CN209608280U - Chute is used in a kind of construction of communication engineering - Google Patents
Chute is used in a kind of construction of communication engineering Download PDFInfo
- Publication number
- CN209608280U CN209608280U CN201920438733.1U CN201920438733U CN209608280U CN 209608280 U CN209608280 U CN 209608280U CN 201920438733 U CN201920438733 U CN 201920438733U CN 209608280 U CN209608280 U CN 209608280U
- Authority
- CN
- China
- Prior art keywords
- screw hole
- fixed
- screw
- block
- fixedly connected
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses a kind of communication engineering construction chutes, it is related to chute technical field, including two symmetrical fixed columns, the inside of each fixed column is mounted on regulating mechanism, the bottom surface of each fixed column is fixedly connected to rack, and the side that two racks are located remotely from each other is mounted on bindiny mechanism.Communication engineering construction chute, achieve the effect that move up and down connecting column, has the function that pillar height degree is fixedly connected with by the first screw, have the advantages that convenient for adjusting, preferably cable or optical cable can be carried out putting guidance, it is opened up by the upper surface of each connecting plate there are two the 5th symmetrical screw hole, connecting column can be made to be fixed with furred ceiling by the 5th screw hole, have the advantages that guarantee monolithic stability, improve whole practical function, achieve the effect that be caught in fixture block can in card slot, the function of having the multiple racks of connection, have the advantages that convenient for connection installation.
Description
Technical field
The utility model relates to chute technical field, chute is used in specially a kind of communication engineering construction.
Background technique
Chute is also cable testing bridge, is the equipment that computer room is specifically used to cabling, and fingering enters the machine of telecommunications, Netcom and broadcasting and TV
It is given out light behind room by chute cloth, cable enters terminal device, for binding the brandreth of light and cable.
For the chute of communication engineering construction, most of be fixed on furred ceiling, high for putting cable or optical cable
It spends relatively fixed, be easy to cause due to cable or cable length deficiency to influence to protrude into terminal device, pole is not easy to adjust.
Utility model content
The purpose of the utility model is to provide a kind of communication engineering construction chute, have the advantages of convenient for adjusting,
Solve the problems, such as that existing chute is not easy to adjust.
The utility model is in order to solve the above technical problems, provide the following technical solutions: cabling is used in a kind of construction of communication engineering
Frame, including two symmetrical fixed columns, the inside of each fixed column is mounted on regulating mechanism, each fixed column
Bottom surface be fixedly connected to rack, the side that two racks are located remotely from each other is mounted on bindiny mechanism.
The regulating mechanism include sliding slot, the first screw hole, through-hole, connecting column, cavity, sliding block, fixed block, the second screw hole and
First screw, the inside of each fixed column are arranged with cavity, and two cavity inner sidewalls close to each other open up
There is sliding slot, the inner sidewall that two cavitys are located remotely from each other offers the first screw hole being spaced substantially equidistant, each cavity
Inside be placed with fixed block, two fixed block one sides close to each other are fixedly connected to compatible with sliding slot
Sliding block, and sliding block is connected in sliding slot, the one side that two fixed blocks are located remotely from each other offers the second screw hole, two institutes
It states the side that fixed column is located remotely from each other and is placed with the first screw, two first screw thread ends one end close to each other point
It two group of first screw hole and Guan Chuan not extend in the second screw hole, first screw hole and the second screw hole connect with the first screw thread
It connecing, the upper surface of each fixed block is fixedly connected to connecting column, and the inner roof wall of each cavity offers through-hole,
The top of two connecting columns extends through two through-holes and extends to the top of fixed column.
The bindiny mechanism includes third screw hole, card slot, link block, the second screw, fixture block and the 4th screw hole, described in two
The one side that rack is located remotely from each other is fixedly connected to link block, and the front of each link block offers card slot, often
The inner roof wall of a card slot offers third screw hole, and the top of each third screw hole is threaded with the second spiral shell
Nail, the back side of each link block are fixedly connected to fixture block compatible with card slot, and the upper surface of each fixture block is equal
Offer the 4th screw hole.
Further, the upper surface of each connecting column is fixedly connected to connecting plate, each connecting plate it is upper
Surface is opened up there are two the 5th symmetrical screw hole.
By using above-mentioned technical proposal, entirety can be made to be fixedly connected with furred ceiling by the 5th screw hole, had just
In the effect of installation.
Further, the connecting column is cylindrical, and the diameter value of connecting column is less than the diameter value of through-hole.
By using above-mentioned technical proposal, it is therefore prevented that generate the case where rubbing between connecting column and through-hole.
Further, the vertical length value of the connecting column is greater than the vertical length value of cavity, the level of the fixed block
Length value is greater than the diameter value of through-hole.
By using above-mentioned technical proposal, whole practical function is improved, it is therefore prevented that fixed block skids off the feelings outside cavity
Condition occurs.
Further, it is placed with fixed plate between two fixed columns, and the left and right sides of fixed plate are respectively with two
A fixed column one side close to each other is fixedly connected.
By using above-mentioned technical proposal, the stabilization between two fixed columns further ensure that, improve whole
Stability.
Further, the quantity of the first screw hole described in two groups is equal, and the quantity of every group of first screw hole is at least 16.
By using above-mentioned technical proposal, whole practical function is improved, has the advantages that be easy to use.
Compared with prior art, the communication engineering construction chute have it is following the utility model has the advantages that
1, the utility model offers cavity and the first screw hole, the second screw hole, by the inside of each fixed column
Being equipped between one screw, fixed block, connecting column, sliding slot and sliding block has achieved the effect that move up and down connecting column have
For the function of being fixedly connected with pillar height degree by the first screw, have the advantages that convenient for adjusting, it can be preferably to cable or light
Cable carries out putting guidance, is opened up by the upper surface of each connecting plate there are two the 5th symmetrical screw hole, Neng Goutong
Crossing the 5th screw hole is fixed connecting column with furred ceiling, has the advantages that guarantee monolithic stability, improves whole practical function.
2, the utility model is fixedly connected to link block, and card by the one side that two racks are located remotely from each other
Being equipped between block, card slot, third screw hole, third screw hole and the second screw, having reached be caught in fixture block can in card slot
Effect has the function of the multiple racks of connection, has the advantages that improve installation splicing efficiency convenient for connection installation.
Detailed description of the invention
Fig. 1 is the utility model fixed column cross-sectional view;
Fig. 2 is the cross-sectional view of the utility model link block side view;
Fig. 3 is structure enlargement diagram at A in the utility model Fig. 1.
In figure: 1- regulating mechanism, 101- sliding slot, the first screw hole of 102-, 103- through-hole, 104- connecting column, 105- cavity,
106- sliding block, 107- fixed block, the second screw hole of 108-, the first screw of 109-, 2- bindiny mechanism, 201- third screw hole, 202- card
Slot, 203- link block, the second screw of 204-, 205- fixture block, the 4th screw hole of 206-, 3- fixed column, 4- connecting plate, the 5th spiral shell of 5-
Hole, 6- fixed plate, 7- rack.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
Fig. 1-3 is please referred to, the utility model provides a kind of technical solution: a kind of communication engineering construction chute, including
Two symmetrical fixed columns 3, the inside of each fixed column 3 are mounted on regulating mechanism 1, and the bottom surface of each fixed column 3 is solid
Surely it is connected with rack 7, the side that two racks 7 are located remotely from each other is mounted on bindiny mechanism 2.
Regulating mechanism 1 includes sliding slot 101, the first screw hole 102, through-hole 103, connecting column 104, cavity 105, sliding block 106, consolidates
Determine block 107, the second screw hole 108 and the first screw 109, the inside of each fixed column 3 is arranged with cavity 105, two cavitys 105
Inner sidewall close to each other offers sliding slot 101, and the inner sidewall that two cavitys 105 are located remotely from each other, which offers, to be spaced substantially equidistant
The first screw hole 102, the inside of each cavity 105 is placed with fixed block 107, two fixed blocks 107 side close to each other
Face is fixedly connected to sliding block 106 compatible with sliding slot 101, and sliding block 106 is connected in sliding slot 101, two fixed blocks 107
The one side being located remotely from each other offers the second screw hole 108, and the side that two fixed columns 3 are located remotely from each other is placed with the first screw
109, two 109 end of thread of the first screw one end close to each other extend through two group of first screw hole 102 and extend to the second spiral shell
In hole 108, the first screw hole 102 is threadedly coupled with the first screw 109 with the second screw hole 108, the upper surface of each fixed block 107
It is fixedly connected to connecting column 104, the inner roof wall of each cavity 105 offers through-hole 103, the top of two connecting columns 104
It extends through two through-holes 103 and extends to the top of fixed column 3.
Bindiny mechanism 2 includes third screw hole 201, card slot 202, link block 203, the second screw 204, fixture block 205 and the 4th
Screw hole 206, the one side that two racks 7 are located remotely from each other are fixedly connected to link block 203, the front of each link block 203
Card slot 202 is offered, the inner roof wall of each card slot 202 offers third screw hole 201, the top of each third screw hole 201
It is threaded with the second screw 204, the back side of each link block 203 is fixedly connected to fixture block compatible with card slot 202
205, the upper surface of each fixture block 205 offers the 4th screw hole 206.
Further, the upper surface of each connecting column 104 is fixedly connected to connecting plate 4, the upper surface of each connecting plate 4
The 5th symmetrical screw hole 5 there are two opening up, can be such that entirety is fixedly connected with furred ceiling, have by the 5th screw hole 5
The effect being easily installed.
Further, connecting column 104 is cylindrical, and the diameter value of connecting column 104 is less than the diameter value of through-hole 103, prevents
Stop and has generated the case where rubbing between connecting column 104 and through-hole 103.
Further, the vertical length value of connecting column 104 is greater than the vertical length value of cavity 105, the level of fixed block 107
Length value is greater than the diameter value of through-hole 103, improves whole practical function, it is therefore prevented that fixed block 107 skids off outside cavity 105
It happens.
Further, be placed with fixed plate 6 between two fixed columns 3, and the left and right sides of fixed plate 6 respectively with two
The one side close to each other of fixed column 3 is fixedly connected, and further ensure that the stabilization between two fixed columns 3, is improved whole
The stability of body.
Further, the quantity of two group of first screw hole 102 is equal, and the quantity of every group of first screw hole 102 is at least 16
It is a, whole practical function is improved, has the advantages that be easy to use.
In use, connecting plate 4 is mounted on furred ceiling by connections such as the 5th screw holes 5 and other screws, so that fixation is whole
The first screw 109 is back-outed when needing to adjust the height of rack 7 in the position of body, helps about 3 fixed column by manpower
It is mobile, when determining height, by the first screw 109 be screwed into again in the first screw hole 102 similar in the second screw hole 108, simultaneously
It is screwed into the second screw hole 108, is used for fixed height, so that height adjustment is completed, when needing multiple racks 7 to be spliced,
Be caught in the fixture block 205 on rack 7 in the card slot 202 of another rack 7, by the second screw 204 be screwed into third screw hole 201 with
In 4th screw hole 206, to complete the splicing of multiple racks 7.
Claims (6)
1. a kind of communication engineering construction chute, including two symmetrical fixed columns (3), it is characterised in that: each described
The inside of fixed column (3) is mounted on regulating mechanism (1), and the bottom surface of each fixed column (3) is fixedly connected to rack
(7), the side that two racks (7) are located remotely from each other is mounted on bindiny mechanism (2);
The regulating mechanism (1) includes sliding slot (101), the first screw hole (102), through-hole (103), connecting column (104), cavity
(105), sliding block (106), fixed block (107), the second screw hole (108) and the first screw (109), each fixed column (3)
Inside is arranged with cavity (105), and two cavity (105) inner sidewalls close to each other offer sliding slot (101), and two
The inner sidewall that the cavity (105) is located remotely from each other offers the first screw hole (102) being spaced substantially equidistant, each cavity
(105) inside is placed with fixed block (107), and two fixed block (107) one sides close to each other are fixedly connected with
Have with sliding slot (101) compatible sliding block (106), and sliding block (106) is connected in sliding slot (101), two fixed blocks
(107) one side being located remotely from each other offers the second screw hole (108), and the side that two fixed columns (3) are located remotely from each other is equal
It is placed with the first screw (109), two the first screw (109) end of thread one end close to each other extend through two group first
Screw hole (102) simultaneously extends in the second screw hole (108), first screw hole (102) and the second screw hole (108) with the first screw
(109) it is threadedly coupled, the upper surface of each fixed block (107) is fixedly connected to connecting column (104), each cavity
(105) inner roof wall offers through-hole (103), and the top of two connecting columns (104) extends through two through-holes (103)
And extend to the top of fixed column (3);
The bindiny mechanism (2) includes third screw hole (201), card slot (202), link block (203), the second screw (204), fixture block
(205) and the 4th screw hole (206), the one side that two racks (7) are located remotely from each other are fixedly connected to link block
(203), the front of each link block (203) offers card slot (202), and the inner roof wall of each card slot (202) is equal
It offers third screw hole (201), the top of each third screw hole (201) is threaded with the second screw (204), each
The back side of the link block (203) is fixedly connected to and card slot (202) compatible fixture block (205), each fixture block
(205) upper surface offers the 4th screw hole (206).
2. a kind of communication engineering construction chute according to claim 1, it is characterised in that: each connecting column
(104) upper surface is fixedly connected to connecting plate (4), and the upper surface of each connecting plate (4) opens up that there are two opposite
The 5th screw hole (5) claimed.
3. a kind of communication engineering construction chute according to claim 1, it is characterised in that: the connecting column (104)
It is cylindrical, and the diameter value of connecting column (104) is less than the diameter value of through-hole (103).
4. a kind of communication engineering construction chute according to claim 1, it is characterised in that: the connecting column (104)
Vertical length value be greater than the vertical length value of cavity (105), the horizontal length value of the fixed block (107) is greater than through-hole
(103) diameter value.
5. a kind of communication engineering construction chute according to claim 1, it is characterised in that: two fixed columns
(3) it is placed between fixed plate (6), and the left and right sides of fixed plate (6) respectively close to each other with two fixed columns (3) one
Side is fixedly connected.
6. a kind of communication engineering construction chute according to claim 1, it is characterised in that: the first screw hole described in two groups
(102) quantity is equal, and the quantity of every group of first screw hole (102) is at least 16.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920438733.1U CN209608280U (en) | 2019-04-02 | 2019-04-02 | Chute is used in a kind of construction of communication engineering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920438733.1U CN209608280U (en) | 2019-04-02 | 2019-04-02 | Chute is used in a kind of construction of communication engineering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209608280U true CN209608280U (en) | 2019-11-08 |
Family
ID=68407086
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920438733.1U Expired - Fee Related CN209608280U (en) | 2019-04-02 | 2019-04-02 | Chute is used in a kind of construction of communication engineering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209608280U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111106582A (en) * | 2019-12-05 | 2020-05-05 | 国网山西省电力公司晋城供电公司 | Wire casing connection structure for information communication machine room of power company |
-
2019
- 2019-04-02 CN CN201920438733.1U patent/CN209608280U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111106582A (en) * | 2019-12-05 | 2020-05-05 | 国网山西省电力公司晋城供电公司 | Wire casing connection structure for information communication machine room of power company |
CN111106582B (en) * | 2019-12-05 | 2021-06-25 | 国网山西省电力公司晋城供电公司 | Wire casing connection structure for information communication machine room of power company |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209608280U (en) | Chute is used in a kind of construction of communication engineering | |
CN208461230U (en) | A kind of power distribution cabinet with wiring groove | |
CN101566712B (en) | Optical cable cross connection cabinet special for FTTB (fiber to the building) and FTTH (fiber to the home) | |
CN205475684U (en) | Frame structure | |
CN109103780A (en) | A kind of indoor integrated photoelectric optical fiber composite low-voltage power cable distribution box | |
CN218448927U (en) | Installation frame structure for box-type substation | |
CN207686342U (en) | A kind of assembled architecture wall support device | |
CN108049506B (en) | Prefabricated house system | |
CN203490397U (en) | Optical splitting fiber distribution box | |
CN109204611A (en) | Window cover under a kind of car | |
CN209707768U (en) | A kind of fiber cable cross connection box fine device of extension | |
CN211348784U (en) | Built-in wire arranging box of optical fiber box | |
CN217624997U (en) | Storage device is used in opto-coupler plate production | |
CN207339134U (en) | A kind of cable bearer with plug-in type chassis | |
CN206611122U (en) | A kind of chute for big data computer room | |
KR20190112154A (en) | Fiber access terminal | |
CN208635802U (en) | A kind of patch wall patch ground dual-purpose type laser level | |
CN206093432U (en) | Support frame and LCD TV | |
CN205278909U (en) | Ceiling lamp convenient to installation | |
CN217540490U (en) | Conveniently-installed light projecting lamp group | |
CN217007760U (en) | Positioning device for optical fiber jumper | |
CN206387934U (en) | A kind of multistation optical fiber distribution box for communication equipment | |
CN213682507U (en) | Light steel plate house convenient to disassemble and assemble for building construction | |
CN210609529U (en) | Novel comprehensive wiring distribution frame | |
CN204595290U (en) | Fixed cell introduced by fiber cable cross connection box optical cable |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20191108 Termination date: 20200402 |