CN209686720U - The concrete prefabricated element module and its spiral that sleeve is directly connected to - Google Patents

The concrete prefabricated element module and its spiral that sleeve is directly connected to Download PDF

Info

Publication number
CN209686720U
CN209686720U CN201920340991.6U CN201920340991U CN209686720U CN 209686720 U CN209686720 U CN 209686720U CN 201920340991 U CN201920340991 U CN 201920340991U CN 209686720 U CN209686720 U CN 209686720U
Authority
CN
China
Prior art keywords
spiral
sleeve
screw thread
reinforcing bar
prefabricated components
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920340991.6U
Other languages
Chinese (zh)
Inventor
杨秀敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201920340991.6U priority Critical patent/CN209686720U/en
Application granted granted Critical
Publication of CN209686720U publication Critical patent/CN209686720U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

The utility model relates to a kind of concrete prefabricated element module that sleeve is directly connected to and its spirals.When the spiral connection of the utility model, it only needs first to cover sleeve on the first spiral completely, so that the end of the first spiral is exposed and is aligned with the external screw thread distribution type on the second spiral, reversely screws sleeve later and the half of sleeve is screwed on the second spiral.Before the concreting of prefabricated components, pre-connection first is carried out to every reinforcing bar, then it pours the concrete of prefabricated components and makes its solidification, dismantle the scene of transporting to, it only needs to align in the first prefabricated components and the second prefabricated components, reversely screw sleeve, so that it may be again coupled to two concrete prefabricated elements.Both rotation spiral had not been needed in connection procedure, did not needed to move spiral in the horizontal direction yet.There is external screw thread in reinforcing bar ontology overall length, spiral length can freely be intercepted according to the prefabricated components size of required preparation.

Description

The concrete prefabricated element module and its spiral that sleeve is directly connected to
Technical field
The utility model relates to building concrete construction applications, and in particular to one kind can be applied to building, water conservancy, traffic sedan-chair The concrete prefabricated element module and its spiral that sleeve in the prefabricated concrete structures engineering such as beam is directly connected to.
Background technique
The reinforcing bar in the concrete structures such as building, water conservancy, traffic, municipal administration, bridge is according to existing national standards now Production, shape has the vertical Le shape of light circle, moon dental strip, ring dental strip to indulge and strangle shape etc., and the connection type of these tradition reinforcing bars has Welding, sleeve connection connect three kinds with cold extrusion, and the connection types such as split type sleeve connection, grout sleeve connection occur, These connection types also can solve the connectivity problem of traditional regular screw threads reinforcing bar for building.With building can be increased substantially Construction efficiency, assembled architecture or even building industrialization the quickly propelling in China for reducing engineering cost, improving construction quality, Prefabricated concrete structure is the mainstream structure of above-mentioned assembled architecture due to its irreplaceable superiority, and prefabrication Concrete structure member it is even closer to the job requirements of construction during Automatic manual transmission at the scene, structural reliability requires more It is high.Key core problem as prefabricated concrete structure and building industrialization is reinforcing bar connectivity problem, and what reinforcing bar connected can Challenge is always existed to the propulsion of prefabricated concrete structure or even building industrialization by property and applicability.
Carrying out mechanical connection to reinforcing bar using sleeve is preferred connection method, and existing regular screw threads reinforcing bar for building is not It can be directly connected to using sleeve, connection method are as follows: regular screw threads steel bar end is first needed to the parent material of reinforcement rebar longitudinal rib of connecting portion It is rejected with crescent moon outstanding using mechanical, obtains cylinder to reduce the cost of parent material of reinforcement rebar effective cross-sectional area, then at this Screw thread is made in rolling in cylinder, then connects two reinforcing bars using matched screw shell.Exist in this way Following two problem, first problem are since machinery rejects steel longitudinal rib and crescent moon outstanding reduces the effective of parent material of reinforcement rebar Area of section, to reduce the tensile capacity of reinforcing bar;Second Problem is since the diameter of end reinforced thread head compares reinforcing bar Base material external profile diameter is small, when sleeve is screwed into the thread head of first reinforcing bar, sleeve first can only be screwed into half, then again will set Cylinder and first reinforcing bar rotate jointly the thread head for being screwed into second reinforcing bar, can not thus solve prefabricated concrete knot The non-rotatable problem of reinforcing bar is connected in structure.
Prefabricated components include skeleton and its concrete block made of reinforcing bar, and need to connect is end reinforced by concrete block Stretch out, when being assembled at the scene, most reinforcing bars as each prefabricated components skeleton along reinforcing bar axis direction be it is immovable, It is particularly difficult for the connection of these reinforcing bars.The vertical reinforcement of vertical concrete prefabricated element (such as pillar or wall) is often used filling Slurry sleeve is attached, but be not suitable for can not edge in horizontal direction concrete prefabricated element (such as beam or floor) for this connection type The connection of the mobile horizontal reinforcement of axis direction, so not can solve the company of precast concrete horizontal member (such as beam or floor) Connect problem.
Occur the reinforcing bar connection type using positive/negative thread sleeve in the patent announced, makes to connect in this way Need connected two reinforcing bars in the axial direction towards movement among sleeve when reinforcing bar, prefabricated components will also be moved and be driven at this time One group or the movement simultaneously of two groups of reinforcing bars, when rotating first reinforcing bar of positive/negative thread sleeve connection, other reinforcing bars are just accordingly covered The silk tooth or steel bar end of cylinder are withstood, and can not connect whole reinforcing bars in two groups of prefabricated components, therefore it is pre- to solve concrete Reinforcing bar irremovable problem in the axial direction in component processed.
In the prefabricated concrete structure of external (such as Japan), the steel for squeezing sleeve connection concrete prefabricated element is commonly used Muscle, method are as follows: a long sleeve is filled in into two ends of reinforcing bar, then uses high-pressure oil pump power transmission and passes through extruding Tonger flattens sleeve point by point, is engaged sleeve lining with reinforcing bar outer rim Le tooth outstanding, thus two reinforcing bars of connection.Using this There is following two in method, first problem is to squeeze the clear distance between sleeve often since extruding tonger size is larger Smaller, operation can not be protruded by squeezing tonger;It is point-by-point flattening sleeve that Second Problem, which is due to squeezing tonger, until sleeve is along long Degree direction is crushed entirely, and the Connection Time is quite very long.
In summary, it connects along the immovable concrete prefabricated element of reinforcing bar axis direction, still belongs to fast and reliablely The blank field urgently filled up.
Utility model content
The purpose of this utility model is to provide a kind of concrete prefabricated element modules that sleeve is directly connected to, existing to solve There is the problem of being difficult to connect concrete prefabricated element immovable along reinforcing bar axis direction in technology fast and reliablely;This is practical Novel purpose also reside in provide it is a kind of it is low in cost, can be directly as the concrete prefabricated element mould that above-mentioned sleeve is directly connected to The spiral that block middle skeleton uses.
To achieve the above object, the concrete prefabricated element module that the sleeve of the utility model is directly connected to uses following skill Art scheme:
The concrete prefabricated element module that sleeve is directly connected to, including the first prefabricated components, the second prefabricated components and sleeve, First prefabricated components include the first spiral and the first concrete block, and the second prefabricated components include the second spiral and second Concrete block, the first spiral and the second spiral include columned reinforcing bar ontology, are had in reinforcing bar ontology overall length There is spiral external screw thread;Each first spiral is arranged in a one-to-one correspondence with each second spiral, and the first spiral needs The end of connection stretches out the first concrete block and is connected by sleeve with corresponding second spiral end, the first screw-thread steel External screw thread on muscle, the external screw thread on the second spiral and the internal screw thread feature on sleeve lining face fit like a glove, so Sleeve can cover completely on the first spiral, the external screw thread on external screw thread and the first spiral on the second spiral Distribution type align when, reversely screwing sleeve can be screwed into the half of sleeve on the second spiral again, make the first spiral and The connection of second spiral.
Spiral used in the concrete prefabricated element module that the sleeve of the utility model is directly connected to uses following skill Art scheme:
It is a kind of for manufacturing the spiral for the concrete prefabricated element module that sleeve is directly connected to, including columned steel Muscle ontology, has spiral external screw thread in reinforcing bar ontology overall length, and externally threaded thread interruption is continuous or completely continuous;It is described The moulding process and chemical component of spiral are identical as common cold rolled reinforcing steel bar with ribs, or with common hot rolled ribbed bars phase Together.
The beneficial effects of the utility model are as follows: the concrete prefabricated element module that the sleeve of the utility model is directly connected to In spiral connection when, it is only necessary to first sleeve is covered completely on the first spiral, makes the end of the first spiral Expose and aligned with the external screw thread distribution type on the second spiral, reversely screwing sleeve later makes the half of sleeve being screwed into second The first spiral can be realized on spiral to connect with the second spiral.The concrete of concrete prefabricated element module pours Before building, pre-connection first is carried out to every reinforcing bar using sleeve, after the concreting and solidification of two prefabricated components modules, It rotates back to drill drift cylinder to dismantle two prefabricated components, when transporting assembled in situ to, it is only necessary to which the first prefabricated components and second are prefabricated Component contraposition, reversely screws sleeve, so that it may be again coupled to two concrete prefabricated element modules, to two prefabricated components On all spirals all connect after can be realized and be bonded two prefabricated components.Both rotation spiral shell had not been needed in connection procedure Line reinforcing bar does not need to move spiral in the horizontal direction yet.And the reinforcing bar ontology of the first spiral and the second spiral There is external screw thread, so spiral length can freely be intercepted according to the prefabricated components size of required preparation, greatly in overall length The preparation efficiency for improving prefabricated components is conducive to the fast development for promoting assembled architecture.
Further, the chemical component Yu moulding process of spiral with common cold rolled reinforcing steel bar with ribs or common hot-rolled strip Rib reinforcement is identical, and price and process-cycle are far below high-precision prestressed concrete spiral.
Detailed description of the invention
Fig. 1 is that the structure of the one embodiment for the concrete prefabricated element module that the sleeve of the utility model is directly connected to is shown It is intended to;
Fig. 2 is the front view of the partial view of spiral in Fig. 1;
Fig. 3 is the side view of Fig. 2;
Fig. 4 is the structural schematic diagram of thread in Fig. 2.
Specific embodiment
The embodiment for the concrete prefabricated element module that the sleeve of the utility model is directly connected to:
The specific structure for the concrete prefabricated element module that the sleeve of the utility model is directly connected to is as shown in Figures 1 to 4, Including the first prefabricated components 1, the second prefabricated components 2 and sleeve 3.First prefabricated components 1 include the first spiral 11 and first Concrete block 12, the second prefabricated components 2 include the second spiral 21 and the second concrete block 22.First spiral 11 and Two spirals 21 include columned reinforcing bar ontology, have spiral external screw thread in reinforcing bar ontology overall length.
When the two sides of the first prefabricated components 1 are required to the second prefabricated components 2 of connection, the both ends of the first spiral 11 are equal By being stretched out in the first concrete block 12.When the first prefabricated components 1 are in edge, only side needs to connect the second prefabricated components 2 When, one end of the first spiral 11 in the first concrete block 12 by stretching out.Second spiral 21 is stretched in second prefabricated components 2 The end quantity of the second concrete block 22 is same out.
In first prefabricated components 1 and the second prefabricated components 2, each first spiral 11 and each second spiral 21 are one by one It is correspondingly arranged, is linked together between corresponding first spiral 11 and the second spiral 21 by sleeve 3.Specifically It is the internal screw thread on 3 inner wall of the external screw thread on the first spiral 11, the external screw thread on the second spiral 21 and sleeve Feature fits like a glove.So sleeve 3 can be covered completely on the first spiral 11, the external screw thread on the second spiral 21 with When external screw thread distribution type on first spiral 11 aligns, reversely screws sleeve 3 and sleeve 3 can be partially threaded into the second screw thread On reinforcing bar 21, it connect the first spiral 11 with the second spiral 21.
External screw thread distribution type contraposition on external screw thread and the first spiral 11 on second spiral 21 refers in the two External screw thread can piece together a complete flank.In the present embodiment, it is only necessary to which the first prefabricated components 1 and second are prefabricated Component 2 aligns, and reversely screws sleeve, so that it may be attached to above-mentioned two concrete prefabricated element, on two prefabricated components All spirals all connect after can be realized and be bonded two prefabricated components.Both rotation screw thread had not been needed in connection procedure Reinforcing bar does not need to move spiral in the horizontal direction yet.For this purpose, first use sleeve 3 by each second screw thread Reinforcing bar 21 is connected on each first spiral 11 in the first prefabricated components 1, then pours the second concrete block 22, mixed to second Solidifying soil block 22 retracts sleeve 3 on first prefabricated components 1 after solidifying, to the first prefabricated components 1 and the second prefabricated components 2 respectively into Row transport and maintenance.In other embodiments, the first concrete block 12 can also be poured again after the connection of corresponding spiral; Or the first concrete block 12 and the second concrete block 22 are poured again after the connection of corresponding spiral.
The specification of first spiral 11 and the specification of the second spiral 21 both may be the same or different.Work as rule When lattice difference, it is only necessary to which the inner hole and internal screw thread for changing 3 both ends of sleeve are allowed to and the first spiral 11, the second spiral 21 match respectively.But it is to be noted that needing that sleeve 3 is first fully screwed into diameter lesser spiral when assembling On, it is reversely retracted on the spiral being relatively large in diameter again after the first spiral 11 and the contraposition of the second spiral 21.
Referring to figs. 2 to Fig. 4, its specific structure is introduced by taking the first spiral 11 as an example, the second spiral 21 Shape it is similar therewith.The chemical component and moulding process of first spiral 11 both can be with common cold rolled reinforcing steel bar with ribs (such as Model C RB550) it is identical, can also be identical as common hot rolled ribbed bars (such as model HRB400), institute is the difference is that reinforcing bar Molding body surface is not rib tooth but external screw thread.And externally threaded thread is either interruption is continuously also possible to completely Continuously.
The chemical component of first spiral 11 and the second spiral 21 and moulding process are and in building structural steel Common Ribbed Bar it is identical, the precision controlling stringency of rolling mill practice and the precision controlling stringency of chemical component, Lower than the prestressed concrete spiral of degree of precision, so its price is also far below high-precision prestressed concrete screw thread Reinforcing bar.It is equivalent to and has filled up the blank with this field of the externally threaded regular screw threads steel of spiral shape.It is concrete prefabricated making When component, it is only necessary to arbitrarily intercept spiral according to required length, need to remove when compared to using common Ribbed Bar Rib tooth separately processes the case where thread head, can greatly improve the preparation speed of concrete precast block, is conducive to that assembled is pushed to build The rapid development built.
The first spiral 11 in the utility model is there are many specification, and the first spiral 11 is specific when different size Size is as shown in Table 1 and Table 2.Dh indicates base circle diameter (BCD) in table;Dv indicates base circle diameter (BCD);H indicates that screw thread is high;B indicates screw thread bottom It is wide;L indicates screw pitch;R indicates root arc;α indicates screw thread lead angle.
1 spiral nominal area of section of table and theoretical weight table
2 spiral outer dimension of table and tolerance table
Finally, it is stated that: above embodiments are merely intended for describing the technical solutions of the present application, but not for limiting the present application, this field Other modifications or equivalent replacement that those of ordinary skill makes the technical solution of the utility model, it is practical without departing from this The spirit and scope of new technique scheme should all cover in the scope of the claims of the utility model.
The embodiment of the spiral of the utility model:
The reality for the concrete prefabricated element module that the specific structure and sleeve of the spiral of the utility model are directly connected to The specific structure for applying the first spiral in example is identical, and specific structure can refer to Fig. 1 to Fig. 4, and this will not be detailed here.

Claims (2)

1. the concrete prefabricated element module that sleeve is directly connected to, including the first prefabricated components, the second prefabricated components and sleeve, Be characterized in that: the first prefabricated components include the first spiral and the first concrete block, and the second prefabricated components include the second screw thread Reinforcing bar and the second concrete block, the first spiral and the second spiral include columned reinforcing bar ontology, in reinforcing bar sheet There is spiral external screw thread in body overall length;Each first spiral is arranged in a one-to-one correspondence with each second spiral, the first spiral shell Line reinforcing bar needs the end connected to stretch out the first concrete block and is connected by sleeve with corresponding second spiral end, External screw thread on first spiral, the external screw thread on the second spiral and the internal screw thread feature on sleeve lining face are complete It coincide, so sleeve can cover completely on the first spiral, external screw thread and the first spiral on the second spiral On external screw thread distribution type contraposition when, reversely screwing sleeve can be screwed into the half of sleeve on the second spiral again, make first Spiral is connect with the second spiral.
2. a kind of spiral for the concrete prefabricated element module being directly connected to for sleeve described in manufacturing claims 1, It is characterized by comprising columned reinforcing bar ontologies, have spiral external screw thread, externally threaded spiral shell in reinforcing bar ontology overall length Tooth interruption is continuous or completely continuous;The moulding process of the spiral and chemical component with common cold rolled reinforcing steel bar with ribs phase Together, or it is identical as common hot rolled ribbed bars.
CN201920340991.6U 2019-03-18 2019-03-18 The concrete prefabricated element module and its spiral that sleeve is directly connected to Active CN209686720U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920340991.6U CN209686720U (en) 2019-03-18 2019-03-18 The concrete prefabricated element module and its spiral that sleeve is directly connected to

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920340991.6U CN209686720U (en) 2019-03-18 2019-03-18 The concrete prefabricated element module and its spiral that sleeve is directly connected to

Publications (1)

Publication Number Publication Date
CN209686720U true CN209686720U (en) 2019-11-26

Family

ID=68605192

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920340991.6U Active CN209686720U (en) 2019-03-18 2019-03-18 The concrete prefabricated element module and its spiral that sleeve is directly connected to

Country Status (1)

Country Link
CN (1) CN209686720U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111173025A (en) * 2019-12-11 2020-05-19 华中科技大学 Assembled transformer substation GIS equipment foundation and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111173025A (en) * 2019-12-11 2020-05-19 华中科技大学 Assembled transformer substation GIS equipment foundation and construction method thereof

Similar Documents

Publication Publication Date Title
CN103758291B (en) A kind of shearing enhancement mode half grout sleeve
CN107254884A (en) A kind of detachable prefabricated assembled concrete-filled steel square tubular column pin node
CN103899044B (en) Embedded pyramidal full grout sleeve
CN202850360U (en) Grouting and anchoring type steel bar connection sleeve and manufacturing mould thereof
CN204163287U (en) Roll forming bar connecting grout sleeve
CN202131717U (en) Composite joint made of twisted steel and used for cement grouting
CN205989416U (en) A kind of horizontal single storekeeper corridor mould
CN104831869A (en) Semi grouting bush
CN209686720U (en) The concrete prefabricated element module and its spiral that sleeve is directly connected to
CN207332123U (en) Efficient energy-saving and emission-reducing high tensile reinforcement connection extruding grout sleeve and architectural prefab
CN107060219A (en) A kind of steel concrete supporting structure and method
CN203701435U (en) Composite connection joint for grouting connection and compression connection
CN203475703U (en) Semi-grouting type steel bar connector
CN106906957A (en) Combined type axial direction cold extrusion reinforcing steel bar connecting sleeve tube and installation tool
CN204081278U (en) Split type steel bar sleeve is partly in the milk joint
CN110953125A (en) Prefabricated polygonal prestressed concrete tower cylinder and manufacturing mold of cylinder sections thereof
CN206667596U (en) A kind of detachable assembling type concrete-filled circular steel tube column
CN105133795A (en) Variable-diameter half grouting sleeve and construction method thereof
CN214995249U (en) A grout sleeve for steel bar connection
CN211116421U (en) Precast concrete fan tower barrel with spiral line connecting seam
CN209653226U (en) Concrete prefabricated element link block with screw thread steel major part and sleeve
CN211114442U (en) Double-helix thread grouting sleeve and assembly for connecting prefabricated part steel bars
CN101781933B (en) Structure and method for reducing steel bar stress in advance before tension withdrawal
CN208415301U (en) A kind of casting system of fit drawing die plate minitype underground pipe gallery
CN206987205U (en) Cast iron sleeve device for longitudinal reinforcement connection