CN209667046U - Erecting brush integrated system structure - Google Patents

Erecting brush integrated system structure Download PDF

Info

Publication number
CN209667046U
CN209667046U CN201822184339.8U CN201822184339U CN209667046U CN 209667046 U CN209667046 U CN 209667046U CN 201822184339 U CN201822184339 U CN 201822184339U CN 209667046 U CN209667046 U CN 209667046U
Authority
CN
China
Prior art keywords
large arm
gag lever
lever post
erecting brush
integrated system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822184339.8U
Other languages
Chinese (zh)
Inventor
撒飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Polymerization Precision Automation Equipment Co Ltd
Original Assignee
Shandong Polymerization Precision Automation Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Polymerization Precision Automation Equipment Co Ltd filed Critical Shandong Polymerization Precision Automation Equipment Co Ltd
Priority to CN201822184339.8U priority Critical patent/CN209667046U/en
Application granted granted Critical
Publication of CN209667046U publication Critical patent/CN209667046U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Cleaning In General (AREA)

Abstract

The utility model relates to a kind of erecting brush integrated system structures, including crossbeam, erecting brush and large arm, erecting brush on the outside of mounting bracket and large arm one end by connecting, the large arm other end and big beam sides are rotatablely connected, and also by driving cylinder to connect with crossbeam on the outside of large arm, it is characterized by: the big beam sides on the inside of the large arm on be additionally provided with a gag lever post, gag lever post is longitudinally disposed and gag lever post top and bottom with its end plate being rotatablely connected respectively by being fixed on big beam sides, and the big beam sides is additionally provided with limit plate in large arm inner end lower part;The structure design of the utility model is reasonable, physics limit protection may be implemented by gag lever post, and installing limit switch by limit plate may be implemented the limit effect automatically controlled, the safety in effective guarantee car washing installation operational process.

Description

Erecting brush integrated system structure
Technical field
The utility model relates to car washing installation technical field more particularly to a kind of erecting brush integrated system structures.
Background technique
In the prior art, erecting brush integrated system overall structure lacks necessary position limitation protection structure, it is caused to use Cheng Zhong is easy to appear and contacts the accident of equipment damage of causing with crossbeam because erecting brush large arm activity is more than maximum magnitude, and increase is set Standby maintenance cost.
The fixed form of the crossbeam of erecting brush integrated system is fixed by the plate isometric with crossbeam, and plate is arranged on crossbeam Portion and lower part, the structural strength of crossbeam in use itself are fully met using needs, and the design of the structure of plate is so that product Increased costs.
Summary of the invention
In order to solve deficiency in the prior art, it is integrated that the utility model provides a kind of erecting brush highly-safe, at low cost System structure.
The technical scheme adopted by the utility model to solve the technical problem is as follows:
A kind of erecting brush integrated system structure, including crossbeam, erecting brush and large arm, erecting brush pass through outside mounting bracket and large arm one end Side connection, the large arm other end and big beam sides are rotatablely connected, and also by driving cylinder to connect with crossbeam on the outside of large arm, feature Be: the big beam sides on the inside of the large arm on be additionally provided with a gag lever post, gag lever post is longitudinally disposed and gag lever post top and bottom Respectively by being fixed on big beam sides with its end plate being rotatablely connected.
Spring protective casing is enclosed on the outside of the gag lever post.
Be equipped with an adjustable limiting screw rod being flexibly connected with it in the middle part of the gag lever post, adjustable limiting screw rod horizontal distribution and One end is arranged towards the large arm.
The adjustable limiting screw rod is threadedly coupled with the gag lever post.
The adjustable limiting screw rod across the gag lever post be arranged, and adjustable limiting bar in gag lever post two sides be respectively equipped with Its stop nut being threadedly coupled.
The large arm two sides are obliquely installed towards its inside, and tilt angle is 5-30 degree.
The big beam sides is additionally provided with limit plate in large arm inner end lower part, and the limit plate is a curved panel, limit plate Both ends are equipped with the end seat of perpendicular distribution, and end seat is connected and fixed with the crossbeam, are equipped in the middle part of limit plate by least one arc The limiting device channel that shape strip through-hole is constituted, and limiting device channel both ends are arranged close to the both ends end of limit plate.
The crossbeam includes symmetrical two groups, solid by end plate connection respectively between two groups of crossbeam front-end and back-end It is fixed.
The beneficial effects of the utility model are:
It is reasonable in design, physics limit protection may be implemented by gag lever post, installing limit switch by limit plate can Safety to realize the limit effect automatically controlled, in effective guarantee car washing installation operational process.
The fixed form that end plate is used between crossbeam, can reduce the production cost of product.
Detailed description of the invention
The present invention will be further described with reference to the accompanying drawings and examples.
Fig. 1 is the schematic perspective view of the utility model.
Fig. 2 is the present invention looks up structural representation of the utility model.
Fig. 3 is the structural schematic diagram of limit plate.
Fig. 4 is the structural schematic diagram of large arm.
Fig. 5 is the partial structural diagram of " A " in Fig. 1
In figure: 1 big beam end plate, 2 cylinder end plates, 3 driving cylinders, 4 erecting brushes, 5 mounting brackets, 6 large arm end plates, 7 large arm, 8 Side plate, 9 limit end plates, 10 gag lever posts, 11 adjustable limiting screw rods, 12 limit plates, 13 crossbeams, 14 arc strip through-holes, 15 end seats, 16 shafts, 17 driving plates.
Specific embodiment
The embodiments of the present invention is illustrated by particular specific embodiment below, those skilled in the art can be by this Content disclosed by specification understands other advantages and effect of the utility model easily.
Embodiment one
According to Fig. 1 to Fig. 5: the present embodiment provides a kind of erecting brush integrated system structures, including two groups 13, four, crossbeam Erecting brush 4 and four large arm 7;
It is connected and fixed respectively by big beam end plate 1 between two groups of crossbeams, 13 front-end and back-end, so that big beam end plate 1 is not Stress is served only for fixing two crossbeams 13, and overall structure consumptive material is small, at low cost;
The erecting brush 4 is bolted by mounting bracket 5 with two side plates 8 on the outside of 7 one end of large arm, and the welding of side plate 8 is solid It is scheduled in large arm 7, the fixed erecting brush 4 in 5 bottom of mounting bracket, 5 back side of mounting bracket is fixed between two side plates 8, erecting brush 4 and big Arm 7 is arranged in a one-to-one correspondence, and is separately positioned on the two sides of 13 front-end and back-end of crossbeam;
7 other end of large arm and 13 side of crossbeam are rotatablely connected, and 7 top and bottom of large arm are equipped with shaft 16, and shaft 16 is inserted into Setting is rotated in the hole of the large arm end plate 6 of 13 side of crossbeam, 7 outside of large arm is also by driving cylinder 3 to connect with crossbeam 13, greatly The driving plate 17 with the drive rod rotation connection of driving cylinder 3 is equipped on the outside of arm 7, cylinder body one end of driving cylinder 3 passes through connection Plate is fixed between the cylinder end plate 2 of 13 side of crossbeam, is rotatablely connected on rear side of connecting plate with cylinder end plate 2, solid on front side of connecting plate It is scheduled on rear end of the cylinder block, wherein the driving cylinder 3 can also be replaced by hydraulic cylinder;
Further, 7 two sides of large arm are obliquely installed towards its inside, and tilt angle is 10 degree, passes through the knot Structure makes large arm 7 constitute c-type structure, increases its flexibility, can increase its elastic deformation amount after collision, reduces damage.
In being additionally provided with a gag lever post 10 on 7 inside of large arm, gag lever post 10 is set with the one-to-one correspondence of large arm 7 for 13 side of crossbeam It sets and 10 height of gag lever post is arranged slightly larger than large arm 7, height phase is arranged in the center setting height of limit plate 12 and the center of large arm 7 Together, it contacts limit plate 12 all with large arm 7 side wall to be limited, gag lever post 10 is longitudinally disposed and 10 top and bottom of gag lever post It is fixed on 13 side of crossbeam by the limit end plate 9 being rotatablely connected with it respectively;
Further, an adjustable limiting screw rod 11 being flexibly connected with it, adjustable limiting are equipped in the middle part of the gag lever post 10 Screw rod 11 is arranged across the gag lever post 10, and adjustable limiting bar 10 is respectively equipped in gag lever post 10 two sides and is threadedly coupled with it Stop nut, 11 horizontal distribution of adjustable limiting screw rod and one end are arranged towards the large arm 7, can be passed through by stop nut The position for clamping gag lever post 10 and fixedly adjustable Limit screw 11, can also adjust adjustable limiting screw rod 11 with this configuration and be used for The length of limit part, for limiting the maximum activity position of large arm 7 by mechanical position limitation, in use, can be according to 4 He of erecting brush The type selecting of large arm 7 is adjusted, and for ensureing under the limit effect of adjustable limiting screw rod 11, large arm 7 is not contacted with crossbeam 13.
13 side of crossbeam is additionally provided with limit plate 12 in 7 inner end lower part of large arm, and the limit plate 12 is a curved panel, 12 both ends of limit plate are equipped with the end seat 15 of perpendicular distribution, and end seat 15 is connected and fixed with the crossbeam 13,12 middle part of limit plate Equipped with the limiting device channel being made of two symmetrical arc strip through-holes 14, and limiting device channel both ends are close to limit The both ends end setting of position plate 12, for installing limit switch in limiting device channel, for by car washing installation controller certainly The activity space of dynamic control large arm 7, cooperates with mechanical position limitation and constitutes double limitation effect, safety also further increases.
Embodiment two
The present embodiment provides a kind of erecting brush integrated system structure, including two groups of crossbeams, 13, four erecting brushes 4 and four large arm 7, It is with the difference of embodiment one:
Spring protective casing is enclosed on the outside of the gag lever post 10, spring protective casing uses rubber tube, for increasing limit The protection effect of position bar 10, under the structure without using adjustable limiting screw rod 11, in the contact process of gag lever post 10 and large arm 7, Gag lever post 10 can be reduced to collsion damage caused by large arm 7.
The foregoing is merely the preferred embodiments of the utility model, as long as realizing the utility model with essentially identical means Purpose technical solution, belong within the protection scope of the utility model.

Claims (8)

1. a kind of erecting brush integrated system structure, including crossbeam, erecting brush and large arm, erecting brush passes through mounting bracket and large arm one end outside Connection, the large arm other end and big beam sides are rotatablely connected, and also by driving cylinder to connect with crossbeam on the outside of large arm, feature exists In: the big beam sides is in being additionally provided with a gag lever post on large arm inside, gag lever post is longitudinally disposed and gag lever post top and bottom are divided Not by being fixed on big beam sides with its end plate being rotatablely connected.
2. erecting brush integrated system structure according to claim 1, it is characterised in that: package is flexible on the outside of the gag lever post Protection tube.
3. erecting brush integrated system structure according to claim 1 or 2, it is characterised in that: be equipped with one in the middle part of the gag lever post The adjustable limiting screw rod being flexibly connected with it, adjustable limiting screw rod horizontal distribution and one end are arranged towards the large arm.
4. erecting brush integrated system structure according to claim 3, it is characterised in that: the adjustable limiting screw rod and the limit Position bar is threadedly coupled.
5. erecting brush integrated system structure according to claim 3, it is characterised in that: the adjustable limiting screw rod passes through described Gag lever post setting, and adjustable limiting bar is respectively equipped with the stop nut being threadedly coupled with it in gag lever post two sides.
6. erecting brush integrated system structure according to claim 1, it is characterised in that: the large arm two sides are towards its inside It is obliquely installed, and tilt angle is 5-30 degree.
7. erecting brush integrated system structure according to claim 1, it is characterised in that: the big beam sides is under large arm inner end Portion is additionally provided with limit plate, and the limit plate is a curved panel, and limit board ends are equipped with the end seat of perpendicular distribution, end seat with The crossbeam is connected and fixed, and the limiting device channel being made of at least one arc strip through-hole is equipped in the middle part of limit plate, and limit Position device channel both ends are arranged close to the both ends end of limit plate.
8. erecting brush integrated system structure according to claim 1, it is characterised in that: the crossbeam includes symmetrical two Group is fixed respectively by end plate connection between two groups of crossbeam front-end and back-end.
CN201822184339.8U 2018-12-25 2018-12-25 Erecting brush integrated system structure Active CN209667046U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822184339.8U CN209667046U (en) 2018-12-25 2018-12-25 Erecting brush integrated system structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822184339.8U CN209667046U (en) 2018-12-25 2018-12-25 Erecting brush integrated system structure

Publications (1)

Publication Number Publication Date
CN209667046U true CN209667046U (en) 2019-11-22

Family

ID=68563323

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822184339.8U Active CN209667046U (en) 2018-12-25 2018-12-25 Erecting brush integrated system structure

Country Status (1)

Country Link
CN (1) CN209667046U (en)

Similar Documents

Publication Publication Date Title
CN209667046U (en) Erecting brush integrated system structure
CN208329170U (en) A kind of adjustable tensioning membrane edge angle connecting device
CN105034786B (en) A kind of engine mounting assembly
CN206864303U (en) Transducer bracket and the switch cubicle using the transducer bracket
CN209800442U (en) High-strength hoop
CN116721837A (en) Marine adjustable transformer base
CN102074904A (en) Modular design based general electrical cabinet for metro vehicles
CN211359315U (en) Spraying system for electronic component
CN208474239U (en) A kind of section of jurisdiction transport trolley oil cylinder mounting device
CN210490174U (en) Connecting device of emergency box
CN206105218U (en) Axial condenser welding frock
CN206029800U (en) Roof beam body assembled fitting platform
CN206685837U (en) Busbar anti-sinking device
CN206784875U (en) A kind of novel building ergonomic support device
CN218811919U (en) Novel plate buffering device in plate heat treatment process
CN110778176A (en) Anti-twisting stereo garage frame structure
CN219967731U (en) Pipe wrench ultrasonic generator fixation clamp
CN211316049U (en) Solar panel fixing equipment with illumination adjusting function for solar street lamp
CN220382728U (en) Strain clamp device for power engineering
CN213203793U (en) Highway bridge guardrail prevents throwing net structure
CN219487358U (en) Electric tractor controller fixing device and electric tractor
CN217882736U (en) A gallows for bus duct installation
CN203819343U (en) Position adjusting device for subframe and engineering machinery
CN215258156U (en) Electric stop valve fixing support
CN221067989U (en) Electricelectric mine card electric control module mounting structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant