CN209670392U CN201920084293.4U CN201920084293U CN209670392U CN 209670392 U CN209670392 U CN 209670392U CN 201920084293 U CN201920084293 U CN 201920084293U CN 209670392 U CN209670392 U CN 209670392U
Authority
CN
China
Prior art keywords
welded
plate
screw rod
bearing
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920084293.4U
Other languages
Chinese (zh)
Inventor
张强
董彩虹
杨声波
李亚翔
陈秋妮
夏伟方
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201920084293.4U priority Critical patent/CN209670392U/en
Application granted granted Critical
Publication of CN209670392U publication Critical patent/CN209670392U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model relates to wall maintenance technology fields, specifically disclose a kind of novel work people construction wall bracing means, for existing wall by support frame be supported when need temporarily to assemble it is time-consuming and laborious, and inconvenient subsequent the problem of being adjusted, now propose following scheme, including bottom plate, the bottom array of the bottom plate is welded with multiple pawls, the top of the bottom plate offers sliding slot along its length, the internal slide of the sliding slot is equipped with sliding block, movable plate is welded at the top of the sliding block, the internal whorl of the movable plate is socketed with horizontally disposed first screw rod, first bearing is welded at the top of the movable plate, the inner ring of the first bearing is welded with the second screw rod being arranged along the vertical direction.The utility model is novel in design, easy to operate, and whole device integrated design does not need temporarily to assemble, time saving and energy saving, but also facilitates the position of adjustment pressurizing unit, convenient to be supported in different terrain, also the later period is facilitated to be adjusted.

Description

A kind of novel work people construction wall bracing means
Technical field
The utility model relates to wall maintenance technology field more particularly to a kind of novel work people construction wall bracing means.
Background technique
Certain inclination can occur since the time is longer for many walls, or because geological activity tilts wall, However especially for some construction walls with historical value for, this is a valuable wealth for descendant, Therefore it needs to safeguard wall well, in order to avoid these wall run-off the straights, needs to be propped up in the side of wall Support, existing supporting method rely primarily on support frame to fix, however support frame needs interim assembling in support, so relatively It is time-consuming and laborious, and if wall further occurrence changes after support, it is inconvenient at this time that support frame is adjusted again, thus We have proposed a kind of novel work people construction wall bracing means.
Utility model content
The utility model proposes a kind of novel work people construction wall bracing means, solve existing wall by support Need temporarily to assemble time-consuming and laborious, and inconvenient subsequent the problem of being adjusted when frame is supported.
To achieve the goals above, the utility model adopts the technical scheme that
A kind of novel work people construction wall bracing means, including bottom plate, the bottom array of the bottom plate be welded with it is multiple fall Tooth, the top of the bottom plate offer sliding slot along its length, and the internal slide of the sliding slot is equipped with sliding block, the sliding block Top be welded with movable plate, the internal whorl of the movable plate is socketed with horizontally disposed first screw rod, the movable plate Top is welded with first bearing, and the inner ring of the first bearing is welded with the second screw rod being arranged along the vertical direction, and described second The outer ring screw thread of screw rod is socketed with casing, and the side of described sleeve pipe is welded with horizontally disposed guide rod, the guide rod it is outer Circle movable sleeve is equipped with the mounting plate being arranged along the vertical direction, and the bottom of mounting plate and bottom plate weld, and described sleeve pipe is far from guiding The side of bar is welded with horizontally disposed placement plate, and the top of the placement plate is hinged with second bearing far from the side of casing, The inner ring of the second bearing is welded with sleeve, and the inner ring screw thread of the sleeve is socketed with third screw rod, and the third screw rod is remote One end from second bearing is hinged with support rod, and the bottom end of support rod and placement plate are hinged, and the support rod is located remote from plate One end be hinged with pressurizing unit.
Preferably, the inside of the mounting plate offers pilot hole along its short transverse, and guide rod runs through pilot hole, institute The lower section for stating pilot hole is equipped with the connecting hole for running through mounting plate, and the first screw rod runs through connecting hole.
Preferably, the top of the bottom plate is welded with baffle far from the side of mounting plate, and the baffle is close to mounting plate Side is welded with 3rd bearing, and the first screw rod and the inner ring of 3rd bearing weld, and first screw rod is far from 3rd bearing One end is welded with the first in command.
Preferably, the pressurizing unit includes fixed plate, connecting rod and pressing plate, and the fixed plate is close to the side of mounting plate Hinged with support rod, the fixed plate is welded with two connecting rods far from the side of support rod, and the connecting rod is far from fixed plate One end be welded with pressing plate.
Preferably, the top of second screw rod is welded with second handle, the outer ring bottom of the first bearing and activity Plate welding.
Preferably, the outer ring bottom of the second bearing is welded with supporting block, and supporting block and placement plate are hinged.
Compared with prior art, the beneficial effects of the utility model are:
1, the utility model passes through mounting base, pawl, the first screw rod, the second screw rod, third screw rod, mounting plate, guiding The structures such as bar, placement plate, casing, sleeve, support rod and pressurizing unit, wherein pawl can increase whole device with ground face contact To the ground grip ability on ground, and pressurizing unit is then supported reinforcing to wall, and entire support device structure integrated design is not required to It temporarily to assemble, fixation quickly and efficiently can be supported to wall, it is time saving and energy saving;
2, the utility model by installation the first screw rod, the second screw rod, third screw rod, mounting plate, guide rod, placement plate, The structures such as casing, sleeve, support rod and pressurizing unit can drive movable plate and placement plate along bottom plate wherein rotating the first screw rod On sliding slot carry out mobile so that it is convenient to adjust the distance that pressurizing unit arrives wall, and the second screw rod of rotation can then drive set Pipe moves up and down, and casing drives the pilot hole of placement plate and guide rod on mounting plate to move so that it is convenient to adjust extruding dress again The height set, and rotational sleeve, sleeve rotates outside third screw rod can change the inclined angle of support rod so that it is convenient to extruding The tilt angle of device is adjusted, so that whole device be facilitated all conveniently to be supported in different terrain;
In conclusion the device is novel in design, easy to operate, whole device integrated design does not need temporarily to assemble, time saving It is laborsaving, but also facilitate the position of adjustment pressurizing unit, it is convenient to be supported in different terrain, also the later period is facilitated to be adjusted.
Detailed description of the invention
Fig. 1 be the utility model proposes a kind of novel work people construction wall bracing means positive structure diagram;
Fig. 2 be the utility model proposes a kind of novel work people construction wall bracing means mounting plate facing structure signal Figure;
Fig. 3 be the utility model proposes a kind of novel work people construction wall bracing means bottom plate side view structure signal Figure.
In figure: 1 bottom plate, 2 pawls, 3 sliding slots, 4 sliding blocks, 5 movable plates, 6 first screw rods, 7 first bearings, 8 second screw rods, 9 Casing, 10 guide rods, 11 mounting plates, 12 placement plates, 13 second bearings, 14 sleeves, 15 third screw rods, 16 support rods, 17 are fixed Plate, 18 connecting rods, 19 pressing plates.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.
Referring to Fig.1-3, a kind of novel work people construction wall bracing means, including bottom plate 1, the bottom array welding of bottom plate 1 There are multiple pawls 2, the top of bottom plate 1 offers sliding slot 3 along its length, and the internal slide of sliding slot 3 is equipped with sliding block 4, sliding The top of block 4 is welded with movable plate 5, and the internal whorl of movable plate 5 is socketed with horizontally disposed first screw rod 6, the top of movable plate 5 Portion is welded with first bearing 7, and the inner ring of first bearing 7 is welded with the second screw rod 8 being arranged along the vertical direction, the second screw rod 8 Outer ring screw thread is socketed with casing 9, and the side of casing 9 is welded with horizontally disposed guide rod 10, the outer ring movable sleeve of guide rod 10 Equipped with the mounting plate 11 being arranged along the vertical direction, and the bottom of mounting plate 11 and bottom plate 1 weld, and casing 9 is far from guide rod 10 Side is welded with horizontally disposed placement plate 12, and the top of placement plate 12 is hinged with second bearing 13 far from the side of casing 9, the The inner ring of two bearings 13 is welded with sleeve 14, and the inner ring screw thread of sleeve 14 is socketed with third screw rod 15, and third screw rod 15 is far from One end of two bearings 13 is hinged with support rod 16, and the bottom end of support rod 16 and placement plate 12 are hinged, and support rod 16 is located remote from One end of plate 12 is hinged with pressurizing unit.
The inside of mounting plate 11 offers pilot hole along its short transverse, and guide rod 10 runs through pilot hole, pilot hole Lower section is equipped with the connecting hole through mounting plate 11, and the first screw rod 6 runs through connecting hole, and the top of bottom plate 1 is far from mounting plate 11 Side is welded with baffle, and baffle is welded with 3rd bearing close to the side of mounting plate 11, and the first screw rod 6 and 3rd bearing is interior Lap welding connects, and the first screw rod 6 is welded with the first in command far from one end of 3rd bearing, and pressurizing unit includes fixed plate 17, connecting rod 18 and pressing plate 19, fixed plate 17 is hinged close to the side of mounting plate 11 and support rod 16, fixed plate 17 far from support rod 16 one Side is welded with two connecting rods 18, and connecting rod 18 is welded with pressing plate 19, the top weldering of the second screw rod 8 far from one end of fixed plate 17 It is connected to second handle, the outer ring bottom of first bearing 7 and movable plate 5 weld, and the outer ring bottom of second bearing 13 is welded with support Block, and supporting block and placement plate 12 are hinged.
In the present embodiment, firstly, pawl 2 can increase whole device to the ground grip ability on ground with ground face contact, and squeeze Device is then supported reinforcing to wall, and entire support device structure integrated design does not need temporarily to assemble, can be quickly and efficiently Fixation is supported to wall, it is time saving and energy saving, rotation the first screw rod 6 can drive movable plate 5 and placement plate 12 along bottom plate 1 Sliding slot 3 carry out mobile so that it is convenient to adjust the distance that pressurizing unit arrives wall, and the second screw rod 8 of rotation can then drive set Pipe 9 moves up and down, and casing 9 drives the pilot hole of placement plate 12 and guide rod 10 on mounting plate 11 to move so that it is convenient to adjust again The height of whole pressurizing unit, and rotational sleeve 14, sleeve 14 rotates outside third screw rod 15 can change the inclined angle of support rod 16 Degree is so that it is convenient to which the tilt angle to pressurizing unit is adjusted, so that whole device be facilitated all to facilitate progress in different terrain Support, also facilitates the later period to be adjusted.
The preferable specific embodiment of the above, only the utility model, but the protection scope of the utility model is not It is confined to this, anyone skilled in the art is within the technical scope disclosed by the utility model, practical according to this Novel technical solution and its utility model design are subject to equivalent substitution or change, should all cover the protection model in the utility model Within enclosing.

Claims (6)

1. a kind of novel work people construction wall bracing means, including bottom plate (1), which is characterized in that the bottom battle array of the bottom plate (1) Column are welded with multiple pawls (2), and the top of the bottom plate (1) offers sliding slot (3) along its length, the sliding slot (3) Internal slide is equipped with sliding block (4), is welded with movable plate (5) at the top of the sliding block (4), the inside spiral shell of the movable plate (5) Line is socketed with horizontally disposed first screw rod (6), is welded with first bearing (7), the first axle at the top of the movable plate (5) The inner ring for holding (7) is welded with the second screw rod (8) being arranged along the vertical direction, and the outer ring screw thread of second screw rod (8) is socketed with Casing (9), the side of described sleeve pipe (9) are welded with horizontally disposed guide rod (10), the outer ring activity of the guide rod (10) It is arranged with the mounting plate (11) being arranged along the vertical direction, and the bottom of mounting plate (11) and bottom plate (1) are welded, described sleeve pipe (9) Side far from guide rod (10) is welded with horizontally disposed placement plate (12), and the top of the placement plate (12) is far from casing (9) side is hinged with second bearing (13), and the inner ring of the second bearing (13) is welded with sleeve (14), the sleeve (14) Inner ring screw thread be socketed with third screw rod (15), the third screw rod (15) is hinged with support far from the one end of second bearing (13) Bar (16), and the bottom end of support rod (16) and placement plate (12) are hingedly, the support rod (16) is located remote from one end of plate (12) It is hinged with pressurizing unit.
2. a kind of novel work people construction wall bracing means according to claim 1, which is characterized in that the mounting plate (11) inside offers pilot hole along its short transverse, and guide rod (10) runs through pilot hole, sets below the pilot hole There is the connecting hole through mounting plate (11), and the first screw rod (6) runs through connecting hole.
3. a kind of novel work people construction wall bracing means according to claim 1, which is characterized in that the bottom plate (1) Top be welded with baffle far from the side of mounting plate (11), the baffle is welded with third axis close to the side of mounting plate (11) It holds, and the first screw rod (6) and the inner ring of 3rd bearing weld, first screw rod (6) is welded with far from one end of 3rd bearing The first in command.
4. a kind of novel work people construction wall bracing means according to claim 1, which is characterized in that the pressurizing unit Including fixed plate (17), connecting rod (18) and pressing plate (19), side and support of the fixed plate (17) close to mounting plate (11) Hingedly, the fixed plate (17) is welded with two connecting rods (18), the connecting rod far from the side of support rod (16) to bar (16) (18) one end far from fixed plate (17) is welded with pressing plate (19).
5. a kind of novel work people construction wall bracing means according to claim 1, which is characterized in that second screw rod (8) top is welded with second handle, and the outer ring bottom and movable plate (5) of the first bearing (7) are welded.
6. a kind of novel work people construction wall bracing means according to claim 1, which is characterized in that the second bearing (13) outer ring bottom is welded with supporting block, and supporting block and placement plate (12) are hinged.
CN201920084293.4U 2019-01-18 2019-01-18 A kind of novel work people construction wall bracing means Expired - Fee Related CN209670392U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920084293.4U CN209670392U (en) 2019-01-18 2019-01-18 A kind of novel work people construction wall bracing means

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920084293.4U CN209670392U (en) 2019-01-18 2019-01-18 A kind of novel work people construction wall bracing means

Publications (1)

Publication Number Publication Date
CN209670392U true CN209670392U (en) 2019-11-22

Family

ID=68566046

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920084293.4U Expired - Fee Related CN209670392U (en) 2019-01-18 2019-01-18 A kind of novel work people construction wall bracing means

Country Status (1)

Country Link
CN (1) CN209670392U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110761568A (en) * 2019-12-03 2020-02-07 江苏省苏安能节能建材科技有限公司 Light steel wall body concatenation formula support
CN112411641A (en) * 2020-11-18 2021-02-26 深圳金煌建设工程有限公司 Post-disaster house deviation rectifying device and method
CN112922388A (en) * 2019-12-05 2021-06-08 武汉船舶职业技术学院 Reinforced supporting structure for constructional engineering

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110761568A (en) * 2019-12-03 2020-02-07 江苏省苏安能节能建材科技有限公司 Light steel wall body concatenation formula support
CN112922388A (en) * 2019-12-05 2021-06-08 武汉船舶职业技术学院 Reinforced supporting structure for constructional engineering
CN112411641A (en) * 2020-11-18 2021-02-26 深圳金煌建设工程有限公司 Post-disaster house deviation rectifying device and method

Similar Documents

Publication Publication Date Title
CN209670392U (en) A kind of novel work people construction wall bracing means
CN208619033U (en) A kind of constructing tunnel drilling equipment
CN207314884U (en) A kind of eyelid retractor for building easy to adjusting height
CN207234721U (en) A kind of solar panels stent of angle adjustable
CN107731125A (en) Landscape garden new energy direction board
CN108361519A (en) A kind of mechanical platform leveling device
CN209065196U (en) A kind of guiding device of rewinding machine
CN208830323U (en) A kind of adjustable rectangle suspension device of geotechnical engineering
CN209716452U (en) A kind of molten steel tapping equipment of regulating flow quantity flow velocity
CN209699096U (en) A kind of industrial robot connection pedestal being conveniently adjusted angle
CN212613832U (en) Auxiliary mechanism is assembled to rack
CN206149191U (en) Memory alloy solar cell panel support
CN208329575U (en) A kind of safe firm banking of building scaffold
CN208604979U (en) A kind of construction support device
CN209339676U (en) A kind of intensive fast assembled base room
CN208089525U (en) A kind of firm banking for water pump
CN209642233U (en) A kind of municipal works line tower
CN211115804U (en) Fixing support capable of adjusting direction of rock drill and rock drill assembly
CN208331443U (en) A kind of nonpetroleum support of pipelines
CN209535305U (en) One kind can be with movable bicycle saddle cushion
CN209642615U (en) A kind of photovoltaic apparatus of fixing-stable
CN209009340U (en) A kind of solar power station capsule oil conservator easy to use
CN209702150U (en) A kind of construction Special material lifting means
CN214303869U (en) Single mechanical pillar for coal mine
CN216042514U (en) Dual self-lifting type external climbing frame for high-rise building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191122

Termination date: 20210118