CN209627995U - Communication engineering equipment cabinet - Google Patents

Communication engineering equipment cabinet Download PDF

Info

Publication number
CN209627995U
CN209627995U CN201920179703.3U CN201920179703U CN209627995U CN 209627995 U CN209627995 U CN 209627995U CN 201920179703 U CN201920179703 U CN 201920179703U CN 209627995 U CN209627995 U CN 209627995U
Authority
CN
China
Prior art keywords
frame
fixed block
blast pipe
cabinet body
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920179703.3U
Other languages
Chinese (zh)
Inventor
焦冬莉
郭文静
李国琴
郝亚楠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taiyuan Institute of Technology
Original Assignee
Taiyuan Institute of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taiyuan Institute of Technology filed Critical Taiyuan Institute of Technology
Priority to CN201920179703.3U priority Critical patent/CN209627995U/en
Application granted granted Critical
Publication of CN209627995U publication Critical patent/CN209627995U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Cooling Or The Like Of Electrical Apparatus (AREA)
  • Filtering Of Dispersed Particles In Gases (AREA)

Abstract

The utility model discloses communication engineering equipment cabinets, are related to communication engineering technical field.Including cabinet body, cabinet body is equipped with top air interchanger, ion destatics wind stick, control cabinet, buffing pad, elastic buffer column and support leg, first through hole is set on cabinet body side wall, frame is set at first through hole, air inlet fan is set in frame, air filter housing is set in total blast pipe, the first fixed block is arranged in air filter housing and frame opposite side, several second through-holes are set on the second fixed block, spring is arranged close to the first fixed block side in second fixed block, movable block is arranged far from first fixed block one end in spring, third through-hole is set on first fixed block, total blast pipe divides blast pipe far from the setting of frame one end, divide on blast pipe and several winding pipes are set, several exhaust vents are set on the side wall opposite with frame on cabinet body.The utility model has the beneficial effects that: reducing the occupancy in space, the dust being convenient to clean in air inlet fan improves heat dissipation and dust removing effects.

Description

Communication engineering equipment cabinet
Technical field
The utility model relates generally to communication engineering technical field, specifically communication engineering equipment cabinet.
Background technique
Existing communication engineering is less with equipment cabinet function, and heat dissipation, dedusting and the effect that destatics are poor, is easy to influence logical Equipment is normally run in letter engineering equipment cabinet.In the prior art, in view of the above-mentioned problems, there is a kind of communication engineering equipment Cabinet, the top of the equipment cabinet main body are equipped with top air interchanger, and the inside of the equipment cabinet main body is equipped with ion and destatics wind Stick, the lower section that the ion destatics wind stick are equipped with temperature inductor, and the surface at equipment cabinet main body back is equipped with heat release hole, The inside of the equipment cabinet main body is equipped with support plate, and the left end of the equipment cabinet main body is equipped with air-intake device, the air-intake device Right side be equipped with air filter housing, the inside of the air filter housing is equipped with air filtration cotton, the lower section of the air filter housing Equipped with control cabinet, the right end of the equipment cabinet main body is equipped with discharge pipe, and the bottom of the equipment cabinet main body is equipped with buffing pad, described The inside of buffing pad is equipped with elastic buffer column, and the bottom end of the buffing pad is fixed with support leg.Communication engineering equipment cabinet knot Structure is simple, easy to use, safe and efficient, is able to carry out heat dissipation dedusting.But above-mentioned apparatus is when in use, still remains following ask Topic:
One side air-intake device and exhaust apparatus occupancy equipment cabinet space are larger in above-mentioned apparatus, putting and moving to cabinet body Movable property is raw to be hindered and interference, and when especially equipment cabinet overall quantity is more, the shortcomings that occupied space is particularly evident.
In the prior art, also occur by being arranged ventilation device in cabinet body, to save space-efficient purpose, but it is logical The exhaust fan of wind apparatus regrets adhering dust after operation, after adhering dust, will lead to flabellum weight bearing and increases, so that wind speed Weaken, heat dissipation and dust removing effects are poor, and since exhaust fan is fixed at cabinet inside, are difficult to be cleared up.
Utility model content
To solve the deficiencies in the prior art, the utility model provides communication engineering equipment cabinet, it is in existing communication work On the basis of journey equipment cabinet, by improving ventilation device, and the setting for cooperating total blast pipe, dividing blast pipe, winding pipe, no The occupancy in space is only reduced, and is convenient to clean the dust in air inlet fan, improves heat dissipation and dust removing effects.
The utility model to achieve the above object, is achieved through the following technical solutions:
Communication engineering equipment cabinet, including cabinet body, the cabinet body is equipped with top air interchanger, ion destatics wind stick, Control cabinet, buffing pad, elastic buffer column and support leg are arranged first through hole on the cabinet body side wall, set at the first through hole Frame is set, connection is detachably fixed between the frame and cabinet body side wall, air inlet fan, the frame position are set in the frame Total blast pipe is set in interior of the cabinet side, air filter housing, the air filter housing and frame are set in total blast pipe The first fixed block is arranged in opposite side, and first fixed block is fixedly connected with total air inlet inside pipe wall, first fixed block and The second fixed block is arranged in air filter housing opposite side, and several second through-holes are arranged on second fixed block, and described second is solid Determine block and spring is set close to the first fixed block side, movable block, the activity is arranged far from first fixed block one end in the spring Block is in contact with the first fixed block, and third through-hole is arranged on first fixed block, and the third through-hole is located at movable block position Place, total blast pipe divide blast pipe far from the setting of frame one end, it is described divide on blast pipe several winding pipes are set, the cabinet Several exhaust vents are set on the side wall opposite with frame on body.
Joint angle is set on total blast pipe, and total blast pipe and cabinet body inner wall are fixedly connected with joint angle.
Screw connects between the frame and cabinet body side wall.
The frame and first through hole are multiple.
The prior art is compared, the beneficial effects of the utility model are:
1, the present apparatus on the basis of existing communication engineering equipment cabinet by improving ventilation device, using being arranged in frame The structure of air inlet fan, and under the action of air filter housing and movable block, it is distinguished and admirable from total blast pipe, divide blast pipe, air inlet Branch pipe flows into cabinet body, then flows out from exhaust vent, not only reduces the occupancy in space, and convenient for barrier dust, reduces ash Dirt enters the intracorporal content of cabinet, and frame can be removed from cabinet body side wall, convenient for clearing up the dust in air inlet fan in time, from And improve equipment cabinet integral heat sink and dust removing effects.
2, total discharge pipe can be fixed on equipment cabinet interior of the cabinet, improve frame and total discharge pipe by the setting of joint angle Dismounting and docking efficiency, convenient for frame is quickly removed from cabinet body side wall, to air inlet fan carry out cleaning dust processing.
3, screw connects between frame and cabinet body side wall, while reducing frame occupied space, enhances frame and fixes Stability, and be easily installed disassembly, advanced optimized the present apparatus.
4, the setting of multiple frames and first through hole, can be according to the intracorporal component of cabinet, the quantity of flexible setting frame And position further increases heat dissipation and dust removing effects so that distinguished and admirable flow direction more has specific aim.
Detailed description of the invention
Attached drawing 1 is the utility model main view schematic diagram;
Attached drawing 2 is the utility model schematic diagram of internal structure;
Attached drawing 3 is the utility model left view figure structure schematic representation;
Attached drawing 4 is the portion the utility model I enlarged drawing.
Label shown in attached drawing: 1, cabinet body;2, first through hole;3, frame;4, air inlet fan;5, total blast pipe;6, air Filter mantle;7, the first fixed block;8, the second fixed block;9, the second through-hole;10, spring;11, movable block;12, third through-hole;13, Divide blast pipe;14, winding pipe;15, exhaust vent;16, joint angle.
Specific embodiment
With reference to the drawings and specific embodiments, the utility model is described in further detail.It should be understood that these embodiments are only used for Illustrate the utility model rather than limitation the scope of the utility model.In addition, it should also be understood that, having read the utility model instruction Content after, those skilled in the art can make various changes or modifications the utility model, and such equivalent forms are equally fallen In range defined herein.
The standardized element used in the utility model can commercially, and shaped piece is according to specification and attached The record of figure can carry out it is customized, the specific connection type of each part be all made of in the prior art mature bolt, rivet, The conventional means such as welding, stickup, used circuit connection are conventional model in the prior art, and this will not be detailed here.
Communication engineering equipment cabinet, including cabinet body 1, the cabinet body 1 is equipped with top air interchanger, ion destatics wind First through hole 2, the first through hole are arranged on 1 side wall of cabinet body for stick, control cabinet, buffing pad, elastic buffer column and support leg Frame 3 is set at 2, connection is detachably fixed between 1 side wall of the frame 3 and cabinet body, air inlet fan 4 is set in the frame 3, As shown in Fig. 3, knot of the air inlet fan by structure compositions such as fixing axle and flabellums, with the exhaust fan rotation operation of main frame Structure is far from identical, by the power supply of alternating current or cabinet body itself as power supply.The frame 3 is located at the setting of 1 interior side of cabinet body Total blast pipe 5 can mutually dismantle assembling between total blast pipe and frame and be fixedly connected as shown in Fig. 2, can also use When only contact, without connection, it is ensured that air inlet fan generate it is distinguished and admirable from air inlet general pipeline flow through.Setting in total blast pipe 5 Air filter housing 6, the air filter housing 6 and 3 opposite side of frame are arranged the first fixed block 7, first fixed block 7 with it is total 5 inner wall of blast pipe is fixedly connected, and the second fixed block 8 is arranged with 6 opposite side of air filter housing in first fixed block 7, described Several second through-holes 9 are set on second fixed block 8, spring 10 is arranged close to 7 side of the first fixed block in second fixed block 8, Movable block 11 is arranged far from 7 one end of the first fixed block in the spring 10, and the movable block 11 is in contact with the first fixed block 7, institute Setting third through-hole 12, the third through-hole 12 on the first fixed block 7 is stated to be located at 11 position of movable block, as shown in Fig. 4, In Under the action of first fixed block and the second fixed block, distinguished and admirable meeting flows to out blast pipe from total blast pipe, without reverse circulated, So that the intracorporal dust of cabinet is flowed out from exhaust vent, without flowing at air inlet fan position, to reduce air inlet fan contamination ash The amount of dirt.Total blast pipe 5 divides blast pipe 13 far from the setting of 3 one end of frame, it is described divide on blast pipe 13 several air inlets are set Several exhaust vents 15 are arranged on the side wall opposite with frame 3 on the cabinet body 1 in branch pipe 14.The present apparatus is used in existing communication engineering By improving ventilation device on the basis of equipment cabinet, using the structure that air inlet fan is arranged in frame, and in air filter housing Under the action of movable block, it is distinguished and admirable from total blast pipe, divide blast pipe, winding pipe to flow into cabinet body, then from exhaust vent flow out, The occupancy in space is not only reduced, and convenient for barrier dust, reduces dust and enters the intracorporal content of cabinet, frame can be from cabinet It is removed on body sidewall, convenient for clearing up the dust in air inlet fan in time, to improve equipment cabinet integral heat sink and dust removing effects.
For the ease of quickly removing frame from cabinet body side wall, joint angle 16 is set on total blast pipe 5, it is described total Blast pipe 5 and 1 inner wall of cabinet body are fixedly connected with joint angle 16.Total discharge pipe can be fixed on equipment cabinet by the setting of joint angle Interior of the cabinet improves frame and the dismounting of total discharge pipe and docks efficiency, convenient for frame is quickly removed from cabinet body side wall, The processing of cleaning dust is carried out to air inlet fan.
It can be with grafting, clamping, in one embodiment of the utility model, the frame 3 between frame and cabinet body side wall Screw is connect between 1 side wall of cabinet body.Screw connects between frame and cabinet body side wall, while reducing frame occupied space, The fixed stability of frame is enhanced, and is easily installed disassembly, has advanced optimized the present apparatus.
As optimization, the frame 3 and first through hole 2 are multiple.The setting of multiple frames and first through hole, being capable of basis The intracorporal component of cabinet, the quantity of flexible setting frame and position further increase so that distinguished and admirable flow direction more has specific aim Heat dissipation and dust removing effects.
Application method:
When in use, frame is fixed on cabinet body side wall to the present apparatus, and air inlet fan is powered, distinguished and admirable from total blast pipe activity compression Block and compressed spring flow out to a point blast pipe through third through-hole, the second through-hole, then from divide blast pipe flow out to winding pipe after by Exhaust vent outflow, to play the role of dedusting of radiating, when air inlet fan is run for a period of time, after adhering dust, by frame It unloads, has cleared up air inlet fan flabellum and later again loaded onto frame set.

Claims (4)

1. communication engineering equipment cabinet, including cabinet body (1), the cabinet body (1) is equipped with top air interchanger, ion destatics wind Stick, control cabinet, buffing pad, elastic buffer column and support leg, it is characterised in that: first through hole is set on cabinet body (1) side wall (2), frame (3) are set at the first through hole (2), are detachably fixed and connect between the frame (3) and cabinet body (1) side wall, Air inlet fan (4) are set in the frame (3), the frame (3) is located at cabinet body (1) interior side and total blast pipe (5), institute is arranged It states in total blast pipe (5) and air filter housing (6) is set, the air filter housing (6) and frame (3) opposite side setting first are solid Determine block (7), first fixed block (7) is fixedly connected with total blast pipe (5) inner wall, first fixed block (7) and air mistake The second fixed block (8) are arranged in filter bowl (6) opposite side, and several second through-holes (9) are arranged on second fixed block (8), described Second fixed block (8) is close to the first fixed block (7) side setting spring (10), and the spring (10) is far from the first fixed block (7) Movable block (11) are arranged in one end, and the movable block (11) is in contact with the first fixed block (7), sets on first fixed block (7) It sets third through-hole (12), the third through-hole (12) is located at movable block (11) position, and total blast pipe (5) is far from frame (3) one end setting divide blast pipe (13), it is described divide on blast pipe (13) be arranged several winding pipes (14), on the cabinet body (1) Several exhaust vents (15) are set on opposite side wall with frame (3).
2. communication engineering equipment cabinet according to claim 1, it is characterised in that: be arranged on total blast pipe (5) and connect It connects angle (16), total blast pipe (5) and cabinet body (1) inner wall are fixedly connected with joint angle (16).
3. communication engineering equipment cabinet according to claim 1, it is characterised in that: the frame (3) and cabinet body (1) side wall Between screw connection.
4. communication engineering equipment cabinet according to claim 1 or 2, it is characterised in that: the frame (3) and first through hole It (2) is multiple.
CN201920179703.3U 2019-01-31 2019-01-31 Communication engineering equipment cabinet Expired - Fee Related CN209627995U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920179703.3U CN209627995U (en) 2019-01-31 2019-01-31 Communication engineering equipment cabinet

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920179703.3U CN209627995U (en) 2019-01-31 2019-01-31 Communication engineering equipment cabinet

Publications (1)

Publication Number Publication Date
CN209627995U true CN209627995U (en) 2019-11-12

Family

ID=68452991

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920179703.3U Expired - Fee Related CN209627995U (en) 2019-01-31 2019-01-31 Communication engineering equipment cabinet

Country Status (1)

Country Link
CN (1) CN209627995U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110906472A (en) * 2019-12-02 2020-03-24 王玥 Air filter for central air conditioner

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110906472A (en) * 2019-12-02 2020-03-24 王玥 Air filter for central air conditioner
CN110906472B (en) * 2019-12-02 2021-01-15 深圳市天雄达科技有限公司 Air filter for central air conditioner

Similar Documents

Publication Publication Date Title
CN209627995U (en) Communication engineering equipment cabinet
CN210138546U (en) Indoor air purification intelligence house device
CN202823018U (en) Indoor air purifier
CN112756363A (en) Screen glass cleaning jig
CN217004734U (en) Energy-saving engineering system for clean room
CN207763206U (en) A kind of multi-functional air conditioner wind cabinet
CN206501012U (en) New polishing dust collection and purification system
CN215295229U (en) Energy-saving and environment-friendly ventilation and exhaust device
CN213760989U (en) Air filter of air conditioner air inlet of airplane
CN211372701U (en) New fan of in-band circulation function
CN208804831U (en) A kind of super-silent purification device as new blower or air purifier
CN209295409U (en) A kind of Dustproof formula air-conditioning box
CN210670821U (en) High-efficient PCB board surface treatment device
CN204429010U (en) A kind of ventilation dust-filtering filter and converter cabinet
CN207752435U (en) A kind of computer heat dissipation dust-extraction unit
CN215490257U (en) Filtering type total heat exchanger
CN219775973U (en) Filter screen type central air conditioner water tray
CN218823226U (en) Industrial computer power-off testing device
CN209228668U (en) A kind of radiating fan for computer structure
CN206082867U (en) Dedicated ke long of stopping that can remove dust once more of feed processing
CN217274674U (en) Intelligence air purification device for house
CN112594852B (en) Laboratory air circulation filtering system and control method thereof
CN214581629U (en) Filter device for air conditioner capable of being automatically cleaned
CN209512219U (en) A kind of cabinet type fresh air purifier
CN208504674U (en) A kind of return air inlet for air-conditioner with ash handling equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191112

Termination date: 20210131

CF01 Termination of patent right due to non-payment of annual fee