CN209610975U - Fast-assembling shower house - Google Patents

Fast-assembling shower house Download PDF

Info

Publication number
CN209610975U
CN209610975U CN201920044569.6U CN201920044569U CN209610975U CN 209610975 U CN209610975 U CN 209610975U CN 201920044569 U CN201920044569 U CN 201920044569U CN 209610975 U CN209610975 U CN 209610975U
Authority
CN
China
Prior art keywords
column
guide rail
shower house
fast
fixing piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920044569.6U
Other languages
Chinese (zh)
Inventor
朱建国
石泽明
李昌东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
W&M SANITARY WARE (FOSHAN) CO Ltd
Original Assignee
W&M SANITARY WARE (FOSHAN) CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by W&M SANITARY WARE (FOSHAN) CO Ltd filed Critical W&M SANITARY WARE (FOSHAN) CO Ltd
Priority to CN201920044569.6U priority Critical patent/CN209610975U/en
Application granted granted Critical
Publication of CN209610975U publication Critical patent/CN209610975U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Residential Or Office Buildings (AREA)

Abstract

The utility model discloses a kind of fast-assembling shower house, the fast-assembling shower house includes column, described column or so is arranged at intervals with two groups, at least one set of column both ends are provided with adjusting fixation kit, the adjusting fixation kit includes the regulating part and fixing piece being connected, the column is provided with mounting groove, and the fixing piece is embedded at the mounting groove;Guide rail, the guide rail are arranged at intervals with two groups up and down, and the guide rail is connected to the regulating part;And dodge gate, the dodge gate are set between two guide rails, and are slid and be connected to two guide rails;When installation, keep at least one set of column mobile relative to the guide rail by adjusting the regulating part, with the distance between at least one set of column of control and wall.Technical solutions of the utility model make shower house reduce installation part and improve the stability and reliability of shower house.

Description

Fast-assembling shower house
Technical field
The utility model relates to bathroom technical field, in particular to a kind of fast-assembling shower house.
Background technique
Shower house occupies little space, pattern is more, is increasingly widely used now by everybody, wherein shower house is mainly by upper The components compositions such as lower guideway, active column, vertical columns, fixed door, mobile door.
It is mainly locked by screw between guide rail and column in existing shower house, assembly manipulation is cumbersome and is easy to appear fixation Failure phenomenon, at the same guide rail can not adjustment length, need that aluminium frame is arranged outside column, realize column by adjusting aluminium frame Cause shower house in assembling process due to the use of numerous components with fitting closely for wall, it is not easy to adjust, be easy to lose Mismatch part and operation error, and the stability of shower house and reliability are reduced, later period detachable maintaining is complicated.
Part is installed and improves the stability of shower house and the fast-assembling of reliability therefore, it is necessary to provide a kind of can reduce Shower house.
Utility model content
The main purpose of the utility model is to provide a kind of fast-assembling shower house, it is intended to and it is non-adjustable to solve guide rail in shower house, It results in the need for that aluminium frame is being arranged outside column, realizes that the technology of column and wall fitted closely is asked by adjusting aluminium frame Topic reduces installation part and improves the stability and reliability of shower house.
To achieve the above object, the utility model proposes fast-assembling shower house include:
Column, described column or so are arranged at intervals with two groups, and at least one set of column both ends are provided with the fixed group of adjusting Part, the adjusting fixation kit includes the regulating part and fixing piece being connected, and the column is provided with mounting groove, the fixing piece It is embedded at the mounting groove;
Guide rail, the guide rail are arranged at intervals with two groups up and down, and the guide rail is connected to the regulating part;And
Dodge gate, the dodge gate are set between two guide rails, and are slid and be connected to two guide rails;
When installation, keep at least one set of column mobile relative to the guide rail by adjusting the regulating part, with control The distance between at least one set of column and wall.
Preferably, the regulating part offers threaded hole, and the guide rail corresponds to the screw thread hole site and offers along described The waist-shaped hole in rail length direction, by lock-screw pass through the waist-shaped hole and the threaded hole by the regulating part with it is described Guide rail is fixed.
Preferably, the fixing piece is in " Y " font, and the opening shape of the mounting groove and the shape of the fixing piece are mutually fitted Match.
Preferably, the regulating part and the fixing piece are integrally formed.
Preferably, the fast-assembling shower house further includes trim, and the trim is connected to the fixing piece, and encloses and be set to On the outside of the guide rail.
Preferably, the trim is provided with dovetails close to the side of the fixing piece, and the fixing piece is in corresponding institute It states dovetails position and is provided with dovetail groove, the trim is mutually blocked with the fixing piece by the dovetails and the dovetail groove Connect fixation.
Preferably, one group of both ends in column described in two groups are provided with the adjusting fixation kit, stand described in another set Column both ends are provided with the first fixture block, and the guide rail is provided with the second fixture block far from the side for adjusting fixation kit, described to lead Rail mutually clamps fixation by second fixture block and first fixture block with the column for being provided with first fixture block.
Preferably, the fast-assembling shower house further includes fixed door, and the fixed door is set between two guide rails, and with The column for being provided with first fixture block is fixedly connected, and the column for being provided with first fixture block offers fixing groove, described solid Determine badge and enter the fixing groove, the column for being provided with first fixture block is fixed on by fixed adhesive tape.
Preferably, the guide rail is provided with limited block, and the limited block is located at the fixed door close to the dodge gate one The both ends of the fixation adhesive tape of side.
Preferably, the limited block is detachably connected with the guide rail.
Technical solutions of the utility model are provided with adjusting fixation kit by both ends at least one set of in two groups of columns, In, adjusting fixation kit includes the regulating part and fixing piece being connected, while column is provided with mounting groove, and fixing piece is embedded at this Mounting groove when installation, adjusts regulating part to control the distance between at least one set of column and wall, then by locking regulating part come reality Now the column and wall are bonded, so that it is not necessary that aluminium frame is arranged outside column, are come by adjusting aluminium frame so that column and wall It fits closely, reduce installation part and improves the stability and reliability of shower house.
Detailed description of the invention
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only It is some embodiments of the utility model, for those of ordinary skill in the art, in the premise not made the creative labor Under, the structure that can also be shown according to these attached drawings obtains other attached drawings.
Fig. 1 is the overall structure diagram of one embodiment of the utility model fast-assembling shower house;
Fig. 2 is the adjusting fixation kit structural schematic diagram of fast-assembling shower house in Fig. 1;
Fig. 3 is the decoration cover structure schematic diagram of fast-assembling shower house in Fig. 1;
Fig. 4 is the first fixture block and the second fixture block structural schematic diagram of fast-assembling shower house in Fig. 1;
Fig. 5 is the standoff features schematic diagram of fast-assembling shower house in Fig. 1;
Drawing reference numeral explanation:
Label Title Label Title
1 Column 51 Pulley
12 Mounting groove 6 Trim
13 First fixture block 61 Dovetails
2 Guide rail 7 Limited block
21 Waist-shaped hole 8 Locating part
22 Second fixture block 9 Adjust fixation kit
3 Lock-screw 91 Regulating part
4 Fixed door 92 Fixing piece
41 Fixed adhesive tape 921 Dovetail groove
5 Dodge gate
The embodiments will be further described with reference to the accompanying drawings for the realization, functional characteristics and advantage of the utility model aim.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describing, it is clear that described embodiment is only a part of the embodiment of the utility model, rather than all Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are not making creative work premise Under every other embodiment obtained, fall within the protection scope of the utility model.
It is to be appreciated that the directional instruction (such as up, down, left, right, before and after ...) of institute in the utility model embodiment It is only used for explaining in relative positional relationship, the motion conditions etc. under a certain particular pose (as shown in the picture) between each component, such as When the fruit particular pose changes, then directionality instruction also correspondingly changes correspondingly.
In the present invention unless specifically defined or limited otherwise, term " connection ", " fixation " etc. should do broad sense reason Solution, for example, " fixation " may be a fixed connection, may be a detachable connection, or integral;It can be mechanical connection, it can also To be electrical connection;It can be directly connected, the connection inside two elements can also be can be indirectly connected through an intermediary Or the interaction relationship of two elements, unless otherwise restricted clearly.It for the ordinary skill in the art, can be with The concrete meaning of above-mentioned term in the present invention is understood as the case may be.
In addition, the description for being related to " first ", " second " etc. in the present invention is used for description purposes only, and cannot understand For its relative importance of indication or suggestion or implicitly indicate the quantity of indicated technical characteristic.Define as a result, " first ", The feature of " second " can explicitly or implicitly include at least one of the features.In addition, the technical side between each embodiment Case can be combined with each other, but must be based on can be realized by those of ordinary skill in the art, when the combination of technical solution Conflicting or cannot achieve when occur will be understood that the combination of this technical solution is not present, also not in the requires of the utility model Protection scope within.
The utility model proposes a kind of fast-assembling shower houses.
In the utility model embodiment, please refer to Fig. 1 and Fig. 2, the fast-assembling shower house include: column 1, guide rail 2 and Dodge gate 51, column 1 or so are arranged at intervals with two groups, and at least one set of 1 both ends of column, which are provided with, adjusts fixation kit 9, adjust solid Determining component 9 includes the regulating part 91 and fixing piece 92 being connected, while column 1 is provided with mounting groove 12, and fixing piece 92 is embedded at The mounting groove 12, about 2 guide rail are arranged at intervals with two groups, are connected to regulating part 91, when installation, by adjust regulating part 91 make to Few one group of column 1 is mobile relative to guide rail 2, to control at least one set of the distance between column 1 and wall.
In this application, guide rail 2 includes upper rail 2 and lower guideway 2, and column 1 is then used to support and connects two guide rails 2, no Indigestibility, since the geographical location of installation is different, required 2 length of guide rail is also inconsistent, and the guide rail 2 of fixed length is easy to lead There are gaps between cause installation rear column 1 and wall, therefore at least one set of both ends are provided with adjusting fixation kit 9 in two groups of columns 1, And offer mounting groove 12, wherein adjusting fixation kit 9 includes the regulating part 91 and fixing piece 92 being connected, and fixing piece 92 is embedding In mounting groove 12, regulating part 91 is then connected with guide rail 2, and the position on guide rail 2 is adjustable, so set, just In, not because limited according to the geographical location of installation, column 1 may make closely to paste with wall by adjusting component when selecting guide rail 2 It closes, it is not necessary that aluminium frame is arranged outside column 1, reduce installation part and improves the stability and reliability of shower house.It needs to illustrate , in other embodiments, the both ends for being also possible to two groups of columns 1, which are provided with, adjusts fixation kit 9, in order to shower house Both sides all the distance between adjustable upright column 1 and wall.In addition, in this embodiment, dodge gate 51 can be moved back along two guide rails 2 Dynamic, the upper end uses common pulley, and bottom end uses spring wheel, it will be understood that so during installation, movable glass part is suspended to In upper rail, bottom buckles into lower railway with spring wheel, so that dodge gate 51 is easy for installation and firm.
Technical solutions of the utility model at least one set of both ends in two groups of columns 1, which are provided with, adjusts fixation kit 9, wherein Adjusting fixation kit 9 includes the regulating part 91 and fixing piece 92 being connected, while column 1 is provided with mounting groove 12, fixing piece 92 It is embedded at the mounting groove 12, when installation, adjusts regulating part 91 to control the distance between at least one set of column 1 and wall, then pass through Regulating part 91 is locked to realize being bonded for the column 1 and wall, so that it is not necessary that aluminium frame is arranged outside column 1, by adjusting aluminium Frame comes so that column 1 and wall fit closely, and reduces installation part and improves the stability and reliability of shower house.
The regulative mode of regulating part 91 Yu guide rail 2 will be introduced now, and regulating part 91 offers threaded hole, the corresponding spiral shell of guide rail 2 Pit position offers the waist-shaped hole 21 along 2 length direction of guide rail, and passing through waist-shaped hole 21 and threaded hole 3 by lock-screw will adjust It saves part 91 and guide rail 2 is fixed.In the present embodiment, the regulating part 91 for offering threaded hole protrudes into 2 inside of guide rail, 2 side of guide rail The waist-shaped hole 21 along 2 length direction of guide rail is offered in corresponding screw thread hole site, regulating part 91 is adjusted between column 1 and wall Distance after, regulating part 91 and guide rail 2 pass through the fixation of lock-screw 3.It is adjusted by wearing lock-screw 3 in sliding in waist-shaped hole 21 Section, so that it is simple and reliable to adjust the fixation of easy to operate and screw.It should be noted that regulating part 91 can in other embodiments To be extensible member, or sliding is connected to guide rail 2, realizes that limit is fixed by modes such as buckles, can guarantee regulating part 91 It is adjusted along its length in guide rail 2.
Next the mounting means of fixing piece 92 Yu column 1 will be introduced, referring to FIG. 2, fixing piece 92 is in " Y " font, peace The opening shape of tankage 12 is adapted with the shape of fixing piece 92.So set, after fixing piece 92 is embedded in mounting groove 12, quilt It retains and can not be moved along the length direction of guide rail 2, so that fixing piece 92 is quick for installation with guide rail 2 and guarantees fixed effect, Right the application is without being limited thereto, and in other embodiments, fixing piece 92 is also possible to T-shaped or " I " fonts etc..
For the ease of adjusting the manufacturing of fixation kit 9, regulating part 91 and fixing piece 92 are integrally formed.It is appreciated that Regulating part 91 is wholely set with fixing piece 92, improves whole structural strength, while convenient for simplifying processing technology, it is specific and Speech, regulating part 91 and fixing piece 92 can be using being integrally formed, and be also possible to punching press integrated molding.
It is consolidated in order to enable adjusting fixation kit 9 and adjusting with guide rail 2, fast-assembling shower house further includes trim 6, trim 6 It is connected to fixing piece 92, and is enclosed set on 2 outside of guide rail.In the present embodiment, trim 6 is the card frame that side is opening, It connect with fixing piece 92, and three medial surfaces are fastened in the side surface of guide rail 2, so set, to adjust fixation kit 9 There is the side wall of trim 6 to limit with guide rail 2, be not easy to shake, while making the whole more beautiful exquisiteness of shower house.
Further, referring to FIG. 3, trim 6 is provided with dovetails 61 close to the side of fixing piece 92, fixing piece 92 in Corresponding 61 position of dovetails is provided with dovetail groove 921, trim 6 and the fixing piece 92 and passes through dovetails 61 and dovetail groove 921 Mutually connect and fix.It can be appreciated that being connected and fixed using dovetails 61 and 921 phase of dovetail groove, so that installation lid is easy for installation, and match Close closer, certainly, T-shape block has also can be set in trim 6, and fixing piece 92 offers compatible T-shape slot, the application This is not construed as limiting, 6 close installation of trim can be guaranteed in fixing piece 92.
The connection type for adjusting fixation kit 9 and column 1 and guide rail 2 is described above, next will specifically introduce two groups Wherein one group of both ends is provided with adjusting fixation kit 9 to column 1, and the mounting means of another set column 1 and guide rail 2 please refers to figure 4, one group of both ends in two groups of columns 1, which are provided with, adjusts fixation kit 9, and 1 both ends of another set column are provided with the first fixture block 13, Guide rail 2 is provided with the second fixture block 22 far from the side for adjusting fixation kit 9, guide rail 2 be provided with the vertical of the first fixture block 13 Column 1 is clamped with 13 phase of the first fixture block by second fixture block 22 and is fixed.Specifically, the second fixture block 22 offers and first The compatible groove of fixture block 13, so that the first fixture block 13 is inserted into the groove and limits column 1 in 2 length direction of guide rail Position clamping, and limited by wall with ground in the width direction of guide rail 2, to realize guide rail 2 and be provided with the first fixture block 13 The installation of column 1 fix.And it can be with for the ease of installation and maintenance, the first fixture block 13 and column 1 and the second fixture block 22 and guide rail 2 It is set as being detachably connected, such as passes through fixed the two of screw etc..
Further, Fig. 1 and Fig. 5 are please referred to, fast-assembling shower house further includes fixed door 4, and fixed door 4 is set to two guide rails 2 Between, and be fixedly connected with the column 1 for being provided with the first fixture block 13, the column 1 for being provided with the first fixture block 13 offers fixing groove, Fixed door 4 is caught in fixing groove, and the column 1 for being provided with the first fixture block 13 is fixed on by fixed adhesive tape 41.Wherein, fixed door 4 one As prepared using glass plate, adopt to be screwed and need the aperture in fixed door 4, there are security risks and installation unstable to ask Topic, and fixing groove is offered in the column 1 for being provided with the first fixture block 13, fixed door 4 is caught in fixing groove, then pass through fixed adhesive tape 41 is fixed, so set, firmly installing fixed door 4 and convenient and efficient.
In order to limit the motion range of dodge gate 51, guide rail 2 is provided with limited block 7, and it is close that limited block 7 is located at fixed door 4 The both ends of the fixation adhesive tape 41 of 51 side of dodge gate.It is appreciated that being avoided using the motion range that limited block 7 limits dodge gate 51 People exerts oneself excessive and makes 51 move distance of dodge gate excessive, damages dodge gate 51 and influences the stability of shower house, is The stability for adjusting fixation kit 9 is improved, referring to FIG. 4, guide rail 2 is connected far from the side of column 1 in adjusting fixation kit 9 There is the locating part 8 to limit 5 sliding scale of dodge gate.Wherein, it offers and slides close to the side of dodge gate 5 in locating part 8 51 compatible arc grooves are taken turns, when dodge gate 5 moves to certain position, the arc groove on locating part 8 resists pulley 51, and makes It obtains dodge gate 5 to move in a certain range, be collided so set, avoiding and adjusting fixation kit 9 when dodge gate 5 moves And reduce stability.
Further, limited block 7 is detachably connected with guide rail 2.So set, the later period maintenance convenient for limited block 7 is replaced. In the present embodiment, connecting hole is offered on limited block 7,2 corresponding position of guide rail offers threaded hole, by wearing screw reality The fastening of existing limited block 7 and guide rail 2, it is possible to understand that it is fastened using screw, it is easy for installation, it is reliable and stable.Certainly, in other implementations In example, limited block 7 and guide rail 2 are also possible to using being fastened and connected or spring fixture block and card slot clamp fixation.
The specific installation steps of fast-assembling shower house in the application will be introduced now:
Lower track portion is put in bottom basin or ground by the first step, will be provided with the column 1 and guide rail of the first fixture block 13 The second fixture block 22 on 2, which clamps, to be fixed, and adjusts regulating part 91 so to control and be provided with the column 1 and wall that adjust fixation kit 9 The distance between, two columns 1 and 2 fixing assembling of guide rail are good, position is finished by horizontal ruler, is preset according to two columns 1 Lead to the hole site, be drilled porthole, then remove two columns 1, then lower railway is fixed with self-tapping screw on bottom basin or ground On, then the second fixture block 22 and the first fixture block 13 that lower railway is arranged close to 1 side of column of the first fixture block 13 clamps solid Fixed, adjustment lower railway arrives the distance for being provided with the column 1 for adjusting fixation kit 9, and with the regulating part 91 in adjusting fixation kit 9 It locks.
Fixed door 4 is put into the fixed card slot of lower railway and the column 1 that is provided with the first fixture block 13, in card by second step Entering fixed adhesive tape 41 keeps fixed door 4 fixed, and upper rail is then corresponded to fixed door 4 and the column 1 for being provided with the first fixture block 13 The second fixture block 22 card for 1 side of column for being caught in, and upper rail being made to be arranged close to the first fixture block 13 is clamped with the first fixture block 13 Fixed, then adjustment upper rail is to being provided with the distance for adjusting the column 1 of fixation kit 9, and with the tune in adjusting fixation kit 9 Part 91 is saved to lock.
51 part of dodge gate is suspended in upper rail by third step, and the pulley of bottom spring structure buckles into lower railway, is adjusted Well upper lower sheave.
6 plate of trim is buckled into two columns 1 by the 4th step, and lower railway trim 6 covers on both ends, not only beautiful but also succinct.
5th step installs top trim 6, door side adhesive tape and knob, and limited block 7 is installed to fixed glass door side glue Top.It can be settled in whole process 20 minutes, it is not only convenient and efficient but also solid and reliable.
The above is only the preferred embodiment of the present invention, and therefore it does not limit the scope of the patent of the utility model, It is all under the inventive concept of the utility model, equivalent structure made based on the specification and figures of the utility model becomes It changes, or directly/be used in other related technical areas indirectly and be included in the scope of patent protection of the utility model.

Claims (10)

1. a kind of fast-assembling shower house characterized by comprising
Column, described column or so are arranged at intervals with two groups, and at least one set of column both ends are provided with adjusting fixation kit, institute Stating and adjusting fixation kit includes the regulating part and fixing piece being connected, and the column is provided with mounting groove, and the fixing piece is embedded In the mounting groove;
Guide rail, the guide rail are arranged at intervals with two groups up and down, and the guide rail is connected to the regulating part;And
Dodge gate, the dodge gate are set between two guide rails, and are slid and be connected to two guide rails;
When installation, keep at least one set of column mobile relative to the guide rail by adjusting the regulating part, to control at least The distance between column and wall described in one group.
2. fast-assembling shower house as described in claim 1, which is characterized in that the regulating part offers threaded hole, the guide rail The corresponding screw thread hole site offers the waist-shaped hole along the rail length direction, passes through the waist-shaped hole by lock-screw The regulating part and the guide rail are fixed with the threaded hole.
3. fast-assembling shower house as described in claim 1, which is characterized in that the fixing piece is in " Y " font, the mounting groove Opening shape is adapted with the shape of the fixing piece.
4. the fast-assembling shower house as described in any one of claims 1 to 3, which is characterized in that the regulating part with it is described solid Determine part integrated molding.
5. fast-assembling shower house as described in claim 1, which is characterized in that the fast-assembling shower house further includes trim, described Trim is connected to the fixing piece, and encloses on the outside of the guide rail.
6. fast-assembling shower house as claimed in claim 5, which is characterized in that the trim is set close to the side of the fixing piece Dovetails are equipped with, the fixing piece is provided with dovetail groove, the trim and the fixing piece in the correspondence dovetails position It is mutually connected and fixed by the dovetails and the dovetail groove.
7. fast-assembling shower house as described in claim 1, which is characterized in that one group of both ends setting in column described in two groups is Adjusting fixation kit is stated, column both ends described in another set are provided with the first fixture block, and the guide rail is far from the fixed group of the adjusting The side of part is provided with the second fixture block, and the guide rail passes through second fixture block and institute with the column for being provided with first fixture block It states the first fixture block and mutually clamps fixation.
8. fast-assembling shower house as claimed in claim 7, which is characterized in that the fast-assembling shower house further includes fixed door, described Fixed door is set between two guide rails, and is fixedly connected with the column for being provided with first fixture block, is provided with described The column of one fixture block offers fixing groove, and the fixed door is caught in the fixing groove, has been fixed on setting by fixed adhesive tape State the column of the first fixture block.
9. fast-assembling shower house as claimed in claim 8, which is characterized in that the guide rail is provided with limited block, the limited block Positioned at the fixed door close to the both ends of the fixation adhesive tape of the dodge gate side.
10. fast-assembling shower house as claimed in claim 9, which is characterized in that the limited block is detachably connected with the guide rail.
CN201920044569.6U 2019-01-10 2019-01-10 Fast-assembling shower house Active CN209610975U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920044569.6U CN209610975U (en) 2019-01-10 2019-01-10 Fast-assembling shower house

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920044569.6U CN209610975U (en) 2019-01-10 2019-01-10 Fast-assembling shower house

Publications (1)

Publication Number Publication Date
CN209610975U true CN209610975U (en) 2019-11-12

Family

ID=68449538

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920044569.6U Active CN209610975U (en) 2019-01-10 2019-01-10 Fast-assembling shower house

Country Status (1)

Country Link
CN (1) CN209610975U (en)

Similar Documents

Publication Publication Date Title
CN109620023A (en) Fast-assembling shower house
JPS62290411A (en) Mount parts for drawer
CA2869892A1 (en) Railing and baluster plug system
CA1297237C (en) Shower-partition
KR20060049524A (en) Window regulator slider and vehicle window regulator equipped therewith
CN209610975U (en) Fast-assembling shower house
US20220356714A1 (en) Infill adaptor for a balustrade
CN208310520U (en) A kind of shower doors pulley assembly
CN210622657U (en) Steel frame keel wall surface of indoor sliding door
US11021879B2 (en) Wall panel and associated apparatus
CN208965853U (en) Keel frame structure convenient to installation
JPS6328307Y2 (en)
CN211037655U (en) Assembling wallboard and ceiling mounting device
CN214365646U (en) Adjustable wooden door frame
CN220828170U (en) Fast-assembling structure of primary rail and auxiliary rail
CN221761077U (en) Glass frame
CN220133358U (en) Leveling structure for leveling wall panel
CN218234149U (en) Wall keel assembly that makes level
CN114834367B (en) Car window outer decorative frame, no step difference plane type closing device and car
CN114482388B (en) Wall top closing-in structure and installation method
JP7390175B2 (en) fence
CN115030441A (en) Clamping type overhead leveling structure and mounting method thereof
CN216787543U (en) Partition wall installation system capable of leveling height
CN213087060U (en) Node connecting assembly for assembly type building
CN221220143U (en) Auxiliary rail structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant