CN209619274U CN201920355976.9U CN201920355976U CN209619274U CN 209619274 U CN209619274 U CN 209619274U CN 201920355976 U CN201920355976 U CN 201920355976U CN 209619274 U CN209619274 U CN 209619274U
Authority
CN
China
Prior art keywords
cooler bin
cooler
coke quenching
dry coke
quenching dedusting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920355976.9U
Other languages
Chinese (zh)
Inventor
李昊岭
汪开保
余钱
钱伏虎
钱虎林
汪高强
方亮青
汪海生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Maanshan Iron and Steel Co Ltd
Original Assignee
Maanshan Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Maanshan Iron and Steel Co Ltd filed Critical Maanshan Iron and Steel Co Ltd
Priority to CN201920355976.9U priority Critical patent/CN209619274U/en
Application granted granted Critical
Publication of CN209619274U publication Critical patent/CN209619274U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Coke Industry (AREA)

Abstract

The utility model discloses a kind of dry coke quenching dedusting coolers, including cooler bin group, it is equipped with cooling duct in each of cooler bin group cooler bin, the cooler further includes shuntings blast pipe for high-temperature flue gas to be shunted to each cooler bin air inlet in Directed cooling case group and is used for the derived confluence discharge pipe of flue gas confluence of each cooler bin air outlet.Even if some multitube cooler bin breaks down, its control valve can be closed, independent cooler bin in addition can work on, without stopping deduster.

Description

A kind of dry coke quenching dedusting cooler
Technical field
The utility model belongs to dry coke quenching equipment technical field, and in particular to a kind of dry coke quenching dedusting cooler.
Background technique
The multitube high-temperature cooler of dry quenching system environmental dust removal device produces in the process primarily directed to charging apparatus dress is burnt Raw high-temperature dust, flue dust collecting sufficiently enter back into deduster after cooling.Ensure flue dust that burnt tank generates during filling burnt not It is excessive, meet the requirement of environmental protection.Since heat-dissipating pipe is chronically in this hot environment, the logical hole of corrosion is serious, and heat dissipation effect is poor and lets out Leakage is serious, influences greatly, to cause cloth bag replacement frequently, overhaul of the equipments heavy workload is taken to other equipment such as environmental dust removal device cloth bags Use cost increase.And charging apparatus dust removing effects are poor, flour dust overflow phenomenon is serious.Due to dry coke quenching category continuous producing apparatus, if It breaks down inside cooler, it can only stop production to overhaul.
Utility model content
The utility model aims to solve the problem that the technical problems existing in the prior art.For this purpose, the utility model provides a kind of do Quenching dedusting cooler, it is therefore an objective to equipment can be overhauled in the case where deduster.
To achieve the goals above, the technical solution that the utility model is taken are as follows:
A kind of dry coke quenching dedusting cooler, including cooler bin group are equipped in each of cooler bin group cooler bin cold But air hose, the cooler further include the shunting for high-temperature flue gas to be shunted to each cooler bin air inlet in Directed cooling case group Blast pipe and for by the derived discharge pipe that converges of the flue gas of each cooler bin air outlet confluence.
Cooler bin inlet and outlet in the cooler bin group is equipped with gas control valve.
The air inlet of the cooler bin is horn-like air inlet.
The lower end of the cooler bin is equipped with dust collecting box, and the bottom end of dust collecting box is equipped with unloading valve.
The side wall of the container is equipped with cleaning door, and the cleaning door is equipped with baffle.
The cleaning door is equipped with high temperature resistant filter cotton.
Cyclone dust collectors are equipped between the cooler bin and container, a side of cyclone dust collectors is equipped with side outlet, The bottom end of cyclone dust collectors is equipped with discharge outlet, and the top of collecting box is connect with discharge outlet.
The cooling duct outer wall is coated with high-temperature resistant anti-corrosive coating.
The utility model has the beneficial effects that cooler is set multiple independently combinable bodies, high-temperature smoke by the utility model It can shunt and respectively enter independent cooler bin, flue gas after cooling is flowed to outlet air general pipeline export, In from the outlet of cooler bin again The inlet and outlet of cooler bin also sets up control valve, after being transformed in this way, even if some multitube cooler bin breaks down, can close it Control valve, independent cooler bin in addition can work on, without stopping deduster.The setting of dust collecting box is convenient for in cooler bin Dust is collected processing;The setting of cyclone dust collectors, the bulky grain convenient for removing the impurity of larger particles, after removing The phenomenon that impurity is collected by collecting box, and small dust is handled by dust collecting box collection, and large granular impurity is avoided to block unloading valve.
Detailed description of the invention
This specification includes the following drawings, and shown content is respectively:
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the structural representation that dust collecting box is separately provided in cooling lower box part;
Fig. 3 is the structural schematic diagram of cooling lower box part setting cyclone dust collectors, collecting box and dust collecting box.
Specific embodiment
Below against attached drawing, by the description of the embodiment, making to specific embodiment of the present utility model further detailed Thin explanation, it is therefore an objective to help those skilled in the art to the design of the utility model, technical solution have it is more complete, accurate and Deep understanding, and facilitate its implementation.
Embodiment 1
As shown in Figure 1, a kind of dry coke quenching dedusting cooler, including cooler bin group, each of cooler bin group cooler bin 1 It is inside equipped with cooling duct 2, which further includes for shunting high-temperature flue gas in Directed cooling case group Each cooler bin air inlet 3 shunts blast pipe 4 and for the discharge pipe that converges derived from the flue gas confluence by each cooler bin air outlet 5 6.Cooler is set multiple independently combinable bodies by such structure setting, and high-temperature smoke, which can shunt, respectively enters independent cooling Case, flue gas after cooling is flowed to outlet air general pipeline export from the outlet of cooler bin again, in the air inlet pipe for being oriented to each cooler bin Control valve can be set in road, even if some multitube cooler bin breaks down, can close its control valve, in addition independent Cooler bin can work on, without stopping deduster.
For the ease of preferably controlling the leading into, export of gas, each of cooler bin group cooler bin inlet and outlet is equal Equipped with gas control valve.Specifically air intake control valve, multiple air intake control valves can be set in the air inlet for connecting each cooler bin The air inlet pipe at place is connect with blast pipe is shunted, and leaving air control valve, multiple outlet controls are arranged in the air outlet of each cooler bin Escape pipe where valve is connect with confluence discharge pipe.The air inlet 3 of cooler bin is preferably horn-like air inlet, so that flue gas is with cross The diffusion way that sectional area is gradually increased enters in cooler bin.When it is implemented, setting two independent parts for multitube cooler It is grouped fit (two cooler bins), high-temperature smoke respectively enters two independent multitube cooler bins, and flue gas is again through two after cooling Independent multitube cooler bin outlet is incorporated to confluence outlet general pipeline.Due to containing a large amount of coke powder, and flue gas in dedusting high-temperature flue gas Flow velocity is fastly up to 16.8 meter per seconds.To extend multitube cooler service life, high-temperature flue gas multitube cooler heat dissipation effect is not being influenced In the case where, using 240 seamless steel pipes as heat-dissipating pipe, having a size of Φ 219 × 5.Two cooling boxes are relative to an entirety For cooler, volume reduces generally, can individually install, and then connection is integral.Overhaul of the equipments is facilitated after transformation, Greatly reduce maintenance workload.
In addition, being coated with high-temperature resistant anti-corrosive coating in cooling duct outer wall to extend the service life of cooling duct.Tool Body can spray fire-resistant anticorrosion paint in cooling duct outer wall by way of spraying, and the thickness of coating can be 1-2mm.
Arrangement using the above structure, dry coke quenching environmental dust removal high temperature multiple pipe cooler put into production use, can reach Expected purpose.Prevent heat dissipation effect difference and leakage serious problems, eliminates the influence to deduster.Service life extends, drop Low maintenance of equipment expense, reduces the labor intensity of worker.It ensure that dry quenching system production run meet the requirement of environmental protection.
Embodiment 2
As shown in Fig. 2, as a further improvement, the lower end of cooler bin 1 is equipped with dust collecting box 7, and the bottom end of dust collecting box is equipped with Unloading valve 8.The top end opening of dust collecting box is connected to cooler bin bottom end outlet, and dust can enter dust collecting box, passes through dust collecting box bottom Unloading valve discharge.It is preferably provided deflector in container, deflector is able to extend flue gas in the cooler bin intracorporal residence time, Reinforce cooling effect, while dust is oriented to dust collecting box by the effect of deflector.It is equipped with cleaning door 9 in the side wall of container, clearly Grey mouth 9 is equipped with baffle.The design of baffle be in order to open and close cleaning door, avoid dust in use process in dust collecting box from It is discharged at cleaning door.Cleaning door is equipped with high temperature resistant filter cotton, is further ensured that the dust inside dust collecting box will not be arranged from cleaning door Out.
Embodiment 3
As shown in figure 3, being equipped with cyclone dust collectors 10 between cooler bin and container, a side of cyclone dust collectors 10 is equipped with Side outlet 11, the bottom ends of cyclone dust collectors 10 are equipped with discharge outlet, and the top of collecting box 12 is connect with discharge outlet, dust collecting box into Mouth is connected to the side outlet of cyclone dust collectors, and unloading valve is arranged in the bottom of dust collecting box.Its working principle is that: the ash in cooler bin Dirt is deposited to cyclone dust collectors, is first removed the flue dust of larger particles by cyclone dust collectors, is led later by discharge outlet Enter collecting box, the gas for disposing larger particles imports inside dust collecting box by side outlet, and dust enters dust collecting box, passes through collection The discharge of cinder box bottom unloading valve.When it is implemented, common deduster can be arranged in dust collecting box, the import of common deduster with Side outlet connection.
The utility model is exemplarily described in conjunction with attached drawing above.Obviously, the utility model implements not It is limited by aforesaid way.As long as the various unsubstantialities that the method concept and technical solution that use the utility model carry out Improvement;Or it is not improved, the above-mentioned conception and technical scheme of the utility model are directly applied into other occasions, at this Within the protection scope of utility model.

Claims (8)

1. a kind of dry coke quenching dedusting cooler, which is characterized in that including cooler bin group, in each of cooler bin group cooler bin It is equipped with cooling duct, the cooler further includes that each cooler bin for shunting high-temperature flue gas in Directed cooling case group is entered the wind Mouth shunts blast pipe and for the discharge pipe that converges derived from the flue gas confluence by each cooler bin air outlet.
2. dry coke quenching dedusting cooler according to claim 1, which is characterized in that the cooler bin disengaging in the cooler bin group Air port is equipped with gas control valve.
3. dry coke quenching dedusting cooler according to claim 1, which is characterized in that the air inlet of the cooler bin is horn-like Air inlet.
4. dry coke quenching dedusting cooler according to claim 1, which is characterized in that the lower end of the cooler bin is equipped with collection ash The bottom end of case, dust collecting box is equipped with unloading valve.
5. dry coke quenching dedusting cooler according to claim 4, which is characterized in that the side wall of the container is equipped with deashing Mouthful, the cleaning door is equipped with baffle.
6. dry coke quenching dedusting cooler according to claim 5, which is characterized in that the cleaning door is filtered equipped with high temperature resistant Cotton.
7. dry coke quenching dedusting cooler according to claim 4, which is characterized in that be equipped between the cooler bin and container Cyclone dust collectors, a side of cyclone dust collectors are equipped with side outlet, and the bottom end of cyclone dust collectors is equipped with discharge outlet, collecting box Top is connect with discharge outlet.
8. dry coke quenching dedusting cooler according to claim 1, which is characterized in that the cooling duct outer wall is coated with resistance to height Warm corrosion-inhibiting coating.
CN201920355976.9U 2019-03-20 2019-03-20 A kind of dry coke quenching dedusting cooler Active CN209619274U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920355976.9U CN209619274U (en) 2019-03-20 2019-03-20 A kind of dry coke quenching dedusting cooler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920355976.9U CN209619274U (en) 2019-03-20 2019-03-20 A kind of dry coke quenching dedusting cooler

Publications (1)

Publication Number Publication Date
CN209619274U true CN209619274U (en) 2019-11-12

Family

ID=68457245

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920355976.9U Active CN209619274U (en) 2019-03-20 2019-03-20 A kind of dry coke quenching dedusting cooler

Country Status (1)

Country Link
CN (1) CN209619274U (en)

Similar Documents

Publication Publication Date Title
CN2813058Y (en) Blast-furnace gas rotary pulse bag type dust collector
CN206989804U (en) A kind of block clearing anti-block apparatus of rotary regenerative air preheater
CN209619274U (en) A kind of dry coke quenching dedusting cooler
CN206508709U (en) Negative-pressure water spraying and dust-removing system
CN202438492U (en) Compressed air blowing device
CN205517091U (en) Automatic dust collector of automatically controlled formula
CN209475803U (en) Full-automatic gas dedusting filter
CN207694512U (en) A kind of biomass fuel boiler device for eliminating smoke and dust
CN207585376U (en) A kind of fiery grading plant that disappears that gathers dust of cement produced with the dry method rotary kiln grate-cooler
CN212253713U (en) Ash bucket ash discharging device
CN102755790B (en) A kind of ammonium polyorthovanadate powder collector
CN206730698U (en) Powder tank centralized dust-removing system and there is its concrete mixing plant
CN206295719U (en) A kind of adjustable intake is easy to row to collect the deduster of dirt
CN212731552U (en) Portable dust purification device
CN201840963U (en) Smoke gas and dust collection and desulfurizing device of roasting bauxite rotary kiln
CN208553578U (en) A kind of spray tower bag-type dust removal system
CN208824191U (en) Aluminium anode assembly room bitumen flue gas processing system
CN205495178U (en) Smelting furnace vent gas treatment system in
CN207471566U (en) Biomass combustion boiler nozzle and ashes cooling system
CN207238284U (en) Multiple tube screwed dedusting ash ejector
CN208541964U (en) Automatic control warm type electric-bag complex dust collector
CN205164388U (en) Dust recovery device
CN203634980U (en) Bag-type dust collector of coking plant
CN205115519U (en) Put forward vanadium converter thick grey air conveying system of once removing dust
CN110396609A (en) The pressure release dust arrester installation of reactor in a kind of production of titanium sponge reduction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant