CN209670127U - A kind of fabricated construction of prefabricated steel reinforced concrete shear walls - Google Patents

A kind of fabricated construction of prefabricated steel reinforced concrete shear walls Download PDF

Info

Publication number
CN209670127U
CN209670127U CN201920054234.2U CN201920054234U CN209670127U CN 209670127 U CN209670127 U CN 209670127U CN 201920054234 U CN201920054234 U CN 201920054234U CN 209670127 U CN209670127 U CN 209670127U
Authority
CN
China
Prior art keywords
wall
reinforced concrete
skeleton
concrete shear
steel reinforced
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920054234.2U
Other languages
Chinese (zh)
Inventor
李远海
李佳亭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Ocean Building Assembly Technology Development Co Ltd
Original Assignee
Chongqing Ocean Building Assembly Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Ocean Building Assembly Technology Development Co Ltd filed Critical Chongqing Ocean Building Assembly Technology Development Co Ltd
Priority to CN201920054234.2U priority Critical patent/CN209670127U/en
Application granted granted Critical
Publication of CN209670127U publication Critical patent/CN209670127U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Bearing And Curtain Walls (AREA)

Abstract

The utility model discloses a kind of fabricated constructions of prefabricated steel reinforced concrete shear walls, belong to fabricated shear wall applied technical field, solve the problems, such as that existing shear wall structure intensity is low, Bar Anchorage is unstable, shear wall is easy to collapse when earthquake, be characterized in that: including shearing exterior wall buck plate, in-situ concrete wall, lacing wire skeleton, shearing interior wall buck plate and vertical steel ledges, the shearing exterior wall buck plate and shearing interior wall buck plate pass through high-strength bolt and are fixed on prefabricated steel reinforced concrete shear walls;Convenient that its stable structural strength is assembled and guaranteed to framework of steel reinforcement, then casting concrete forms in-situ concrete wall;Shear wall buck plate is fixed on inner sidewall and lateral wall, can accelerate the speed of application of prefabricated steel reinforced concrete shear walls, and the construction quality for improving steel concrete shear wall facilitates assembled work, improve work efficiency to greatly simplify working procedure.

Description

A kind of fabricated construction of prefabricated steel reinforced concrete shear walls
Technical field
The utility model relates to fabricated shear wall applied technical field, it is specifically related to a kind of prefabricated steel reinforced concrete and cuts The fabricated construction of power wall.
Background technique
With the rapid development of building industrialization, country goes out the policy guidance and preferential policy of assembled-type house successively Platform, assembly of integral shearing wall structure because its preferable globality, rigidity is big, bearing capacity is high the advantages that, in high-rise assembled knot It is used widely in structure.The safety problem of assembly of integral shearing wall structure is also increasingly taken seriously, however the peace of structure Not merely it is the quality of its component, while the connection being also contemplated that between prefabricated member entirely.
In building structure, shear wall is the core anti-seismic component of building structure, carries the earthquake of overall structure 80% Effect, shear wall are also known as wind-resistant wall, seismic structural wall, earthquake resistant wall or structural wall, wind load are primarily subjected in house or structures or geological process is drawn The wall of the horizontal loading and vertical load that rise, prevents structure shear from destroying, also known as seismic structural wall, earthquake resistant wall, generally makes of armored concrete At it divides plane shear wall and cylinder shear wall, and plane shear wall is used for reinforced concrete frame structure, lift slab structure, Wu Liang In floor system, and the connection structure that it is vertically stitched when building shear wall is mostly important.
But existing shear wall structure intensity is low, it is difficult to achieve the effect that antidetonation, it is internal to lack stable framework of steel reinforcement Structure, and assembly difficulty, construction is inconvenient, so that its shear wall is easy to collapse when earthquake, builds out so as to cause whole The phenomenon that now collapsing, it is difficult to achieve the effect that user wants, and be difficult in succession when connection, so that it is sheared Wall needs to waste the excessive time when connection.
Therefore, it is necessary to design a kind of fabricated construction of prefabricated steel reinforced concrete shear walls, guarantee shear wall structure intensity While, the convenience of construction is improved, avoids the problem that shear wall is easy appearance of collapsing when earthquake.
Utility model content
In view of the deficienciess of the prior art, the purpose of this utility model is to provide a kind of prefabricated steel reinforced concretes to shear The fabricated construction of wall, to solve the problems in above-mentioned background technique.
To achieve the above object, the utility model provides the following technical solutions:
A kind of fabricated construction of prefabricated steel reinforced concrete shear walls, including shearing exterior wall buck plate, cast-in-place concrete wall Body, lacing wire skeleton, shearing interior wall buck plate and vertical steel ledges, the shearing exterior wall buck plate and shearing interior wall buck plate are logical It crosses high-strength bolt to be fixed on prefabricated steel reinforced concrete shear walls, in-situ concrete wall, lacing wire skeleton and vertical steel ledges are equal It is arranged in prefabricated steel reinforced concrete shear walls, the vertical steel ledges includes wall vertical bar, fixing muscle and steel skeleton brace, Fixing muscle is fixed between two wall vertical bars arranged in parallel, forms wall vertical bar skeleton, two arranged in parallel Wall vertical bar between be connected with several fixing muscles, fixing muscle equidistantly distributed from top to bottom connects between vertical steel ledges There is lacing wire skeleton, vertical steel ledges and the lacing wire skeleton two sides being attached thereto pass through iron wire and are banded with precast reinforced net, prefabricated Formwork for placing is equipped on the outside of steel mesh, casting concrete forms in-situ concrete wall between formwork for placing.
It is welding or fixing muscle end between the fixing muscle and wall vertical bar as further program of the utility model Bending banding is in wall vertical bar.
As further program of the utility model, several are connected between two wall vertical bars arranged in parallel Fixing muscle, fixing muscle equidistantly distributed from top to bottom.
As further program of the utility model, wall vertical bar skeleton is along prefabricated steel reinforced concrete shear wall length direction Equidistantly distributed, steel skeleton brace are the reinforcing bar composition of two intersections, and the both ends of reinforcing bar are respectively welded at wall vertical bar skeleton Wall vertical bar on.
As further program of the utility model, the steel skeleton brace in the vertical steel ledges is several and edge Wall vertical bar skeleton equidistantly distributed from bottom to top.
As further program of the utility model, the lacing wire skeleton includes drag hook, reinforcing bar bearing diagonal and lateral lacing wire, The both ends of two lateral lacing wires are bent into drag hook, and drag hook is fixed in the fixing muscle of lacing wire skeleton, and reinforcing bar bearing diagonal is welded on Between lateral lacing wire, reinforcing bar bearing diagonal is made of the reinforcing bar of two cross welds.
As further program of the utility model, lacing wire skeleton quantity between the vertical steel ledges be several and Spaced set from bottom to top.
It is outer by the fixed shearing of high-strength bolt on in-situ concrete wall outer wall as further program of the utility model Wall buck plate passes through the fixed deadening felt of high-strength bolt and shearing interior wall buck plate on in-situ concrete wall inner wall.
As further program of the utility model, the shearing exterior wall buck plate splices board group by the assembly successively spliced At assembly splice plate two sides are equipped with splicing boss, and assembly splice plate side is equipped with plug I and plug II, plug I, assembly splicing Bolt hole is offered on plate and plug II.
A kind of anti-seismic structure wall of the fabricated construction including the prefabricated steel reinforced concrete shear walls.
In conclusion the utility model has the advantages that compared with prior art
The fabricated construction of the prefabricated steel reinforced concrete shear walls of the utility model, structure is simple, easy to assembly, and convenient pair Framework of steel reinforcement is assembled and is guaranteed its stable structural strength, and then casting concrete forms in-situ concrete wall;Inside Shear wall buck plate is fixed on side wall and lateral wall, can accelerate the speed of application of prefabricated steel reinforced concrete shear walls, is improved The construction quality of steel concrete shear wall facilitates assembled work, improves work efficiency to greatly simplify working procedure.
For the structure feature and effect for more clearly illustrating the utility model, come with reference to the accompanying drawing with specific embodiment pair The utility model is described in detail.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of utility model.
Fig. 2 is the structural schematic diagram of lacing wire skeleton in utility model.
Fig. 3 is the structural schematic diagram of vertical steel ledges in utility model.
Fig. 4 is the structural schematic diagram that stirrup is connected in utility model.
Fig. 5 is the structural schematic diagram that exterior wall buck plate is sheared in utility model.
Appended drawing reference: 1- high-strength bolt, 2- shear exterior wall buck plate, the precast reinforced net of 3-, the horizontal steel skeleton of 4- wall, 5- Bending part, 6- hook part, 7- in-situ concrete wall, 8- lacing wire skeleton, 9- wall vertical bar, the brace of 10- steel skeleton, 11- are solid Determine muscle, 12- shearing interior wall buck plate, 13- deadening felt, 14- connection stirrup, 15- drag hook, 16- reinforcing bar bearing diagonal, 17- laterally to draw Muscle, 18- vertical steel ledges, 21- plug I, 22- assembly splice plate, 23- plug II, 24- splice boss.
Specific embodiment
The technical solution of the utility model is described further in the following with reference to the drawings and specific embodiments.
Embodiment 1
Referring to FIG. 1 to FIG. 5, in the present embodiment, a kind of fabricated construction of prefabricated steel reinforced concrete shear walls, including shearing Exterior wall buck plate 2, in-situ concrete wall 7, lacing wire skeleton 8, shearing interior wall buck plate 12 and vertical steel ledges 18, the shearing Exterior wall buck plate 2 and shearing interior wall buck plate 12 are fixed on prefabricated steel reinforced concrete shear walls by high-strength bolt 1, cast-in-place Concrete wall 7, lacing wire skeleton 8 and vertical steel ledges 18 are arranged in prefabricated steel reinforced concrete shear walls.
The vertical steel ledges 18 includes wall vertical bar 9, fixing muscle 11 and steel skeleton brace 10, and fixing muscle 11 is fixed on It is welding between fixing muscle 11 and wall vertical bar 9 between two wall vertical bars 9 arranged in parallel;Two are parallel to each other and set It is connected with several fixing muscles 11 between the wall vertical bar 9 set, the equidistantly distributed from top to bottom of fixing muscle 11 forms wall vertical bar Skeleton, so that two wall vertical bars 9 arranged in parallel are connected and fixed.
In order to further enhance firmness fixed between two wall vertical bars 9 arranged in parallel, wall vertical bar Connection stirrup 14 is equipped between the wall vertical bar 9 arranged in parallel of two of skeleton, connection 14 both ends of stirrup are equipped with bending Portion 5 simultaneously forms hook part 6, and hook part 6 is wound around in wall vertical bar 9 and by two 9 bandings of wall vertical bar arranged in parallel It is fixed, further enhance the stability and structural strength of its connection.
The wall vertical bar skeleton is along prefabricated steel reinforced concrete shear wall length direction equidistantly distributed, wall vertical bar skeleton Between vertical steel ledges 18 is connected to form by steel skeleton brace 10, steel skeleton brace 10 is the reinforcing bar groups of two intersections At the both ends of reinforcing bar are respectively welded in the wall vertical bar 9 of wall vertical bar skeleton, and the steel skeleton in the vertical steel ledges 18 is oblique Lacing wire 10 be several and along wall vertical bar skeleton equidistantly distributed from bottom to top, to form a firm vertical steel ledges 18。
Lacing wire skeleton 8 is connected between the vertical steel ledges 18, lacing wire skeleton 8 includes drag hook 15, reinforcing bar bearing diagonal 16 It is bent into drag hook 15 with the both ends of lateral lacing wire 17, two lateral lacing wires 17, drag hook 15 is fixed on the fixing muscle of lacing wire skeleton 8 On 11, reinforcing bar bearing diagonal 16 is welded between lateral lacing wire 17, and reinforcing bar bearing diagonal 16 is made of the reinforcing bar of two cross welds.
8 quantity of lacing wire skeleton between the vertical steel ledges 18 is several and spaced set from bottom to top, thus Adjacent vertical steel ledges 18 is connected and fixed, structural strength is high.
The vertical steel ledges 18 and 8 two sides of lacing wire skeleton being attached thereto pass through iron wire and are banded with precast reinforced net 3, Formwork for placing is equipped on the outside of precast reinforced net 3, casting concrete forms in-situ concrete wall 7 between formwork for placing, dismantles and pours Building mould passes through the fixed shearing exterior wall buck plate 2 of high-strength bolt 1, cast-in-place concrete wall on 7 outer wall of in-situ concrete wall Pass through the fixed deadening felt 13 of high-strength bolt 1 and shearing interior wall buck plate 12 on 7 inner wall of body.
The shearing exterior wall buck plate 2 is made of the assembly splice plate 22 successively spliced, and assembly 22 two sides of splice plate are equipped with Splice boss 24, facilitates the splicing of adjacent assembly splice plate 22,22 side of assembly splice plate is equipped with plug I 21 and plug II 23 are used for the splicing of side;Bolt hole is offered on plug I 21, assembly splice plate 22 and plug II 23 for high-strength bolt 1 Installation is fixed.
Embodiment 2
Please refer to FIG. 1 to FIG. 5, in the present embodiment, a kind of anti-seismic structure wall, the dress including prefabricated steel reinforced concrete shear walls With formula structure, between fixing muscle 11 and wall vertical bar 9 thereon are as follows: 11 end bending banding of fixing muscle is in wall vertical bar 9;In advance Its of the fabricated construction of steel reinforced concrete shear walls processed is same as Example 1 with structure.
The fabricated construction of the prefabricated steel reinforced concrete shear walls of the utility model, structure is simple, easy to assembly, and convenient pair Framework of steel reinforcement is assembled and is guaranteed its stable structural strength, and then casting concrete forms in-situ concrete wall;Inside Shear wall buck plate is fixed on side wall and lateral wall, can accelerate the speed of application of prefabricated steel reinforced concrete shear walls, is improved The construction quality of steel concrete shear wall facilitates assembled work, improves work efficiency to greatly simplify working procedure.
Technical principle of the utility model has been described above with reference to specific embodiments, is only the preferred implementation of the utility model Mode.The protection scope of the utility model is not limited merely to above-described embodiment, technology belonging to the idea of the present invention Scheme belongs to the protection scope of the utility model.Those skilled in the art, which does not need to pay for creative labor, to be associated To other specific embodiments of the utility model, these modes are fallen within the protection scope of the utility model.

Claims (9)

1. a kind of fabricated construction of prefabricated steel reinforced concrete shear walls, including shearing exterior wall buck plate (2), cast-in-place concrete wall Body (7), lacing wire skeleton (8), shearing interior wall buck plate (12) and vertical steel ledges (18), the shearing exterior wall buck plate (2) and Shearing interior wall buck plate (12) is fixed on prefabricated steel reinforced concrete shear walls by high-strength bolt (1), cast-in-place concrete wall Body (7), lacing wire skeleton (8) and vertical steel ledges (18) are arranged in prefabricated steel reinforced concrete shear walls, which is characterized in that institute Stating vertical steel ledges (18) includes wall vertical bar (9), fixing muscle (11) and steel skeleton brace (10), and fixing muscle (11) is fixed on Between two wall vertical bars (9) arranged in parallel, wall vertical bar skeleton, two wall vertical bars arranged in parallel are formed (9) several fixing muscles (11) are connected between, fixing muscle (11) equidistantly distributed from top to bottom, between vertical steel ledges (18) Be connected with lacing wire skeleton (8), vertical steel ledges (18) and lacing wire skeleton (8) two sides being attached thereto pass through iron wire be banded with it is pre- Steel mesh (3) processed, precast reinforced net (3) outside are equipped with formwork for placing, and casting concrete forms cast-in-place coagulation between formwork for placing Cob wall body (7).
2. a kind of fabricated construction of prefabricated steel reinforced concrete shear walls according to claim 1, which is characterized in that described It is welding or fixing muscle (11) end bending banding between fixing muscle (11) and wall vertical bar (9) on wall vertical bar (9).
3. a kind of fabricated construction of prefabricated steel reinforced concrete shear walls according to claim 2, which is characterized in that two Several fixing muscles (11) are connected between wall vertical bar (9) arranged in parallel, fixing muscle (11) is equidistant from top to bottom Distribution.
4. a kind of fabricated construction of prefabricated steel reinforced concrete shear walls according to claim 3, which is characterized in that wall For vertical bar skeleton along prefabricated steel reinforced concrete shear wall length direction equidistantly distributed, steel skeleton brace (10) is two intersections Reinforcing bar composition, the both ends of reinforcing bar are respectively welded in the wall vertical bar (9) of wall vertical bar skeleton.
5. a kind of fabricated construction of prefabricated steel reinforced concrete shear walls according to claim 4, which is characterized in that described Steel skeleton brace (10) in vertical steel ledges (18) be several and along wall vertical bar skeleton equidistantly distributed from bottom to top.
6. a kind of fabricated construction of -5 any prefabricated steel reinforced concrete shear walls, feature exist according to claim 1 In the lacing wire skeleton (8) includes drag hook (15), reinforcing bar bearing diagonal (16) and lateral lacing wire (17), two lateral lacing wires (17) Both ends be bent into drag hook (15), drag hook (15) is fixed in the fixing muscle (11) of lacing wire skeleton (8), reinforcing bar bearing diagonal (16) It is welded between lateral lacing wire (17), the reinforcing bar composition of reinforcing bar bearing diagonal (16) You Lianggen cross weld.
7. a kind of fabricated construction of prefabricated steel reinforced concrete shear walls according to claim 6, which is characterized in that described Lacing wire skeleton (8) quantity between vertical steel ledges (18) is several and spaced set from bottom to top.
8. a kind of fabricated construction of prefabricated steel reinforced concrete shear walls according to claim 7, which is characterized in that cast-in-place Pass through high-strength bolt (1) fixed shearing exterior wall buck plate (2), in-situ concrete wall (7) inner wall on concrete wall (7) outer wall It is upper to pass through high-strength bolt (1) fixed deadening felt (13) and shearing interior wall buck plate (12).
9. a kind of fabricated construction of prefabricated steel reinforced concrete shear walls according to claim 8, which is characterized in that described Shearing exterior wall buck plate (2) is made of the assembly splice plate (22) successively spliced, and it is convex that assembly splice plate (22) two sides are equipped with splicing Platform (24), assembly splice plate (22) side be equipped with plug I (21) and plug II (23), plug I (21), assemble splice plate (22) and Bolt hole is offered on plug II (23).
CN201920054234.2U 2019-01-14 2019-01-14 A kind of fabricated construction of prefabricated steel reinforced concrete shear walls Expired - Fee Related CN209670127U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920054234.2U CN209670127U (en) 2019-01-14 2019-01-14 A kind of fabricated construction of prefabricated steel reinforced concrete shear walls

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920054234.2U CN209670127U (en) 2019-01-14 2019-01-14 A kind of fabricated construction of prefabricated steel reinforced concrete shear walls

Publications (1)

Publication Number Publication Date
CN209670127U true CN209670127U (en) 2019-11-22

Family

ID=68565581

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920054234.2U Expired - Fee Related CN209670127U (en) 2019-01-14 2019-01-14 A kind of fabricated construction of prefabricated steel reinforced concrete shear walls

Country Status (1)

Country Link
CN (1) CN209670127U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111070379A (en) * 2019-12-30 2020-04-28 浙江宝红建筑工业化制造有限责任公司 Production method of high-bearing easy-to-install composite beam
CN111764547A (en) * 2020-06-11 2020-10-13 河海大学 Prefabricated assembly type shear wall structure and manufacturing method thereof
CN113202211A (en) * 2021-05-11 2021-08-03 陕西省建筑设计研究院(集团)有限公司 Construction method of assembled oblique steel plate mesh cast-in-place concrete shear wall
CN113202210A (en) * 2021-05-11 2021-08-03 陕西省建筑设计研究院(集团)有限公司 Assembled slant steel sheet net piece cast in situ concrete shear force wall

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111070379A (en) * 2019-12-30 2020-04-28 浙江宝红建筑工业化制造有限责任公司 Production method of high-bearing easy-to-install composite beam
CN111070379B (en) * 2019-12-30 2021-09-28 浙江宝红建筑工业化制造有限责任公司 Production method of high-bearing easy-to-install composite beam
CN111764547A (en) * 2020-06-11 2020-10-13 河海大学 Prefabricated assembly type shear wall structure and manufacturing method thereof
CN111764547B (en) * 2020-06-11 2021-05-11 河海大学 Prefabricated assembly type shear wall structure and manufacturing method thereof
CN113202211A (en) * 2021-05-11 2021-08-03 陕西省建筑设计研究院(集团)有限公司 Construction method of assembled oblique steel plate mesh cast-in-place concrete shear wall
CN113202210A (en) * 2021-05-11 2021-08-03 陕西省建筑设计研究院(集团)有限公司 Assembled slant steel sheet net piece cast in situ concrete shear force wall

Similar Documents

Publication Publication Date Title
CN209670127U (en) A kind of fabricated construction of prefabricated steel reinforced concrete shear walls
CN108867943A (en) Prefabricated sandwich wall and prefabricated sandwich wall production method
US5218809A (en) Earthquake resistant structure utilizing a confinement reinforcing framework
CN206174146U (en) Assembly type structure's assembly node
CN208668765U (en) Precast prestressed beam and assembled composite frame structure
CN206503150U (en) A kind of basalt composite reinforcing material anchor lattice beam retaining structure
CN108457422A (en) Precast prestressed beam, assembled composite frame structure and its installation method
CN208455907U (en) A kind of prefabricated laminated floor slab
KR101358878B1 (en) Reinforcement member and girder using the same
CN108487636B (en) Prefabrication steel concrete compound shear wall assembled-type house construction method
CN212715350U (en) Section steel concrete beam column structure
CN210738091U (en) Novel reinforcing system for aluminum template
CN207934488U (en) A kind of Core Walls Structure bottom ruggedized construction
CN209293197U (en) Wall and floor connection structure and assembled arthitecutral structure system
CN215406913U (en) Beam rib frame vertical structure and structural beam
CN202000485U (en) L-shaped connecting node for superposed outer wall of shear wall structure
CN205955008U (en) Basement roof arch without beam pile cap node that is all -trans
CN211473348U (en) Scaffold wall connecting piece
CN210420839U (en) Ramp bridge steel bar structure
CN209244050U (en) A kind of floor prefabricated components, assembled floor and assembled stair
CN204343444U (en) Factorial praluction new and effective assembled architecture frame column beam
CN209227842U (en) Prefabricated sandwich wall and assembled arthitecutral structure system
CN208121961U (en) A kind of assembling frame corner node structure
CN208718097U (en) A kind of precast construction connecting node that concrete is combined with steel construction
CN212478190U (en) Shear wall structure of construction steel bar formwork concrete

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191122