CN209613227U - Construction of the highway stone screening plant - Google Patents

Construction of the highway stone screening plant Download PDF

Info

Publication number
CN209613227U
CN209613227U CN201920299629.9U CN201920299629U CN209613227U CN 209613227 U CN209613227 U CN 209613227U CN 201920299629 U CN201920299629 U CN 201920299629U CN 209613227 U CN209613227 U CN 209613227U
Authority
CN
China
Prior art keywords
screen box
conveyer belt
overflow pipe
water
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920299629.9U
Other languages
Chinese (zh)
Inventor
黄战强
李雅博
崔婷媛
钱龙道
卢明亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201920299629.9U priority Critical patent/CN209613227U/en
Application granted granted Critical
Publication of CN209613227U publication Critical patent/CN209613227U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Filtration Of Liquid (AREA)

Abstract

The utility model discloses construction of the highway stone screening plants, are the screen box that cavity and upper surface offer charging aperture including inside;The screen box side is provided with water circulation component, and the water circulation component top is connect by connecting tube with filter assemblies, and the filter assemblies are connect by overflow pipe with the screen box;The screen box offers the discharge hole higher than the overflow pipe far from one upper lateral part of overflow pipe, and the screen box is internally provided with the conveyer belt that upper end is pierced by by the discharge hole.Beneficial effect is: by setting conveyer belt and water circulation component, continuous screening and removing impurities can be carried out to stone, the silt in stone can be sieved into screen box bottom by netted conveyer belt, and screening efficiency is high, and good impurity removing effect;By the filter assemblies of installation and the cooperation of water circulation component, screened water can be filtered, and water flow is made to form water circulation inside screen box, recycling, to realize water-saving result, the feature of environmental protection is good.

Description

Construction of the highway stone screening plant
Technical field
The utility model relates to highway construction technology fields, and in particular to construction of the highway stone screening plant.
Background technique
Domestic communication transport is gradually improved, and constantly has new road and rail Along Traffic Trunk Lines open-minded, the construction of these roads Need a large amount of stone as the support of ground, these stones need to screen it before use, once stone be mixed into compared with More sundries can form cavity in stone and cement mixing inside mixture, its durability is influenced after theing cement solidifies.
Present stone screening, majority, generally can only be to single kinds in screening using screening techniques such as vibration, rollings The sundries of class is filtered, and cannot achieve while screening while to sandstone and plastics, sawdust isodensity smaller sundries, screening Effect is undesirable;The screening plant screened using water flow, is needed constantly to consume water in screening process, can not returned to water flow It receives filtering to recycle, the feature of environmental protection is poor.
Utility model content
The purpose of this utility model is that solve the above-mentioned problems and provides construction of the highway stone screening plant, this Preferred technical solution carries out step sizing removal of impurities to stone in many technical solutions that utility model provides, while can be to sieve Water flow is selected to be filtered the technical effects such as circulation, elaboration as detailed below.
To achieve the above object, the utility model provides following technical scheme:
Construction of the highway provided by the utility model stone screening plant, including it is internal be cavity screen box, and upper table Face offers charging aperture;The screening upper box part is provided with the loading hopper being connected to the charging aperture;The screen box length side The tapping valve of flanged joint is provided with to a side lower part, the screen box other side is provided with water circulation component, the water Recirculation assembly top is connect by connecting tube with filter assemblies, and the filter assemblies are connect by overflow pipe with the screen box;
The screen box offers discharge hole far from one upper lateral part of overflow pipe, and the discharge hole is higher than the spilling water Pipe, the screen box are internally provided with the barrier that bottom end is lower than the discharge hole, the barrier upper surface and two sides with The screening chamber interior wall connection, and barrier upper end link position is located at one of the charging aperture far from the filter assemblies Side;
The screen box is internally provided with upper end and is pierced by the conveyer belt being driven by motor, and the conveying by the discharge hole Band lower end is located at immediately below the charging aperture, and is located at the overflow pipe or less;The conveyer belt upper surface and the barrier Between be not in contact.
Using above-mentioned construction of the highway stone screening plant, when needing to screen stone, first by the screening Add inside case add water to height of water level be between the overflow pipe and the discharge hole, then will stone to be screened be added described in In loading hopper, stone is entered inside the screen box by the loading hopper;It is fallen after the water that stone is fallen into inside the screen box In the conveyor belt surface, and is sent by the conveyer belt to the discharge hole and exported;Lighter impurity swims in circulation water surface, And the barrier block effect under concentrate on the barrier and it is described screening chamber interior wall formed cavity in, then with Recirculated water is exported along the overflow pipe to the recirculation assembly, and heavier impurity is fallen on the conveyer belt, and with recirculated water Flushing falls into the screen box bottom;After the completion of stone screening, the tapping valve is opened, the water circulation component is then opened, The water circulation component, can be heavy to the screen box bottom to being directly discharged through the tapping valve after sending water inside the screen box Long-pending silt is rinsed.
Preferably, the conveyer belt inside upper part is uniformly arranged along its length, there are five V-type support frames, and the branch Support length direction is vertical with the conveyer belt length direction, and support frame as described above both ends and the fixed company of the screening chamber interior wall It connects.
It preferably, the conveyor belt material is rubber, and is reticular structure.
Preferably, the filter assemblies include Rose Box and filter cage, the screen box and the Rose Box pass through institute Overflow pipe connection is stated, the filter cage is installed inside the Rose Box, the filter cage is that top and length direction side are equal The cage construction of opening, and the side of the filter cage is open close to the overflow pipe;The filter cage outer wall and the filtering Chamber interior wall is in contact, and the filter cage top is provided with case lid, and case lid upper surface center is fixedly installed with handle.
Preferably, the water circulation component includes water tank and water pump, the screen box is far under the tapping valve side Portion is connect by flange with the water pump, and the water pump top is connect by delivery pipe with the water tank.
Beneficial effect is: 1, by setting conveyer belt and water circulation component, continuous screening and removing impurities can be carried out to stone, Silt in stone can be sieved into screen box bottom by netted conveyer belt, and screening efficiency is high, and good impurity removing effect;
2, by the cooperation of the filter assemblies of installation and water circulation component, screened water can be filtered, and makes water Stream forms water circulation inside screen box, and recycling, to realize water-saving result, the feature of environmental protection is good.
Detailed description of the invention
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only It is some embodiments of the utility model, for those of ordinary skill in the art, in the premise not made the creative labor Under, it is also possible to obtain other drawings based on these drawings.
Fig. 1 is the front sectional view of the utility model;
Fig. 2 is the part A partial enlarged view of Fig. 1;
Fig. 3 is the axis side view of the utility model;
Fig. 4 is the schematic diagram of the filter cage of the utility model.
The reference numerals are as follows:
1, screen box;101, charging aperture;102, discharge hole;2, barrier;3, overflow pipe;4, loading hopper;5, filter assemblies; 501, Rose Box;502, handle;503, case lid;504, filter cage;6, connecting tube;7, water circulation component;701, water tank;702, defeated Send pipe;703, water pump;8, tapping valve;9, motor;10, conveyer belt;11, support frame.
Specific embodiment
To keep the purpose of this utility model, technical solution and advantage clearer, below by the technology to the utility model Scheme is described in detail.Obviously, the described embodiments are only a part of the embodiments of the utility model, rather than all Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are not before making creative work Obtained all other embodiment is put, the range that the utility model is protected is belonged to.
Shown in referring to figures 1-4, the utility model provides construction of the highway stone screening plant, including internal is cavity Screen box 1, and upper surface offers charging aperture 101;1 top of screen box is provided with the loading hopper 4 being connected to charging aperture 101; 1 length direction of screen box, one side lower part is provided with the tapping valve 8 of flanged joint, and 1 other side of screen box is provided with water circulation Component 7,7 top of water circulation component are connect by connecting tube 6 with filter assemblies 5, and filter assemblies 5 pass through overflow pipe 3 and screen box 1 Connection;
Screen box 1 offers discharge hole 102 far from 3 one upper lateral part of overflow pipe, and discharge hole 102 is higher than overflow pipe 3, screening Case 1 is internally provided with the barrier 2 that bottom end is lower than discharge hole 102, and 2 upper surface of barrier and two sides are and in screen box 1 Wall connection, and 2 upper end link position of barrier is located at side of the charging aperture 101 far from filter assemblies 5;
Screen box 1 is internally provided with upper end and is pierced by the conveyer belt 10 driven by motor 9, and conveyer belt 10 by discharge hole 102 Lower end is located at immediately below charging aperture 101, and is located at 3 or less overflow pipe;Do not connect between 10 upper surface of conveyer belt and barrier 2 Touching.
As this programme preferred embodiment, 10 inside upper part of conveyer belt is uniformly arranged along its length there are five V-type Support frame 11, and 11 length direction of support frame is vertical with 10 length direction of conveyer belt, and 11 both ends of support frame and 1 inner wall of screen box It is fixedly connected, 10 material of conveyer belt is rubber, and is reticular structure;
So set, passing through the support of support frame 11, to make conveyer belt 10 transmit steadily, and conveyer belt 10 has deformation Ability, then conveyer belt 10 keeps 10 top section of conveyer belt V-shaped under the supporting role of support frame 11, can be in conveying Rising prevents material sideslip from scattering, to improve transmission effect, and silt is allow to fall into 1 bottom of screen box by netted gap Portion;
Filter assemblies 5 include Rose Box 501 and filter cage 504, and screen box 1 is connect with Rose Box 501 by overflow pipe 3, Filter cage 504 is installed inside Rose Box 501, filter cage 504 is the cage construction that top and length direction side are open, and The side of filter cage 504 is open close to overflow pipe 3;504 outer wall of filter cage is in contact with 501 inner wall of Rose Box, on filter cage 504 Portion is provided with case lid 503, and 503 upper surface center of case lid is fixedly installed with handle 502, and the floating inside screen box 1 is miscellaneous Object enters Rose Box 501 by overflow pipe 3, and water flow can carry out sundries after entering Rose Box 501 by filter cage 504 Filter, and water circulation component 7 is inputted from affiliated connecting tube 6;When filter assemblies 5 are using after certain time, operator passes through handle Filter cage 504 by taking out inside Rose Box 501, and is cleared up filter cage 504 by hand 502;After cleaning is completed, it can incite somebody to action Filter cage 504 is reinstalled in inside Rose Box 501;
Water circulation component 7 include water tank 701 and water pump 703, screen box 1 far from 8 one side lower part of tapping valve by flange with Water pump 703 connects, and 703 top of water pump is connect by delivery pipe 702 with water tank 701, when needing to carry out stone screening, beats first Boiled water pump 703, water pump 703 enters the water pump 703 inside water tank 701 inside screen box 1, makes to screen by complement filter component 5 Water circulation is formed inside case 1;After stone is completed to screen, open tapping valve 8, water pump 703 to sending water inside screen box 1, and 1 bottom of screen box is rinsed, thus by inside screen box 1 sewage and silt be discharged by tapping valve 8;
Using the above structure, when needing to screen stone, it will add inside screen box 1 add water to height of water level first Between overflow pipe 3 and discharge hole 102, then stone to be screened is added in loading hopper 4, stone is entered by loading hopper 4 Inside screen box 1;10 surface of conveyer belt is fallen in after the water that stone is fallen into inside screen box 1, and is sent by conveyer belt 10 to discharge hole 102 outputs;Lighter impurity swims in circulation water surface, and concentrates on barrier 2 and screening under the effect of blocking of barrier 2 In the cavity that 1 inner wall of case is formed, then exported along overflow pipe 3 to recirculation assembly with recirculated water, heavier impurity falls in conveyer belt On 10, and 1 bottom of screen box is fallen into the flushing of recirculated water;After the completion of stone screening, tapping valve 8 is opened, water is then opened and follows Ring assemblies 7, water circulation component 7, can be to 1 bottom deposits of screen box to being directly discharged through tapping valve 8 after sending water inside screen box 1 Silt is rinsed.
By setting conveyer belt and water circulation component, continuous screening and removing impurities can be carried out to stone, netted conveyer belt can The silt in stone is sieved into screen box bottom, screening efficiency is high, and good impurity removing effect;
By the filter assemblies of installation and the cooperation of water circulation component, screened water can be filtered, and make water flow Water circulation is formed inside screen box, recycling, to realize water-saving result, the feature of environmental protection is good.
Above description is only a specific implementation of the present invention, but the protection scope of the utility model is not limited to In this, anyone skilled in the art within the technical scope disclosed by the utility model, can readily occur in variation Or replacement, it should be covered within the scope of the utility model.Therefore, the protection scope of the utility model should be with the power Subject to the protection scope that benefit requires.

Claims (5)

1. construction of the highway stone screening plant, it is characterised in that: including the internal screen box (1) for cavity, and upper surface is opened Equipped with charging aperture (101);Screen box (1) top is provided with the loading hopper (4) being connected to the charging aperture (101);It is described One side lower part of screen box (1) length direction is provided with the tapping valve (8) of flanged joint, and screen box (1) other side is set It is equipped with water circulation component (7), water circulation component (7) top is connect by connecting tube (6) with filter assemblies (5), the mistake Filter component (5) is connect by overflow pipe (3) with the screen box (1);
The screen box (1) offers discharge hole (102) far from (3) one upper lateral part of overflow pipe, and the discharge hole (102) Higher than the overflow pipe (3), the screen box (1) is internally provided with the barrier (2) that bottom end is lower than the discharge hole (102), Barrier (2) upper surface is connect with the screen box (1) inner wall with two sides, and the barrier (2) upper end connection position Side setting in the charging aperture (101) far from the filter assemblies (5);
The screen box (1) is internally provided with upper end and is pierced by the conveyer belt driven by motor (9) by the discharge hole (102) (10), and the conveyer belt (10) lower end is located at immediately below the charging aperture (101), and is located at the overflow pipe (3) below;Institute It states and is not in contact between conveyer belt (10) upper surface and the barrier (2).
2. construction of the highway according to claim 1 stone screening plant, it is characterised in that: on the inside of the conveyer belt (10) Top is uniformly arranged along its length there are five V-type support frame (11), and support frame as described above (11) length direction and the conveying Band (10) length direction is vertical, and support frame as described above (11) both ends are fixedly connected with the screen box (1) inner wall.
3. construction of the highway according to claim 2 stone screening plant, it is characterised in that: conveyer belt (10) material It for rubber, and is reticular structure.
4. construction of the highway according to claim 1 stone screening plant, it is characterised in that: filter assemblies (5) packet Rose Box (501) and filter cage (504) are included, the screen box (1) and the Rose Box (501) are connected by the overflow pipe (3) It connects, is equipped with the filter cage (504) inside the Rose Box (501), the filter cage (504) is top and length direction one The cage construction that side is open, and the side of the filter cage (504) is open close to the overflow pipe (3);The filter cage (504) outer wall is in contact with the Rose Box (501) inner wall, and filter cage (504) top is provided with case lid (503), and institute It states case lid (503) upper surface center and is fixedly installed with handle (502).
5. construction of the highway according to claim 1 stone screening plant, it is characterised in that: the water circulation component (7) Including water tank (701) and water pump (703), the screen box (1) far from (8) one side lower part of tapping valve by flange with it is described Water pump (703) connection, water pump (703) top are connect by delivery pipe (702) with the water tank (701).
CN201920299629.9U 2019-03-08 2019-03-08 Construction of the highway stone screening plant Expired - Fee Related CN209613227U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920299629.9U CN209613227U (en) 2019-03-08 2019-03-08 Construction of the highway stone screening plant

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920299629.9U CN209613227U (en) 2019-03-08 2019-03-08 Construction of the highway stone screening plant

Publications (1)

Publication Number Publication Date
CN209613227U true CN209613227U (en) 2019-11-12

Family

ID=68456267

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920299629.9U Expired - Fee Related CN209613227U (en) 2019-03-08 2019-03-08 Construction of the highway stone screening plant

Country Status (1)

Country Link
CN (1) CN209613227U (en)

Similar Documents

Publication Publication Date Title
CN104785361A (en) Energy-saving ore washer achieving two-time cleaning function
CN102847703B (en) Method for producing clean recycled soil and recycled aggregate by using construction waste
CN101484227A (en) Apparatus and method for de-watering of slurries
CN206383298U (en) A kind of concrete grout water reclamation system
CN110665934A (en) Construction waste's recovery processing system
CN110104918A (en) A kind of ditch mud processing method
CN205731566U (en) A kind of concrete aggregate system of processing
CN208869512U (en) Concrete recycle cyclic utilization system
CN111842281A (en) Waste water circulating system for collecting concrete waste
CN209468221U (en) A kind of concrete mixing plant Sewage treatment utilizes device
CN209613227U (en) Construction of the highway stone screening plant
CN209835808U (en) Concrete gravel slurry water recovery system
CN210057626U (en) Building site waste water and rainwater cyclic utilization system
CN215612295U (en) Novel high-efficient grit piece-rate system of environmental protection
CN216092641U (en) Green processing apparatus of concrete clout
CN214637261U (en) Integrated shield muck environment-friendly treatment device
CN210230263U (en) Double-wheel sand washing and recycling integrated machine
CN212093150U (en) Full-automatic cleaning device for building raw materials
CN107970679A (en) Concrete mixing plant sewage recovering system
CN210675484U (en) Automatic jigging type coal washing equipment
CN209835809U (en) Automatic recovery system of concrete slurry
CN114307386A (en) Green's concrete mixing plant sewage recovery and cyclic utilization system
CN208916950U (en) Energy-saving direct filter tank
CN111451207A (en) Gravel cleaning equipment and cleaning method thereof
CN107626682B (en) Blast furnace ore tank regional water cleaning and recycling system and application method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191112