CN209655510U - A kind of air curtain hangs wall construction and air curtain - Google Patents
A kind of air curtain hangs wall construction and air curtain Download PDFInfo
- Publication number
- CN209655510U CN209655510U CN201920257901.7U CN201920257901U CN209655510U CN 209655510 U CN209655510 U CN 209655510U CN 201920257901 U CN201920257901 U CN 201920257901U CN 209655510 U CN209655510 U CN 209655510U
- Authority
- CN
- China
- Prior art keywords
- pendant
- air curtain
- wall construction
- connecting portion
- mounting hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Finishing Walls (AREA)
Abstract
The utility model relates to a kind of air curtains to hang wall construction and air curtain, it includes body that the air curtain, which hangs wall construction, first pendant and the second pendant, the body is fixed on metope by the cooperation of first pendant and the second pendant, wherein, first pendant and the second pendant are connected and fixed by a fastener, the lower end of the body offers the mounting hole for leading to second pendant, and the mounting hole opens up in the horizontal direction, fastener can be installed from the front of body, due to keeping the normal operation of machine, the positive direction of body is not have obstacle necessarily, therefore, the extension wall construction can adapt in various installation environments, it will not be limited by space, cause to be difficult to install.
Description
Technical field
The utility model relates to fixed structure technical fields, hang wall construction and air curtain more particularly to a kind of air curtain.
Background technique
Currently, the electric appliance that air curtain, air-conditioning etc. are operated using air is typically all to be mounted on indoor metope to use, In
Body offers air inlet and air outlet, realizes respective purpose and function by the process of sucking and the discharge of air.
General extension wall construction is usually screwed body, and installation screw hole is generally arranged at body backboard and Gua Qiang
The junction of mechanism, and be open straight down, screw needs to tighten from the bottom up, and surface can facilitate construction personnel from body
Underface operation, but the structure needs to have sufficient space that could complete to install below body, but can in certain use environments
It is restricted, is not readily accomplished the installation.
Utility model content
One is provided utility model aims to solve defect present in wall construction is hung in the prior art based on this
Kind can adapt to hang wall construction in the air curtain of various installation environments, solve since insufficient space is difficult to body being mounted on wall
The technical issues of face.
A kind of air curtain extension wall construction, it is characterised in that: including body and hang wall component, the extension wall component includes:
First pendant, first pendant are fixed on metope;
Second pendant, second pendant are affixed with first pendant and body respectively;
Fastener, the fastener is for connecting first pendant and the second pendant;
Wherein, the lower end of the body offers the mounting hole of horizontal direction, and the mounting hole leads to second pendant,
The fastener passes through the mounting hole and connects first pendant and the second pendant.
The further improvement of wall construction is hung as above-mentioned air curtain, first pendant upper end offers hanging hole, and described the
The upper end of two pendants is provided with hook portion, and the hook portion can be inserted into the hanging hole.
The further improvement of wall construction is hung as above-mentioned air curtain, the lower end of first pendant is provided with the first connection
Portion, the lower end of second pendant are provided with second connecting portion, and the fastener connects the first connecting portion and the second connection
Portion.
The further improvement of wall construction is hung as above-mentioned air curtain, the fastener is screw or bolt, and described first connects
Socket part and second connecting portion offer the screw hole with the appended claims.
The further improvement of wall construction is hung as above-mentioned air curtain, the first connecting portion and the second connecting portion are along court
Diagonally downward and inclined surface is formed to the direction of the mounting hole, the screw hole difference of the first connecting portion and second connecting portion
It is arranged on the inclined surface of the first connecting portion and second connecting portion.
The further improvement of wall construction is hung as above-mentioned air curtain, first pendant is identical with the body length
Plate, second pendant include two, and described two second pendants are symmetrical arranged along the length direction of first pendant.
As above-mentioned air curtain hang wall construction further improvement, the body include a backboard, second pendant with
The backboard is affixed, and the mounting hole is provided on the backboard.
As above-mentioned air curtain hang wall construction further improvement, the backboard lower end towards it is described hang wall component side
It is extended with top, the end of the top forms a support surface.
Present invention also provides a kind of air curtain, the air curtain includes that the air curtain of above-mentioned any one hangs wall construction,
Wherein, the organism bottom offers air outlet, and the mounting hole is provided at the air outlet.
One or more technical solutions provided in the embodiments of the present application have at least the following technical effects or advantages:
1, it includes body, the first pendant and the second pendant that air curtain described in the utility model, which hangs wall construction, by described
The body is fixed on metope by the cooperation of the first pendant and the second pendant, wherein first pendant and the second pendant are logical
It crosses a fastener to be connected and fixed, the lower end of the body offers the mounting hole for leading to second pendant, and the mounting hole
It opens up in the horizontal direction, fastener can be installed from the front of body, and due to keeping the normal operation of machine, body is just
Face direction is necessarily not have obstacle, therefore, be can adapt in the extension wall construction in various installation environments, will not be by space
Limitation, cause to be difficult to install.
2, the cooperation of the hook portion of the hanging hole of first pendant and the second pendant can be such that body has when hanging wall installation
The process of one pre-determined bit keeps the installation process of body more convenient, also more stable after installation.
3, the first connecting portion and second connecting portion edge diagonally downward and are formed towards the direction of the mounting hole
Inclined surface allows the fastener to be tilted towards Shangdi and is installed across the mounting hole, easily facilitates construction personnel's
Operation.
4, in air curtain at outlet air port the space of air outlet generation is utilized, be more convenient for constructor in the setting
The operation of member.
In order to better understand and implement, according to the present invention will be described in detail below with reference to the accompanying drawings.
Detailed description of the invention
Fig. 1 is the exploded view that air curtain described in the utility model hangs wall construction and air curtain;
Fig. 2 is the installation diagram that air curtain described in the utility model hangs wall construction and air curtain;
Fig. 3 is the perspective view of air curtain described in the utility model;
Fig. 4 is the exploded view of air curtain described in the utility model.
Specific embodiment
Referring now to attached drawing hereinafter, the utility model is described in more detail below, shows the utility model in the figure
Embodiment.However, the utility model can be presented as many different forms, and should not be construed as being limited to presented herein
Specific embodiment.Exactly, these embodiments are used to the scope of the utility model being communicated to those skilled in the art.
Unless otherwise defined, otherwise, term (including technical and scientific terms) used herein is interpreted as
With the identical meaning of the meaning that is generally understood with the technical staff in field belonging to the utility model.Moreover, it will be appreciated that
, term used herein be interpreted as have with the consistent meaning of meaning in this specification and related fields, and
And it should not be explained by ideal or excessively formal meaning, unless being clearly specified that herein.
In the description of the present invention, it should be understood that term " center ", " longitudinal direction ", " transverse direction ", "upper", "lower",
The orientation or positional relationship of the instructions such as "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outside" is
It is based on the orientation or positional relationship shown in the drawings, is merely for convenience of describing the present invention and simplifying the description, rather than indicate
Or imply that signified device or element must have a particular orientation, be constructed and operated in a specific orientation, therefore cannot understand
For limitations of the present invention.In the description of the present invention, unless otherwise indicated, the meaning of " plurality " is two or two
More than a.
As shown in Figures 1 to 4, Fig. 1 is the exploded view that air curtain described in the utility model hangs wall construction and air curtain;Fig. 2
The installation diagram of wall construction and air curtain is hung for air curtain described in the utility model;Fig. 3 is the vertical of air curtain described in the utility model
Body figure;Fig. 4 is the exploded view of air curtain described in the utility model.
The utility model provides a kind of air curtain, including body 1 and extension wall component, the body 1 pass through the extension wall
Component is fixed on metope.
Each component part of the present embodiment air curtain is described in detail individually below.
The extension wall component is fixed on metope for body 1 described in part, realizes the purpose for hanging wall installation, the extension wall component
Including the first pendant 2, the second pendant 3 and fastener 4.First pendant 2 is fixed on metope, and second pendant 3 is distinguished
Affixed with first pendant 2 and body, the fastener 4 is for connecting first pendant 2 and the second pendant 3.Wherein, institute
The lower end for stating body 1 offers the mounting hole 21 of horizontal direction, and the mounting hole 11 leads to second pendant 3, the fastening
Part 4 passes through the mounting hole 11 and connects first pendant 2 and the second pendant 3, and horizontally arranged mounting hole 11 makes institute
Stating fastener 4 can be installed from the front of body 1, and due to keeping the normal operation of machine, the positive direction of body 1 is must
Obstacle is not so had, therefore, can adapt to be limited, be led by space in various installation environments in the extension wall construction
Cause is difficult to install.
Specifically, first pendant 2 is plate identical with 1 length of body, in addition, second pendant 3
It can be plate, the present embodiment includes two second pendants 3, length of described two second pendants 3 along first pendant 2
It spends direction to be symmetrical arranged, described two second pendants 3 can fix respectively the both ends of the body 1, stablize body 1
Ground is hung on a wall.The lower end of first pendant 2 is provided with first connecting portion 21, and the lower end of second pendant 3 is provided with
Two interconnecting pieces 31, the fastener 4 connect the first connecting portion 21 and second connecting portion 31, in the present embodiment, described tight
Firmware 4 is screw or bolt, and the first connecting portion 21 and second connecting portion 31 offer the screw with the fastener 4 cooperation
Hole.The fastener 4 is screw, needs to be installed by screwdriver component, since mounting hole 11 is arranged in 1 lower end of body
And in the horizontal direction, construction personnel can tighten up a screw from the front of body, guarantee have enough spatial operation spiral shells
Silk batch.
As preferred embodiment, the first connecting portion 21 and the second connecting portion 31 are along towards the mounting hole 11
Direction diagonally downward and form inclined surface, the screw hole of the first connecting portion 21 and second connecting portion 31 is separately positioned on institute
On the inclined surface for stating first connecting portion 21 and second connecting portion 31, the screw hole of the direction diagonally downward, for stand under body
The construction personnel of side is more friendly, can more easily be directed at the installation that screw hole carries out screw, improves working efficiency.
As preferred embodiment, 2 upper end of the first pendant offers hanging hole, the upper end setting of second pendant 3
There is hook portion 32, the hook portion 32 can be inserted into the hanging hole, and the hanging hole 22 can be other types of for circular hole, square hole etc.
An extension 22 is extended to second pendant 3 in hole, in the present embodiment, the upper end of first pendant 2, and the hanging hole is opened
It is located on the extension 22, the hanging hole is rectangular opening.The upper-end bent of second pendant 3 forms hook portion 32, the extension
Hook portion 32 can pass through the hanging hole, ride over the hook portion 32 on the extension 22, complete the first pendant 2 and second and hang
Pre-determined bit between part 3.
The body 1 includes backboard 101 and front panel 102, and the backboard 101 and second pendant 3 are fixed, in this reality
It applies in example, second pendant 3 is affixed by screw and the backboard 101.As preferred embodiment, under the backboard 101
It holds towards the side for hanging wall component and is extended with top 12, the end of the top 12 forms a support surface, described to support
The height at top 12 is lower than the bottom of first pendant 2 and the second pendant 3, and the top 12 protrudes from the length of backboard 101
Degree is equal to the thickness after first pendant 2 and the combination of the second pendant 3, and after installing the body, the top 12 is supported
On metope, the pressure for hanging wall component can reduce, prevent first pendant 2 and the second pendant 3 from deforming, extend and hang wall
The physical life of component.
In the present embodiment, the front panel 102 offers air inlet 13, and the bottom of the body 1 offers air outlet
14, the mounting hole 11 is provided at the air outlet 14, and construction personnel is able to observe that institute in the lower section of the body 1
Mounting hole 11 is stated, and the tools such as screwdriver can be reached using the space that the air outlet 14 is formed and be carried out tightly at mounting hole
The installation of firmware 4.
When installation, a suitable height is first selected, first pendant 2 is fixed on metope by screw or bolt etc.
On, then second pendant 3 is installed on the backboard 101 of the body 1, then by the hook portion 32 of second pendant 3
It hooks into and realizes pre-determined bit in the hanging hole of first pendant 2, the first connecting portion 21 of the first pendant 2 described in most consequent and second is hung
The screw hole of the second connecting portion 31 of part 3 is aligned and is overlapped, and fixed can be completed of screw means is hung wall installation.
Compared with the prior art, the embodiment of the present application has the following technical effect that or advantage:
1, it includes body, the first pendant and the second pendant that air curtain described in the utility model, which hangs wall construction, by described
The body is fixed on metope by the cooperation of the first pendant and the second pendant, wherein first pendant and the second pendant are logical
It crosses a fastener to be connected and fixed, the lower end of the body offers the mounting hole for leading to second pendant, and the mounting hole
It opens up in the horizontal direction, fastener can be installed from the front of body, and due to keeping the normal operation of machine, body is just
Face direction is necessarily not have obstacle, therefore, be can adapt in the extension wall construction in various installation environments, will not be by space
Limitation, cause to be difficult to install.
2, the cooperation of the hook portion of the hanging hole of first pendant and the second pendant can be such that body has when hanging wall installation
The process of one pre-determined bit keeps the installation process of body more convenient, also more stable after installation.
3, the first connecting portion and second connecting portion edge diagonally downward and are formed towards the direction of the mounting hole
Inclined surface allows the fastener to be tilted towards Shangdi and is installed across the mounting hole, easily facilitates construction personnel's
Operation.
4, in air curtain at outlet air port the space of air outlet generation is utilized, be more convenient for constructor in the setting
The operation of member.
Above-described embodiments merely represent several embodiments of the utility model, the description thereof is more specific and detailed,
But it cannot be understood as the limitations to utility model patent range.It should be pointed out that for the common skill of this field
For art personnel, without departing from the concept of the premise utility, various modifications and improvements can be made, these are belonged to
The protection scope of the utility model.
Claims (9)
1. a kind of air curtain hangs wall construction, it is characterised in that: including body and hang wall component, the extension wall component includes:
First pendant, first pendant are fixed on metope;
Second pendant, second pendant are affixed with first pendant and body respectively;
Fastener, the fastener is for connecting first pendant and the second pendant;
Wherein, the lower end of the body offers the mounting hole of horizontal direction, and the mounting hole leads to second pendant, described
Fastener passes through the mounting hole and connects first pendant and the second pendant.
2. air curtain according to claim 1 hangs wall construction, it is characterised in that: first pendant upper end offers extension
Hole, the upper end of second pendant are provided with hook portion, and the hook portion can be inserted into the hanging hole.
3. air curtain according to claim 1 hangs wall construction, it is characterised in that: the lower end of first pendant is provided with the
One interconnecting piece, the lower end of second pendant are provided with second connecting portion, and the fastener connects the first connecting portion and the
Two interconnecting pieces.
4. air curtain according to claim 3 hangs wall construction, it is characterised in that: the fastener is screw or bolt, institute
It states first connecting portion and second connecting portion offers screw hole with the appended claims.
5. air curtain according to claim 4 hangs wall construction, it is characterised in that: the first connecting portion and described second connects
Socket part edge diagonally downward and forms inclined surface, the spiral shell of the first connecting portion and second connecting portion towards the direction of the mounting hole
Wire hole is separately positioned on the inclined surface of the first connecting portion and second connecting portion.
6. air curtain according to claim 1 hangs wall construction, it is characterised in that: first pendant is long with the body
Identical plate is spent, second pendant includes two, length direction pair of described two second pendants along first pendant
Claim setting.
7. air curtain according to claim 1 hangs wall construction, it is characterised in that: the body includes a backboard, and described the
Two pendants and the backboard are affixed, and the mounting hole is provided on the backboard.
8. air curtain according to claim 7 hangs wall construction, it is characterised in that: the backboard lower end is towards the extension wall group
The side of part is extended with top, and the end of the top forms a support surface, and the height of the top is lower than described the
The bottom of one pendant and the second pendant.
9. a kind of air curtain, it is characterised in that: the air curtain includes the air curtain as described in claim 1 to 8 any one
Hang wall construction, wherein the organism bottom offers air outlet, and the mounting hole is provided at the air outlet.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920257901.7U CN209655510U (en) | 2019-02-28 | 2019-02-28 | A kind of air curtain hangs wall construction and air curtain |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920257901.7U CN209655510U (en) | 2019-02-28 | 2019-02-28 | A kind of air curtain hangs wall construction and air curtain |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209655510U true CN209655510U (en) | 2019-11-19 |
Family
ID=68525584
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920257901.7U Active CN209655510U (en) | 2019-02-28 | 2019-02-28 | A kind of air curtain hangs wall construction and air curtain |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209655510U (en) |
-
2019
- 2019-02-28 CN CN201920257901.7U patent/CN209655510U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209655510U (en) | A kind of air curtain hangs wall construction and air curtain | |
CN205878555U (en) | Air conditioner wall hanging plate and split air conditioner | |
CN209706161U (en) | Kitchen ventilator anti-drop structure | |
CN206771521U (en) | Indoor apparatus of air conditioner and air conditioner | |
CN205795461U (en) | A kind of convenient hanging device | |
CN114087768A (en) | Connection structure and air conditioner with same | |
CN213509159U (en) | Adjustable electrical appliance host installation structure | |
CN212177468U (en) | Exhaust fan with simple and easy-to-install panel | |
CN207893874U (en) | Center base connector and air conditioner | |
CN207279941U (en) | Boom support component for ceiling-mounted air conditioner | |
CN209623077U (en) | A kind of air conditioner | |
CN209024845U (en) | A kind of clothes airing machine for closing drying clothing | |
CN208475487U (en) | A kind of outdoor machine of air-conditioner buckle frame | |
CN107859934A (en) | A kind of panel light of fastening structure | |
CN207936437U (en) | A kind of air inlet faceplate of vertical air conditioner | |
CN207113022U (en) | A kind of air conditioner room unit wall hanging board and air conditioner | |
CN213019923U (en) | Indoor unit of air conditioner | |
CN208832590U (en) | A kind of assembling structure in heater air duct | |
CN205137236U (en) | Panel light with multiple mounting means | |
CN216620281U (en) | Connection structure and air conditioner with same | |
CN218154469U (en) | Indoor unit and air conditioner | |
CN221105400U (en) | Structure for preventing hook from falling off | |
CN213248264U (en) | Hook component | |
CN217063586U (en) | Hook and inversion system | |
CN221076625U (en) | Hanging device of ceiling machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |