CN209614079U - A kind of construction of the highway reinforcing bar intercept unit - Google Patents

A kind of construction of the highway reinforcing bar intercept unit Download PDF

Info

Publication number
CN209614079U
CN209614079U CN201822006402.9U CN201822006402U CN209614079U CN 209614079 U CN209614079 U CN 209614079U CN 201822006402 U CN201822006402 U CN 201822006402U CN 209614079 U CN209614079 U CN 209614079U
Authority
CN
China
Prior art keywords
reinforcing bar
fixedly connected
construction
mounting plate
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201822006402.9U
Other languages
Chinese (zh)
Inventor
崔玉友
邢佳伟
杨汉超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wang Tianbiao
Original Assignee
Wang Tianbiao
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wang Tianbiao filed Critical Wang Tianbiao
Priority to CN201822006402.9U priority Critical patent/CN209614079U/en
Application granted granted Critical
Publication of CN209614079U publication Critical patent/CN209614079U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model relates to technical field of building construction, and disclose a kind of construction of the highway reinforcing bar intercept unit, including lower case and upper housing, the inside of lower case is fixedly connected with bottom plate, lower installation board is provided with above bottom plate, lower installation board is fixedly connected on the inside of lower case, the bottom end of upper housing is fixedly connected with upper mounting plate, the upper surface of upper mounting plate is fixedly connected with fixed link, the bottom end of fixed link is fixedly connected on the upper surface of upper mounting plate, the top of fixed link is fixedly connected with upper mounted plate, upper mounted plate is fixedly mounted on the top inside upper housing, the lower surface of upper mounted plate is provided with the support plate inside upper housing.Construction of the highway reinforcing bar intercept unit, pass through the first caging bolt of setting and the second caging bolt, screwing steel bars are treated using upper mounting plate and lower installation board effectively to be fixed, and ensure that reinforcing bar to be processed in the stabilization of truncated process, consequently facilitating equipment carries out truncation work.

Description

A kind of construction of the highway reinforcing bar intercept unit
Technical field
The utility model relates to technical field of building construction, specially a kind of construction of the highway reinforcing bar intercept unit.
Background technique
Building iron refers to for the various reinforcing bars in armored concrete, is the indispensable building materials of construction, building Bar types multiplicity, is divided into non-alloyed steel reinforcing bar, low-alloy steel reinforcing bar and steel alloy reinforcing bar by steel grade;It is divided into heat by production technology Steel rolling muscle, heat-treated steel bar, waste heat treatment steel bar, cold rolled reinforcing bar, cold drawn bar etc., in the tub that building iron is commonly wrapped about, Need using when pull out and be truncated, due to being frequently necessary to the building iron of high-volume, same specification in building construction process, and current The truncation of building iron is usually carried out by hand, not only efficiency is lower, and the section after building iron truncation is irregular, quality It is poor, for this purpose, we have proposed a kind of construction of the highways to be solved the above problems with reinforcing bar intercept unit.
Utility model content
(1) the technical issues of solving
In view of the deficiencies of the prior art, the utility model provides a kind of construction of the highway reinforcing bar intercept unit, has pair Reinforcing bar carries out effectively fixed consequently facilitating the advantages of being truncated, it is ineffective to solve the problems, such as that the prior art is truncated.
(2) technical solution
Effectively fix consequently facilitating the purpose being truncated, the following skill of the utility model offer to realize above-mentioned to reinforcing bar Art scheme: a kind of construction of the highway reinforcing bar intercept unit, including lower case and upper housing, the inside of the lower case are fixedly connected There is bottom plate, lower installation board is provided with above the bottom plate, the lower installation board is fixedly connected on the interior of lower case Portion, the bottom end of the upper housing are fixedly connected with upper mounting plate, and the upper surface of the upper mounting plate is fixedly connected with fixed link, institute The bottom end for stating fixed link is fixedly connected on the upper surface of upper mounting plate, and the top of the fixed link is fixedly connected with upper mounted plate, Fixed plate is fixedly mounted on the top inside upper housing, and the lower surface of fixed plate is provided in upper housing The support plate in portion, holding frame is fixedly installed in the middle part of the lower case, and the holding frame passes through the second caging bolt screw thread and connects Connect and be fixedly installed with driving power in the middle part of the upper surface of bottom plate, the upper housing top, the driving power it is defeated Outlet is electrically connected with driving motor, and the driving motor is fixedly mounted on the top of holding frame, the output end of the driving motor It is fixedly connected with truncation electric saw.
Preferably, the specification of the lower case is adapted with the specification of upper housing.
Preferably, the inside of the lower installation board and upper mounting plate is placed with reinforcing bar to be processed.
Preferably, the surface of the upper mounting plate is threaded with the first caging bolt, and first caging bolt runs through And extend to the upper surface of bottom plate.
Preferably, the quantity of first caging bolt is eight, and eight the first caging bolts are uniformly distributed and are provided with The two sides of mounting plate.
Preferably, the quantity of the fixed link is four, and four fixed links are evenly distributed on the upper surface of upper mounting plate.
Preferably, the surface of the holding frame is fixedly installed with observation window, and the observation window is located in the middle part of reinforcing bar to be processed Front.
(3) beneficial effect
Compared with prior art, the utility model provides a kind of construction of the highway reinforcing bar intercept unit, and having following has Beneficial effect:
1, construction of the highway reinforcing bar intercept unit is utilized by the first caging bolt of setting and the second caging bolt Upper mounting plate and lower installation board are treated screwing steel bars and are effectively fixed, and ensure that reinforcing bar to be processed in the steady of truncated process It is fixed, consequently facilitating equipment carries out truncation work.
2, construction of the highway reinforcing bar intercept unit, by setting observation window and holding frame, holding frame is to steel to be processed While muscle is fixed, construction personnel detects truncation effect by observation window, to ensure that the construction of the highway is used The using effect of reinforcing bar intercept unit.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is the utility model upper mounting plate structural schematic diagram.
In figure: 1 lower case, 2 upper housings, 3 bottom plates, 4 lower installation boards, 5 upper mounting plates, 6 first caging bolts, 7 to Screwing steel bars, 8 holding frames, 9 second caging bolts, 10 observation windows, 11 fixed links, 12 upper mounted plates, 13 support plates, 14 driving electricity Source, 15 driving motors, 16 truncation electric saws.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
A kind of construction of the highway reinforcing bar intercept unit referring to FIG. 1-2, including lower case 1 and upper housing 2, lower case 1 Specification is adapted with the specification of upper housing 2, and the inside of lower case 1 is fixedly connected with bottom plate 3, and the top of bottom plate 3 is set It is equipped with lower installation board 4, lower installation board 4 is fixedly connected on the inside of lower case 1, and the bottom end of upper housing 2 is fixedly connected with installation Plate 5, the surface of upper mounting plate 5 are threaded with the first caging bolt 6, and the first caging bolt 6 runs through and extends to bottom plate 3 Upper surface, the quantity of the first caging bolt 6 is eight, and eight the first caging bolts 6 are uniformly distributed and are provided with upper mounting plate 5 Two sides, the inside of lower installation board 4 and upper mounting plate 5 is placed with reinforcing bar 7 to be processed, and the upper surface of upper mounting plate 5 is fixedly connected There is fixed link 11, the quantity of fixed link 11 is four, and four fixed links 11 are evenly distributed on the upper surface of upper mounting plate 5, fixed The bottom end of bar 11 is fixedly connected on the upper surface of upper mounting plate 5, and the top of fixed link 11 is fixedly connected with upper mounted plate 12, upper solid Fixed board 12 is fixedly mounted on the top inside upper housing 2, and the lower surface of upper mounted plate 12 is provided with the branch inside upper housing 2 Fagging 13, the middle part of lower case 1 are fixedly installed with holding frame 8, and the surface of holding frame 8 is fixedly installed with observation window 10, observation window 10 are located at the front at 7 middle part of reinforcing bar to be processed, treat screwing steel bars by setting observation window 10 and holding frame 8, holding frame 8 7 while be fixed, and construction personnel is detected by 10 pairs of truncation effects of observation window, to ensure that the construction of the highway is used The using effect of reinforcing bar intercept unit, holding frame 8 are threaded in the upper surface of bottom plate 3 by the second caging bolt 9, By the first caging bolt 6 of setting and the second caging bolt 9, screwing steel bars are treated using upper mounting plate 5 and lower installation board 4 7 are effectively fixed, and ensure that reinforcing bar 7 to be processed in the stabilization of truncated process, consequently facilitating equipment carries out truncation work, on Driving power 14 is fixedly installed in the middle part of 2 top of shell, the output end of driving power 14 is electrically connected with driving motor 15, driving Motor 15 is fixedly mounted on the top of holding frame 8, and the output end of driving motor 15 is fixedly connected with truncation electric saw 16, for cutting Disconnected reinforcing bar.
In conclusion construction of the highway reinforcing bar intercept unit, passes through the first caging bolt of setting 6 and the second limit spiral shell Bolt 9 is treated screwing steel bars 7 using upper mounting plate 5 and lower installation board 4 and is effectively fixed, and ensure that reinforcing bar 7 to be processed exists The stabilization of truncated process, consequently facilitating equipment carries out truncation work;It is right by setting observation window 10 and holding frame 8, holding frame 8 While reinforcing bar 7 to be processed is fixed, construction personnel is detected by 10 pairs of truncation effects of observation window, to ensure that this The using effect of construction of the highway reinforcing bar intercept unit.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that There is also other identical elements in process, method, article or equipment including the element.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (7)

1. a kind of construction of the highway reinforcing bar intercept unit, including lower case (1) and upper housing (2), it is characterised in that: the lower casing The inside of body (1) is fixedly connected with bottom plate (3), is provided with lower installation board (4) above the bottom plate (3), described Lower installation board (4) is fixedly connected on the inside of lower case (1), and the bottom end of the upper housing (2) is fixedly connected with upper mounting plate (5), the upper surface of the upper mounting plate (5) is fixedly connected with fixed link (11), and the bottom end of the fixed link (11) is fixedly connected Upper mounted plate (12), fixed plate are fixedly connected on the top of the upper surface of upper mounting plate (5), the fixed link (11) (12) it is fixedly mounted on the internal top of upper housing (2), the lower surface of fixed plate (12) is provided with positioned at upper housing (2) Internal support plate (13) is fixedly installed with holding frame (8) in the middle part of the lower case (1), and the holding frame (8) passes through second Caging bolt (9) is threaded in the upper surface of bottom plate (3), is fixedly installed with drive in the middle part of upper housing (2) top Dynamic power supply (14), the output end of the driving power (14) are electrically connected with driving motor (15), and the driving motor (15) is fixed It is mounted on the top of holding frame (8), the output end of the driving motor (15) is fixedly connected with truncation electric saw (16).
2. a kind of construction of the highway reinforcing bar intercept unit according to claim 1, it is characterised in that: the lower case (1) Specification be adapted with the specification of upper housing (2).
3. a kind of construction of the highway reinforcing bar intercept unit according to claim 1, it is characterised in that: the lower installation board (4) and the inside of upper mounting plate (5) is placed with reinforcing bar to be processed (7).
4. a kind of construction of the highway reinforcing bar intercept unit according to claim 1, it is characterised in that: the upper mounting plate (5) surface is threaded with the first caging bolt (6), and first caging bolt (6) runs through and extends to bottom plate (3) Upper surface.
5. a kind of construction of the highway reinforcing bar intercept unit according to claim 4, it is characterised in that: the first limit spiral shell The quantity of bolt (6) is eight, and eight the first caging bolts (6) are uniformly distributed the two sides for being provided with upper mounting plate (5).
6. a kind of construction of the highway reinforcing bar intercept unit according to claim 1, it is characterised in that: the fixed link (11) Quantity be four, four fixed links (11) are evenly distributed on the upper surface of upper mounting plate (5).
7. a kind of construction of the highway reinforcing bar intercept unit according to claim 1, it is characterised in that: the holding frame (8) Surface be fixedly installed with observation window (10).
CN201822006402.9U 2018-12-03 2018-12-03 A kind of construction of the highway reinforcing bar intercept unit Expired - Fee Related CN209614079U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822006402.9U CN209614079U (en) 2018-12-03 2018-12-03 A kind of construction of the highway reinforcing bar intercept unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822006402.9U CN209614079U (en) 2018-12-03 2018-12-03 A kind of construction of the highway reinforcing bar intercept unit

Publications (1)

Publication Number Publication Date
CN209614079U true CN209614079U (en) 2019-11-12

Family

ID=68444932

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822006402.9U Expired - Fee Related CN209614079U (en) 2018-12-03 2018-12-03 A kind of construction of the highway reinforcing bar intercept unit

Country Status (1)

Country Link
CN (1) CN209614079U (en)

Similar Documents

Publication Publication Date Title
CN208322851U (en) Waste material collection device is used in a kind of processing of iron fitting
CN209614079U (en) A kind of construction of the highway reinforcing bar intercept unit
CN208067463U (en) A kind of hardware dies cutting device for processing
CN206942181U (en) A kind of construction wall faces the guard assembly at side hole
CN212284389U (en) Hammering component for hydraulic crusher
CN210049334U (en) Turbid circulating water tank anti-blocking device for cooling tower
CN211562339U (en) Novel chemical industry tail gas's processing apparatus
CN211100802U (en) Guide crossbeam locking structure of short stress rolling mill
CN212777731U (en) High-efficiency radiation heat collection module for solar air conditioner
CN219112912U (en) Quick processing apparatus in roll surface
CN211419625U (en) Sewage treatment agent scattering device for sewage treatment
CN216879598U (en) High-efficient grinder of copper scrap sediment
CN212910555U (en) Electrical cabinet with heat dissipation function
CN210917553U (en) Wisdom water supply data processing apparatus based on thing networking
CN216706346U (en) A cutting machine that is used for flexible circulation cooling of car steel pipe preparation
CN213699519U (en) Efficient energy-saving type slurry fully mixing mechanism
CN214172665U (en) Automatic cog equipment with heat dissipation function for high-heat product
CN216154811U (en) Ore conveyer belt controlling means
CN210711038U (en) Deionization equipment for water treatment
CN213673840U (en) Dismounting device for adjusting sleeve of cone crusher
CN217594817U (en) Feeding equipment for crushing construction waste
CN219518112U (en) Herringbone S-shaped honeycomb filter screen
CN214832047U (en) Quick-detachable antiglare shield
CN217683595U (en) Movable clamping anti-seismic support
CN219073223U (en) Impurity treatment device for wood chip processing

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191112

Termination date: 20201203