CN209646276U - A kind of Energy-Saving Architectural Coatings making apparatus - Google Patents

A kind of Energy-Saving Architectural Coatings making apparatus Download PDF

Info

Publication number
CN209646276U
CN209646276U CN201822064884.3U CN201822064884U CN209646276U CN 209646276 U CN209646276 U CN 209646276U CN 201822064884 U CN201822064884 U CN 201822064884U CN 209646276 U CN209646276 U CN 209646276U
Authority
CN
China
Prior art keywords
fixed frame
fixed
treatment box
mixing tank
link
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201822064884.3U
Other languages
Chinese (zh)
Inventor
贺宇凡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Quanzhou Polaris Clothing Trade Co Ltd
Original Assignee
Quanzhou Polaris Clothing Trade Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Quanzhou Polaris Clothing Trade Co Ltd filed Critical Quanzhou Polaris Clothing Trade Co Ltd
Priority to CN201822064884.3U priority Critical patent/CN209646276U/en
Application granted granted Critical
Publication of CN209646276U publication Critical patent/CN209646276U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a kind of coating making apparatus more particularly to a kind of Energy-Saving Architectural Coatings making apparatus.The technical issues of the utility model, is: providing a kind of Energy-Saving Architectural Coatings making apparatus for being uniformly mixed, conveniently precisely adding various reagents.Technical solution is as follows: a kind of Energy-Saving Architectural Coatings making apparatus, includes mounting rack, collecting vessel, the first fixed frame, belt pulley, flat belt, the second fixed frame, treatment box, chamber door, the first lower hopper, web plate, first valve etc.;Mounting rack top right side is placed with collecting vessel, and mounting rack top left side is equipped with the first fixed frame, and the first fixed frame inner left wall top is equipped with the second fixed frame, is equipped with treatment box on the right side of the second fixed frame.The utility model can mix the base-material in mixing tank with pigment by the idler wheel being arranged, and this measure does not need people's hand mix, increases working efficiency, can be stirred to coating by the first scraper plate of setting, coating is enable preferably to be discharged.

Description

A kind of Energy-Saving Architectural Coatings making apparatus
Technical field
The utility model relates to a kind of coating making apparatus more particularly to a kind of Energy-Saving Architectural Coatings making apparatus.
Background technique
Building energy conservation is initially the lost of energy in reduction building in developed country, commonly known as " improves the energy in building Source utilization rate ", under conditions of guaranteeing to improve building comfort, efficiency of energy utilization is continuously improved in the reasonable employment energy.Building Energy conservation refers specifically to energy conservation standard be executed, using energy-saving in the planning in building, design, newly-built, transformation and use process Technology, technique, equipment, material and product improve thermal and insulating performance and heating, air conditioner refrigerating heating system efficiency, add The operational management of strong building energy consumption system under the premise of guaranteeing indoor thermal environment quality, increases room using renewable energy Inside and outside energy exchange thermal resistance is generated with reducing heating system, air conditioner refrigerating heating, illumination, hot water supply because of a large amount of heat loss Energy consumption.
As the requirement of building energy-saving environmental protection is continuously improved, building section can be sprayed on the cement asbestos board that roof is laid with Energy coating, increases its heat-proof quality, and the preparation section of sprayed on material is complex at present, and mixing is not uniform enough, is not easy to precisely Add various reagents.
Therefore it needs to research and develop a kind of making apparatus for being uniformly mixed, conveniently precisely adding various reagents.
Utility model content
In order to overcome the preparation section of current sprayed on material complex, mixing is not uniform enough, is not easy to precisely add various The technical issues of the shortcomings that reagent, the utility model, is: providing a kind of building for being uniformly mixed, conveniently precisely adding various reagents Energy-saving coatings making apparatus.
Technical solution is as follows: a kind of Energy-Saving Architectural Coatings making apparatus, include mounting rack, collecting vessel, the first fixed frame, Belt pulley, flat belt, the second fixed frame, treatment box, chamber door, the first lower hopper, web plate, the first valve, elevating lever, first are scraped Plate, the first fixed link, inserted link, mixing tank, the second lower hopper, third lower hopper, the second valve, first bearing seat, first rotating shaft, First motor and idler wheel, mounting rack top right side are placed with collecting vessel, and mounting rack top left side is equipped with the first fixed frame, and first is solid Frame inner left wall top is determined equipped with the second fixed frame, and the second fixed frame right side is equipped with treatment box, and processing right wall of box top rotary type is set There is chamber door, treatment box bottom centre is inserted to be equipped with the first lower hopper, is equipped with web plate, the first lower hopper bottom at the top of the first lower hopper Portion is equipped with the first valve, and treatment box top center is provided with first through hole, is combined with elevating lever in first through hole, on the left of elevating lever under Portion is provided with the second through-hole, and lower part is symmetrically arranged with the first scraper plate at left and right sides of elevating lever, and it is fixed that treatment box top right side is equipped with first Bar, the first fixed link left lower are provided with third through-hole, and inserted link is combined in third through-hole, and the first fixed frame top right side is equipped with Mixing tank, mixing tank top center are equipped with the second lower hopper, are equipped with third lower hopper, third lower hopper bottom among mixing tank bottom Portion is connected to treatment box top left side, and third lower hopper lower part is equipped with the second valve, and two walls have inserted set before and after mixing tank There is first bearing seat, first rotating shaft is installed in the first bearing seat of two side of front and back, is equipped with first on the left of mixing tank upper back Motor, the output shaft of first motor and the first rotating shaft rear end of top connect, and first rotating shaft is equipped with idler wheel, and idler wheel is located at mixing In case, first rotating shaft rear portion is equipped with belt pulley, and belt pulley is wound with flat between first motor and mixing tank on three belt pulleys Belt.
It optionally, further include having the first placement plate, loading bucket, the first stereoplasm tube, the first hose, third fixed frame, second Bearing block, the second shaft, connecting rod, fixed ring, cylinder body, compound tube, piston, first movement bar, fixed block, fixing sleeve, second Stereoplasm tube, check valve and the second hose, the first fixed frame left lower are equipped with the first placement plate, are placed with dress in the first placement plate Bucket is carried, mixing tank left wall top is equipped with the first stereoplasm tube, and the first stereoplasm tube left end is equipped with the first hose, the first fixed frame top left Side is equipped with third fixed frame, and third fixed frame top left side is inserted to be equipped with second bearing seat, and the is equipped in second bearing seat Two shafts, the second shaft lower end are equipped with connecting rod, and connecting rod left and right ends are symmetrically arranged with fixed ring, are equipped with cylinder body in fixed ring, Cylinder body left lower is equipped with compound tube, and piston is combined in cylinder body, is equipped with first movement bar among top land, on the right side of cylinder body under Portion is equipped with fixed block, and fixed block right end is equipped with fixing sleeve, is equipped with the second stereoplasm tube, the second stereoplasm tube and combination among cylinder base Check valve is equipped in pipe, the second stereoplasm tube lower end is equipped with the second hose, and the second hose end passes through fixing sleeve.
It optionally, further include thering is the second sliding block, the second mobile bar, third mobile bar, installing frame, the first spring, the 4th to move Lever and the second scraper plate, treatment box rear wall top are provided with sliding slot, and sliding slot inner sliding type is equipped with the second sliding block, and the second sliding block rear end is set There is the second mobile bar, the second slip front is equipped with third mobile bar, and third mobile bar is located in treatment box, third mobile bar lower end Equipped with installing frame, installing frame inner top has equipped with the first spring, and the first lower spring end is equipped with the 4th mobile bar, the 4th mobile bar Lower end is equipped with the second scraper plate, and the second scraper plate bottom is contacted with bottom in treatment box.
It optionally, further include having endless glide, third sliding block and the second placement plate, it is sliding that mounting rack top right side is equipped with annular Rail, the symmetrical slidingtype in the left and right sides is equipped with third sliding block in endless glide, and third upper end of slide block is equipped with the second placement plate, and second puts It sets and is placed with collecting vessel on plate.
Optionally, further include having second spring, the second fixed link, drawstring, hook and link, set on the right side for the treatment of box inner top There is second spring, second spring lower end is connect with chamber door left upper portion, and treatment box top right side is equipped with the second fixed link, and second is solid Fixed pole is located at the first fixed link right, and the second fixed link right upper portion is provided with fourth hole, and chamber door right upper portion is equipped with drawstring, draws End restrict across fourth hole, drawstring end is equipped with hook, and treatment box top right side is equipped with link, and link is located at the second fixed link And first between fixed link.
When people need to prepare coating, suitable base-material can be discharged into mixing tank by people by the second lower hopper, It is discharged into the pigment to mixing tank for centainly mixing mass ratio again again, facilitates next use, then people restart first motor Rotation, first motor rotation drive the first rotating shaft rotation of top, and the first rotating shaft rotation of top drives the belt rotation of top Dynamic, the pulley rotation of top drives two pulley rotations of lower section, two pulley rotation bands of lower section by flat belt The first rotating shaft rotation of dynamic lower section, first rotating shaft rotation drive idler wheel rotation, idler wheel rotation can in mixing tank base-material with Pigment is mixed, and then people successively add in suitable dispersing agent, wetting agent and multifunctional assistant to mixing tank again, mixing After the completion, people close first motor, then open the second valve, and the coating mixed in mixing tank passes through third lower hopper therewith It flows into treatment box, after the coating mixed in mixing tank is drained, people turn off the second valve, then the coating in treatment box After precipitating dozens of minutes, people open the first valve again, and the base-material in treatment box passes through web plate therewith and is flowed into the first lower hopper Interior, the coating in the first lower hopper can be drained into collecting vessel, and then people can be manually by inserted link from the second through-hole and It is taken out in three through-holes, then people are rotated further by elevating lever, and elevating lever rotation is able to drive the first scraper plate rotation of two sides of left and right, left The first scraper plate rotation of right two sides can prevent web plate from blocking, and more effectively help coating discharge, as the coating row in treatment box After complete, people move up elevating lever again, and after elevating lever is moved upward to suitable position, the second through-hole can be with third through-hole phase Corresponding, then inserted link is inserted into the second through-hole and third through-hole by people again, so that elevating lever is capable of fixing, then people are again The first valve is closed, and people can open chamber door manually, then uniform block unmixed in treatment box be cleared up by tool Fall, after block has been cleared up, people turn off chamber door.
Because further including having the first placement plate, loading bucket, the first stereoplasm tube, the first hose, third fixed frame, second bearing Seat, the second shaft, connecting rod, fixed ring, cylinder body, compound tube, piston, first movement bar, fixed block, fixing sleeve, the second hard Pipe, check valve and the second hose, the first fixed frame left lower are equipped with the first placement plate, are placed with loading in the first placement plate Bucket, mixing tank left wall top are equipped with the first stereoplasm tube, and the first stereoplasm tube left end is equipped with the first hose, the first fixed frame top left side Equipped with third fixed frame, third fixed frame top left side is inserted to be equipped with second bearing seat, is equipped with second in second bearing seat Shaft, the second shaft lower end are equipped with connecting rod, and connecting rod left and right ends are symmetrically arranged with fixed ring, are equipped with cylinder body, cylinder in fixed ring Body left lower is equipped with compound tube, and piston is combined in cylinder body, is equipped with first movement bar, cylinder body lower right side among top land Equipped with fixed block, fixed block right end is equipped with fixing sleeve, is equipped with the second stereoplasm tube, the second stereoplasm tube and compound tube among cylinder base It is inside equipped with check valve, the second stereoplasm tube lower end is equipped with the second hose, and the second hose end passes through fixing sleeve, so when people need Will be in mixing tank when the one of which of addition dispersing agent, wetting agent and multifunctional assistant, people can will load bucket and be placed on In first placement plate, then people rotate the second shaft manually again, and the second shaft rotates so that cylinder body rotates, and cylinder body turns to it After right above corresponding loading bucket, people stop operating the second shaft again, and then people again take the second hose out of fixing sleeve It out and is inserted into loading bucket, then combines the first hose end with pipe end is combined, then people move up and down the first shifting manually Lever, first movement bar move up and down band piston and move up and down, and piston, which moves upwardly so that, loads reagent in bucket by the Two hoses enter in the second stereoplasm tube, and the reagent in the second stereoplasm tube enters in cylinder body, and check valve can guarantee the flow direction of reagent, Prevent reagent from flowing back, piston moves down the intracorporal reagent of squeeze cylinder, and the intracorporal reagent of cylinder is extruded so that reagent passes through combination Pipe enters in the first hose, and check valve can guarantee the flow direction of reagent, prevent reagent from flowing back, and the reagent in the first hose can lead to It crosses the first stereoplasm tube to flow into mixing tank, after the reagent in mixing tank is added to appropriate level, people stop mobile first again and move Lever, then people again disassemble the first hose and compound tube, then the second hose is penetrated in fixing sleeve, so that fixing sleeve It is capable of fixing the second hose.
Because further including having the second sliding block, the second mobile bar, third mobile bar, installing frame, the first spring, the 4th mobile bar With the second scraper plate, treatment box rear wall top is provided with sliding slot, and sliding slot inner sliding type is equipped with the second sliding block, and the second sliding block rear end is equipped with the Two mobile bars, the second slip front are equipped with third mobile bar, and third mobile bar is located in treatment box, and third mobile bar lower end is equipped with Installing frame, installing frame inner top have equipped with the first spring, and the first lower spring end is equipped with the 4th mobile bar, the 4th mobile bar lower end Equipped with the second scraper plate, the second scraper plate bottom is contacted with bottom in treatment box, so when the unmixed uniform block of residual in treatment box When shape object, people can move right the second sliding block either manually or by the second mobile bar, and sliding slot can do guiding fortune to the second sliding block Dynamic, the second sliding block moves right drives installing frame to move right by third mobile bar, and installing frame moves right through the first bullet Spring drives the 4th mobile bar to move right, and the 4th mobile bar, which moves right, drives the second scraper plate to move right, and the second scraper plate is to the right Movement can scrape to the right block remaining in treatment box, and block is scraped to after suitable position to the right by the second scraper plate, people Can open chamber door, then block remaining in treatment box is cleaned up, then people are moved to the left second manually again Mobile bar resets, and facilitates next use, remaining block in the cleaning treatment box that this measure can be more convenient.
Because further including having endless glide, third sliding block and the second placement plate, mounting rack top right side is equipped with endless glide, The symmetrical slidingtype in the left and right sides is equipped with third sliding block in endless glide, and third upper end of slide block is equipped with the second placement plate, and second places Collecting vessel is placed on plate, so people can rotate the second placement plate, endless glide manually after the collecting vessel when left is filled Guiding movement can be done to the second placement plate with third sliding block, the rotation of the second placement plate drives collecting vessel rotation, the collection of right After bucket turns to immediately below the first lower hopper, people stop operating again, and then people take the collecting vessel filled away, then will be new Collecting vessel is placed on the second placement plate.
Because further including having second spring, the second fixed link, drawstring, hook and link, it is equipped on the right side for the treatment of box inner top Second spring, second spring lower end are connect with chamber door left upper portion, and treatment box top right side is equipped with the second fixed link, and second is fixed Bar is located at the first fixed link right, and the second fixed link right upper portion is provided with fourth hole, and chamber door right upper portion is equipped with drawstring, drawstring End pass through fourth hole, drawstring end be equipped with hook, treatment box top right side be equipped with link, link be located at the second fixed link with Between first fixed link, so when people need to open chamber door, hook can be hung over link manually by people, drawstring band therewith Dynamic chamber door is opened, and chamber door is opened so that second spring is stretched, and the second fixed link and fourth hole can do guiding fortune to drawstring It is dynamic, enable chamber door to be constantly in opening state, facilitates people to clear up the block in treatment box, when people need to close case Men Shi, people can manually remove hook from link, and second spring drives chamber door to close therewith.
The utility model can mix the base-material in mixing tank with pigment by the idler wheel being arranged, and this measure does not need People's hand mix, increases working efficiency, can be stirred to coating by the first scraper plate of setting, enable coating more Good discharge.
Detailed description of the invention
Fig. 1 is the first schematic view of the front view of the utility model.
Fig. 2 is second of schematic view of the front view of the utility model.
Fig. 3 is the third schematic view of the front view of the utility model.
Fig. 4 is the 4th kind of schematic view of the front view of the utility model.
Fig. 5 is the 5th kind of schematic view of the front view of the utility model.
The label of each components is as follows in attached drawing: 1: mounting rack, and 2: collecting vessel, 3: the first fixed frames, 4: belt pulley, 5: flat Belt, 6: the second fixed frames, 7: treatment box, 8: chamber door, 9: the first lower hoppers, 10: web plate, 11: the first valves, 12: the first is logical Hole, 13: elevating lever, 14: the second through-holes, 15: the first scraper plates, 16: the first fixed links, 17: third through-hole, 18: inserted link, 19: mixed Mould assembling, 20: the second lower hoppers, 21: third lower hopper, 22: the second valves, 23: first bearing seat, 24: first rotating shaft, 25: the One motor, 26: idler wheel, 27: the first placement plates, 28: loading bucket, 29: the first stereoplasm tubes, 30: the first hoses, 31: third is fixed Frame, 32: second bearing seat, 33: the second shafts, 34: connecting rod, 35: fixed ring, 36: cylinder body, 37: compound tube, 38: piston, 39: first movement bar, 40: fixed block, 41: fixing sleeve, 42: the second stereoplasm tubes, 43: check valve, 44: the second hoses, 45: sliding Slot, 46: the second sliding blocks, 47: the second mobile bars, 48: third mobile bar, 49: installing frame, 50: the first springs, 51: the four is mobile Bar, 52: the second scraper plates, 53: endless glide, 54: third sliding block, 55: the second placement plates, 56: second spring, 57: the second is fixed Bar, 58: fourth hole, 59: drawstring, 60: hook, 61: link.
Specific embodiment
The optimal technical scheme that according to the present invention will be described in detail below with reference to the accompanying drawings.
Embodiment 1
A kind of Energy-Saving Architectural Coatings making apparatus includes as shown in Figs. 1-5 mounting rack 1, collecting vessel 2, the first fixed frame 3, belt pulley 4, flat belt 5, the second fixed frame 6, treatment box 7, chamber door 8, the first lower hopper 9, web plate 10, the first valve 11, liter Bar 13, the first scraper plate 15, the first fixed link 16, inserted link 18, mixing tank 19, the second lower hopper 20, third lower hopper 21, second drop Valve 22, first bearing seat 23, first rotating shaft 24, first motor 25 and idler wheel 26,1 top right side of mounting rack are placed with collecting vessel 2,1 top left side of mounting rack is equipped with the first fixed frame 3, and 3 inner left wall top of the first fixed frame is equipped with the second fixed frame 6, and second is solid Determine to be equipped with treatment box 7 on the right side of frame 6,7 right wall top rotary type for the treatment of box is equipped with chamber door 8, and 7 bottom for the treatment of box centre is inserted to be equipped with First lower hopper 9 is equipped with web plate 10 at the top of first lower hopper 9, and 9 bottom of the first lower hopper is equipped with the first valve 11, and treatment box 7 pushes up It is provided with first through hole 12 among portion, elevating lever 13 is combined in first through hole 12,13 left lower of elevating lever is provided with the second through-hole 14,13 left and right sides lower part of elevating lever is symmetrically arranged with the first scraper plate 15, and 7 top right side for the treatment of box is equipped with the first fixed link 16, the One fixed link, 16 left lower is provided with third through-hole 17, and inserted link 18,3 top right side of the first fixed frame are combined in third through-hole 17 Equipped with mixing tank 19,19 top center of mixing tank is equipped with the second lower hopper 20, is equipped with third lower hopper among 19 bottom of mixing tank 21,21 bottom of third lower hopper is connected to 7 top left side for the treatment of box, and 21 lower part of third lower hopper is equipped with the second valve 22, mixing Two walls of the front and back of case 19 have it is inserted be equipped with first bearing seat 23, first rotating shaft is installed in the first bearing seat 23 of two side of front and back 24, first motor 25 is equipped on the left of mixing tank 19 upper back, after the output shaft of first motor 25 and the first rotating shaft 24 of top End connection, first rotating shaft 24 are equipped with idler wheel 26, and idler wheel 26 is located in mixing tank 19, and 24 rear portion of first rotating shaft is equipped with belt pulley 4, Belt pulley 4 is wound with flat belt 5 on three belt pulleys 4 between first motor 25 and mixing tank 19.
Embodiment 2
A kind of Energy-Saving Architectural Coatings making apparatus includes as shown in Figs. 1-5 mounting rack 1, collecting vessel 2, the first fixed frame 3, belt pulley 4, flat belt 5, the second fixed frame 6, treatment box 7, chamber door 8, the first lower hopper 9, web plate 10, the first valve 11, liter Bar 13, the first scraper plate 15, the first fixed link 16, inserted link 18, mixing tank 19, the second lower hopper 20, third lower hopper 21, second drop Valve 22, first bearing seat 23, first rotating shaft 24, first motor 25 and idler wheel 26,1 top right side of mounting rack are placed with collecting vessel 2,1 top left side of mounting rack is equipped with the first fixed frame 3, and 3 inner left wall top of the first fixed frame is equipped with the second fixed frame 6, and second is solid Determine to be equipped with treatment box 7 on the right side of frame 6,7 right wall top rotary type for the treatment of box is equipped with chamber door 8, and 7 bottom for the treatment of box centre is inserted to be equipped with First lower hopper 9 is equipped with web plate 10 at the top of first lower hopper 9, and 9 bottom of the first lower hopper is equipped with the first valve 11, and treatment box 7 pushes up It is provided with first through hole 12 among portion, elevating lever 13 is combined in first through hole 12,13 left lower of elevating lever is provided with the second through-hole 14,13 left and right sides lower part of elevating lever is symmetrically arranged with the first scraper plate 15, and 7 top right side for the treatment of box is equipped with the first fixed link 16, the One fixed link, 16 left lower is provided with third through-hole 17, and inserted link 18,3 top right side of the first fixed frame are combined in third through-hole 17 Equipped with mixing tank 19,19 top center of mixing tank is equipped with the second lower hopper 20, is equipped with third lower hopper among 19 bottom of mixing tank 21,21 bottom of third lower hopper is connected to 7 top left side for the treatment of box, and 21 lower part of third lower hopper is equipped with the second valve 22, mixing Two walls of the front and back of case 19 have it is inserted be equipped with first bearing seat 23, first rotating shaft is installed in the first bearing seat 23 of two side of front and back 24, first motor 25 is equipped on the left of mixing tank 19 upper back, after the output shaft of first motor 25 and the first rotating shaft 24 of top End connection, first rotating shaft 24 are equipped with idler wheel 26, and idler wheel 26 is located in mixing tank 19, and 24 rear portion of first rotating shaft is equipped with belt pulley 4, Belt pulley 4 is wound with flat belt 5 on three belt pulleys 4 between first motor 25 and mixing tank 19.
It further include having the first placement plate 27, loading bucket 28, the first stereoplasm tube 29, the first hose 30, third fixed frame 31, the Two bearing bracket 32, the second shaft 33, connecting rod 34, fixed ring 35, cylinder body 36, compound tube 37, piston 38, first movement bar 39, Fixed block 40, fixing sleeve 41, the second stereoplasm tube 42, check valve 43 and the second hose 44,3 left lower of the first fixed frame are equipped with the One placement plate 27 is placed in first placement plate 27 and loads bucket 28, and 19 left wall top of mixing tank is equipped with the first stereoplasm tube 29, and first 29 left end of stereoplasm tube is equipped with the first hose 30, and 3 top left side of the first fixed frame is equipped with third fixed frame 31, and third fixed frame 31 is pushed up It is inserted on the left of portion to be equipped with second bearing seat 32, second shaft 33 is installed in second bearing seat 32,33 lower end of the second shaft is set There is a connecting rod 34,34 left and right ends of connecting rod are symmetrically arranged with fixed ring 35, cylinder body 36 are equipped in fixed ring 35, under 36 left side of cylinder body Portion is equipped with compound tube 37, and piston 38 is combined in cylinder body 36, and 38 top center of piston is equipped with first movement bar 39,36 right side of cylinder body Lower part is equipped with fixed block 40, and 40 right end of fixed block is equipped with fixing sleeve 41, is equipped with the second stereoplasm tube 42 among 36 bottom of cylinder body, and second Check valve 43 is equipped in stereoplasm tube 42 and compound tube 37,42 lower end of the second stereoplasm tube is equipped with the second hose 44, the second hose 44 End passes through fixing sleeve 41.
Embodiment 3
A kind of Energy-Saving Architectural Coatings making apparatus includes as shown in Figs. 1-5 mounting rack 1, collecting vessel 2, the first fixed frame 3, belt pulley 4, flat belt 5, the second fixed frame 6, treatment box 7, chamber door 8, the first lower hopper 9, web plate 10, the first valve 11, liter Bar 13, the first scraper plate 15, the first fixed link 16, inserted link 18, mixing tank 19, the second lower hopper 20, third lower hopper 21, second drop Valve 22, first bearing seat 23, first rotating shaft 24, first motor 25 and idler wheel 26,1 top right side of mounting rack are placed with collecting vessel 2,1 top left side of mounting rack is equipped with the first fixed frame 3, and 3 inner left wall top of the first fixed frame is equipped with the second fixed frame 6, and second is solid Determine to be equipped with treatment box 7 on the right side of frame 6,7 right wall top rotary type for the treatment of box is equipped with chamber door 8, and 7 bottom for the treatment of box centre is inserted to be equipped with First lower hopper 9 is equipped with web plate 10 at the top of first lower hopper 9, and 9 bottom of the first lower hopper is equipped with the first valve 11, and treatment box 7 pushes up It is provided with first through hole 12 among portion, elevating lever 13 is combined in first through hole 12,13 left lower of elevating lever is provided with the second through-hole 14,13 left and right sides lower part of elevating lever is symmetrically arranged with the first scraper plate 15, and 7 top right side for the treatment of box is equipped with the first fixed link 16, the One fixed link, 16 left lower is provided with third through-hole 17, and inserted link 18,3 top right side of the first fixed frame are combined in third through-hole 17 Equipped with mixing tank 19,19 top center of mixing tank is equipped with the second lower hopper 20, is equipped with third lower hopper among 19 bottom of mixing tank 21,21 bottom of third lower hopper is connected to 7 top left side for the treatment of box, and 21 lower part of third lower hopper is equipped with the second valve 22, mixing Two walls of the front and back of case 19 have it is inserted be equipped with first bearing seat 23, first rotating shaft is installed in the first bearing seat 23 of two side of front and back 24, first motor 25 is equipped on the left of mixing tank 19 upper back, after the output shaft of first motor 25 and the first rotating shaft 24 of top End connection, first rotating shaft 24 are equipped with idler wheel 26, and idler wheel 26 is located in mixing tank 19, and 24 rear portion of first rotating shaft is equipped with belt pulley 4, Belt pulley 4 is wound with flat belt 5 on three belt pulleys 4 between first motor 25 and mixing tank 19.
It further include having the first placement plate 27, loading bucket 28, the first stereoplasm tube 29, the first hose 30, third fixed frame 31, the Two bearing bracket 32, the second shaft 33, connecting rod 34, fixed ring 35, cylinder body 36, compound tube 37, piston 38, first movement bar 39, Fixed block 40, fixing sleeve 41, the second stereoplasm tube 42, check valve 43 and the second hose 44,3 left lower of the first fixed frame are equipped with the One placement plate 27 is placed in first placement plate 27 and loads bucket 28, and 19 left wall top of mixing tank is equipped with the first stereoplasm tube 29, and first 29 left end of stereoplasm tube is equipped with the first hose 30, and 3 top left side of the first fixed frame is equipped with third fixed frame 31, and third fixed frame 31 is pushed up It is inserted on the left of portion to be equipped with second bearing seat 32, second shaft 33 is installed in second bearing seat 32,33 lower end of the second shaft is set There is a connecting rod 34,34 left and right ends of connecting rod are symmetrically arranged with fixed ring 35, cylinder body 36 are equipped in fixed ring 35, under 36 left side of cylinder body Portion is equipped with compound tube 37, and piston 38 is combined in cylinder body 36, and 38 top center of piston is equipped with first movement bar 39,36 right side of cylinder body Lower part is equipped with fixed block 40, and 40 right end of fixed block is equipped with fixing sleeve 41, is equipped with the second stereoplasm tube 42 among 36 bottom of cylinder body, and second Check valve 43 is equipped in stereoplasm tube 42 and compound tube 37,42 lower end of the second stereoplasm tube is equipped with the second hose 44, the second hose 44 End passes through fixing sleeve 41.
It further include having the second sliding block 46, the second mobile bar 47, third mobile bar 48, installing frame 49, the first spring the 50, the 4th Mobile bar 51 and the second scraper plate 52,7 rear wall top for the treatment of box are provided with sliding slot 45, and 45 inner sliding type of sliding slot is equipped with the second sliding block 46, Second sliding block, 46 rear end be equipped with the second mobile bar 47,46 front end of the second sliding block be equipped with third mobile bar 48, third mobile bar 48 In in treatment box 7,48 lower end of third mobile bar is equipped with installing frame 49, and 49 inner top of installing frame has equipped with the first spring 50, the One spring, 50 lower end be equipped with the 4th mobile bar 51,51 lower end of the 4th mobile bar be equipped with the second scraper plate 52,52 bottom of the second scraper plate with Bottom contacts in treatment box 7.
Embodiment 4
A kind of Energy-Saving Architectural Coatings making apparatus includes as shown in Figs. 1-5 mounting rack 1, collecting vessel 2, the first fixed frame 3, belt pulley 4, flat belt 5, the second fixed frame 6, treatment box 7, chamber door 8, the first lower hopper 9, web plate 10, the first valve 11, liter Bar 13, the first scraper plate 15, the first fixed link 16, inserted link 18, mixing tank 19, the second lower hopper 20, third lower hopper 21, second drop Valve 22, first bearing seat 23, first rotating shaft 24, first motor 25 and idler wheel 26,1 top right side of mounting rack are placed with collecting vessel 2,1 top left side of mounting rack is equipped with the first fixed frame 3, and 3 inner left wall top of the first fixed frame is equipped with the second fixed frame 6, and second is solid Determine to be equipped with treatment box 7 on the right side of frame 6,7 right wall top rotary type for the treatment of box is equipped with chamber door 8, and 7 bottom for the treatment of box centre is inserted to be equipped with First lower hopper 9 is equipped with web plate 10 at the top of first lower hopper 9, and 9 bottom of the first lower hopper is equipped with the first valve 11, and treatment box 7 pushes up It is provided with first through hole 12 among portion, elevating lever 13 is combined in first through hole 12,13 left lower of elevating lever is provided with the second through-hole 14,13 left and right sides lower part of elevating lever is symmetrically arranged with the first scraper plate 15, and 7 top right side for the treatment of box is equipped with the first fixed link 16, the One fixed link, 16 left lower is provided with third through-hole 17, and inserted link 18,3 top right side of the first fixed frame are combined in third through-hole 17 Equipped with mixing tank 19,19 top center of mixing tank is equipped with the second lower hopper 20, is equipped with third lower hopper among 19 bottom of mixing tank 21,21 bottom of third lower hopper is connected to 7 top left side for the treatment of box, and 21 lower part of third lower hopper is equipped with the second valve 22, mixing Two walls of the front and back of case 19 have it is inserted be equipped with first bearing seat 23, first rotating shaft is installed in the first bearing seat 23 of two side of front and back 24, first motor 25 is equipped on the left of mixing tank 19 upper back, after the output shaft of first motor 25 and the first rotating shaft 24 of top End connection, first rotating shaft 24 are equipped with idler wheel 26, and idler wheel 26 is located in mixing tank 19, and 24 rear portion of first rotating shaft is equipped with belt pulley 4, Belt pulley 4 is wound with flat belt 5 on three belt pulleys 4 between first motor 25 and mixing tank 19.
It further include having the first placement plate 27, loading bucket 28, the first stereoplasm tube 29, the first hose 30, third fixed frame 31, the Two bearing bracket 32, the second shaft 33, connecting rod 34, fixed ring 35, cylinder body 36, compound tube 37, piston 38, first movement bar 39, Fixed block 40, fixing sleeve 41, the second stereoplasm tube 42, check valve 43 and the second hose 44,3 left lower of the first fixed frame are equipped with the One placement plate 27 is placed in first placement plate 27 and loads bucket 28, and 19 left wall top of mixing tank is equipped with the first stereoplasm tube 29, and first 29 left end of stereoplasm tube is equipped with the first hose 30, and 3 top left side of the first fixed frame is equipped with third fixed frame 31, and third fixed frame 31 is pushed up It is inserted on the left of portion to be equipped with second bearing seat 32, second shaft 33 is installed in second bearing seat 32,33 lower end of the second shaft is set There is a connecting rod 34,34 left and right ends of connecting rod are symmetrically arranged with fixed ring 35, cylinder body 36 are equipped in fixed ring 35, under 36 left side of cylinder body Portion is equipped with compound tube 37, and piston 38 is combined in cylinder body 36, and 38 top center of piston is equipped with first movement bar 39,36 right side of cylinder body Lower part is equipped with fixed block 40, and 40 right end of fixed block is equipped with fixing sleeve 41, is equipped with the second stereoplasm tube 42 among 36 bottom of cylinder body, and second Check valve 43 is equipped in stereoplasm tube 42 and compound tube 37,42 lower end of the second stereoplasm tube is equipped with the second hose 44, the second hose 44 End passes through fixing sleeve 41.
It further include having the second sliding block 46, the second mobile bar 47, third mobile bar 48, installing frame 49, the first spring the 50, the 4th Mobile bar 51 and the second scraper plate 52,7 rear wall top for the treatment of box are provided with sliding slot 45, and 45 inner sliding type of sliding slot is equipped with the second sliding block 46, Second sliding block, 46 rear end be equipped with the second mobile bar 47,46 front end of the second sliding block be equipped with third mobile bar 48, third mobile bar 48 In in treatment box 7,48 lower end of third mobile bar is equipped with installing frame 49, and 49 inner top of installing frame has equipped with the first spring 50, the One spring, 50 lower end be equipped with the 4th mobile bar 51,51 lower end of the 4th mobile bar be equipped with the second scraper plate 52,52 bottom of the second scraper plate with Bottom contacts in treatment box 7.
It further include having endless glide 53, third sliding block 54 and the second placement plate 55, it is sliding that 1 top right side of mounting rack is equipped with annular Rail 53, the symmetrical slidingtype in the left and right sides is equipped with third sliding block 54 in endless glide 53, and 54 upper end of third sliding block is equipped with second and places Plate 55 is placed with collecting vessel 2 in second placement plate 55.
It further include having second spring 56, the second fixed link 57, drawstring 59, hook 60 and link 61,7 inner top for the treatment of box is right Side is equipped with second spring 56, and 56 lower end of second spring is connect with 8 left upper portion of chamber door, and it is solid that 7 top right side for the treatment of box is equipped with second Fixed pole 57, the second fixed link 57 are located at 16 right of the first fixed link, and 57 right upper portion of the second fixed link is provided with fourth hole 58, case 8 right upper portions of door are equipped with drawstring 59, and 59 end of drawstring passes through fourth hole 58, and 59 end of drawstring is equipped with hook 60, and treatment box 7 pushes up Link 61 is equipped on the right side of portion, link 61 is between the second fixed link 57 and the first fixed link 16.
When people need to prepare coating, suitable base-material can be discharged into mixing tank 19 by the second lower hopper 20 by people It is interior, then be discharged into the pigment to mixing tank 19 for centainly mixing mass ratio again, facilitate next use, then people restart first Motor 25 rotates, and the rotation of first motor 25 drives the first rotating shaft 24 of top to rotate, and the rotation of first rotating shaft 24 of top drives The belt pulley 4 of side rotates, and the rotation of belt pulley 4 of top drives two belt pulleys 4 rotation of lower section by flat belt 5, lower section Two rotations of belt pulley 4 drive the first rotating shaft 24 of lower section to rotate, and the rotation of first rotating shaft 24 drives idler wheel 26 to rotate, and 26 turns of idler wheel Kinetic energy is enough to mix the base-material in mixing tank 19 with pigment, and then people successively add suitable dispersing agent, wetting agent again In multifunctional assistant to mixing tank 19, after the completion of mixing, people close first motor 25, then open the second valve 22, mix The coating mixed in case 19 passes through third lower hopper 21 therewith and flows into treatment box 7, the coating row mixed in mixing tank 19 After complete, people turn off the second valve 22, and then after the coating precipitating dozens of minutes in treatment box 7, people open the first valve again Door 11, the base-material in treatment box 7 pass through web plate 10 therewith and are flowed into the first lower hopper 9, and the coating in the first lower hopper 9 can be with It is drained into collecting vessel 2, then people can manually take out inserted link 18 out of the second through-hole 14 and third through-hole 17, then people Be rotated further by elevating lever 13, elevating lever 13 rotates the first scraper plate 15 rotation for being able to drive two sides of left and right, the first of two sides of left and right The rotation of scraper plate 15 can prevent web plate 10 from blocking, and more effectively help coating discharge, after the coating in treatment box 7 is drained, people Move up elevating lever 13 again, after elevating lever 13 is moved upward to suitable position, the second through-hole 14 can be with third through-hole 17 Corresponding, then inserted link 18 is inserted into the second through-hole 14 and third through-hole 17 by people again, so that elevating lever 13 is capable of fixing, Then people turn off the first valve 11, and people can open chamber door 8 manually, then will be unmixed equal in treatment box 7 by tool Even block cleans up, and after block has been cleared up, people turn off chamber door 8.
Because further including having the first placement plate 27, loading bucket 28, the first stereoplasm tube 29, the first hose 30, third fixed frame 31, second bearing seat 32, the second shaft 33, connecting rod 34, fixed ring 35, cylinder body 36, compound tube 37, piston 38, first movement Bar 39, fixed block 40, fixing sleeve 41, the second stereoplasm tube 42, check valve 43 and the second hose 44,3 left lower of the first fixed frame It equipped with the first placement plate 27, is placed in the first placement plate 27 and loads bucket 28,19 left wall top of mixing tank is equipped with the first stereoplasm tube 29,29 left end of the first stereoplasm tube is equipped with the first hose 30, and 3 top left side of the first fixed frame is equipped with third fixed frame 31, and third is solid Determine that 31 top left side of frame is inserted to be equipped with second bearing seat 32, the second shaft 33, the second shaft are installed in second bearing seat 32 33 lower ends are equipped with connecting rod 34, and 34 left and right ends of connecting rod are symmetrically arranged with fixed ring 35, are equipped with cylinder body 36, cylinder body in fixed ring 35 36 left lowers are equipped with compound tube 37, and piston 38 is combined in cylinder body 36, and 38 top center of piston is equipped with first movement bar 39, cylinder 36 lower right side of body is equipped with fixed block 40, and 40 right end of fixed block is equipped with fixing sleeve 41, is equipped with the second hard among 36 bottom of cylinder body Pipe 42 is equipped with check valve 43 in second stereoplasm tube 42 and compound tube 37, and 42 lower end of the second stereoplasm tube is equipped with the second hose 44, the Two hoses, 44 end passes through fixing sleeve 41, so when people need toward adding dispersing agent, wetting agent and multi-functional in mixing tank 19 When the one of which of auxiliary agent, people can will load bucket 28 and be placed in the first placement plate 27, and then people rotate the manually again Two shafts 33, the second shaft 33 rotates so that cylinder body 36 rotates, after cylinder body 36 turns to its 28 surface of corresponding loadings bucket, people Second shaft 33 that stops operating again, then people the second hose 44 is taken out out of fixing sleeve 41 again and be inserted into load bucket 28 Interior, then combine 30 end of the first hose with 37 end of compound tube, then people move up and down first movement bar 39 manually, and first Mobile bar 39 moves up and down band piston 38 and moves up and down, and piston 38 moves upwardly so that the reagent loaded in bucket 28 passes through second Hose 44 enters in the second stereoplasm tube 42, and the reagent in the second stereoplasm tube 42 enters in cylinder body 36, and check valve 43 can guarantee to try The flow direction of agent, prevents reagent from flowing back, and piston 38 moves down the reagent squeezed in cylinder body 36, and the reagent in cylinder body 36, which is extruded, to be made Reagent is obtained to enter in the first hose 30 by compound tube 37, check valve 43 can guarantee the flow direction of reagent, prevent reagent from flowing back, the Reagent in one hose 30 can be flowed into mixing tank 19 by the first stereoplasm tube 29, and the reagent in mixing tank 19 is added to properly After degree, people stop mobile first movement bar 39 again, and then people again disassemble the first hose 30 with compound tube 37, then Second hose 44 is penetrated in fixing sleeve 41, so that fixing sleeve 41 is capable of fixing the second hose 44.
Because further include have the second sliding block 46, the second mobile bar 47, third mobile bar 48, installing frame 49, the first spring 50, 4th mobile bar 51 and the second scraper plate 52,7 rear wall top for the treatment of box are provided with sliding slot 45, and 45 inner sliding type of sliding slot is equipped with the second sliding block 46,46 rear end of the second sliding block is equipped with the second mobile bar 47, and 46 front end of the second sliding block is equipped with third mobile bar 48, third mobile bar 48 In treatment box 7,48 lower end of third mobile bar is equipped with installing frame 49, and 49 inner top of installing frame has equipped with the first spring 50, First spring, 50 lower end is equipped with the 4th mobile bar 51, and 51 lower end of the 4th mobile bar is equipped with the second scraper plate 52,52 bottom of the second scraper plate It is contacted with bottom in treatment box 7, so when remaining unmixed uniform block in treatment box 7, people can be either manually or by Second mobile bar 47 moves right the second sliding block 46, and sliding slot 45 can do guiding movement to the second sliding block 46, the second sliding block 46 to It moves right and drives installing frame 49 to move right by third mobile bar 48, installing frame 49 moves right to be driven by the first spring 50 4th mobile bar 51 moves right, the 4th mobile bar 51 move right drive the second scraper plate 52 move right, the second scraper plate 52 to Moving right can scrape to the right remaining block in treatment box 7, and block is scraped to the right by the second scraper plate 52 to suitable position Afterwards, people can open chamber door 8, then remaining block in treatment box 7 is cleaned up, and then people are again manually to moving to left Dynamic second mobile bar 47 resets, and facilitates next use, remaining block in the cleaning treatment box 7 that this measure can be more convenient.
Because further including having endless glide 53, third sliding block 54 and the second placement plate 55,1 top right side of mounting rack is equipped with ring Shape sliding rail 53, the symmetrical slidingtype in the left and right sides is equipped with third sliding block 54 in endless glide 53, and 54 upper end of third sliding block is equipped with second Placement plate 55 is placed with collecting vessel 2 in second placement plate 55, so people can turn manually after the collecting vessel 2 when left is filled Dynamic second placement plate 55, endless glide 53 and third sliding block 54 can do guiding movement, the second placement plate to the second placement plate 55 55 rotations drive collecting vessel 2 to rotate, and after the collecting vessel 2 of right turns to immediately below the first lower hopper 9, people stop operating again, Then people take the collecting vessel 2 filled away, then new collecting vessel 2 is placed on the second placement plate 55.
Because further including having second spring 56, the second fixed link 57, drawstring 59, hook 60 and link 61, top in treatment box 7 Second spring 56 is equipped on the right side of portion, 56 lower end of second spring is connect with 8 left upper portion of chamber door, and 7 top right side for the treatment of box is equipped with the Two fixed links 57, the second fixed link 57 are located at 16 right of the first fixed link, and 57 right upper portion of the second fixed link is provided with fourth hole 58,8 right upper portion of chamber door is equipped with drawstring 59, and 59 end of drawstring passes through fourth hole 58, and 59 end of drawstring is equipped with hook 60, processing 7 top right side of case is equipped with link 61, and link 61 is between the second fixed link 57 and the first fixed link 16, so when people need When opening chamber door 8, hook 60 can be hung over link 61 manually by people, and drawstring 59 drives chamber door 8 to open therewith, and chamber door 8 is opened So that second spring 56 is stretched, the second fixed link 57 and fourth hole 58 can do guiding movement to drawstring 59, so that chamber door 8 It can be constantly in opening state, people is facilitated to clear up the block in treatment box 7, when people need to close chamber door 8, people Hook 60 can be removed from link 61 manually, second spring 56 drives chamber door 8 to close therewith.
While there has been shown and described that the embodiments of the present invention, but for those of ordinary skill in the art and Speech, it is possible to understand that these embodiments can be changed in the case where not departing from the principles of the present invention and spirit, this The range of utility model is defined by the appended claims and the equivalents thereof.

Claims (5)

1. a kind of Energy-Saving Architectural Coatings making apparatus, which is characterized in that include mounting rack, collecting vessel, the first fixed frame, belt Wheel, flat belt, the second fixed frame, treatment box, chamber door, the first lower hopper, web plate, the first valve, elevating lever, the first scraper plate, One fixed link, inserted link, mixing tank, the second lower hopper, third lower hopper, the second valve, first bearing seat, first rotating shaft, first Motor and idler wheel, mounting rack top right side are placed with collecting vessel, and mounting rack top left side is equipped with the first fixed frame, the first fixed frame Inner left wall top is equipped with the second fixed frame, and treatment box is equipped on the right side of the second fixed frame, and processing right wall of box top rotary type is equipped with case Door, treatment box bottom centre is inserted to be equipped with the first lower hopper, is equipped with web plate at the top of the first lower hopper, the first lower hopper bottom is set There is the first valve, treatment box top center is provided with first through hole, and elevating lever is combined in first through hole, and elevating lever left lower is opened There is the second through-hole, lower part is symmetrically arranged with the first scraper plate at left and right sides of elevating lever, and treatment box top right side is equipped with the first fixed link, the One fixed link left lower is provided with third through-hole, and inserted link is combined in third through-hole, and the first fixed frame top right side is equipped with mixing Case, mixing tank top center are equipped with the second lower hopper, are equipped with third lower hopper among mixing tank bottom, third lower hopper bottom with The connection for the treatment of box top left side, third lower hopper lower part are equipped with the second valve, and two walls, which have, before and after mixing tank inserted is equipped with the One bearing block is equipped with first rotating shaft in the first bearing seat of two side of front and back, is equipped with first motor on the left of mixing tank upper back, The output shaft of first motor and the first rotating shaft rear end of top connect, and first rotating shaft is equipped with idler wheel, and idler wheel is located in mixing tank, First rotating shaft rear portion is equipped with belt pulley, and belt pulley is wound with flat belt on three belt pulleys between first motor and mixing tank.
2. a kind of Energy-Saving Architectural Coatings making apparatus according to claim 1, which is characterized in that further include having the first placement Plate loads bucket, the first stereoplasm tube, the first hose, third fixed frame, second bearing seat, the second shaft, connecting rod, fixed ring, cylinder Body, compound tube, piston, first movement bar, fixed block, fixing sleeve, the second stereoplasm tube, check valve and the second hose, first is fixed Frame left lower is equipped with the first placement plate, and loading bucket is placed in the first placement plate, and mixing tank left wall top is equipped with the first hard Pipe, the first stereoplasm tube left end are equipped with the first hose, and the first fixed frame top left side is equipped with third fixed frame, third fixed frame top Left side is inserted to be equipped with second bearing seat, and the second shaft is equipped in second bearing seat, and the second shaft lower end is equipped with connecting rod, even Extension bar left and right ends are symmetrically arranged with fixed ring, and cylinder body is equipped in fixed ring, and cylinder body left lower is equipped with compound tube, cooperation in cylinder body There is piston, first movement bar is equipped among top land, cylinder body lower right side is equipped with fixed block, and fixed block right end, which is equipped with, to be fixed Set, cylinder base centre are equipped with the second stereoplasm tube, are equipped with check valve, the second stereoplasm tube lower end in the second stereoplasm tube and compound tube Equipped with the second hose, the second hose end passes through fixing sleeve.
3. a kind of Energy-Saving Architectural Coatings making apparatus according to claim 2, which is characterized in that further include thering is second to slide Block, the second mobile bar, third mobile bar, installing frame, the first spring, the 4th mobile bar and the second scraper plate, treatment box rear wall top It is provided with sliding slot, sliding slot inner sliding type is equipped with the second sliding block, and the second sliding block rear end is equipped with the second mobile bar, and the second slip front is equipped with Third mobile bar, third mobile bar are located in treatment box, and third mobile bar lower end is equipped with installing frame, and installing frame inner top is set There is the first spring, the first lower spring end is equipped with the 4th mobile bar, and the 4th mobile bar lower end is equipped with the second scraper plate, the second scraper plate bottom It is contacted with bottom in treatment box.
4. a kind of Energy-Saving Architectural Coatings making apparatus according to claim 3, which is characterized in that further include having annular cunning Rail, third sliding block and the second placement plate, mounting rack top right side are equipped with endless glide, the symmetrical sliding in the left and right sides in endless glide Formula is equipped with third sliding block, and third upper end of slide block is equipped with the second placement plate, is placed with collecting vessel in the second placement plate.
5. a kind of Energy-Saving Architectural Coatings making apparatus according to claim 4, which is characterized in that further include having the second bullet Spring, the second fixed link, drawstring, hook and link, treatment box inner top right side are equipped with second spring, second spring lower end and chamber door Left upper portion connection, treatment box top right side are equipped with the second fixed link, and the second fixed link is located at the first fixed link right, and second is solid Fixed pole right upper portion is provided with fourth hole, and chamber door right upper portion is equipped with drawstring, and drawstring end passes through fourth hole, and drawstring end is set There is hook, treatment box top right side is equipped with link, and link is between the second fixed link and the first fixed link.
CN201822064884.3U 2018-12-10 2018-12-10 A kind of Energy-Saving Architectural Coatings making apparatus Expired - Fee Related CN209646276U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822064884.3U CN209646276U (en) 2018-12-10 2018-12-10 A kind of Energy-Saving Architectural Coatings making apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822064884.3U CN209646276U (en) 2018-12-10 2018-12-10 A kind of Energy-Saving Architectural Coatings making apparatus

Publications (1)

Publication Number Publication Date
CN209646276U true CN209646276U (en) 2019-11-19

Family

ID=68518044

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822064884.3U Expired - Fee Related CN209646276U (en) 2018-12-10 2018-12-10 A kind of Energy-Saving Architectural Coatings making apparatus

Country Status (1)

Country Link
CN (1) CN209646276U (en)

Similar Documents

Publication Publication Date Title
CN108314293A (en) Low temperature belt-type drying system
CN108554274A (en) A kind of building stone emplaster making mixing plant
CN109621764A (en) A kind of Energy-Saving Architectural Coatings making apparatus
CN209646276U (en) A kind of Energy-Saving Architectural Coatings making apparatus
CN209646771U (en) A kind of Energy-Saving Architectural Coatings spraying equipment
CN206121597U (en) Brick and tile production is with mixed mixer of raw materials
CN206216910U (en) A kind of efficient mixing device for building
CN208809830U (en) A kind of sealant tinuous production of liftable transposition
CN208431963U (en) A kind of solar water heater with descaling function
CN208050147U (en) A kind of agricultural planting efficiently seed selection equipment
CN208084665U (en) One kind being convenient for clean cement mixer
CN215809928U (en) R-tetrahydropapaverine-N-acetyl-L-leucine drying device
CN208327785U (en) A kind of belt type sludge deep dehydration machine
CN108793502A (en) A kind of rainwater treatment device
CN213032479U (en) Stoving equipment for chemical production
CN208776556U (en) Low temperature belt-type drying system
CN211362897U (en) Novel concrete mixing device
CN210915339U (en) Bentonite nanocrystallization equipment
CN207142857U (en) A kind of rare-earth process waste water quick treatment device
CN208850177U (en) A kind of rice cropping fertilizer apparatus
CN208105791U (en) Integrate the multi-functional plastering machine of indoor and outdoor wall decoration
CN207153556U (en) A kind of construction paint mixing device
CN108437220B (en) Foamed concrete agitating device
CN205650521U (en) Automatic washing water tank machine
CN209425869U (en) A kind of heated mixing device for building

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191119

Termination date: 20201210