CN209644159U - A kind of project cost budget tool box - Google Patents

A kind of project cost budget tool box Download PDF

Info

Publication number
CN209644159U
CN209644159U CN201920258147.9U CN201920258147U CN209644159U CN 209644159 U CN209644159 U CN 209644159U CN 201920258147 U CN201920258147 U CN 201920258147U CN 209644159 U CN209644159 U CN 209644159U
Authority
CN
China
Prior art keywords
cabinet
box
telescopic rod
tool
lid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920258147.9U
Other languages
Chinese (zh)
Inventor
王焱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Huajian Project Management Co Ltd
Original Assignee
Shenzhen Huajian Project Management Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Huajian Project Management Co Ltd filed Critical Shenzhen Huajian Project Management Co Ltd
Priority to CN201920258147.9U priority Critical patent/CN209644159U/en
Application granted granted Critical
Publication of CN209644159U publication Critical patent/CN209644159U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Handcart (AREA)

Abstract

The utility model discloses a kind of project cost budget tool boxes, the budget tool box includes the cabinet of top end opening, it is placed in the lid of the box opening, it is placed in the telescopic rod of the back side up extension of the cabinet, it is placed in the connecting plate of the cabinet lower end, it is placed in the universal wheel of the connecting plate lower end, the lid is hinged close to the side of the telescopic rod and the cabinet, side of the lid far from the telescopic rod is snapped connection with the cabinet, handle is equipped on the outside of the lid, the inside of the lid is equipped with tool placing groove, it is transversely provided with partition in the cabinet, the cabinet is divided into upper box and lower box, it is longitudinally equipped with baffle in the upper box, upper box is divided into tool placing box and frangible tool placing box;The utility model structure is simple and convenient to operate, is practical, convenient for staff timely to record data and record clear, facilitates the use of different modes in carrying process, reduces manpower, strong flexibility.

Description

A kind of project cost budget tool box
Technical field
The utility model relates to fields, in particular to a kind of project cost budget tool box.
Background technique
The straight meaning of project cost is exactly the construction price of engineering.The three elements of engineering valuation: amount, is taken valence.Broadly engineering Cost covers construction engineering cost, highway engineering cost, marine traffic engineering cost, railway engineering cost, total construction cost of water project, electric power Project cost, communication engineering cost, Aerospace Engineering cost etc..Project cost, which refers to, carries out what a certain engineering construction was spent Full payment, core content are investment estimate, estimation per design, amendment budgetary estimate, working drawing budget, Engineering Settlement, budget needed for the completion of projects Etc..The main task of project cost: according to drawing, quota and bill code, flat cost included in engineering is calculated (artificial, material and equipment, construction equipment use), enterprise administration expense, measure expense, set-fee, profit and tax etc..Thus early work During journey cost, need to work out each stage cost file of project, such as: investment estimate, estimation per design, amendment budgetary estimate, construction drawing Budget, bid contrul valence (bill of quantities budget), offer by tender, Engineering Settlement, budget needed for the completion of projects etc..
The house and its appurtenant work built to meet the demands of production and living are known as architectural engineering.People are to proposed House and its appurtenant work before construction, to the consumption of objectivized labour required for it and flexibe work(labour) all calculated in advance, It goes to build it either with or without strength to evaluate oneself.Therefore, fixed according to the design drawing of proposed architectural engineering, engineering budget Volume, expense standard (i.e. overhead cost quota), construction material budgetary price and matched pertinent regulations etc., are counted in advance Calculate and determine the Technological Economy file for each creating, extend, reconstructing and rebuilding full payment needed for project, then referred to as architectural engineering Budget.
Budgeter is at work, it is often necessary to browse a large amount of technical data to obtain data, and use tool at any time It is surveyed and drawn, calculating process is cumbersome, lacks necessary device and places various tool equipment, and it is time-consuming and laborious, increase staff Workload.
Existing tool box inconvenience timely records data, need to open cabinet can just find the backing plate to write or It takes and directly writes, it has not been convenient to and the word write out is unclear, working efficiency is low, influences the course;Compare in some tool boxes Weight, light is portable very tired, it has not been convenient to be carried;Existing tool box does not account for the storage of multiple types of tools, such as frangible tool Storage.
Utility model content
Utility model is designed to provide a kind of project cost budget tool box, solves data record inconvenience, writes Word is unclear, does not account for the storage of multiple types of tools and the problem that tool box is inconvenient to carry.
The utility model is realized in this way a kind of project cost budget tool box, which includes that top is opened Mouthful cabinet, be placed in the box opening lid, be placed in the cabinet back side up extension telescopic rod, be placed in it is described The connecting plate of cabinet lower end, the universal wheel for being placed in the connecting plate lower end, side and institute of the lid close to the telescopic rod State that cabinet is hinged, side of the lid far from the telescopic rod is snapped connection with the cabinet,
Handle is equipped on the outside of the lid, the inside of the lid is equipped with tool placing groove, is transversely provided in the cabinet The cabinet is divided into upper box and lower box by partition, is longitudinally equipped with baffle in the upper box and upper box is divided into tool placement Case and frangible tool placing box,
The telescopic rod top end is equipped with the connecting rod vertical with the telescopic rod, and the upper end side of the telescopic rod is equipped with logical The backing plate that the connecting rod is flexibly connected is crossed, the backing plate is equipped with engaging lug close to the both ends of the side of the telescopic rod, described Engaging lug is equipped with the through-hole cooperated with the connecting rod, and the backing plate is passed through logical on the engaging lug by the connecting rod Hole is realized to be rotatablely connected with the telescopic rod, and the telescopic rod is equipped with fixture block close to the side of the cabinet, and the fixture block is placed in Make the backing plate vertical with the telescopic rod below the backing plate.
The further technical solution of the utility model is: the tool placing groove includes signature pen placing groove and measuring tool Placing groove.
The further technical solution of the utility model is: drawer is equipped in the lower box, the lower box front is equipped with The opening of the drawer, the lower box bottom inside are equipped with sliding rail, and the bottom outside of the drawer is equipped with matches with the sliding rail The idler wheel of conjunction.
The further technical solution of the utility model is: the drawer front is equipped with handle.
The further technical solution of the utility model is: the surrounding and inner bottom surface of the frangible tool placing box are equipped with soft The buffer layer of matter is placed with soft round anticollision particle in the frangible tool placing box.
The further technical solution of the utility model is: the backing plate and engaging lug are integral structure.
The further technical solution of the utility model is: the handle is equipped with Anti-slip cover.
The utility model has the beneficial effects that the utility model structure is simple and convenient to operate, is practical, for the people that works It is convenient for member timely to record data and record clear, facilitate the use of different modes in carrying process, reduces manpower, spirit It is active strong;Backing plate, is stuck on fixture block when in use, facilitates book by backing plate and the movable connection of telescopic rod in the utility model It writes, it is quick in time, when not needing using backing plate, backing plate is rotated, so that side of the backing plate far from cabinet, does not interfere out of cabinet Taking and placing thing, strong flexibility;The utility model considers the storage of a plurality of types of tools, by space reasonable utilization and is applicable in Range is wide.
Detailed description of the invention
Fig. 1 is a kind of external structure schematic diagram in project cost budget tool box provided by the utility model;
Fig. 2 is enlarged drawing at A provided by the utility model;
Fig. 3 is a kind of schematic diagram of internal structure in project cost budget tool box provided by the utility model.
Appended drawing reference: 1. cabinets, 2. lids, 3. telescopic rods, 4. connecting plates, 5. universal wheels, 21. handles, 22. tools are placed Slot, 11. partitions, 12. upper boxes, 13. lower boxes, 14. baffles, 121. tool placing boxes, 122. frangible tool placing boxes, 31. Connecting rod, 32. backing plates, 33. engaging lugs, 34. fixture blocks, 221. signature pen placing grooves, 222. measuring tool placing grooves, 131. are taken out Drawer, 132. handles.
Specific embodiment
It explains below in conjunction with exemplary embodiment of the attached drawing to the utility model, implements including the utility model The various details of example should think them only exemplary to help understanding.Therefore, those of ordinary skill in the art answer It, can be with various changes and modifications are made to the embodiments described herein, without departing from the scope of the utility model when recognizing And spirit.Equally, for clarity and conciseness, descriptions of well-known functions and structures are omitted from the following description.
Embodiment one:
Fig. 1-Fig. 3 shows a kind of project cost budget tool box, the budget tool box include top end opening cabinet 1, Be placed in the lid 2 of 1 opening of cabinet, the back side up extension for being placed in the cabinet 1 telescopic rod 3, be placed in the cabinet 1 The connecting plate 4 of lower end, the universal wheel 5 for being placed in 4 lower end of connecting plate, side and institute of the lid 2 close to the telescopic rod 3 It is hinged to state cabinet 1, side of the lid 2 far from the telescopic rod 3 is snapped connection with the cabinet 1,
Handle 21 is equipped on the outside of the lid 2, the inside of the lid 2 is equipped with tool placing groove 22, cross in the cabinet 1 The cabinet 1 is divided for upper box 12 and lower box 13 to partition 11 is equipped with, being longitudinally equipped with baffle 14 in the upper box 12 will Upper box 12 divides for tool placing box 121 and frangible tool placing box 122,
3 top of telescopic rod is equipped with the connecting rod 31 vertical with the telescopic rod 3, the upper end side of the telescopic rod 3 Equipped with the backing plate 32 being flexibly connected by the connecting rod 31, the backing plate 32 is set close to the both ends of the side of the telescopic rod 3 There is engaging lug 33, the engaging lug 33 is equipped with the through-hole cooperated with the connecting rod 31, and the backing plate 32 passes through the connection Bar 31 passes through the through-hole realization on the engaging lug 33 and is rotatablely connected with the telescopic rod 3, and the telescopic rod 3 is close to the cabinet 1 side is equipped with fixture block 34, and the lower section that the fixture block 34 is placed in the backing plate 32 makes the backing plate 32 and the telescopic rod 31 Vertically.
The tool placing groove 22 includes signature pen placing groove 221 and measuring tool placing groove 222.
Drawer 131 is equipped in the lower box 13,13 front of lower box is equipped with the opening of the drawer 131, described 13 bottom inside of lower box is equipped with sliding rail, and the bottom outside of the drawer 131 is equipped with the idler wheel cooperated with the sliding rail.
131 front of drawer is equipped with handle 132.
The surrounding and inner bottom surface of the frangible tool placing box 122 are equipped with soft buffer layer, and the frangible tool is put It sets and is placed with soft round anticollision particle in case 122.
The backing plate 32 is integral structure with engaging lug 33.
The handle 21 is equipped with Anti-slip cover.
When mobility kit, it can hold in connecting rod 31 by pulling out telescopic rod 3, pass through universal wheel 5 and ground Friction drive tool box mobile, save manpower, or by handle 21 directly to mention tool box mobile, there are two types of mode can Choosing is flexibly used according to the actual situation;When needing to record data during the work time, does not need to open tool box, pass through pull-out Backing plate 32 is turned to the other side and is stuck on snap-gauge 34 by telescopic rod 3, and fixed backing plate 32 facilitates record data, do not need using when Backing plate 32 is turned into the side far from fixture block 34, realizes and folds, saves space;Tool box is internally comprised in the course of work Some tool rest areas that normal pressure arrives, and consider the placement of frangible tool, practical and space utilization is reasonable.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this Made any modifications, equivalent replacements, and improvements etc., should be included in the utility model within the spirit and principle of utility model Protection scope within.

Claims (7)

1. a kind of project cost budget tool box, it is characterised in that: the budget tool box includes the cabinet (1) of top end opening, sets In the cabinet (1) opening lid (2), be placed in the cabinet (1) back side up extension telescopic rod (3), be placed in institute The universal wheel (5) stated the connecting plate (4) of cabinet (1) lower end, be placed in the connecting plate (4) lower end, the lid (2) is close to described The side of telescopic rod (3) and the cabinet (1) hingedly, side and the cabinet of the lid (2) far from the telescopic rod (3) (1) it snaps connection,
Handle (21) are equipped on the outside of the lid (2), the inside of the lid (2) is equipped with tool placing groove (22), the cabinet (1) it is transversely provided with partition (11) in, the cabinet (1) is divided into upper box (12) and lower box (13), the upper box (12) is interior It is longitudinal that upper box (12) is divided into tool placing box (121) and frangible tool placing box (122) equipped with baffle (14),
Telescopic rod (3) top is equipped with the connecting rod (31) vertical with the telescopic rod (3), the upper end of the telescopic rod (3) Side is equipped with the backing plate (32) being flexibly connected by the connecting rod (31), and the backing plate (32) is close to the telescopic rod (3) The both ends of side are equipped with engaging lug (33), and the engaging lug (33) is equipped with the through-hole cooperated with the connecting rod (31), described Backing plate (32) is passed through the through-hole on the engaging lug (33) and realized by the connecting rod (31) to be connected with the telescopic rod (3) rotation It connects, the telescopic rod (3) is equipped with fixture block (34) close to the side of the cabinet (1), and the fixture block (34) is placed in the backing plate (32) make the backing plate (32) vertical with the telescopic rod (3) below.
2. a kind of project cost budget tool box according to claim 1, it is characterised in that: the tool placing groove (22) Including signature pen placing groove (221) and measuring tool placing groove (222).
3. a kind of project cost budget tool box according to claim 1, it is characterised in that: set in the lower box (13) Have drawer (131), lower box (13) front is equipped with the opening of the drawer (131), lower box (13) bottom inside Equipped with sliding rail, the bottom outside of the drawer (131) is equipped with the idler wheel cooperated with the sliding rail.
4. a kind of project cost budget tool box according to claim 3, it is characterised in that: drawer (131) front Equipped with handle (132).
5. a kind of project cost budget tool box according to claim 1, it is characterised in that: the frangible tool placing box (122) surrounding and inner bottom surface is equipped with soft buffer layer, is placed with soft circle in the frangible tool placing box (122) Anticollision particle.
6. a kind of project cost budget tool box according to claim 1, it is characterised in that: the backing plate (32) with connect Ear (33) is integral structure.
7. a kind of project cost budget tool box according to claim 1, it is characterised in that: the handle (21) is equipped with Anti-slip cover.
CN201920258147.9U 2019-02-28 2019-02-28 A kind of project cost budget tool box Active CN209644159U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920258147.9U CN209644159U (en) 2019-02-28 2019-02-28 A kind of project cost budget tool box

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920258147.9U CN209644159U (en) 2019-02-28 2019-02-28 A kind of project cost budget tool box

Publications (1)

Publication Number Publication Date
CN209644159U true CN209644159U (en) 2019-11-19

Family

ID=68525477

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920258147.9U Active CN209644159U (en) 2019-02-28 2019-02-28 A kind of project cost budget tool box

Country Status (1)

Country Link
CN (1) CN209644159U (en)

Similar Documents

Publication Publication Date Title
CN209644159U (en) A kind of project cost budget tool box
CN209449991U (en) A kind of project cost budget tool box
CN212088672U (en) Engineering cost workstation
CN206314712U (en) A kind of multifunctional engineering account valuation tool box
CN211608428U (en) Toolbox is used in reconnaissance of engineering cost budget
CN208064791U (en) A kind of project cost dedicated
CN207100827U (en) A kind of construction engineering cost tool box
CN211044802U (en) Novel portable marketing simulation sand table
CN206866815U (en) A kind of construction costs budget tool box
CN208318611U (en) A kind of survey tools storage device
CN209036489U (en) A kind of grid maintenance tool box
CN213696199U (en) Budget structure containing box of building engineering cost
CN209235303U (en) Project cost file management cabinet
CN206025520U (en) Engineering cost budget toolbox that can accomodate
CN215340910U (en) Data estimation drilling device for construction cost
CN212995069U (en) Engineering cost budget case that possesses file function
CN205197289U (en) Accounting educational aid box
CN212971996U (en) Cost budget case that building engineering technology specialty was used
CN210203677U (en) Storage device for engineering cost
CN211933195U (en) Enterprise management is arrangement case for consultation file
CN221659249U (en) Tool placement box
CN214870450U (en) Engineering cost specialized tool case
CN205306566U (en) Lead counseling platform for tax
CN214127542U (en) Workstation for engineering cost
CN206485123U (en) Art Design instrument cases

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant