CN209654070U - Modularization mine air conditioner device - Google Patents
Modularization mine air conditioner device Download PDFInfo
- Publication number
- CN209654070U CN209654070U CN201920064739.7U CN201920064739U CN209654070U CN 209654070 U CN209654070 U CN 209654070U CN 201920064739 U CN201920064739 U CN 201920064739U CN 209654070 U CN209654070 U CN 209654070U
- Authority
- CN
- China
- Prior art keywords
- module
- air conditioner
- modularization
- mine air
- buffer tank
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
This application discloses a kind of modularization mine air conditioner devices, belong to underground mine air-conditioning equipment field, for underground mine, it includes Multiple Sinking Pump, the Multiple Sinking Pump is connected by pipeline and the entrance of condenser module, the outlet of condenser module is connected separately with buffer tank module, evaporator module by pipeline, the buffer tank module also passes through pipeline and connect with axial flow blower component, the air outlet of axial flow blower component and the entrance of evaporator module connect, and the exit of evaporator module is connected with pneumatic hose.In view of above-mentioned technical proposal, the application can be realized quick, the flexible assembling of mine air conditioner, and can be replaced maintenance in time in the event of a failure.
Description
Technical field
The application belongs to underground mine air-conditioning equipment field, specifically, more particularly to a kind of modularization mine air conditioner dress
It sets.
Background technique
Refrigeration of underground mine equipment used in country's underground mining industry uses external import refrigeration equipment, this kind of equipment more at present
Acquisition cost is high, and bulky, causes installation, maintenance inconvenient, generally requires to transport to equipment component after underground
Could assemble, to installation, debug, bring very big inconvenience, once and equipment go wrong needs transporting ground back after complete machine disassembly
It could repair.
Summary of the invention
The application's is designed to provide a kind of modularization mine air conditioner device, can be realized mine air conditioner it is quick,
Flexible assembling, and maintenance can be replaced in time in the event of a failure.
In order to achieve the above objectives, the application is achieved through the following technical solutions:
Modularization mine air conditioner device described herein, including Multiple Sinking Pump, the Multiple Sinking Pump pass through pipe
The outlet of the connection of the entrance of road and condenser module, condenser module is connected separately with buffer tank module, evaporation by pipeline
Device module, the buffer tank module also pass through pipeline and connect with axial flow blower component, the air outlet of axial flow blower component and steaming
The entrance connection of device module is sent out, and the exit of evaporator module is connected with pneumatic hose.
Further speaking, recoil is installed on Multiple Sinking Pump described herein and the connecting line of condenser module
Wash full-automatic filter.
Further speaking, buffer tank module described herein uses pressure-bearing buffer tank, in pressure-bearing buffer tank
Bottom be provided with blowdown valve.
Further speaking, the wind pressure in pneumatic hose described herein is 500 ~ 600Pa.
Further speaking, it is connected between pipeline described herein using the metal tube with retractility.
Further speaking, condenser module described herein, buffer tank module, axial flow blower component and evaporator
Module is mounted on the bracket with wheel.
Further speaking, condenser module described herein, buffer tank module, axial flow blower component and evaporator
It is fixed between module by metal bracelet.
Compared with prior art, the beneficial effect of the application is:
1, the application is by carrying out modularization for underground mine air-conditioning, to realize that disparate modules can be with mine elevator
Memory matching, and modules can be transported to underground mine roadway by mine elevator, labor needed for greatly improving installation
Momentum improves installation effectiveness.
2, after the mine air conditioner device in the application breaks down, can the module of failure be separated and is transported back
Ground, is repaired using spare module component, and the refrigeration for not delaying underground air-conditioning uses, and reduces mine halt production risk and equipment
Maintenance cost.
Detailed description of the invention
Fig. 1 is the complete machine structural scheme of mechanism of the application.
In figure: 1, backwashing full-automatic filter;2, Multiple Sinking Pump;3, condenser module;4, buffer tank module;5,
Axial flow blower component;6, evaporator module;7, pneumatic hose;8, metal bracelet.
Specific embodiment
Technical solution described herein is described further with reference to the accompanying drawings and embodiments.
Embodiment 1: a kind of modularization mine air conditioner device, including Multiple Sinking Pump 2, the Multiple Sinking Pump 2 is logical
It crosses pipeline to connect with the entrance of condenser module 3, the outlet of condenser module 3 is connected separately with buffer tank module by pipeline
4, evaporator module 6, the buffer tank module 4 are also connect by pipeline with axial flow blower component 5, axial flow blower component 5
Air outlet is connect with the entrance of evaporator module 6, and the exit of evaporator module 6 is connected with pneumatic hose 7.
Embodiment 2: a kind of modularization mine air conditioner device, wherein the company of the Multiple Sinking Pump 2 and condenser module 3
Adapter tube road is equipped with backwash full-automatic filter 1.The buffer tank module 4 uses pressure-bearing buffer tank, slow in pressure-bearing
The bottom of waste preventer is provided with blowdown valve.Wind pressure in the pneumatic hose 7 is 500 ~ 600Pa.Using between the pipeline has
The metal tube of retractility connects.Structure and company described in the structure and connection relationship and any previous embodiment of rest part
It is identical to connect relationship.
Embodiment 3: a kind of modularization mine air conditioner device, wherein the condenser module 3, buffer tank module 4, axis
Flow fan component 5 and evaporator module 6 are mounted on the bracket with wheel.The condenser module 3, buffer tank module
4, fixed by metal bracelet 8 between axial flow blower component 5 and evaporator module 6.The structure and connection relationship of rest part with
Structure described in any previous embodiment and connection relationship are identical.
In the above-described embodiments, the Multiple Sinking Pump 2 is to be located at water temperature in 32 ~ 45 ° of sump, can be incited somebody to action
Water is pumped into condenser module 3.And for the normal use for guaranteeing condenser module 3, need in Multiple Sinking Pump 2 and cold
Anti- cleaning full-automatic filter 1 is installed in the connecting pipe of condenser module 3.Anti- cleaning full-automatic filter 1 can be to multistage
Impurity contained in the water body that immersible pump 2 is pumped into is filtered.
In this application, DN125 pipe can be used in the connecting pipe between the Multiple Sinking Pump 2 and condenser module 3
Road connection.After the effect of condenser module 3, the export pipeline of condenser module 3 using DN100 pipeline respectively with buffered water
Tank module 4 and axial flow blower component 5 connect.Wherein going out in the condenser module 3 and 4 connecting pipe of buffer tank module
Coolant-temperature gage is 5 ~ 7 DEG C.It, can be real under the action of axial flow blower component 5 after the water body of the water temperature is sent in evaporator module 6
Now to the heat exchange of be sent into air, to realize that the air outlet temperature after the heat exchange of evaporator module 6 is controlled at 15 DEG C or so.
The air outlet of evaporator module 6 described herein is connect with pneumatic hose 7.In order to facilitate mobile and transhipment, at this
In application, condenser module 3, buffer tank module 4, axial flow blower component 5, evaporator module 6 are mounted on wheel
Bracket on, can be realized movement of the above-mentioned module in mine.Using metal bracelet 8 between adjacent modules
Connection, prevents modules from moving in the course of work in mine.Also, due to the modules described in this application
Between connection is all made of is pipeline connection, the pipe fitting of connecting pipe is needed using the metal tube with certain telescopicing performance
Part guarantees the stability of overall work system so that it can adapt to the relative movement occurred between modules.
The machine important technological parameters are as follows: host 1 director 1900* wide 1350* high 2200, maximal input 71KW, it is maximum
Refrigerating capacity 254KW, air quantity 18000m3/h, wind pressure 600Pa, 700 meters of air supplying distance.It the use of temperature in preceding mine is 37-39 DEG C,
Humidity is 100%.Mine minery temperature is down to 26-28 DEG C, humidity 60%-70% after this equipment installation and operation, cool-down dehumidification section
For after face along 40 meters.
Claims (7)
1. a kind of modularization mine air conditioner device, including Multiple Sinking Pump (2), it is characterised in that: the Multiple Sinking Pump (2) is logical
It crosses pipeline to connect with the entrance of condenser module (3), the outlet of condenser module (3) is connected separately with buffer tank by pipeline
Module (4), evaporator module (6), the buffer tank module (4) are also connect by pipeline with axial flow blower component (5), axis stream
The air outlet of fan assembly (5) is connect with the entrance of evaporator module (6), and the exit of evaporator module (6) be connected with it is soft
Air hose (7).
2. modularization mine air conditioner device according to claim 1, it is characterised in that: the Multiple Sinking Pump (2) with it is cold
Backwash full-automatic filter (1) is installed on the connecting line of condenser module (3).
3. modularization mine air conditioner device according to claim 2, it is characterised in that: the buffer tank module (4) is adopted
With pressure-bearing buffer tank, the bottom of pressure-bearing buffer tank is provided with blowdown valve.
4. modularization mine air conditioner device according to claim 3, it is characterised in that: the wind pressure in the pneumatic hose (7)
For 500 ~ 600Pa.
5. according to claim 1 to modularization mine air conditioner device described in any one of 4 claims, it is characterised in that:
It is connected between the pipeline using the metal tube with retractility.
6. modularization mine air conditioner device according to claim 1, it is characterised in that: the condenser module (3), buffering
Water tank module (4), axial flow blower component (5) and evaporator module (6) are mounted on the bracket with wheel.
7. modularization mine air conditioner device according to claim 6, it is characterised in that: the condenser module (3), buffering
It is fixed by metal bracelet (8) between water tank module (4), axial flow blower component (5) and evaporator module (6).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920064739.7U CN209654070U (en) | 2019-01-15 | 2019-01-15 | Modularization mine air conditioner device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920064739.7U CN209654070U (en) | 2019-01-15 | 2019-01-15 | Modularization mine air conditioner device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209654070U true CN209654070U (en) | 2019-11-19 |
Family
ID=68521245
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920064739.7U Expired - Fee Related CN209654070U (en) | 2019-01-15 | 2019-01-15 | Modularization mine air conditioner device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209654070U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111412009A (en) * | 2020-05-12 | 2020-07-14 | 山东澳神热泵空调有限公司 | Intelligent modularized mine air conditioning system |
-
2019
- 2019-01-15 CN CN201920064739.7U patent/CN209654070U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111412009A (en) * | 2020-05-12 | 2020-07-14 | 山东澳神热泵空调有限公司 | Intelligent modularized mine air conditioning system |
CN111412009B (en) * | 2020-05-12 | 2022-01-04 | 山东澳神热泵空调有限公司 | Intelligent modularized mine air conditioning system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209654070U (en) | Modularization mine air conditioner device | |
CN112963134A (en) | Ultrahigh-pressure double-channel large-drift-diameter high-low-pressure fracturing manifold | |
CN201470193U (en) | Filter | |
CN209041635U (en) | A kind of nonpetroleum pipeline transportation valve | |
CN102997503A (en) | Heat exchanger and heat pump outdoor unit and heat pump air conditioner using same | |
CN208976116U (en) | A kind of seamless steel pipe special graphite ink jet printer | |
CN207702638U (en) | The cooling device of new wind cabinet | |
CN102441307A (en) | Smelting furnace exhaust gas filtering system | |
CN205859607U (en) | A kind of novel public work hose station | |
CN201917265U (en) | Spoiling device at shell side inlet of heat exchanger | |
CN219081640U (en) | Self-adaptive anti-freezing type spray dust removing device for coal mine | |
CN208635427U (en) | A kind of device using dirty nitrogen cold energy precooled air | |
CN206918616U (en) | Wheel rim intelligence oil gas lubricating system | |
CN205350680U (en) | Wear -resisting elbow device that iron -smelter ash conveying pipe used | |
CN217774491U (en) | Air-assisted sprayer pipeline system with rotation compensation and air-assisted sprayer | |
CN220614873U (en) | Large-caliber pipe vacuum box | |
KR20030064364A (en) | Apparatus for automatically cleaning heat exchanger tube, using ball circulation pump | |
CN205360187U (en) | High integrated air supply input process and flow control device | |
CN215462037U (en) | Urea evaporation system convenient to overhaul | |
CN204528666U (en) | Cone pump helps the system of blowing | |
CN209458089U (en) | Central integrated vacuum device for plastic pipe pipeline production line | |
CN216556510U (en) | Industrial gas supply system | |
CN208035889U (en) | Air-conditioner of engineering machinery condensation water recovery and use system | |
CN213063716U (en) | Double-pipeline stable lightweight urea injection system | |
CN212548874U (en) | Cut grain smog processing apparatus |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20191119 Termination date: 20210115 |
|
CF01 | Termination of patent right due to non-payment of annual fee |