CN209621262U - A kind of injection well testing liquid collector - Google Patents

A kind of injection well testing liquid collector Download PDF

Info

Publication number
CN209621262U
CN209621262U CN201822096944.XU CN201822096944U CN209621262U CN 209621262 U CN209621262 U CN 209621262U CN 201822096944 U CN201822096944 U CN 201822096944U CN 209621262 U CN209621262 U CN 209621262U
Authority
CN
China
Prior art keywords
injection well
liquid collector
testing liquid
well testing
pipe nipple
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201822096944.XU
Other languages
Chinese (zh)
Inventor
王革
周现环
刘天奇
于建民
李雄
陈华钧
马龙娜
李海燕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Natural Gas Co Ltd
Original Assignee
China Petroleum and Natural Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Natural Gas Co Ltd filed Critical China Petroleum and Natural Gas Co Ltd
Priority to CN201822096944.XU priority Critical patent/CN209621262U/en
Application granted granted Critical
Publication of CN209621262U publication Critical patent/CN209621262U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a kind of injection well testing liquid collectors, are related to oil field equipment field.The liquid collector includes: the collecting tank being seal-installed at the top of the hoop of wellhead of water injection well;The gate valve for connecting and being connected with the lubricator lower part of wellhead of water injection well;One end connect and is connected with gate valve, and the other end stretches to the infusion tube in collecting tank;The blowdown pipe nipple for connecting and being connected with sump bottom;The cesspool for connecting and being connected with blowdown pipe nipple by sewage pipe.The problem of can collecting the sewage by overflowing in steel wire for logging and packing gap immediately using the liquid collector, efficiently solve sewage pollution wellhead of water injection well region or even well site.

Description

A kind of injection well testing liquid collector
Technical field
The utility model relates to oil field equipment field, in particular to a kind of injection well testing liquid collector.
Background technique
For injection well testing process, usually using the upper end of the hoop of the lower end and wellhead of water injection well of lubricator Connection (wherein, the wellhead assembly of hoop lower end and water injection well connects), the upper end of lubricator are equipped with sealing by silk plug and use Packing box (including packing and the packing gland being pressed at the top of packing), wherein steel wire for logging sequentially passes through packing box, blowout prevention Pipe and wellhead assembly enter water injection well and carry out test jobs.
In test process, especially during pressure test, the gap location between steel wire for logging and packing is easily easy to produce The problem of giving birth to overflow, wellhead of water injection well and well site caused to pollute.
Thus, it is necessary to a kind of liquid collector be provided, to collect the sewage that steel wire for logging and packing gap location overflow in time.
Utility model content
In consideration of it, the utility model provides a kind of injection well testing liquid collector, above-mentioned technical problem can be solved.Specifically For, including following technical scheme:
A kind of injection well testing liquid collector, the liquid collector include: the clip for being seal-installed on wellhead of water injection well The collecting tank of overhead;
The gate valve for connecting and being connected with the lubricator lower part of the wellhead of water injection well;
One end connect and is connected with the gate valve, and the other end stretches to the infusion tube in the collecting tank;
The blowdown pipe nipple for connecting and being connected with the sump bottom;
The cesspool for connecting and being connected with the blowdown pipe nipple by sewage pipe.
In one possible implementation, the collecting tank includes: slot ontology, is located at the slot bodies top, and edge The installation step to extend radially outwardly;
The installation step seat on the roof of the hoop, and the roof of the installation step and the hoop it Between have the first sealant.
In one possible implementation, there is the second sealing between the slot ontology and the side wall of the hoop Layer.
In one possible implementation, the slot ontology is the annular groove enclosed outside the hoop;
The installation step is the circular ring shape plate connecting with the inner ring roof of the annular groove.
In one possible implementation, the slot bottom of the slot ontology is oblique, and the blowdown pipe nipple with it is described It connects and is connected at the most short position of slot bottom.
In one possible implementation, the sewage pipe is sheathed on outside the blowdown pipe nipple;
There is coarse structure, for increasing between the blowdown pipe nipple and the sewage pipe on the outer wall of the blowdown pipe nipple Frictional force.
In one possible implementation, the coarse structure is gingival cyst of mucous gland in the newborn buckle structure.
In one possible implementation, the liquid collector further include: fastening clamp, the fastening clamp are arranged in Outside the sewage pipe, for sewage pipe and the blowdown pipe nipple described in clamping.
In one possible implementation, bottom end 80-100mm of the gate valve apart from the lubricator.
The beneficial effect of technical solution provided by the embodiment of the utility model includes at least:
Injection well testing liquid collector provided by the embodiment of the utility model can be used for collecting between steel wire for logging and packing The sewage overflowed at gap opens shaft collar, simultaneously closes off gate valve during injection well testing, pacifies since collecting tank seals Loaded at the top of hoop, allows the sewage overflowed from the gap of steel wire for logging and packing to flow directly into collecting tank, avoid Inflow well head and well site.After the completion of injection well testing, shaft collar is closed, while opening gate valve, in blowout prevention tube cavity Part of contaminated water successively flows into collecting tank through gate valve, infusion tube.And for being located at gate valve part below in blowout prevention tube cavity Sewage can unload lubricator, be importing directly into this part of contaminated water in collecting tank by above watching out for jet pipe.For in collecting tank For the sewage of collection, it can be directly discharged into cesspool by blowdown pipe nipple.As it can be seen that being mentioned using the utility model embodiment The liquid collector of confession can collect the sewage by overflowing in steel wire for logging and packing gap immediately, efficiently solve sewage pollution The problem of wellhead of water injection well region or even well site.
Detailed description of the invention
It, below will be to required in embodiment description in order to illustrate more clearly of the technical scheme in the embodiment of the utility model Attached drawing to be used is briefly described, it should be apparent that, the accompanying drawings in the following description is only some realities of the utility model Example is applied, it for those of ordinary skill in the art, without creative efforts, can also be according to these attached drawings Obtain other attached drawings.
Fig. 1 is the structural schematic diagram of liquid collector provided by the embodiment of the utility model;
Fig. 2 is the top view of collecting tank provided by the embodiment of the utility model.
Appended drawing reference in figure respectively indicates:
1- collecting tank, 101- slot ontology, 102- installation step,
2- gate valve, 3- infusion tube, 4- blowdown pipe nipple, 5- sewage pipe, 6- cesspool,
The first sealant of 7-, the second sealant of 8-, 9- fastening clamp,
M- hoop, N- lubricator.
Specific embodiment
To keep the technical solution of the utility model and advantage clearer, the utility model is implemented below in conjunction with attached drawing Mode is described in further detail.
It should be noted that for the water injection well involved in the utility model embodiment, the lubricator of well head The upper end connection (wherein, the wellhead assembly of hoop lower end and water injection well connects) of the hoop of lower end and well head, lubricator Upper end is connected by silk plug and sealing with packing box, and wherein packing box includes packing and the packing pressure being pressed at the top of packing Lid, steel wire for logging sequentially pass through packing box, lubricator and wellhead assembly and enter water injection well progress test jobs.
Above structure based on water injection well, in order to solve sewage pollution well head that steel wire for logging and packing gap location overflow and The problem of well site, the utility model embodiment provide a kind of injection well testing liquid collector, as shown in Fig. 1, the liquid collecting Device includes: the collecting tank 1 being seal-installed at the top of the hoop M of wellhead of water injection well;With the lower part lubricator N of wellhead of water injection well The gate valve 2 for connecting and being connected;One end connect and is connected with gate valve 2, and the other end stretches to the infusion tube 3 in collecting tank 1;With collection The blowdown pipe nipple 4 that 1 bottom of liquid bath connects and is connected;The cesspool 6 for connecting and being connected with blowdown pipe nipple 4 by sewage pipe 5.
Injection well testing liquid collector provided by the embodiment of the utility model can be used for collecting between steel wire for logging and packing It is as follows to collect principle for the sewage overflowed at gap:
During injection well testing, shaft collar is opened, gate valve 2 is simultaneously closed off, since collecting tank 1 is seal-installed on card It binds round at the top of head M, allows the sewage overflowed from the gap of steel wire for logging and packing to flow directly into collecting tank 1, avoid stream Enter well head and well site.After the completion of injection well testing, shaft collar is closed, while opening gate valve 2, the portion in the inner cavity lubricator N Sewage is divided successively to flow into collecting tank 1 through gate valve 2, infusion tube 3.And for being located at the portion below of gate valve 2 in the inner cavity lubricator N Divide sewage, lubricator N can be unloaded, be importing directly into this part of contaminated water in collecting tank 1 by above watching out for jet pipe N.For collection For the sewage collected in liquid bath 1, it can be directly discharged into cesspool 6 by blowdown pipe nipple 4.As it can be seen that practical new using this The liquid collector that type embodiment provides, can collect the sewage by overflowing in steel wire for logging and packing gap immediately, effectively solve The problem of sewage pollution wellhead of water injection well region or even well site.
It should be noted that in the utility model embodiment, cesspool 6 can seat on ground, also, the position of cesspool 6 Setting in the lower section of collecting tank 1, to ensure that the sewage collected in collecting tank 1 can be directly discharged into cesspool 6 by gravity.
For collecting tank 1, structure design palpus satisfaction can collect whole by steel wire for logging and packing gap location The sewage of spilling is based on the purpose, as an example, as shown in Figure 1 and Figure 2, the collecting tank 1 can include: slot ontology 101, it is located at 101 top of slot ontology, and the installation step 102 extended radially outward.Wherein, installation step 102 in clip On the roof of head M, and there is the first sealant 7 between installation step 102 and the roof of hoop M.
In above-mentioned collecting tank 1, installation step 102 serve not only as mounting structure make collecting tank 1 steadily seat in water injection well well At the top of the hoop M of mouth, and as edge collection structure, to collect the sewage by flowing down on lubricator N outer wall.It is close by first Sealing 7 prevents sewage from overflowing pollution well head by the gap location to seal the gap between collecting tank 1 and hoop M.
In order to further increase the leakproofness between collecting tank 1 and hoop M, formation secondary seal is further, such as attached Shown in Fig. 1, there is the second sealant 8 between the slot ontology 101 of collecting tank 1 and the side wall of hoop M.
Wherein, the first sealant 7 and the second sealant 8 can use the form of sealing rubber ring.
In addition, for collecting tank 1, in order to ensure the sewage overflowed by each position can be collected by catch basin It arrives, collecting tank 1 can be made to be set as a circle around hoop M, for example, as shown in Fig. 2, slot ontology 101 is to enclose to be set to card Bind round the annular groove outside head M;Installation step 102 is the circular ring shape plate connecting with the inner ring roof of annular groove, wherein slot sheet Both body 101 and installation step 102 can be integrally formed, and on the premise of ensuring tightness, while ensure the strong of collecting tank 1 Degree.
Collecting tank 1 can be prepared using rigid plastics, so be not only convenient for forming, and make its stabilizing base convenient for improving In on hoop M.
Sewage for the ease of collecting in collecting tank 1 can be quickly and completely discharged into cesspool 6, and the utility model is implemented In example, the slot bottom of collecting tank 1 is oblique, and connect and be connected at blowdown pipe nipple 4 and the most short position of slot bottom.Collecting tank 1 The gradient of slot bottom can be 1:10, for example, the slot bottom of collecting tank 1 can be made radially to incline gradually downward from the inside to the outside Tiltedly, and until reach most short at the link position of slot bottom and lateral wall.
Blowdown pipe nipple 4 is connect with the upper end of sewage pipe 5, and the lower end of sewage pipe 5 stretches in cesspool 6, when sewage water flow When more rapid, certain impact force may be caused, to sewage pipe 5 in order to ensure the connection between blowdown pipe nipple 4 and sewage pipe 5 Tightness, in the utility model embodiment, sewage pipe 5 is sheathed on outside blowdown pipe nipple 4, is had on the outer wall of blowdown pipe nipple 4 thick Rough structure ensures that sewage pipe 5 is steady using the increased frictional force for increasing the frictional force between blowdown pipe nipple 4 and sewage pipe 5 It is connected and is connected on blowdown pipe nipple 4.
Sewage pipe 5 can use elastic material, such as vulcanie to be prepared.In addition, above-mentioned coarse structure include but It is not limited to: the protrusion with various geometries.As an example, which is gingival cyst of mucous gland in the newborn buckle structure, gingival cyst of mucous gland in the newborn buckle structure The fastening dynamics between tubular part can be effectively increased.
Further, as shown in Fig. 1, liquid collector provided by the embodiment of the utility model further include: fastening clamp 9, The fastening clamp 9 is arranged in outside sewage pipe 5, is used for clamping sewage pipe 5 and blowdown pipe nipple 4, is further ensured blowdown pipe nipple 4 It is fastenedly connected with sewage pipe 5.
In application, sewage pipe 5 can be sheathed on outside blowdown pipe nipple 4, and be arranged in fastening clamp 9 outside sewage pipe 5, To reach fastening effect.
Above-mentioned to refer to, gate valve 2 is connect with the lower part of lubricator N, for being located at the portion below of gate valve 2 in the inner cavity lubricator N Divide sewage, lubricator N can be unloaded, be importing directly into this part of contaminated water in collecting tank 1 by above watching out for jet pipe N.In order to make The process is gone on smoothly, and prevents this part of contaminated water from being scattered in non-1 region of collecting tank, in the utility model embodiment, gate valve 2 Bottom end 80-100mm apart from lubricator N, for example, 80mm, 90mm, 100mm etc..
The above is merely for convenience of it will be understood by those skilled in the art that the technical solution of the utility model, not to Limit the utility model.Within the spirit and principle of the utility model, any modification, equivalent replacement, improvement and so on, It should be included within the scope of protection of this utility model.

Claims (9)

1. a kind of injection well testing liquid collector, which is characterized in that the liquid collector includes: to be seal-installed on water injection well well Collecting tank at the top of the hoop of mouth;
The gate valve for connecting and being connected with the lubricator lower part of the wellhead of water injection well;
One end connect and is connected with the gate valve, and the other end stretches to the infusion tube in the collecting tank;
The blowdown pipe nipple for connecting and being connected with the sump bottom;
The cesspool for connecting and being connected with the blowdown pipe nipple by sewage pipe.
2. injection well testing liquid collector according to claim 1, which is characterized in that the collecting tank includes: slot sheet Body is located at the slot bodies top, and the installation step extended radially outward;
The installation step seat has between the installation step and the roof of the hoop on the roof of the hoop There is the first sealant.
3. injection well testing liquid collector according to claim 2, which is characterized in that the slot ontology and the clip There is the second sealant between the side wall of head.
4. injection well testing liquid collector according to claim 2, which is characterized in that the slot ontology is encloses set on institute State the annular groove outside hoop;
The installation step is the circular ring shape plate connecting with the inner ring roof of the annular groove.
5. injection well testing liquid collector according to claim 2, which is characterized in that the slot bottom of the slot ontology is in incline It is ramp-like, and connect and be connected at the blowdown pipe nipple and the most short position of the slot bottom.
6. injection well testing liquid collector according to claim 1, which is characterized in that the sewage pipe is sheathed on described Outside blowdown pipe nipple;
There is coarse structure, for increasing rubbing between the blowdown pipe nipple and the sewage pipe on the outer wall of the blowdown pipe nipple Wipe power.
7. injection well testing liquid collector according to claim 6, which is characterized in that the coarse structure is gingival cyst of mucous gland in the newborn button Structure.
8. injection well testing liquid collector according to claim 6, which is characterized in that the liquid collector further include: tight Gu clip, the fastening clamp is arranged in outside the sewage pipe, for sewage pipe and the blowdown pipe nipple described in clamping.
9. injection well testing liquid collector according to claim 1-8, which is characterized in that the gate valve distance The bottom end 80mm-100mm of the lubricator.
CN201822096944.XU 2018-12-13 2018-12-13 A kind of injection well testing liquid collector Active CN209621262U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822096944.XU CN209621262U (en) 2018-12-13 2018-12-13 A kind of injection well testing liquid collector

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822096944.XU CN209621262U (en) 2018-12-13 2018-12-13 A kind of injection well testing liquid collector

Publications (1)

Publication Number Publication Date
CN209621262U true CN209621262U (en) 2019-11-12

Family

ID=68445705

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822096944.XU Active CN209621262U (en) 2018-12-13 2018-12-13 A kind of injection well testing liquid collector

Country Status (1)

Country Link
CN (1) CN209621262U (en)

Similar Documents

Publication Publication Date Title
CN209621262U (en) A kind of injection well testing liquid collector
CN209366853U (en) Seal liquid lid
CN208777932U (en) A kind of well head soft slurry collecting device
CN206121325U (en) A catch water for marsh gas preliminary treatment
CN205857352U (en) Floor drain for washing machine with self-cleaning function
CN209366854U (en) Seal liquid lid
CN210269307U (en) Crack water collection device
CN209629472U (en) A kind of compression bucket draws water core
CN206156041U (en) Flourishing oil vessel
CN208822411U (en) A kind of underneath type negative pressure bucket draws water core
CN207244818U (en) A kind of urban rainwater collection device
CN201172859Y (en) Loose joint type water-sealed floor drain
CN219030589U (en) Waste gas and waste liquid collecting system for recycling chemical barrels
CN207776831U (en) A kind of antifouling splash-proof diversion device of oil pipe
CN206129448U (en) Empty filter of wet -type
CN215656932U (en) Waste liquid collecting device
CN209416770U (en) A kind of sampling device for fetching water
CN205735610U (en) A kind of oiling device for banbury
CN205189076U (en) Counter basin pipe in water
CN205525526U (en) Domestic leak protection oil cup
CN221031041U (en) Rainwater collecting and drainage device
CN214858064U (en) Novel fistulization bag
CN209480315U (en) A kind of carafe convenient for filling
CN208650205U (en) A kind of water accumulator
CN209892161U (en) Oil field development dirty liquid reinjection device that leakproofness is good

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant