CN209622229U - A kind of municipal administration being easily installed plastic cement pipeline - Google Patents

A kind of municipal administration being easily installed plastic cement pipeline Download PDF

Info

Publication number
CN209622229U
CN209622229U CN201920341770.0U CN201920341770U CN209622229U CN 209622229 U CN209622229 U CN 209622229U CN 201920341770 U CN201920341770 U CN 201920341770U CN 209622229 U CN209622229 U CN 209622229U
Authority
CN
China
Prior art keywords
fixed
tube body
interface
connector
easily installed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920341770.0U
Other languages
Chinese (zh)
Inventor
张志龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiangxi Autonomous Prefecture Plastic Co Ltd
Original Assignee
Xiangxi Autonomous Prefecture Plastic Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xiangxi Autonomous Prefecture Plastic Co Ltd filed Critical Xiangxi Autonomous Prefecture Plastic Co Ltd
Priority to CN201920341770.0U priority Critical patent/CN209622229U/en
Application granted granted Critical
Publication of CN209622229U publication Critical patent/CN209622229U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a kind of municipal administration being easily installed plastic cement pipelines, including tube body, the side of tube body is fixed with rain pipe, the other end of tube body is fixed with sewage pipe, and one end of tube body is fixed with connector, and the other end of tube body is fixed with interface, the bottom of connector side and the bottom of interface side are fixed with baffle, the inner wall fixation of the inner wall and connector of interface is covered with sealant, and the two sides of connector are fixed with card slot, and the two sides of interface are fixed with fastener.The utility model is directly docked by connector with interface, and it is connected together by bayonet and card slot, it does not need to be installed using hot-melt adhesive paste or connecting tube, it is easily installed, and installation speed is fast, reduces costs, the side of tube body is fixed with rain pipe, the other end of tube body is fixed with sewage pipe, and tube body has the function of while delivering rainwater and sewage.

Description

A kind of municipal administration being easily installed plastic cement pipeline
Technical field
The utility model relates to a kind of plastic cement pipelines, and in particular to a kind of municipal administration being easily installed plastic cement pipeline belongs to Pipe installation technology field.
Background technique
Plastic cement pipeline is a kind of using conveyance conduit made of plastic cement material, and tool has been widely used, be used primarily in water supply, In draining, agricultural irrigation, hydraulic engineering and various commercial plants, common municipal administration is not easy to install with plastic cement pipeline, because it is more It is attached using the form of hot melting connection joint and interface, or by connecting tube, this mode construction cost is higher, installation effect Rate is slow, and common municipal administration is all made of the form that rain pipe is separated with sewage pipe with plastic cement pipeline, when shoveling and installation It needs respectively to operate it, in addition to increasing machinery cost, also improves the cost of labor of construction indirectly.
Utility model content
To solve the above problems, the purpose of this utility model is to provide a kind of municipal administration being easily installed plastic cement pipeline, To solve the problems, such as that common municipal administration mentioned above in the background art is not easy to installation with plastic cement pipeline and installation fee is higher.
To achieve the above object, a kind of technical solution that the utility model is taken are as follows: municipal administration plastic pipe being easily installed Road, including tube body, the side of the tube body are fixed with rain pipe, and the other end of the tube body is fixed with sewage pipe, described One end of tube body is fixed with connector, and the other end of the tube body is fixed with interface, the bottom of the connector side and interface The bottom of side is fixed with baffle, and support plate, the inner wall and interface of the connector are fixed between two baffles Inner wall it is fixed be covered with sealant, the two sides of the connector are fixed with card slot, and the fixation of the two sides of the interface is set There is fastener, the inside of two fasteners is fixed with fixed plate, and the side of the fixed plate is fixed with reset spring, institute The one end for stating reset spring is fixed with fixture block, and the fixture block is connected together with card slot, and the side of the fixture block is fixed with drawing The side of bar, the pull rod is fixed with handle.
Wherein, two hanging rings are fixed at the top of the tube body.
Wherein, the two sides of the support plate are fixed between filling sand.
Wherein, the inside of the rain pipe and the inside of sewage pipe are fixed with support rod.
Wherein, the surface fixation of the sealant is covered with barrier paper.
Further, the inner wall of the inner wall of the rain pipe and sewage pipe fixation is covered with collision mat.
Compared with prior art, the utility model has the following beneficial effects: the utility model is straight by connector and interface Docking is connect, and is connected together by bayonet and card slot, does not need to be installed using hot-melt adhesive paste or connecting tube, be easily installed, And installation speed is fast, reduces costs, the side of tube body is fixed with rain pipe, and the other end of tube body is fixed with sewage pipe, Tube body has the function of while delivering rainwater and sewage, when shoveling and installation need not respectively to rain pipe and sewage pipe into Row operation, reduces construction procedure, and then reducing except machinery cost, has also indirectly saved the artificial of construction personnel Take.The inner wall fixation of the inner wall and connector of interface is covered with sealant, has the effect of stable interface and connector, connector side Bottom and the bottom of interface side be fixed with baffle, be fixed with support plate between two baffles, increase tube body bottom The stability in portion.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the structural schematic diagram of interface in the utility model;
Fig. 3 is the schematic enlarged-scale view in the utility model at fastener.
Description of symbols:
1, tube body;2, rain pipe;3, sewage pipe;4, connector;5, interface;6, card slot;7, hanging ring;8, sealant;9, it supports Bar;10, support plate;11, between filling sand;12, fastener;13, fixed plate;14, reset spring;15, fixture block;16, pull rod;17, handle; 18, baffle.
Specific embodiment
In order to make the technical problems, technical solutions and advantages to be solved by the utility model clearer, below in conjunction with attached drawing And specific embodiment is described in detail.
It please refers to shown in 1~attached drawing of Figure of description 3, the utility model provides a kind of municipal administration plastic cement being easily installed Pipeline, including tube body 1, the side of tube body 1 are fixed with rain pipe 2, and the other end of tube body 1 is fixed with sewage pipe 3, tube body 1 One end be fixed with connector 4, the other end of tube body 1 is fixed with interface 5, the bottom of 5 side of bottom and interface of 4 side of connector Portion is fixed with baffle 18, and support plate 10 is fixed between two baffles 18, and the inner wall of connector 4 and the inner wall of interface 5 are equal Fixed to be covered with sealant 8, the two sides of connector 4 are fixed with card slot 6, and the two sides of interface 5 are fixed with fastener 12, and two The inside of fastener 12 is fixed with fixed plate 13, and the side of fixed plate 13 is fixed with reset spring 14, reset spring 14 One end is fixed with fixture block 15, and fixture block 15 is connected together with card slot 6, and the side of fixture block 15 is fixed with pull rod 16, pull rod 16 Side is fixed with handle 17.
The top of the tube body 1 is fixed with two hanging rings 7, can be bundled on vehicle body when transport by hanging ring 7.
The two sides of the support plate 10 are fixed with fill sand between 11, the yellow sand bed course of 1 bottom of tube body can be stablized, will not will be yellow The bottom of sand cushion extrusion tube body 1.
The inside of the rain pipe 2 and the inside of sewage pipe 3 are fixed with support rod 9, and support effect is good, in backfill Rain pipe 2 and sewage pipe 3 will not be deformed later.
The surface fixation of the sealant 8 is covered with barrier paper, it is ensured that the adhesivity of sealant 8 when installation.
The inner wall fixation of the inner wall and sewage pipe 3 of the rain pipe 2 is covered with collision mat, improves the impervious of tube body 1 Function.
The application method of the utility model are as follows: when transporting tube body 1, tube body 1 can be bundled on vehicle body by hanging ring 7, After excavator has dug groove, it is put into yellow sand bed course in the trench, by the top for being placed on yellow sand bed course of tube body 1 slowly, this When baffle 18 and support plate 10 by yellow sand stablize below tube body 1, the interface 5 of tube body 1 and the connector 4 of adjacent tubes 1 are put In same axis, the barrier paper of 5 inner wall of barrier paper and interface of 4 inner wall of connector is torn respectively, is pulled by handle 17 toward side Pull rod 16, connector 4 in opened condition, is put into the inside of interface 5, unclamps again handle by 15 pressed home spring 14 of fixture block at this time 17, reset spring 14 pushes fixture block 15 to reset, and fixture block 15 is connected together with card slot 6 at this time, 8 butt joint 4 of sealant and interface 5 Bonding strength is consolidated, and pipeline can carry out backfill after checking and accepting.
In the description of the present invention, it should be understood that the orientation or positional relationship of instruction is based on shown in attached drawing Orientation or positional relationship, be merely for convenience of describing the present invention and simplifying the description, rather than indication or suggestion is signified Device or element must have a particular orientation, be constructed and operated in a specific orientation, therefore should not be understood as practical new to this The limitation of type.
In the present invention unless specifically defined or limited otherwise, for example, it may be being fixedly connected, be also possible to It is detachably connected, or integral;It can be mechanical connection, be also possible to be electrically connected;It can be directly connected, it can also be in Between medium be indirectly connected, can be the connection inside two elements or the interaction relationship of two elements, unless otherwise clear Restriction can understand above-mentioned term in the utility model as the case may be for the ordinary skill in the art In concrete meaning.
Above specific embodiment is only the preferred embodiment of this creation, all in this wound not to limit this creation Any modification, equivalent substitution, improvement and etc. done within the spirit and principle of work, should be included in this creation protection scope it It is interior.

Claims (6)

1. a kind of municipal administration being easily installed plastic cement pipeline, including tube body (1), which is characterized in that the side of the tube body (1) is solid Surely rain pipe (2) are equipped with, the other end of the tube body (1) is fixed with sewage pipe (3), and one end fixation of the tube body (1) is set Have connector (4), the other end of the tube body (1) is fixed with interface (5), the bottom of connector (4) side and interface (5) one The bottom of side is fixed with baffle (18), is fixed with support plate (10) between two baffles (18), the connector (4) Inner wall and interface (5) inner wall fixation be covered with sealant (8), the two sides of the connector (4) are fixed with card slot (6), the two sides of the interface (5) are fixed with fastener (12), and the inside of two fasteners (12) is fixed with fixation The side of plate (13), the fixed plate (13) is fixed with reset spring (14), and one end fixation of the reset spring (14) is set Having fixture block (15), the fixture block (15) is connected together with card slot (6), and the side of the fixture block (15) is fixed with pull rod (16), The side of the pull rod (16) is fixed with handle (17).
2. the municipal administration being easily installed plastic cement pipeline according to claim 1, which is characterized in that the top of the tube body (1) Portion is fixed with two hanging rings (7).
3. the municipal administration being easily installed plastic cement pipeline according to claim 1, which is characterized in that the support plate (10) Two sides are fixed between filling sand (11).
4. the municipal administration being easily installed plastic cement pipeline according to claim 1, which is characterized in that the rain pipe (2) Internal and sewage pipe (3) inside are fixed with support rod (9).
5. the municipal administration being easily installed plastic cement pipeline according to claim 1, which is characterized in that the sealant (8) Surface fixation is covered with barrier paper.
6. the municipal administration being easily installed plastic cement pipeline according to claim 1, which is characterized in that the rain pipe (2) The fixation of the inner wall of inner wall and sewage pipe (3) is covered with collision mat.
CN201920341770.0U 2019-03-18 2019-03-18 A kind of municipal administration being easily installed plastic cement pipeline Expired - Fee Related CN209622229U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920341770.0U CN209622229U (en) 2019-03-18 2019-03-18 A kind of municipal administration being easily installed plastic cement pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920341770.0U CN209622229U (en) 2019-03-18 2019-03-18 A kind of municipal administration being easily installed plastic cement pipeline

Publications (1)

Publication Number Publication Date
CN209622229U true CN209622229U (en) 2019-11-12

Family

ID=68457054

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920341770.0U Expired - Fee Related CN209622229U (en) 2019-03-18 2019-03-18 A kind of municipal administration being easily installed plastic cement pipeline

Country Status (1)

Country Link
CN (1) CN209622229U (en)

Similar Documents

Publication Publication Date Title
CN102777189B (en) A kind of ultra-long tube curtain non-relay jacking construction device and method
CN209622229U (en) A kind of municipal administration being easily installed plastic cement pipeline
CN205839796U (en) Utility tunnel internode connection structure
CN210280081U (en) Pipe structure convenient to clearance inner wall
CN204554185U (en) A kind of insulation threeway adopting Flange joint
CN206608506U (en) The T-shaped wire clamp of photovoltaic
CN211649434U (en) Internal stop type rubber ring butt joint structure of winding pipe
CN105135054B (en) The pipe jacking construction method of super-long pipeline
CN204371413U (en) A kind of highstrenghtpiston's pipe for escaping
CN202972253U (en) Reinforced water drainage pipe connector and connection structure thereof
CN206667415U (en) A kind of toilet seat shift unit
CN207298164U (en) A kind of socket joint type pipeline socket connecting elements
CN208236419U (en) A kind of push-bench is appeared sealing ring structure through walls
CN202176860U (en) Underground well and pipeline connecting device
CN201129585Y (en) Bidirectional socket pipe parts
CN220487600U (en) Pipe jacking thick slurry injection device
CN213268227U (en) Inspection well grouting system
CN209873878U (en) Integral type pipe fitting inspection shaft
CN205781534U (en) A kind of quickly spigot-and-socket HDPE reality wall drain pipe
CN103587956A (en) Segmented lifting and conveying device of deep-sea mining annular pipelines
CN204704491U (en) Integratedly build water string
CN204611146U (en) Pipeline section type steel pipe joint
CN203602084U (en) Deep-sea mining annular pipe segmented lifting and conveying device
CN202559358U (en) Pile bottom grouting device
CN203322740U (en) Temporary gas-liquid collecting device for metering station

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191112