wing plate reinforcement part 123.The thickness of web reinforcement part 114 is greater than the other parts of rack web 11, so that the part Intensity be greater than rack web 11 other positions.Equally, the thickness of wing plate reinforcement part 123 is greater than other portions of rack wing plate 12 Point, so that the intensity of the part is greater than the other parts of rack wing plate 12.Specifically in the present embodiment, the rack welded together Web 11 and rack wing plate 12, the upper part of the generally L-shaped track frame of Formation cross-section.Respectively by rack web 11 and rack Wing plate 12 corresponds to the side bending on L-shaped both sides, as web reinforcement part 114 and wing plate reinforcement part 123.L-shaped horizontal sides The walking surface of (i.e. rack wing plate 12) as sorting trolley, L-shaped vertical edge (i.e. rack web 11) is as sorting trolley guiding Face, the traveling wheel for sorting trolley are run along the horizontal plane and vertical plane of track.As shown in Figure 1, the lower part of track frame 1 is divided into Gantry base 13 is set to the bottom outside of transverse connection 2 as the support section of entire track frame.Gantry base is cut Face is the L shape on three sides, including vertical plane 131, horizontal plane 132 and the inclined-plane for connecting vertical plane 131 and horizontal plane 132 133.Specifically in the present embodiment, inclined-plane 133 is 45 ° of inclined inclined-planes.Transverse connection 2, including the bottom 21 and bottom of at The support portion 22 of the upward frames wing plate 12 in the both ends in portion 21, and rack web 11 then leans on support portion in the inside of support portion 22 22 settings.Due to the support of support portion 22, in halved belt sorter use process, the rack wing as the main stress object of track The power (pressure perpendicular to rack wing plate plane that sorting trolley applies) that plate 12 is subject to is not easy to be applied to rack wing plate and rack At the welding position of web, track structure is more stable, and the service life is longer.
In order to avoid the processing of track curved arc, the rack web 11 as track vertical plane and the rack wing plate as track plane of structure 12 are all made of independent sheet metal component, independently carry out welding together again after being processed into required shape.Track of climbing is in-orbit The vertical plane in road has the track of radian, and the arc (i.e. web segmental arc) with track vertical plane can be cut on sheet metal component and is made It for rack web 11, is cut on sheet metal component with the rack wing plate 12 with rack web Corresponding matching shape, then by rack Two corresponding sides of web 11 and rack wing plate 12 weld together, the generally L-shaped track frame of Formation cross-section Upper part.Those skilled in the art can according to need selection any one can be to the tool or side that sheet metal component is cut Method come to sheet metal component carry out cutting processing to obtain the sheet metal component of required shape in the present embodiment, for example, being used in the present embodiment Laser cutting mode.Further, it can also be cut on rack web 11 and rack wing plate 12 respectively by the way of cutting Web welding location structure 113 and wing plate welding location structure 122 are cut out, for example, being cut into convex on rack web 11 Platform welds location structure as web, and locating slot is cut on rack wing plate as wing plate and welds location structure.It is used to form The web segmental arc 112 of the gradient and for positioning welding web welding location structure 113 and wing plate weld location structure 122 It is all made of cutting mode to be formed on sheet metal component, program is simple to operation in technique, and cost of manufacture is lower, the precision and matter of welding Amount is higher, to guarantee the circular shape and dimensional accuracy of climbing track.
Climbing rail body part facade in the present embodiment is arc section, to guarantee that the climbing of halved belt sorter small vehicle is suitable Freely.Correspondingly, the web segmental arc 112 of climbing track frame web 11 is arc-shaped.It is illustrated in figure 5 halved belt sorter Climbing section schematic diagram in track: climbing section includes the high-end H of climbing being set between two horizontal segment S1, climbing straight section S2 and climbs Slope low side L.Wherein, the high-end H and low side L that climbs that climbs uses the climbing track of the utility model.Climb high-end H position Climbing track circular arc be evagination circular arc, climbing low side L climbing track be interior concave arc, arc radius is bigger, in circular arc Trolley quantity in section is more, and the opposite angle of climbing of adjacent trolley is smaller, and trolley climbing operation is more smooth, but arc radius is got over Greatly, section the space occupied of climbing and length are bigger, influence place layout.Climbing high-end and climbing low side arc radius can be with It is identical, it can also be different.Preferably, by the arc radius for rationally designing climbing track, so that in the circular arc of climbing track 2-3 intersection sorting trolley can be at least arranged in section, to guarantee that halved belt sorting function is smooth excessive at climbing.For example, The arc radius R of design climbing orbital arc section is 13000-17000mm(such as 15000mm), correspondingly, the machine for track of climbing The arc radius of the web segmental arc 112 of frame web 11 is 13000-17000mm(such as 15000mm).
As shown in Fig. 2, sorting trolley climb run on track during article relative to pallet belt have sliding Trend.Article will appear sliding or even be toppled on pallet belt in order to prevent, and the gradient A for track of climbing is desirably no more than 15 °, It is general to select 8 °, 10 °, 12 °, 15 °.Correspondingly, climb track rack web 11 web segmental arc 112 angle preferably not It is general to select 8 °, 10 °, 12 °, 15 ° greater than 15 °.
As shown in Fig. 2, at least one end of climbing orbital segment is straight docking section 14, straight 14 structure of docking section and standard track (such as it is straight positioned at the high-end climbing between climbing low side of climbing in the horizontal segment S1 or Fig. 5 of the climbing end two sides in Fig. 5 Section S2) structure is identical to be docked.Correspondingly, rack web 11 further includes set on the straight right of the end of web segmental arc 112 Section is connect, it is corresponding directly to portion 14 to be formed.As shown in figure 4, straight docking section 14 passes through end connecting plate 141, spacer 142, rail Road link block 143, adjustable cup foot 144 are attached with standard track, to facilitate and guarantee that track splicing is smooth, avoid arc section There is orbital plane problem of misalignment with straightway splicing.The straight segment length at circular arc both ends can satisfy is spliced with standard track , if length is 500mm.
Although being described in conjunction with the accompanying the embodiments of the present invention, those of ordinary skill in the art can be in institute Various deformations or amendments are made in attached the scope of the claims.

Claims (10)

  1. The track 1. a kind of halved belt sorter is climbed, two track frames including passing through transverse connection lateral connection are special Sign is:
    The track frame includes rack web, the rack wing plate equipped with wing plate interconnecting piece equipped with web interconnecting piece;
    The rack web includes the web segmental arc that cutting is formed, and the web interconnecting piece and wing plate interconnecting piece welding connect It connects.
  2. The track 2. a kind of halved belt sorter according to claim 1 is climbed, it is characterised in that:
    The web interconnecting piece is equipped with web and welds location structure;
    The wing plate interconnecting piece is equipped with wing plate and welds location structure;
    The web welding location structure is mutually matched with wing plate welding location structure.
  3. The track 3. a kind of halved belt sorter according to claim 2 is climbed, it is characterised in that:
    Web welding location structure has multiple, and at least one described web welding location structure is set to the web Segmental arc;
    Wing plate welding location structure have it is multiple, and at least one described wing plate welding location structure be set to the abdomen The web welding location structure of plate segmental arc is corresponding.
  4. The track 4. a kind of halved belt sorter according to claim 1 is climbed, it is characterised in that:
    The rack web further includes set on the straight Butt Section of the end of the web segmental arc.
  5. 5. a kind of halved belt sorter climbing track described in any one of -4 according to claim 1, it is characterised in that:
    The web segmental arc is arc-shaped, and the arc radius of the web segmental arc is 13000-17000mm.
  6. 6. a kind of halved belt sorter climbing track described in any one of -4 according to claim 1, it is characterised in that:
    The web segmental arc is arc-shaped, and the angle of the web segmental arc is not more than 15 °.
  7. The track 7. a kind of halved belt sorter according to claim 1 is climbed, it is characterised in that:
    The rack web, opposite with web interconnecting piece side is equipped with web reinforcement part.
  8. The track 8. a kind of halved belt sorter according to claim 1 is climbed, it is characterised in that:
    The rack wing plate, opposite with wing plate interconnecting piece side is equipped with wing plate reinforcement part.
  9. The track 9. a kind of halved belt sorter according to claim 1 is climbed, it is characterised in that:
    The transverse connection supports the support portion of the rack wing plate including bottom and at the both ends of the bottom upwards;
    The rack web is set on the inside of the support portion.
  10. The track 10. a kind of halved belt sorter according to claim 9 is climbed, it is characterised in that:
    The track frame further includes the gantry base of the bottom outside set on the transverse connection.
CN201920140813.9U 2019-01-28 2019-01-28 A kind of halved belt sorter climbing track Active CN209697493U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920140813.9U CN209697493U (en) 2019-01-28 2019-01-28 A kind of halved belt sorter climbing track

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920140813.9U CN209697493U (en) 2019-01-28 2019-01-28 A kind of halved belt sorter climbing track

Publications (1)

Publication Number Publication Date
CN209697493U true CN209697493U (en) 2019-11-29

Family

ID=68641853

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920140813.9U Active CN209697493U (en) 2019-01-28 2019-01-28 A kind of halved belt sorter climbing track

Country Status (1)

Country Link
CN (1) CN209697493U (en)

Similar Documents

Publication Publication Date Title
US9290363B2 (en) Tailor welded panel beam for construction machine and method of manufacturing
KR100487596B1 (en) Friction stir joining method
CN101885368B (en) Method for manufacturing and installing guide rail in container ship cargo hold
CN107309587B (en) Tool for welding white car body by robot
US7748099B2 (en) Method for creating cargo container with U-shaped panels
JP2001105161A (en) Friction stirring joining method for structural body, and structural body
CN106458524B (en) Running rail system for escalator or moving elevator
CN209697493U (en) A kind of halved belt sorter climbing track
CN209701605U (en) A kind of halved belt sorter turning track and halved belt sorter
CN202098812U (en) Tension device of belt conveyor
CN106346235A (en) Bogie assembling device
CN101804939B (en) Passenger transferring apparatus
CN102059513B (en) Process for manufacturing integral chassis towing beam for railway passenger vehicle
CN208560696U (en) Multiple-spindle trolley device
CN206666944U (en) Assembled attachment structure for suspension type monorail traffic track beam
CN103978987B (en) Towing beam and rail vehicle
CN211109282U (en) Novel light-load high-speed stacker
CN100526177C (en) Method and blank for manufacturing a bent curve element, bent curve element, curve unit comprising a bent curve element and also conveying track comprising such a curve unit
CN217174373U (en) Bridge uninstallation adjusting device
JP3502482B2 (en) Traversing bogie drive for elevator-type multi-story parking system
CN107971702B (en) Board unit manufacturing process and process equipment
CN209889682U (en) Spiral climbing track of crossed belt sorting machine and crossed belt sorting machine
CN208978986U (en) Hanging Nickel-plating Working Line multistage can dock flat car
JP3968117B1 (en) Heavy goods transport structure in staircase transportation
CN205967767U (en) Guide tracked automatic weld equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 313023 shangqiang Industrial Park, Daixi Town, Wuxing District, Huzhou City, Zhejiang Province

Patentee after: Dema Technology Group Co.,Ltd.

Patentee after: Shanghai dema Logistics Technology Co., Ltd

Address before: 313023 shangqiang Industrial Park, Daixi Town, Wuxing District, Huzhou City, Zhejiang Province

Patentee before: ZHEJIANG DAMON TECHNOLOGY Co.,Ltd.

Patentee before: Shanghai dema Logistics Technology Co., Ltd