CN209626722U - Buried transformer station box pre-buried structure - Google Patents
Buried transformer station box pre-buried structure Download PDFInfo
- Publication number
- CN209626722U CN209626722U CN201820939866.2U CN201820939866U CN209626722U CN 209626722 U CN209626722 U CN 209626722U CN 201820939866 U CN201820939866 U CN 201820939866U CN 209626722 U CN209626722 U CN 209626722U
- Authority
- CN
- China
- Prior art keywords
- buried
- framework
- cabinet
- pit slot
- transformer station
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Housings And Mounting Of Transformers (AREA)
Abstract
The utility model discloses a kind of buried transformer station box pre-buried structures, including pre-buried pit slot, cabinet and conduit line, the pre-buried pit slot is armored concrete pouring structure, the section of the pre-buried pit slot is in inverted trapezoidal, the cabinet includes accommodating framework and case lid, opening is provided with above the receiving framework, the case lid lid sets and is sealed in and accommodates in framework, the first ventilation opening is provided with above the front and rear sides end face of the receiving framework, the structure design of the utility model is reasonable, structure is buried provided with novel transformer station box, so that water flow is deflected into the intrinsic drainage pipeline in city, not only effectively prevent rainy day water flow from entering box house by ventilation opening, the proper heat reduction of cabinet is not interfered simultaneously, the surface of conduit line is arranged in cabinet, progress cable is facilitated to import and export, mitigate construction Difficulty, while the cabinet is arranged on prefabricated pile foundation support column and is limited by limited block, the stability for effectively preventing the settlement influence equipment of cabinet from running.
Description
Technical field
The utility model relates to a kind of buried transformer station box pre-buried structures.
Background technique
It with the gradually development of urban construction, needs to be supported by electric power, traditional substation takes up a large area, fortune
Row noise is big and has electromagnetic radiation, not only influences urban, while but also the common people generate fear, buried substation
Ventilation opening is arranged directly above cabinet and bassets for effective solution problem above, traditional buried substation, is easy
It causes water flow to enter in cabinet, especially in rainy season, influences the normal operation of equipment.
Utility model content
The purpose of the utility model is to overcome the above deficiencies in the existing technologies, and provide a kind of structure design conjunction
The buried transformer station box pre-buried structure of reason.
The technical scheme in the invention for solving the above technical problem is: a kind of buried pre-buried knot of transformer station box
Structure, including pre-buried pit slot, cabinet and conduit line, the pre-buried pit slot are armored concrete pouring structure, and described is pre-
The section of pit slot is buried in inverted trapezoidal, the cabinet includes accommodating framework and case lid, is provided with above the receiving framework
Opening, the case lid lid set and are sealed in and accommodate in framework, be respectively provided with above the front and rear sides end face of the receiving framework
There is the first ventilation opening, the outer of first ventilation opening is provided with baffle plate, and the baffle plate is fixed with case lid, baffle plate
Two sides with accommodate framework end face be bonded fixations so that baffle plate and accommodate framework end face constitute and receiving framework cavity
The side wall face interval setting of first vent passages of connection, the baffle plate and pre-buried pit slot constitutes the second vent passages, institute
The bottom of the first vent passages and the second vent passages stated is interconnected, and there are the second ventilation in the two sides of the case lid when being arranged
Mouthful, the second ventilation opening is connected to the second ventilation through-hole, and the second vent position of side is provided with several exhaust fans, the other side
Second vent position is provided with several induction fans, and second ventilation opening is arranged in above the horizontal plane of pre-buried pit slot,
The bottom of second vent passages is connected to drainage channel, and the receiving framework is erected at the surface of conduit line.
Further: first ventilation opening is provided with Electric air valve.
Further: the bottom of the pre-buried pit slot is provided with for setting up the pile foundation support column for accommodating framework, is held
Frame of receiving is erected on pile foundation support column, and the edge of the receiving framework bottom is provided with limited block, the limited block
A side end face with accommodate framework bottom end face be bonded, limited block is located in pre-buried pit slot by Pseudobulbus Bletillae (Rhizoma Bletillae) riveting.
Further: the receiving framework end face is multiple using aluminium alloy securing plate, splash guard, fire-proof plate and soundproof plate
It closes and constitutes.
It is further: the access hole being connected to the cavity for accommodating framework, the maintenance are provided at the top of the case lid
Mouth, which is provided with access cover, makes its sealing.
The utility model compared with prior art, has the following advantages that and effect: it is reasonable in design, provided with novel
Transformer station box buries structure, so that water flow is deflected into the intrinsic drainage pipeline in city, not only effectively prevents rainy day water flow
Box house is entered by ventilation opening, while not interfering the proper heat reduction of cabinet, the surface of conduit line is arranged in cabinet, convenient
It carries out cable to import and export, mitigates difficulty of construction, while the cabinet is arranged on prefabricated pile foundation support column and passes through
Limited block is limited, the stability for effectively preventing the settlement influence equipment of cabinet from running.
Detailed description of the invention
Fig. 1 is that the buried transformer station box pre-buried structure of the utility model embodiment is intended to.
Specific embodiment
The utility model is described in further detail with reference to the accompanying drawing and by embodiment, and following embodiment is pair
The explanation of the utility model and the utility model is not limited to following embodiment.
Referring to Fig. 1, a kind of buried transformer station box pre-buried structure of the present embodiment, including pre-buried pit slot 1, cabinet and electricity
Cable channel 3, the pre-buried pit slot are armored concrete pouring structure, and the section of the pre-buried pit slot is in inverted trapezoidal, described
Cabinet include accommodating framework 21 and case lid 22, opening, the lid of case lid 22 are provided with above the receiving framework 21
And if be sealed in and accommodate in framework 21, the front and rear sides end face of the receivings framework 21 top is provided with the first ventilation opening
23, the outer of first ventilation opening 23 is provided with baffle plate 4, and the baffle plate 4 and case lid 22 are fixed, baffle plate 4
Two sides are bonded fixation with the end face for accommodating framework 21, so that the end face of baffle plate 4 and receiving framework 21 constitutes and accommodates framework 21
Cavity connection the first vent passages 51, it is logical that the side wall face interval setting of the baffle plate 4 and pre-buried pit slot constitutes second
The bottom of wind channel 52, first vent passages 51 and the second vent passages 52 is interconnected, and the two of the case lid 22
Side is provided with the second ventilation opening 53, and the second ventilation opening 53 is connected to the second ventilation through-hole, and 53 position of the second ventilation opening of side is set
Several exhaust fans 54 are equipped with, 53 position of the second ventilation opening of the other side is provided with several induction fans 55, second ventilation
Mouth 53 is arranged in above the horizontal plane of pre-buried pit slot 1, and the bottom of second vent passages 52 is connected to drainage channel 6, institute
The receiving framework 21 stated is erected at the surface of conduit line 3, and first ventilation opening 23 is provided with Electric air valve 56, described
Pre-buried pit slot 1 bottom be provided with for set up accommodate framework 21 pile foundation support column 5, accommodate frame be erected at pile foundation
On support column 5, the edge of 21 bottom of receiving framework is provided with limited block 51, a side end face of the limited block 51 with
The end face fitting of 21 bottom of framework is accommodated, limited block 51 is located in pre-buried pit slot 1 by Pseudobulbus Bletillae (Rhizoma Bletillae) riveting, the receiving framework 21
End face uses aluminium alloy securing plate, splash guard, fire-proof plate and the compound composition of soundproof plate, be provided at the top of the case lid 22 with
The access hole 221 of the cavity connection of framework 21 is accommodated, the access hole 221, which is provided with access cover 222, makes its sealing, this reality
With novel pre-buried setting in underground, this is reasonable in design, structure is buried provided with novel transformer station box, so that water flow is rolled over
Stream enters the intrinsic drainage pipeline in city, not only effectively prevents rainy day water flow from entering box house by ventilation opening, by drainage wind
Fan 55 is drained and is excluded by exhaust fan 54, and air-flow flows through the cavity for accommodating framework 21, so that the proper heat reduction of cabinet is not interfered,
The surface of conduit line 3 is arranged in cabinet, and progress cable is facilitated to import and export, and mitigates difficulty of construction, while the cabinet
It is arranged on prefabricated pile foundation support column 5 and is limited by limited block 51, effectively prevents the settlement influence of cabinet from setting
The stability of received shipment row.
Above content is only illustrate to examples for clearly illustrating the present invention described in this specification.The utility model
Person of ordinary skill in the field can make various modifications or additions to the described embodiments or using class
As mode substitute, content without departing from the utility model specification or surmount model defined in the claims
It encloses, all should belong to the protection range of the utility model.
Claims (5)
1. a kind of buried transformer station box pre-buried structure, it is characterised in that: including pre-buried pit slot, cabinet and conduit line,
The pre-buried pit slot is armored concrete pouring structure, and the section of the pre-buried pit slot is in inverted trapezoidal, the cabinet packet
It includes and accommodates framework and case lid, be provided with opening above the receiving framework, the case lid lid sets and is sealed in receiving frame
On body, be provided with the first ventilation opening above the front and rear sides end face of the receiving framework, first ventilation opening it is outer
Along baffle plate is provided with, the baffle plate is fixed with case lid, and the two sides of baffle plate are bonded fixation with the end face for accommodating framework, is made
Baffle plate and the end face for accommodating framework constitute with the first vent passages for being connected to of cavity of receiving framework, the baffle plate and
The side wall face interval setting of pre-buried pit slot constitutes the second vent passages, the bottom of first vent passages and the second vent passages
Portion is interconnected, and the two sides of the case lid are provided with the second ventilation opening, and the second ventilation opening is connected to the second ventilation through-hole, side
The second vent position be provided with several exhaust fans, the second vent position of the other side is provided with several induction fans, institute
The second ventilation opening stated is arranged in above the horizontal plane of pre-buried pit slot, and the bottom of second vent passages and drainage channel connect
Logical, the receiving framework is erected at the surface of conduit line.
2. buried transformer station box pre-buried structure according to claim 1, it is characterised in that: first ventilation opening
It is provided with Electric air valve.
3. buried transformer station box pre-buried structure according to claim 1, it is characterised in that: the pre-buried pit slot
Bottom is provided with for setting up the pile foundation support column for accommodating framework, and receiving frame is erected on pile foundation support column, described
The edge for accommodating framework bottom is provided with limited block, and a side end face of the limited block and the end face for accommodating framework bottom are pasted
It closes, limited block is located in pre-buried pit slot by Pseudobulbus Bletillae (Rhizoma Bletillae) riveting.
4. buried transformer station box pre-buried structure according to claim 1, it is characterised in that: the receiving framework end
Face uses aluminium alloy securing plate, splash guard, fire-proof plate and the compound composition of soundproof plate.
5. buried transformer station box pre-buried structure according to claim 1, it is characterised in that: set at the top of the case lid
It is equipped with the access hole being connected to the cavity for accommodating framework, the access hole, which is provided with access cover, makes its sealing.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820939866.2U CN209626722U (en) | 2018-06-15 | 2018-06-15 | Buried transformer station box pre-buried structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820939866.2U CN209626722U (en) | 2018-06-15 | 2018-06-15 | Buried transformer station box pre-buried structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209626722U true CN209626722U (en) | 2019-11-12 |
Family
ID=68441401
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820939866.2U Expired - Fee Related CN209626722U (en) | 2018-06-15 | 2018-06-15 | Buried transformer station box pre-buried structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209626722U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111446059A (en) * | 2020-04-07 | 2020-07-24 | 江西成名电气有限公司 | A waterproof construction for burying formula transformer |
-
2018
- 2018-06-15 CN CN201820939866.2U patent/CN209626722U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111446059A (en) * | 2020-04-07 | 2020-07-24 | 江西成名电气有限公司 | A waterproof construction for burying formula transformer |
CN111446059B (en) * | 2020-04-07 | 2021-02-26 | 江西成名电气有限公司 | A waterproof construction for burying formula transformer |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101182781B (en) | Breathing place used for synthesis pipe canal | |
CN209626722U (en) | Buried transformer station box pre-buried structure | |
CN202678069U (en) | Noise reducing device for outdoor transformer | |
CN206059980U (en) | Outdoor power equipment installs room ventilation moisture-proof construction | |
CN201935943U (en) | Waterproof meter box with louver | |
CN208014482U (en) | A kind of waterproof outer cover of transformer | |
CN108544952A (en) | New-energy automobile charging pile protective device | |
CN205224537U (en) | Underground stereo garage | |
CN205227660U (en) | Underground stereo garage mechanical ventilation equipment | |
CN219067505U (en) | Outdoor waterproof type switch board | |
CN106049533A (en) | Long-distance comprehensive pipe gallery system | |
CN107084628A (en) | Hyperbolic cooling tower sound-attenuating system | |
CN205141596U (en) | Husky cable pit is prevent wind in underground by transformer substation | |
CN201077994Y (en) | Breathing place used for synthesis pipe canal | |
CN202308862U (en) | Semi-buried landscape transformer station and cabinet structure thereof | |
CN201278616Y (en) | Novel outdoor cabinet with top cover water-proof structure | |
CN204199803U (en) | Diesel-driven generator underground garage sunk type air inlet structure | |
CN210273279U (en) | Safe type box-type substation | |
CN209860462U (en) | Box-type substation capable of being installed in sinking mode and reducing floor area | |
CN202416798U (en) | Cast-in-place ventilation and smoke discharge system | |
CN203554314U (en) | Photovoltaic inverter room protective structure | |
CN208873573U (en) | Water-proof ventilation structure suitable for combined transformer | |
CN207169378U (en) | The air blast carbon dioxide cleaner of light current power network adhesion deinsectization is installed | |
CN209179292U (en) | A kind of higher furred ceiling of safety | |
CN213402049U (en) | Box-type substation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20191112 Termination date: 20200615 |