CN209620631U - Masonry engineering hanging wire control device - Google Patents

Masonry engineering hanging wire control device Download PDF

Info

Publication number
CN209620631U
CN209620631U CN201920245264.1U CN201920245264U CN209620631U CN 209620631 U CN209620631 U CN 209620631U CN 201920245264 U CN201920245264 U CN 201920245264U CN 209620631 U CN209620631 U CN 209620631U
Authority
CN
China
Prior art keywords
adjustable
masonry
rod
splint
horizontal plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920245264.1U
Other languages
Chinese (zh)
Inventor
许光浩
王萌
孙泽宇
于海洋
宋晓光
张鑫
王勋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN201920245264.1U priority Critical patent/CN209620631U/en
Application granted granted Critical
Publication of CN209620631U publication Critical patent/CN209620631U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports Or Holders For Household Use (AREA)

Abstract

A masonry project hanging wire control device comprises a clamping plate group and an adjustable clamping piece; the clamping plate group comprises a horizontal plate and a fixed clamping plate; the horizontal plate is erected at the top of the built wall body along the thickness direction of the built wall body, and the length of the horizontal plate is not less than the thickness of the built wall body; one end of the top of the horizontal plate is provided with a winding rod, and the winding rod is aligned with the outer side surface of the wall body to be built; two fixed clamping plates are respectively arranged at two sides of the bottom of the horizontal plate; the fixed splint on one side of the horizontal plate is provided with an installation groove for installing a cord; the middle part of the surface of the fixed clamping plate at the other side of the horizontal plate is provided with a hole; the adjustable clamping piece comprises an adjustable clamping plate, an adjustable rod and a handle; the adjustable rod is arranged in the hole in a penetrating way and is adjustable in the transverse direction; the adjustable clamping plate is connected to the inner end of the adjustable rod and is arranged in parallel with the fixed clamping plate; the handle is connected to the outer end of the adjustable rod. The utility model provides a more complicated and not very nimble and the hanging wire of traditional method of building by laying bricks or stones technical problem who produces the deviation easily.

Description

一种砌筑工程挂线控制装置A line-hanging control device for masonry engineering

技术领域technical field

本实用新型属于建筑工程领域,特别是一种砌筑工程挂线控制装置。The utility model belongs to the field of construction engineering, in particular to a wire hanging control device for masonry engineering.

背景技术Background technique

工程建设中都会存在大量的二次砌筑工程,砌筑工程的质量是保证房屋质量的重要基础,砌筑工程的强度和刚度直接影响房屋的稳定性和使用功能;因为砌筑工程涉及面广、参与人员众多,施工现场情况复杂,管理上稍有疏忽极易引起质量事故。所以如何在保证砌筑工程质量的同时快速施工一直是行业发展和研究的趋势。目前的砌筑方法是先在墙两角铺上引线砖、再把线挂在两端,但利用这种砌筑方案比较复杂且不太灵活、并且挂线容易产生偏差。There will be a large number of secondary masonry projects in engineering construction. The quality of masonry projects is an important basis for ensuring the quality of houses. The strength and stiffness of masonry projects directly affect the stability and use functions of houses; because masonry projects involve a wide range of , There are many people involved, the construction site is complicated, and a slight negligence in management can easily lead to quality accidents. Therefore, how to quickly construct while ensuring the quality of masonry projects has always been the trend of industry development and research. The current masonry method is to lay lead bricks on the two corners of the wall, and then hang the wires at the two ends. However, this kind of masonry scheme is more complicated and less flexible, and the wires are prone to deviation.

实用新型内容Utility model content

本实用新型的目的是提供一种砌筑工程挂线控制装置,要解决传统的砌筑方法比较复杂且不太灵活、并且挂线容易产生偏差的技术问题。The purpose of the utility model is to provide a line-hanging control device for masonry engineering, to solve the technical problems that the traditional masonry method is relatively complicated and inflexible, and the line-hanging tends to deviate.

为实现上述目的,本实用新型采用如下技术方案。In order to achieve the above object, the utility model adopts the following technical solutions.

一种砌筑工程挂线控制装置,包括有夹持板组和可调夹件;所述夹持板组包括有水平板和固定夹板;所述水平板沿已砌筑墙体的厚度方向搭设在已砌筑墙体的顶部,且其长度不小于已砌筑墙体的厚度;所述水平板的顶部一端设置有绕线杆,该绕线杆与待砌筑墙体的外侧面对齐;所述固定夹板有两块,分别设置在水平板的底部两侧,并且两块固定夹板位于已砌筑墙体的两侧;在水平板一侧的固定夹板上设置有用以安装线绳的安装槽;在水平板另一侧的固定夹板的板面中部开设有孔洞;所述可调夹件包括有可调夹板、可调杆和手柄;所述可调杆穿设在孔洞中,且横向可调;所述可调夹板连接在可调杆的内端,且与固定夹板平行设置;所述手柄连接在可调杆的外端。A line-hanging control device for masonry engineering, including a clamping plate group and adjustable clamps; the clamping plate group includes a horizontal plate and a fixed splint; the horizontal plate is erected along the thickness direction of a masonry wall On the top of the built wall, and its length is not less than the thickness of the built wall; the top end of the horizontal plate is provided with a winding rod, and the winding rod is aligned with the outer surface of the wall to be built There are two fixed splints, which are respectively arranged on both sides of the bottom of the horizontal plate, and the two fixed splints are located on both sides of the built wall; the fixed splint on one side of the horizontal plate is provided with wire ropes Mounting slot; a hole is provided in the middle part of the fixed splint on the other side of the horizontal plate; the adjustable clamp includes an adjustable splint, an adjustable rod and a handle; the adjustable rod is passed through the hole, and The horizontal adjustment is possible; the adjustable splint is connected to the inner end of the adjustable rod and arranged parallel to the fixed splint; the handle is connected to the outer end of the adjustable rod.

优选的,所述固定夹板呈倒置的L形,包括有横边和竖边;所述固定夹板的横边连接在水平板的底面上。Preferably, the fixing splint is in an inverted L shape and includes horizontal and vertical sides; the horizontal side of the fixing splint is connected to the bottom surface of the horizontal plate.

优选的,所述固定夹板的前端、位于横边与竖边的转角处开设有豁口,并且该豁口形成所述的安装槽。Preferably, a notch is formed at the front end of the fixing splint at the corner of the horizontal side and the vertical side, and the notch forms the installation groove.

优选的,所述孔洞的侧壁上设置有螺纹;所述可调杆为侧壁上设有与孔洞上螺纹相适应的螺纹杆。Preferably, threads are provided on the side wall of the hole; the adjustable rod is a threaded rod on the side wall that is compatible with the thread on the hole.

优选的,所述固定夹板的外侧、对应孔洞的位置处连接有螺母;所述可调杆为与螺母相适应的螺纹杆。Preferably, a nut is connected to the outer side of the fixing splint at a position corresponding to the hole; the adjustable rod is a threaded rod adapted to the nut.

优选的,所述可调夹板呈圆形,由钢板制成。Preferably, the adjustable splint is circular and made of steel plate.

与现有技术相比本实用新型具有以下特点和有益效果。Compared with the prior art, the utility model has the following characteristics and beneficial effects.

1、本实用新型大大简化了挂线装置,使工人能更加快速的挂线,特别是在呈折线形砌筑墙体时,将本实用新型设置在墙体的转角位置处,能够使线绳构成矩阵,并且能使墙体的多个位置同时施工,大大提高了砌筑施工的效率。1. The utility model greatly simplifies the wire hanging device, so that workers can hang the wire more quickly, especially when the wall is built in a broken line shape, the utility model is set at the corner position of the wall, so that the wire rope can A matrix is formed, and multiple positions of the wall can be constructed at the same time, which greatly improves the efficiency of masonry construction.

2、本实用新型的砌筑工程挂线控制装置相对于传统的挂线装置具有操作简单易上手,在转角处可使线绳构成矩阵的特点,操作简便,无需其他复杂的操作即可将快速挂线。2. Compared with the traditional wire-hanging device of the utility model, the wire-hanging control device of the masonry project has the characteristics of simple and easy-to-handle operation, and the wire rope can form a matrix at the corner. Thread.

3、本实用新型的夹持板组夹在砌块的两侧,由可调夹板对砌块施加力,使夹具与砌块牢牢的固定在一起,确保了挂线高度的准确性,很好的解决了砌筑高度的控制问题,并且这种砌筑工程挂线控制装置固定好之后只与砌筑墙体接触,不与其他外物接触,确保了线绳高度的稳定性。3. The clamping plate group of the utility model is clamped on both sides of the block, and the adjustable splint exerts force on the block, so that the clamp and the block are firmly fixed together, ensuring the accuracy of the hanging line height, which is very fast The problem of controlling the height of the masonry is well solved, and after the masonry project hanging line control device is fixed, it only contacts the masonry wall and does not contact with other foreign objects, thus ensuring the stability of the wire rope height.

附图说明Description of drawings

下面结合附图对本实用新型做进一步详细的说明。Below in conjunction with accompanying drawing, the utility model is described in further detail.

图1是当孔洞的侧壁上设置有螺纹时的本实用新型的正面结构示意图。Fig. 1 is a schematic view of the front structure of the utility model when the side wall of the hole is provided with threads.

图2是当孔洞的侧壁上设置有螺纹时的本实用新型的平面结构示意图。Fig. 2 is a schematic plan view of the utility model when threads are provided on the side wall of the hole.

图3是本实用新型中夹持板组的侧面结构示意图。Fig. 3 is a schematic diagram of the side structure of the clamping plate group in the present invention.

图4是当固定夹板的外侧连接有螺母时的本实用新型的正面结构示意图。Fig. 4 is a schematic view of the front structure of the utility model when nuts are connected to the outside of the fixing splint.

图5是本实用新型中固定夹板上安装槽的结构示意图。Fig. 5 is a structural schematic diagram of the installation groove on the fixing splint in the utility model.

图6是本实用新型施工时的状态图。Fig. 6 is a state diagram during construction of the utility model.

附图标记:1-水平板、2-固定夹板、3-已砌筑墙体、4-线绳、5-安装槽、6-可调夹板、7-可调杆、8-手柄、9-孔洞、10-螺母、11-绕线杆。Reference signs: 1-horizontal plate, 2-fixed splint, 3-built wall, 4-wire, 5-installation groove, 6-adjustable splint, 7-adjustable rod, 8-handle, 9- Hole, 10-nut, 11-winding rod.

具体实施方式Detailed ways

本实施例中的砌筑工程挂线控制装置适用于各种厚度的已砌筑墙体3的砌筑工程,在使用时先将线绳4卡在安装槽5中,然后与绕线杆11缠绕在一起,拿起该控制装置将固定夹板2置于已砌筑墙体3的两侧,调节可调杆7,通过可调杆7的旋转带动可调夹板6,调整固定夹板2与可调夹板6之间的空隙,直到可调夹板6牢牢的顶在已砌筑墙体3的侧壁;拉扯线绳4将线绳4拉伸到已砌筑墙体3另一端的砌筑工程挂线控制装置上重复如上操作;如需使线绳4构成矩阵,在线绳4的两端进行如上操作,其余的线绳4安装在转角处的砌筑工程挂线控制装置上,将线绳4固定住即可。The line hanging control device for masonry works in this embodiment is applicable to the masonry works of the existing masonry walls 3 of various thicknesses. When in use, the line rope 4 is first stuck in the installation groove 5, and then connected with the winding rod 11 Winding together, pick up the control device and place the fixed splint 2 on both sides of the masonry wall 3, adjust the adjustable rod 7, drive the adjustable splint 6 through the rotation of the adjustable rod 7, and adjust the fixed splint 2 and the adjustable splint. Adjust the gap between the splints 6 until the adjustable splint 6 is firmly against the side wall of the built wall 3; pull the wire rope 4 to stretch the wire rope 4 to the other end of the built wall 3 Repeat the above operation on the engineering hanging wire control device; if the wire rope 4 needs to form a matrix, perform the above operation on both ends of the wire rope 4, and install the remaining wire rope 4 on the masonry engineering wire hanging control device at the corner, and put the wire rope 4 into a matrix. Rope 4 is fixed and gets final product.

如图1-6所示,这种砌筑工程挂线控制装置,包括有夹持板组和可调夹件;所述夹持板组包括有水平板1和固定夹板2;所述水平板1沿已砌筑墙体3的厚度方向搭设在已砌筑墙体3的顶部,且其长度不小于已砌筑墙体3的厚度;所述水平板1的顶部一端设置有绕线杆11,该绕线杆11与待砌筑墙体的外侧面对齐;所述固定夹板2有两块,分别设置在水平板1的底部两侧,并且两块固定夹板2位于已砌筑墙体3的两侧;在水平板1一侧的固定夹板2上设置有用以安装线绳4的安装槽5;在水平板1另一侧的固定夹板2的板面中部开设有孔洞9;所述可调夹件包括有可调夹板6、可调杆7和手柄8;所述可调杆7穿设在孔洞9中,且横向可调;所述可调夹板6连接在可调杆7的内端,且与固定夹板2平行设置;所述手柄8连接在可调杆7的外端。As shown in Figure 1-6, this kind of masonry engineering hanging line control device includes a clamping plate group and an adjustable clamp; the clamping plate group includes a horizontal plate 1 and a fixed clamping plate 2; the horizontal plate 1 erected on the top of the already built wall 3 along the thickness direction of the built wall 3, and its length is not less than the thickness of the built wall 3; the top end of the horizontal plate 1 is provided with a winding rod 11 , the winding rod 11 is aligned with the outer side of the wall to be built; there are two fixed splints 2, which are respectively arranged on both sides of the bottom of the horizontal plate 1, and the two fixed splints 2 are located on the wall that has been built. 3 on both sides; the fixed splint 2 on one side of the horizontal plate 1 is provided with a mounting groove 5 for installing the wire rope 4; a hole 9 is provided in the middle of the fixed splint 2 on the other side of the horizontal plate 1; The adjustable clip includes an adjustable splint 6, an adjustable rod 7 and a handle 8; the adjustable rod 7 is penetrated in the hole 9 and can be adjusted laterally; the adjustable splint 6 is connected to the adjustable rod 7 The inner end is arranged parallel to the fixed splint 2; the handle 8 is connected to the outer end of the adjustable rod 7.

本实施例中,所述绕线杆11的高度为3cm~7cm。In this embodiment, the height of the winding rod 11 is 3cm-7cm.

本实施例中,所述固定夹板2呈倒置的L形,包括有横边和竖边;所述固定夹板2的横边连接在水平板1的底面上。In this embodiment, the fixing splint 2 is in an inverted L shape, including a horizontal side and a vertical side; the horizontal side of the fixing splint 2 is connected to the bottom surface of the horizontal plate 1 .

本实施例中,所述固定夹板2竖边的顶部前端开设有缺口,所述固定夹板2的横边前端、靠近竖边的一侧开设有缺口;所述固定夹板2竖边上的矩形缺口与横边上矩形缺口共同构成豁口,并且形成所述安装槽5。In this embodiment, the top front end of the vertical side of the fixed splint 2 is provided with a gap, and the front end of the horizontal side of the fixed splint 2 and the side close to the vertical side are provided with a gap; the rectangular gap on the vertical side of the fixed splint 2 Together with the rectangular notch on the lateral side, a notch is formed, and the installation groove 5 is formed.

本实施例中,所述孔洞9的侧壁上设置有螺纹;所述可调杆7为侧壁上设有与孔洞9上螺纹相适应的螺纹杆。In this embodiment, the side wall of the hole 9 is provided with threads; the adjustable rod 7 is a threaded rod on the side wall that is compatible with the threads on the hole 9 .

本实施例中,所述固定夹板2的外侧、对应孔洞9的位置处连接有螺母10;所述可调杆7为与螺母10相适应的螺纹杆。In this embodiment, a nut 10 is connected to the outside of the fixing splint 2 at the position corresponding to the hole 9 ; the adjustable rod 7 is a threaded rod adapted to the nut 10 .

本实施例中,所述可调夹板6呈圆形,由钢板制成。In this embodiment, the adjustable splint 6 is circular and made of steel plate.

上述实施例并非具体实施方式的穷举,还可有其它的实施例,上述实施例目的在于说明本实用新型,而非限制本实用新型的保护范围,所有由本实用新型简单变化而来的应用均落在本实用新型的保护范围内。The above-mentioned embodiments are not exhaustive of the specific implementations, and there are other embodiments. The purpose of the above-mentioned embodiments is to illustrate the utility model, rather than limit the scope of protection of the utility model. All applications that are simply changed by the utility model are Fall within the protection scope of the present utility model.

Claims (6)

1.一种砌筑工程挂线控制装置,其特征在于:包括有夹持板组和可调夹件;所述夹持板组包括有水平板(1)和固定夹板(2);所述水平板(1)沿已砌筑墙体(3)的厚度方向搭设在已砌筑墙体(3)的顶部,且其长度不小于已砌筑墙体(3)的厚度;所述水平板(1)的顶部一端设置有绕线杆(11),该绕线杆(11)与待砌筑墙体的外侧面对齐;所述固定夹板(2)有两块,分别设置在水平板(1)的底部两侧,并且两块固定夹板(2)位于已砌筑墙体(3)的两侧;在水平板(1)一侧的固定夹板(2)上设置有用以安装线绳(4)的安装槽(5);在水平板(1)另一侧的固定夹板(2)的板面中部开设有孔洞(9);所述可调夹件包括有可调夹板(6)、可调杆(7)和手柄(8);所述可调杆(7)穿设在孔洞(9)中,且横向可调;所述可调夹板(6)连接在可调杆(7)的内端,且与固定夹板(2)平行设置;所述手柄(8)连接在可调杆(7)的外端。1. A line-hanging control device for masonry engineering, characterized in that: it includes a clamping plate set and an adjustable clamp; the clamping plate set includes a horizontal plate (1) and a fixed splint (2); the The horizontal slab (1) is erected on the top of the masonry wall (3) along the thickness direction of the masonry wall (3), and its length is not less than the thickness of the masonry wall (3); the horizontal slab One end of the top of (1) is provided with a winding rod (11), and the winding rod (11) is aligned with the outer surface of the wall to be built; there are two fixing splints (2), which are respectively arranged on the horizontal plate (1) on both sides of the bottom, and two fixed splints (2) are located on both sides of the masonry wall (3); the fixed splint (2) on the side of the horizontal plate (1) is provided with a wire rope (4) installation groove (5); a hole (9) is opened in the middle of the plate surface of the fixed splint (2) on the other side of the horizontal plate (1); the adjustable clamp includes an adjustable splint (6) , an adjustable rod (7) and a handle (8); the adjustable rod (7) is penetrated in the hole (9) and can be adjusted horizontally; the adjustable splint (6) is connected to the adjustable rod (7 ) and set parallel to the fixed splint (2); the handle (8) is connected to the outer end of the adjustable rod (7). 2.根据权利要求1所述的砌筑工程挂线控制装置,其特征在于:所述固定夹板(2)呈倒置的L形,包括有横边和竖边;所述固定夹板(2)的横边连接在水平板(1)的底面上。2. The line-hanging control device for masonry works according to claim 1, characterized in that: the fixed splint (2) is in an inverted L shape, including horizontal and vertical sides; the fixed splint (2) The transverse edge is connected to the bottom surface of the horizontal plate (1). 3.根据权利要求2所述的砌筑工程挂线控制装置,其特征在于:所述固定夹板(2)的前端、位于横边与竖边的转角处开设有豁口,并且该豁口形成所述的安装槽(5)。3. The line-hanging control device for masonry works according to claim 2, characterized in that: a gap is opened at the front end of the fixed splint (2) at the corner of the horizontal side and the vertical side, and the gap forms the mounting slot (5). 4.根据权利要求1所述的砌筑工程挂线控制装置,其特征在于:所述孔洞(9)的侧壁上设置有螺纹;所述可调杆(7)为侧壁上设有与孔洞(9)上螺纹相适应的螺纹杆。4. The wire hanging control device for masonry works according to claim 1, characterized in that: the side wall of the hole (9) is provided with threads; the adjustable rod (7) is provided with a thread on the side wall A threaded rod adapted to the thread on the hole (9). 5.根据权利要求1所述的砌筑工程挂线控制装置,其特征在于:所述固定夹板(2)的外侧、对应孔洞(9)的位置处连接有螺母(10);所述可调杆(7)为与螺母(10)相适应的螺纹杆。5. The line-hanging control device for masonry works according to claim 1, characterized in that: nuts (10) are connected to the outer side of the fixed splint (2) at positions corresponding to the holes (9); the adjustable Rod (7) is the threaded rod compatible with nut (10). 6.根据权利要求1所述的砌筑工程挂线控制装置,其特征在于:所述可调夹板(6)呈圆形,由钢板制成。6. The line-hanging control device for masonry works according to claim 1, characterized in that: the adjustable splint (6) is circular and made of steel plate.
CN201920245264.1U 2019-02-27 2019-02-27 Masonry engineering hanging wire control device Expired - Fee Related CN209620631U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920245264.1U CN209620631U (en) 2019-02-27 2019-02-27 Masonry engineering hanging wire control device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920245264.1U CN209620631U (en) 2019-02-27 2019-02-27 Masonry engineering hanging wire control device

Publications (1)

Publication Number Publication Date
CN209620631U true CN209620631U (en) 2019-11-12

Family

ID=68454871

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920245264.1U Expired - Fee Related CN209620631U (en) 2019-02-27 2019-02-27 Masonry engineering hanging wire control device

Country Status (1)

Country Link
CN (1) CN209620631U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111395784A (en) * 2020-04-22 2020-07-10 内蒙古建设股份有限公司 Wall-building wire hanging device
CN112378391A (en) * 2020-05-31 2021-02-19 中国二十二冶集团有限公司 Building wall building verticality pay-off device with parapet wall and verticality pay-off control construction method
CN113404315A (en) * 2021-06-15 2021-09-17 马振国 Convenient to use's assembled building wall connecting device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111395784A (en) * 2020-04-22 2020-07-10 内蒙古建设股份有限公司 Wall-building wire hanging device
CN112378391A (en) * 2020-05-31 2021-02-19 中国二十二冶集团有限公司 Building wall building verticality pay-off device with parapet wall and verticality pay-off control construction method
CN112378391B (en) * 2020-05-31 2024-03-26 中国二十二冶集团有限公司 Perpendicularity paying-off device for building wall with parapet wall and perpendicularity paying-off control construction method
CN113404315A (en) * 2021-06-15 2021-09-17 马振国 Convenient to use's assembled building wall connecting device

Similar Documents

Publication Publication Date Title
CN209620631U (en) Masonry engineering hanging wire control device
CN202602167U (en) Pay-off pulley
CN209891742U (en) Brick laying reference line fixing device for house civil buildings
CN205061368U (en) Adjustable quick steel plate lifting clamp
CN208039826U (en) A kind of adjustable clamping hoop type strenthening member of square cross section column type mould
CN215886019U (en) A U-shaped clamp for hoisting a square pipe
CN211074042U (en) A prefabricated box girder inner mold fixing device
CN203894459U (en) Fastening clamp for ADSS optical cable all-purpose rod
CN211257817U (en) A kind of reinforcement for hanging formwork installation
CN210944523U (en) Pre-buried structure of lifting by crane
CN211143404U (en) Combined connecting mechanism for curtain wall connection
CN212671238U (en) Positioning fixture of control line
CN112072581A (en) Pipeline erecting device for assembled wall
CN209620638U (en) Accurate control mold for horizontal mortar joint of masonry engineering
CN219006580U (en) Rotary cutting mechanism with positioning function for building
CN219909398U (en) Assembled building connection structure
CN220086847U (en) Supporting and hanging frame structure for bridge frame
CN220264955U (en) Large-span prestressed hollow slab lifting device
CN218884823U (en) Floor measuring device for fabricated building
CN212053774U (en) Building templates connecting device for civil engineering
CN206073995U (en) Detection tool for verticality of aluminum alloy template
CN217480814U (en) A new device for two-pass re-exit of pipeline hanging form
CN221838005U (en) Adjustable concrete block masonry template device
CN221917018U (en) Assembled building wallboard lifting device
CN103741885B (en) The strand tapered anchorage of carbon fiber board stretch-draw

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191112