CN209681006U CN201920443604.1U CN201920443604U CN209681006U CN 209681006 U CN209681006 U CN 209681006U CN 201920443604 U CN201920443604 U CN 201920443604U CN 209681006 U CN209681006 U CN 209681006U
Authority
CN
China
Prior art keywords
stretching device
mobile
tool
hook
fixing tool
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920443604.1U
Other languages
Chinese (zh)
Inventor
乔正召
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Changtong Group Co Ltd
Original Assignee
Guizhou Changtong Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Changtong Group Co Ltd filed Critical Guizhou Changtong Group Co Ltd
Priority to CN201920443604.1U priority Critical patent/CN209681006U/en
Application granted granted Critical
Publication of CN209681006U publication Critical patent/CN209681006U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The utility model discloses a kind of electric pole framework of steel reinforcement pre-stress stretching devices, including fixing tool, Mobile tool and stretching device, fixing tool, Mobile tool and stretching device arrangement are point-blank, Mobile tool is between fixing tool and stretching device, stretching device is fixedly connected with Mobile tool, stretching device stretching moves Mobile tool along stretching device and fixing tool line, the electric pole framework of steel reinforcement pre-stress stretching device further includes fixed station, fixing tool is fixedly mounted on fixed station, Mobile tool is movably arranged on fixed station, stretching device is fixedly mounted on fixed station.With solve the problem of the prior art by self gravity or be bolted on ground come keep self-position constant this fixed form otherwise using when need first to lay the foundations in equipment lower part to use bolt fixed and when equipment is carried needs first demounting bolt.

Description

A kind of electric pole framework of steel reinforcement pre-stress stretching device
Technical field
The utility model relates to machinery equipment field more particularly to a kind of electric pole framework of steel reinforcement pre-stress stretching devices.
Background technique
The framework of steel reinforcement of electric pole needs to carry out tensioning before use reinforcing bar is straightened, and the tool of existing tensioning includes fixing Tooling, Mobile tool and stretching device, fixing tool, Mobile tool and stretching device arrange point-blank, Mobile tool Between fixing tool and stretching device, stretching device is fixedly connected with Mobile tool, and stretching device stretching makes Mobile tool It is moved along stretching device and fixing tool line, fixing tool need to be used one fixation of framework of steel reinforcement when tensioning, then made again Framework of steel reinforcement other end is fixed with mobile working, starting stretching device makes Mobile tool pull framework of steel reinforcement towards stretching device one Head stretching, extension.It is fixed when this tensioning equipment uses the problem is that since the power of the prestressed, reinforced stretching of electric pole is quite huge Tooling and stretching device generally by self gravity or are bolted on ground and keep the constant of self-position, but this two It plants fixed form or needs first when equipment being easy to cause to topple under huge pulling force or be displaced or use in equipment lower part It lays the foundations to need first demounting bolt when using bolt fixed and equipment carrying.
Summary of the invention
Technical problem to be solved by the utility model is: a kind of electric pole framework of steel reinforcement pre-stress stretching device is provided, with solution Certainly the prior art by self gravity or is bolted on ground and keeps the constant of self-position, and this fixed form is wanted It needs first to lay the foundations in equipment lower part when using to use bolt is fixed to need asking for first demounting bolt when carrying with equipment Topic.
The technical solution of the utility model is: a kind of electric pole framework of steel reinforcement pre-stress stretching device, including fixing tool, shifting It starts building to fill and stretching device, fixing tool, Mobile tool and stretching device arranges point-blank, Mobile tool, which is located at, to be fixed Between tooling and stretching device, stretching device is fixedly connected with Mobile tool, and stretching device stretching makes Mobile tool along stretching dress It sets and is moved with fixing tool line, the electric pole framework of steel reinforcement pre-stress stretching device further includes fixed station, and fixing tool is fixed It is mounted on fixed station, Mobile tool is movably arranged on fixed station, and stretching device is fixedly mounted on fixed station.
The fixing tool includes fixing tool ontology and hook, and hook includes bar portion and hook portion, and one end of the rod is connected to The other end is directed toward Mobile tool on fixing tool ontology, and hook portion is fixedly connected on one end that bar portion is directed toward Mobile tool.
The hook includes fixed hook and Removable hook, and fixing tool ontology is equipped with the length that direction faces Mobile tool Hole, fixed hook are fixedly connected on strip hole one end on fixing tool ontology, and Removable hook bar portion is pacified by strip hole activity On fixing tool ontology, fixed hook hook portion and Removable hook hook portion it is back-to-back and with strip hole point-blank.
The strip bore edges are equipped with baffle, and Removable hook bar portion is fixedly connected with gear close to one end of fixing tool ontology Block, stop width be greater than barrier width, stop width be less than strip hole width, block along strip hole move change fixed hook and The distance of Removable hook, block are prevented Removable hook from mobile to Mobile tool by baffle.
The Mobile tool includes mobile station and bolt, and bolt is fixedly connected on mobile station top, the screw hole direction of bolt On stretching device and fixing tool line.
The mobile station includes mobile ontology and wheel, and wheel is at least a pair of to be respectively symmetrically fixedly mounted on mobile ontology Lower part.
Fixed station where the wheel motion profile of the Mobile tool is equipped with guide groove, and wheel is mounted in guide groove.
The guide groove side is provided with the card slot along guide groove length direction, and mobile body side is fixedly connected with snap-gauge, and snap-gauge is logical It crosses card slot and stretches out guide groove.
The beneficial effects of the utility model are:
Compared with prior art, the utility model is fixed fixing tool and stretching device position by fixed station, fixed Tooling and stretching device are not allowed to be also easy to produce displacement under powerful pulling force effect, and are not required to lay the foundations when equipment installation, equipment Demounting bolt is not needed when carrying.
Detailed description of the invention
Fig. 1 is perspective view when the utility model does not install electric pole framework of steel reinforcement;
Fig. 2 is the enlarged view at the utility model Figure 1A;
Fig. 3 is the utility model front view;
Fig. 4 is the enlarged view at the utility model Fig. 3 D;
Fig. 5 is the utility model front view;
Fig. 6 is the structural schematic diagram of the utility model Removable hook;
Fig. 7 is perspective view when the utility model installs electric pole framework of steel reinforcement;
In figure: 1 fixing tool, 2 Mobile tools, 3 stretching devices, 4 fixed stations, 5 electric pole frameworks of steel reinforcement, 101 fixing tools Ontology, 102 fixed hooks, 103 Removable hooks, 104 baffles, 106 strip holes, 1031 bar portions, 1032 hook portions, 1033 blocks, 201 Mobile station, 202 bolts, 2011 snap-gauges, 2012 mobile ontologies, 2013 wheels, 401 guide grooves, 4011 card slots.
Specific embodiment
With reference to the accompanying drawing and utility model is described further in specific embodiment:
Referring to figs. 1 to Fig. 7, a kind of electric pole framework of steel reinforcement pre-stress stretching device, including fixing tool 1,2 and of Mobile tool Stretching device 3, point-blank, Mobile tool 2 is located at regular worker for fixing tool 1, Mobile tool 2 and the arrangement of stretching device 3 It fills between 1 and stretching device 3, stretching device 3 is fixedly connected with Mobile tool 2, and the stretching of stretching device 3 makes Mobile tool 2 along drawing It stretches device 3 and 1 line of fixing tool is mobile, the electric pole framework of steel reinforcement pre-stress stretching device further includes fixed station 4, regular worker It fills 1 to be bolted on fixed station 4, Mobile tool 2 is mounted on fixed station 4 by guide rail or without any constraint, is stretched Device 3 is bolted on fixed station 4.Stretching device 3 generates pulling force stretching electric pole framework of steel reinforcement 5 and to fix when using There is tendency close to each other, fixed station 4 offsets 1 He of fixing tool by self structure intensity between tooling 1 and stretching device 3 Pulling force between stretching device 3, avoid it is close to each other between fixing tool 1 and stretching device 3, and since equipment is integrally pacified On fixed station 4, equipment lower part is not required to lay the foundations so that bolt is fixed when installation, and it is easy that equipment does not need demounting bolt when carrying In movement.
The fixing tool 1 includes fixing tool ontology 101 and hook, and hook includes bar portion 1031 and hook portion 1032, bar 1031 one end of portion is connected to the other end on fixing tool ontology 101 and is directed toward Mobile tool 2, and hook portion 1032 is welded on the finger of bar portion 1031 To one end of Mobile tool 2.In use, 5 one end of electric pole framework of steel reinforcement is tangled so as to tensioning by hook portion 1032.
The hook includes fixed hook 102 and Removable hook 103, and fixing tool ontology 101 is equipped with direction and faces shifting Start building to fill 2 strip hole 106, fixed hook 102 is welded on 106 one end of strip hole, Removable hook on fixing tool ontology 101 103 bar portions 1031 are movably arranged on fixing tool ontology 101 by strip hole 106,102 hook portion 1032 of fixed hook and activity Link up with 103 hook portions 1032 it is back-to-back and with strip hole 106 point-blank.In use, can be by being moved in strip hole 106 Removable hook 103 is moved to adapt to 5 tensioning tooling of electric pole framework of steel reinforcement of different-diameter, Removable hook 103 can after adjusting good position Its position is fixed by cushion blocks such as wooden units.
106 edge of strip hole is equipped with baffle 104, and 103 bar portion 1031 of Removable hook is close to fixing tool ontology 101 Block 1033 is welded in one end, and 1033 width of block is greater than 104 width of baffle, and 1033 width of block is less than 106 width of strip hole, gear Block 1033 moves the distance for changing fixed hook 102 and Removable hook 103 along strip hole 106, and block 1033 is hindered by baffle 104 Gear prevents Removable hook 103 from mobile to Mobile tool 2.
The Mobile tool 2 includes mobile station 201 and bolt 202, and bolt 202 is fixedly connected on 201 top of mobile station, spiral shell The screw hole direction of bolt 202 is on stretching device 3 and 1 line of fixing tool.202 screw hole dimensions of bolt and 5 end of electric pole framework of steel reinforcement Portion's screw size matches, and by the screw rod of 5 end of electric pole framework of steel reinforcement when use, in addition mobile station 201 is also by electric pole reinforcing bar Frame 5 is highly lifted in order to which electric pole framework of steel reinforcement 5 installs spiral bar and erection circle etc..
The mobile station 201 includes mobile ontology 2012 and wheel 2013, and wheel 2013 is at least a pair of respectively symmetrically solid Dingan County is mounted in mobile 2012 lower part of ontology.The frictional force between mobile station 201 and fixed station 4 can be reduced by wheel 2013.
Fixed station 4 where 2013 motion profile of wheel of the Mobile tool 2 is equipped with guide groove 401, and wheel 2013 is pacified In guide groove 401.Wheel is limited to fixed position by guide groove 401, and the landing of Mobile tool 2 is avoided to cause danger.
401 side of guide groove is provided with the card slot 4011 along 401 length direction of guide groove, and mobile 2012 side of ontology is fixed to be connected Snap-gauge 2011 is connect, snap-gauge 2011 stretches out guide groove 401 by card slot 4011.2 up and down direction of Mobile tool is limited by snap-gauge 2011 Position, Mobile tool 2 is flown up under the action of reinforcing bar elastic force to hurt sb.'s feelings when electric pole framework of steel reinforcement 5 being avoided to break.
It, cannot the above content is specific preferred embodiment further detailed description of the utility model is combined Assert that the specific implementation of the utility model is only limited to these instructions.For the ordinary skill of the utility model technical field For personnel, without departing from the concept of the premise utility, a number of simple deductions or replacements can also be made, should all regard To belong to the protection scope of the utility model.

Claims (8)

1. a kind of electric pole framework of steel reinforcement pre-stress stretching device, including fixing tool (1), Mobile tool (2) and stretching device (3), point-blank, Mobile tool (2), which is located at, to be fixed for fixing tool (1), Mobile tool (2) and stretching device (3) arrangement Between tooling (1) and stretching device (3), stretching device (3) is fixedly connected with Mobile tool (2), and stretching device (3) stretching makes to move Dress (2) start building along stretching device (3) and the movement of fixing tool (1) line, it is characterised in that: the electric pole framework of steel reinforcement prestressing force Tensioning equipment further includes fixed station (4), and fixing tool (1) is fixedly mounted on fixed station (4), Mobile tool (2) activity installation On fixed station (4), stretching device (3) is fixedly mounted on fixed station (4).
2. electric pole framework of steel reinforcement pre-stress stretching device according to claim 1, it is characterised in that: the fixing tool It (1) include fixing tool ontology (101) and hook, hook includes bar portion (1031) and hook portion (1032), bar portion (1031) one end It is connected to the other end on fixing tool ontology (101) and is directed toward Mobile tool (2), hook portion (1032) is fixedly connected on bar portion (1031) It is directed toward the one end of Mobile tool (2).
3. electric pole framework of steel reinforcement pre-stress stretching device according to claim 2, it is characterised in that: the hook includes solid Fixed hook (102) and Removable hook (103), fixing tool ontology (101) are equipped with the strip hole that direction faces Mobile tool (2) (106), fixed hook (102) is fixedly connected on strip hole (106) one end on fixing tool ontology (101), Removable hook (103) Bar portion (1031) is movably arranged on fixing tool ontology (101) by strip hole (106), fixed hook (102) hook portion (1032) and Removable hook (103) hook portion (1032) it is back-to-back and with strip hole (106) point-blank.
4. electric pole framework of steel reinforcement pre-stress stretching device according to claim 3, it is characterised in that: the strip hole (106) edge is equipped with baffle (104), and Removable hook (103) bar portion (1031) is fixed close to the one end of fixing tool ontology (101) It connects block (1033), block (1033) width is greater than baffle (104) width, and block (1033) width is less than strip hole (106) Width, block (1033) is along strip hole (106) the mobile distance for changing fixed hook (102) and Removable hook (103), block (1033) stopped to keep Removable hook (103) mobile to Mobile tool (2) by baffle (104).
5. electric pole framework of steel reinforcement pre-stress stretching device according to claim 1, it is characterised in that: the Mobile tool It (2) include mobile station (201) and bolt (202), bolt (202) is fixedly connected on mobile station (201) top, bolt (202) Screw hole direction is on stretching device (3) and fixing tool (1) line.
6. electric pole framework of steel reinforcement pre-stress stretching device according to claim 5, it is characterised in that: the mobile station It (201) include mobile ontology (2012) and wheel (2013), wheel (2013) is at least a pair of to be respectively symmetrically fixedly mounted on shifting Dynamic ontology (2012) lower part.
7. electric pole framework of steel reinforcement pre-stress stretching device according to claim 6, it is characterised in that: the Mobile tool (2) the fixed station (4) where wheel (2013) motion profile is equipped with guide groove (401), and wheel (2013) is mounted on guide groove (401) in.
8. electric pole framework of steel reinforcement pre-stress stretching device according to claim 7, it is characterised in that: the guide groove (401) Side is provided with the card slot (4011) along guide groove (401) length direction, and mobile ontology (2012) side is fixedly connected with snap-gauge (2011), Snap-gauge (2011) stretches out guide groove (401) by card slot (4011).
CN201920443604.1U 2019-04-03 2019-04-03 A kind of electric pole framework of steel reinforcement pre-stress stretching device Active CN209681006U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920443604.1U CN209681006U (en) 2019-04-03 2019-04-03 A kind of electric pole framework of steel reinforcement pre-stress stretching device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920443604.1U CN209681006U (en) 2019-04-03 2019-04-03 A kind of electric pole framework of steel reinforcement pre-stress stretching device

Publications (1)

Publication Number Publication Date
CN209681006U true CN209681006U (en) 2019-11-26

Family

ID=68607099

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920443604.1U Active CN209681006U (en) 2019-04-03 2019-04-03 A kind of electric pole framework of steel reinforcement pre-stress stretching device

Country Status (1)

Country Link
CN (1) CN209681006U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109894547A (en) * 2019-04-03 2019-06-18 贵州长通集团有限公司 A kind of prestressing force pull-up structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109894547A (en) * 2019-04-03 2019-06-18 贵州长通集团有限公司 A kind of prestressing force pull-up structure

Similar Documents

Publication Publication Date Title
CN202704923U (en) Cover plate lifting device
CN209681006U (en) A kind of electric pole framework of steel reinforcement pre-stress stretching device
CN102923582B (en) Gantry crane
CN106514863B (en) Integral pretensioning equipment
CN109894547A (en) A kind of prestressing force pull-up structure
CN207177305U (en) Prefabricated beam stretching jack suspension door frame
CN212153355U (en) Be used for multisection ground wall steel reinforcement cage cable traction sheave device
CN103601033B (en) Bundling wire square forming device
CN203301060U (en) Adjustable lift platform on strain insulator string of UHV power transmission line
CN206693617U (en) A kind of building template securing device
CN202467863U (en) Tunnel widening section lining trolley
CN213475232U (en) Automatic installation equipment of construction protection network
CN213384780U (en) Top-telescopic maintenance platform carried on aircraft maintenance platform
CN210193095U (en) Winding integrated device for crossing wiring of power grid
CN210163091U (en) Quick hoisting device of cable trench cover
CN204283460U (en) Portion of side, convenient stable type adjustable height tunnel anchor cable construction platform
CN210341633U (en) Telescopic truss for bridge inspection vehicle
CN112281563A (en) Device and method for laying geocell
CN208072222U (en) Outward moving dismounting device for bridge high pier climbing mould crank arm beam
CN207061529U (en) A kind of electric pole framework of steel reinforcement stretching device
CN202848912U (en) Portal crane
CN201588397U (en) Fall protection device and fixed brackets thereof for steel structure engineering construction
CN203529653U (en) Cable pulley for construction hoist and construction hoist
CN213740611U (en) Open a position ware mobile device suitable for bridge construction
CN110282509B (en) Winding integrated device for crossing wiring of power grid

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant