CN209620631U - Masonry engineering hanging wire control device - Google Patents

Masonry engineering hanging wire control device Download PDF

Info

Publication number
CN209620631U
CN209620631U CN201920245264.1U CN201920245264U CN209620631U CN 209620631 U CN209620631 U CN 209620631U CN 201920245264 U CN201920245264 U CN 201920245264U CN 209620631 U CN209620631 U CN 209620631U
Authority
CN
China
Prior art keywords
adjustable
strap
masonry
hanging wire
control device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920245264.1U
Other languages
Chinese (zh)
Inventor
许光浩
王萌
孙泽宇
于海洋
宋晓光
张鑫
王勋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN201920245264.1U priority Critical patent/CN209620631U/en
Application granted granted Critical
Publication of CN209620631U publication Critical patent/CN209620631U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports Or Holders For Household Use (AREA)

Abstract

A masonry project hanging wire control device comprises a clamping plate group and an adjustable clamping piece; the clamping plate group comprises a horizontal plate and a fixed clamping plate; the horizontal plate is erected at the top of the built wall body along the thickness direction of the built wall body, and the length of the horizontal plate is not less than the thickness of the built wall body; one end of the top of the horizontal plate is provided with a winding rod, and the winding rod is aligned with the outer side surface of the wall body to be built; two fixed clamping plates are respectively arranged at two sides of the bottom of the horizontal plate; the fixed splint on one side of the horizontal plate is provided with an installation groove for installing a cord; the middle part of the surface of the fixed clamping plate at the other side of the horizontal plate is provided with a hole; the adjustable clamping piece comprises an adjustable clamping plate, an adjustable rod and a handle; the adjustable rod is arranged in the hole in a penetrating way and is adjustable in the transverse direction; the adjustable clamping plate is connected to the inner end of the adjustable rod and is arranged in parallel with the fixed clamping plate; the handle is connected to the outer end of the adjustable rod. The utility model provides a more complicated and not very nimble and the hanging wire of traditional method of building by laying bricks or stones technical problem who produces the deviation easily.

Description

A kind of masonry project hanging wire control device
Technical field
The utility model belongs to building engineering field, especially a kind of masonry project hanging wire control device.
Background technique
Can all there be a large amount of secondary masonry project in engineering construction, the quality of masonry project is the weight for guaranteeing housing quality Basis is wanted, the strength and stiffness of masonry project directly affect the stability in house and use function;Because masonry project is related to face Extensively, participant is numerous, and construction site situation is complicated, slightly neglects in management and easily causes quality accident.So how to protect Rapid construction is always the trend of industry development and research while demonstrate,proving masonry project quality.Current building method is first in wall Two corners spread lead brick, line are hung over both ends again, but complicated using this masonrys project plan comparison and less flexibly and hanging wire appearance It is also easy to produce deviation.
Utility model content
The purpose of the utility model is to provide a kind of masonry project hanging wire control devices, to solve traditional building method ratio It is more complex and less flexibly and hanging wire the technical issues of being easy to produce deviation.
To achieve the above object, the utility model adopts the following technical solution.
A kind of masonry project hanging wire control device includes clamping board group and adjustable folder;The clamping board group includes Level board and strap;The level board rides upon the top of masonry panel, and its along the thickness direction of masonry panel Thickness of the length not less than masonry panel;Top one end of the level board is provided with wire winding pole, the wire winding pole with wait build The lateral surface of wall is aligned;The strap has two pieces, is separately positioned on the two sides of the bottom of level board, and two pieces of fixing clamps Plate is located at the two sides of masonry panel;The mounting groove to install cotton rope is provided on the strap of level board side;In Hole is opened up in the middle part of the plate face of the strap of the level board other side;The adjustable folder includes adjustable splint, adjustable rod And handle;The adjustable rod is threaded through in hole, and laterally adjustable;The adjustable splint is connected to the inner end of adjustable rod, and with Strap is arranged in parallel;The handle is connected to the outer end of adjustable rod.
Preferably, the strap is in inverted L shape, includes horizontal edge and vertical edge;The horizontal edge of the strap connects It connects on the bottom surface of level board.
Preferably, the front end of the strap, gap, and the gap are offered positioned at the corner of horizontal edge and vertical edge Form the mounting groove.
Preferably, screw thread is provided on the side wall of described hole;The adjustable rod is that side wall is equipped with and screw thread on hole Adaptable threaded rod.
Preferably, the outside of the strap, corresponding hole position at be connected with nut;The adjustable rod is and spiral shell The threaded rod that parent phase adapts to.
Preferably, the adjustable splint is rounded, is made of steel plate.
The utility model has the characteristics that and beneficial effect compared with prior art.
1, the utility model enormously simplifies thread-laying device, enables the more quick hanging wire of worker, is being in especially broken line When shape masonry panel, the utility model is arranged at the angular position of wall, cotton rope can be made to constitute matrix, and wall can be made Multiple positions of body are constructed simultaneously, substantially increase the efficiency of building construction.
2, the masonry project hanging wire control device of the utility model has easy to operate easy relative to traditional thread-laying device Upper hand, the characteristics of can on the corner making cotton rope constitute matrix, easy to operate, the operation complicated without other will can quickly be hung Line.
3, the clamping board group of the utility model is clipped in the two sides of building block, by adjustable splint to building block applied force, make fixture with Building block is firmly fixed together, it is ensured that and the accuracy of hanging wire height, very good solution build the control problem of height, and And this masonry project hanging wire control device is fixed and is only contacted later with masonry panel, is not contacted with other foreign objects, it is ensured that The stability of cotton rope height.
Detailed description of the invention
The utility model is described in more detail with reference to the accompanying drawing.
Fig. 1 is the positive structure schematic of the utility model when being provided with screw thread on the side wall of hole.
Fig. 2 is the planar structure schematic diagram of the utility model when being provided with screw thread on the side wall of hole.
Fig. 3 is the side structure schematic diagram that board group is clamped in the utility model.
Fig. 4 is the positive structure schematic of the utility model when being connected with nut on the outside of strap.
Fig. 5 is the structural schematic diagram of mounting groove on strap in the utility model.
State diagram when Fig. 6 is the utility model construction.
Appended drawing reference: masonry panel, 4- cotton rope, 5- mounting groove, 6- can by 1- level board, 2- strap, 3- Adjust clamping plate, 7- adjustable rod, 8- handle, 9- hole, 10- nut, 11- wire winding pole.
Specific embodiment
Masonry project hanging wire control device in the present embodiment is suitable for the masonry work of the masonry panel 3 of various thickness Cotton rope 4 is first stuck in mounting groove 5 by journey when in use, is then intertwined with wire winding pole 11, and picking up the control device will consolidate Clamp plate 2 is placed in the two sides of masonry panel 3, adjusts adjustable rod 7, drives adjustable splint 6, adjustment by the rotation of adjustable rod 7 Gap between strap 2 and adjustable splint 6, until adjustable splint 6 firmly withstands on the side wall of masonry panel 3;It pulls Cotton rope 4 is stretched on the masonry project hanging wire control device of 3 other end of masonry panel by cotton rope 4 repeats as above operation;If you need to So that cotton rope 4 is constituted matrix, as above operated at the both ends of cotton rope 4, the masonry project of remaining cotton rope 4 installation on the corner is hung On thread control device, cotton rope 4 is fixed.
As shown in figures 1 to 6, this masonry project hanging wire control device includes clamping board group and adjustable folder;The folder Holding board group includes level board 1 and strap 2;The level board 1 rides upon along the thickness direction of masonry panel 3 and has built The top of wall 3, and its length is not less than the thickness of masonry panel 3;Top one end of the level board 1 is provided with wire winding pole 11, which is aligned with the lateral surface to masonry panel;The strap 2 has two pieces, is separately positioned on level board 1 Two sides of the bottom, and two pieces of straps 2 are located at the two sides of masonry panel 3;It is set on the strap 2 of 1 side of level board It is equipped with the mounting groove 5 to install cotton rope 4;Hole 9 is opened up in the middle part of the plate face of the strap 2 of 1 other side of level board;Institute Stating adjustable folder includes adjustable splint 6, adjustable rod 7 and handle 8;The adjustable rod 7 is threaded through in hole 9, and laterally adjustable; The adjustable splint 6 is connected to the inner end of adjustable rod 7, and is arranged in parallel with strap 2;The handle 8 is connected to adjustable rod 7 Outer end.
In the present embodiment, the height of the wire winding pole 11 is 3cm~7cm.
In the present embodiment, it includes horizontal edge and vertical edge that the strap 2, which is in inverted L shape,;The strap 2 Horizontal edge is connected on the bottom surface of level board 1.
In the present embodiment, the top nose of 2 vertical edge of strap opens up jagged, the horizontal edge of the strap 2 Front end, close to vertical edge side open up it is jagged;Rectangular notch is total in rectangular notch and horizontal edge on 2 vertical edge of strap With composition gap, and form the mounting groove 5.
In the present embodiment, screw thread is provided on the side wall of described hole 9;The adjustable rod 7 is that side wall is equipped with and hole 9 The adaptable threaded rod of upper screw thread.
In the present embodiment, nut 10 is connected at the outside of the strap 2, the position of correspondence hole 9;It is described adjustable Bar 7 is the threaded rod being adapted with nut 10.
In the present embodiment, the adjustable splint 6 is rounded, is made of steel plate.
Above-described embodiment is not the exhaustion of specific embodiment, can also there is other embodiments, and above-described embodiment purpose exists In illustrating the utility model, rather than the protection scope of the utility model is limited, it is all from the utility model simple change Using all falling in the protection scope of the utility model.

Claims (6)

1. a kind of masonry project hanging wire control device, it is characterised in that: include clamping board group and adjustable folder;The grip block Group includes level board (1) and strap (2);The level board (1) rides upon along the thickness direction of masonry panel (3) The top of masonry panel (3), and its length is not less than the thickness of masonry panel (3);Top one end of the level board (1) is set Wire winding pole (11) are equipped with, which is aligned with the lateral surface to masonry panel;The strap (2) has two pieces, point She Zhi not be in the two sides of the bottom of level board (1), and two pieces of straps (2) are located at the two sides of masonry panel (3);In level The mounting groove (5) to install cotton rope (4) is provided on the strap (2) of plate (1) side;In level board (1) other side Hole (9) are opened up in the middle part of the plate face of strap (2);The adjustable folder include adjustable splint (6), adjustable rod (7) and Handle (8);The adjustable rod (7) is threaded through in hole (9), and laterally adjustable;The adjustable splint (6) is connected to adjustable rod (7) inner end, and be arranged in parallel with strap (2);The handle (8) is connected to the outer end of adjustable rod (7).
2. masonry project hanging wire control device according to claim 1, it is characterised in that: the strap (2) is in The L shape set, includes horizontal edge and vertical edge;The horizontal edge of the strap (2) is connected on the bottom surface of level board (1).
3. masonry project hanging wire control device according to claim 2, it is characterised in that: before the strap (2) End offers gap positioned at the corner of horizontal edge and vertical edge, and the gap forms the mounting groove (5).
4. masonry project hanging wire control device according to claim 1, it is characterised in that: on the side wall of described hole (9) It is provided with screw thread;The adjustable rod (7) is that side wall is equipped with the threaded rod being adapted with screw thread on hole (9).
5. masonry project hanging wire control device according to claim 1, it is characterised in that: outside the strap (2) Side, corresponding hole (9) position at be connected with nut (10);The adjustable rod (7) is the threaded rod being adapted with nut (10).
6. masonry project hanging wire control device according to claim 1, it is characterised in that: the adjustable splint (6) is in circle Shape is made of steel plate.
CN201920245264.1U 2019-02-27 2019-02-27 Masonry engineering hanging wire control device Active CN209620631U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920245264.1U CN209620631U (en) 2019-02-27 2019-02-27 Masonry engineering hanging wire control device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920245264.1U CN209620631U (en) 2019-02-27 2019-02-27 Masonry engineering hanging wire control device

Publications (1)

Publication Number Publication Date
CN209620631U true CN209620631U (en) 2019-11-12

Family

ID=68454871

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920245264.1U Active CN209620631U (en) 2019-02-27 2019-02-27 Masonry engineering hanging wire control device

Country Status (1)

Country Link
CN (1) CN209620631U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112378391A (en) * 2020-05-31 2021-02-19 中国二十二冶集团有限公司 Building wall building verticality pay-off device with parapet wall and verticality pay-off control construction method
CN113404315A (en) * 2021-06-15 2021-09-17 马振国 Convenient to use's assembled building wall connecting device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112378391A (en) * 2020-05-31 2021-02-19 中国二十二冶集团有限公司 Building wall building verticality pay-off device with parapet wall and verticality pay-off control construction method
CN112378391B (en) * 2020-05-31 2024-03-26 中国二十二冶集团有限公司 Perpendicularity paying-off device for building wall with parapet wall and perpendicularity paying-off control construction method
CN113404315A (en) * 2021-06-15 2021-09-17 马振国 Convenient to use's assembled building wall connecting device

Similar Documents

Publication Publication Date Title
CN209620631U (en) Masonry engineering hanging wire control device
CN212743416U (en) Concrete slab thickness controller
CN207265612U (en) A kind of constitutionally stable cable clamp
CN206947849U (en) A kind of distribution line hotline maintenance drainage thread supports fixed support
CN206585292U (en) A kind of adjustable Fast Installation Built-in terminal box
CN206391064U (en) A kind of arm fracture fixation device
CN208268540U (en) A kind of novel pipe fixing device
CN206929432U (en) A kind of antidetonation branch suspension clamp
CN206655478U (en) Adjustable window hole molding board support meanss
CN109853825A (en) A kind of suspending assembly
CN203374991U (en) Steel structure electric line pipe and trunking hanging connecting piece
CN208687122U (en) A kind of reusable pipe sleeve fixes device with one heart
CN209293451U (en) A kind of quick cloth apparatus for ash of masonry
CN205616057U (en) Adjustable clamping device is counted to fragment of brick
CN205616056U (en) Brick clamping device
CN210685126U (en) Exhibition hall cloth exhibition position furred ceiling suspended structure
CN221143548U (en) Multifunctional beam clamp
CN215520124U (en) Support frame for assembly type building
CN209025401U (en) A kind of Multifunctional plastering tool
CN221318887U (en) Hoisting balance beam
CN209620251U (en) Fixable steel pipe bundle
CN217921178U (en) Tower crane counterfort connecting device for building
CN208241217U (en) A kind of fixation device communicating cable
CN214222401U (en) Antidetonation gallows suitable for air conditioning engineering system
CN213062745U (en) Aluminum profile mounting structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant