CN209608264U - A kind of temporary cable holder device of foldable turnover - Google Patents

A kind of temporary cable holder device of foldable turnover Download PDF

Info

Publication number
CN209608264U
CN209608264U CN201920634779.0U CN201920634779U CN209608264U CN 209608264 U CN209608264 U CN 209608264U CN 201920634779 U CN201920634779 U CN 201920634779U CN 209608264 U CN209608264 U CN 209608264U
Authority
CN
China
Prior art keywords
vertical
bar
cross bar
transverse steel
bearing diagonal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920634779.0U
Other languages
Chinese (zh)
Inventor
殷帅杰
李书信
吉亚兵
刘磊
陆超豪
熊杰
程建军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Original Assignee
Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd filed Critical Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Priority to CN201920634779.0U priority Critical patent/CN209608264U/en
Application granted granted Critical
Publication of CN209608264U publication Critical patent/CN209608264U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of temporary cable holder device of foldable turnover, including vertical bar, cross bar, bearing diagonal, adjusting bolt, vertical reinforcement and transverse steel;The vertical bar, cross bar and bearing diagonal are 40*40*3mm angle steel, the both ends of the vertical bar pass through through-wall bolt and wall connecting respectively, the vertical bar is located on perpendicular, by adjusting, bolt is vertical with one end of cross bar to be connected for the middle and upper part of the vertical bar, bearing diagonal is provided between the cross bar and vertical bar, the both ends of the bearing diagonal pass through adjusting bolt respectively and connect with cross bar and vertical bar, under being facing perpendicularly to of the cross bar, the both ends of the upper surface of its horizontal plane are respectively arranged with the vertical reinforcement of 50mm long, transverse steel is fixed between the vertical reinforcement, the installation of the outside of the vertical reinforcement and transverse steel is socketed with insulation PCV pipe, cable is placed on the insulation PCV pipe of the transverse steel.The utility model structure is simple, easy to disassemble to be reused.

Description

A kind of temporary cable holder device of foldable turnover
Technical field
The utility model relates to construction tools, and in particular to a kind of temporary cable branch of foldable turnover is rack-mounted It sets.
Background technique
In construction site, cable laying using aerial and buried two kinds of forms, along place border enclosure wall frequently with Aerial form, the mode that overcast has plastics pendant, steel bracket and porcelain vase to be combined, wherein plastics pendant is because of material Attribute, under outdoor conditions, durability is poor;Steel bracket+porcelain vase mode is at high cost, and production is complicated, replaces and is not easy after porcelain vase is damaged, Later maintenance cost is high.
Summary of the invention
Goal of the invention: the utility model aim is in view of the deficiencies of the prior art, to provide a kind of facing for foldable turnover When cable support device.
Technical solution: a kind of temporary cable holder device of foldable turnover described in the utility model, including vertical bar, cross Bar, adjusts bolt, vertical reinforcement and transverse steel at bearing diagonal;The vertical bar, cross bar and bearing diagonal are 40*40*3mm Angle steel, the both ends of the vertical bar pass through through-wall bolt and wall connecting respectively, and the vertical bar is located on perpendicular, the vertical bar Bolt is vertical with one end of cross bar connects by adjusting for middle and upper part, bearing diagonal is provided between the cross bar and vertical bar, it is described The both ends of bearing diagonal pass through adjusting bolt respectively and connect with cross bar and vertical bar, under being facing perpendicularly to of the cross bar, horizontal plane The both ends of upper surface are respectively arranged with the vertical reinforcement of 50mm long, and transverse steel is fixed between the vertical reinforcement, described perpendicular It is staggered the extending direction of transverse steel to the fixation position of reinforcing bar, one end of the transverse steel bends downward 180 degree crotch, institute The crotch for stating transverse steel is fixedly connected with the horizontal plane of cross bar, and the outside installation of the vertical reinforcement and transverse steel is socketed with Insulate PCV pipe, and cable is placed on the insulation PCV pipe of the transverse steel.
Preferably, the horizontal plane of the vertical bar is fixed on wall by through-wall bolt, the vertical plane and cross of the vertical bar The vertical plane of bar is close to, and the cross bar is rotated by 90 ° counterclockwise to be connect by adjusting bolt with vertical bar, and keeps steady by bearing diagonal It is fixed.
Preferably, the diameter of the vertical reinforcement and transverse steel is 8mm, and the insulation PCV pipe is that DN15PVC is managed.
Preferably, the length of the vertical bar is 550mm, and the length of the cross bar and bearing diagonal is 400mm.
The utility model has the advantages that the cross bar, vertical bar and bearing diagonal of (1) the utility model are all made of angle steel and are constructed, structure is simple, It is easily manufactured;When removing the present apparatus, the adjusting bolt at bearing diagonal both ends need to only be removed, so that it may carry out the present apparatus to fold week The use of other construction sites is gone to, convenient for turnover;
(2) the utility model is on cross bar by being arranged transverse steel and vertical reinforcement, and with transverse steel and vertical steel Socket insulation PCV pipe, can satisfy the requirement that construction site cable temporary support uses, cable is placed in transverse steel on muscle On insulation PCV pipe on, the vertical reinforcement of transverse steel two sides setting can prevent falling off for cable, the structure letter of the present apparatus List, replacement is convenient, maintenance cost is low.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of holder device described in the utility model;
Fig. 2 is the top view of holder device described in the utility model.
Wherein, 1- cross bar;2- bearing diagonal;3- vertical bar;4- adjusts bolt;5- vertical reinforcement;6- transverse steel;7- spiral shell through walls Bolt.
Specific embodiment
Technical solutions of the utility model are described in detail below by attached drawing, but the protection scope of the utility model It is not limited to the embodiment.
Embodiment: a kind of temporary cable holder device of foldable turnover, including vertical bar 3, cross bar 1, bearing diagonal 2, adjusting Bolt 4, vertical reinforcement 5 and transverse steel 6;The vertical bar 3, cross bar 1 and bearing diagonal 2 are 40*40*3mm angle steel, described The length of vertical bar 3 is 550mm, and the length of the cross bar 1 and bearing diagonal 2 is 400mm, and the both ends of the vertical bar 3 pass through respectively Through-wall bolt 7 and wall connecting, through-wall bolt 7 are 10# split bolt, and the vertical bar 3 is located on perpendicular, the vertical bar 3 Bolt 4 is vertical with one end of cross bar 1 connect by adjusting for middle and upper part, be provided with bearing diagonal 2 between the cross bar 1 and vertical bar 3, The both ends of the bearing diagonal 2 pass through adjusting bolt 4 respectively and connect with cross bar 1 and vertical bar 3, and the horizontal plane of the vertical bar 3 is by wearing Wall screw 7 is fixed on wall, and the vertical plane of the vertical bar 3 is close to the vertical plane of cross bar 1, the rotation counterclockwise of cross bar 1 90 ° are connect with vertical bar 3 by adjusting bolt 4, and keep stablizing by bearing diagonal 2, i.e., by the adjusting bolt 4 at 2 both ends of bearing diagonal When dismounting, cross bar 1 and vertical bar 3 can be folded;Under being facing perpendicularly to of the cross bar 1, the two of the upper surface of horizontal plane End is respectively arranged with the vertical reinforcement 5 of 50mm long, is fixed with transverse steel 6, the vertical reinforcement 5 between the vertical reinforcement 5 It is 8mm with the diameter of transverse steel 6, the fixation position of the vertical reinforcement 5 is staggered the extending direction of transverse steel 6, the cross 180 degree crotch is bent downward to one end of reinforcing bar 6, the crotch of the transverse steel 6 is fixedly connected with the horizontal plane of cross bar 1, institute The outside installation for stating vertical reinforcement 5 and transverse steel 6 is socketed with insulation PCV pipe, and the insulation PCV pipe is that DN15PVC is managed, cable It is placed on the insulation PCV pipe of the transverse steel 6.
The specific manufacturing process of the utility model is as follows:
1. shown in attached Fig. 1 and 2, diagonal steel carries out blanking as described above, diagonal steel carries out drilling manufacture;Angle steel Between link bolt hole diameter 8mm, the through-wall bolt bore dia 12mm on vertical bar 3;Between angle steel before bolt hole punching, first carry out pre-splicing The exact position for determining bolt hole is filled, the angle steel of vertical bar 3 and cross bar 1 can be folded effectively after assembly;
2. welding vertical reinforcement 5 and transverse steel 6 on cross bar 1, installation insulation pvc pipe;The vertical reinforcement 5 of two sides welds Connecing position need to be staggered the extending direction of transverse steel, and convenient for the installation insulation PCV pipe of transverse steel 6, reinforcement welding uses fillet weld, Size of welds 3mm;
3. cable support device is assembled: vertical bar 3, cross bar 1 and 2 steel of bearing diagonal are spliced by adjusting bolt 4;
4. installing cable support device;The corresponding position that the through-wall bolt hole on bracket is marked on enclosure wall, utilizes electric drill Backing plate is arranged using through-wall bolt fixed cable support device in punching between enclosure wall and vertical bar, if enclosure wall is concrete walls, It is connected using 10# expansion bolt.
5. cable laying;By cable laying in the insulation PCV pipe on the insulation PCV pipe on transverse steel, on transverse steel It insulate for cable lower part, the insulation PCV pipe on the vertical reinforcement of two sides insulate for cable two sides, while preventing cable from sliding;
Turnover: construction site temporary cable holder device is folded 6. removing, dismounting through-wall bolt, then bearing diagonal two first The adjusting bolt at end, cross bar and vertical bar are folded;By through-wall bolt, adjust the cables such as bolt, folded cross bar and vertical bar Bracket is individually positioned in containing box, goes to the use of other construction sites week.
As described above, although the utility model has been indicated and described referring to specific preferred embodiment, it must not It is construed to the limitation to the utility model itself.In the spirit and scope for not departing from the utility model that appended claims define Under the premise of, it can various changes can be made in the form and details to it.

Claims (4)

1. a kind of temporary cable holder device of foldable turnover, it is characterised in that: including vertical bar, cross bar, bearing diagonal, adjust spiral shell Bolt, vertical reinforcement and transverse steel;The vertical bar, cross bar and bearing diagonal are 40*40*3mm angle steel, and the two of the vertical bar End is respectively by through-wall bolt and wall connecting, and the vertical bar is located on perpendicular, and the middle and upper part of the vertical bar passes through adjusting Bolt is vertical with one end of cross bar to be connected, and bearing diagonal, the both ends difference of the bearing diagonal are provided between the cross bar and vertical bar It is connect by adjusting bolt with cross bar and vertical bar, under being facing perpendicularly to of the cross bar, the both ends of the upper surface of horizontal plane are distinguished It is provided with the vertical reinforcement of 50mm long, transverse steel, the fixation position of the vertical reinforcement are fixed between the vertical reinforcement Be staggered the extending direction of transverse steel, and one end of the transverse steel bends downward 180 degree crotch, the crotch of the transverse steel It is fixedly connected with the horizontal plane of cross bar, the outside installation of the vertical reinforcement and transverse steel is socketed with insulation PCV pipe, and cable is put It is placed on the insulation PCV pipe of the transverse steel.
2. a kind of temporary cable holder device of foldable turnover according to claim 1, it is characterised in that: the vertical bar Horizontal plane be fixed on wall by through-wall bolt, the vertical plane of the vertical bar is close to the vertical plane of cross bar, the cross bar It is rotated by 90 ° and is connect by adjusting bolt with vertical bar counterclockwise, and keep stablizing by bearing diagonal.
3. a kind of temporary cable holder device of foldable turnover according to claim 1, it is characterised in that: described vertical The diameter of reinforcing bar and transverse steel is 8mm, and the insulation PCV pipe is that DN15PVC is managed.
4. a kind of temporary cable holder device of foldable turnover according to claim 1, it is characterised in that: the vertical bar Length be 550mm, the length of the cross bar and bearing diagonal is 400mm.
CN201920634779.0U 2019-05-06 2019-05-06 A kind of temporary cable holder device of foldable turnover Active CN209608264U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920634779.0U CN209608264U (en) 2019-05-06 2019-05-06 A kind of temporary cable holder device of foldable turnover

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920634779.0U CN209608264U (en) 2019-05-06 2019-05-06 A kind of temporary cable holder device of foldable turnover

Publications (1)

Publication Number Publication Date
CN209608264U true CN209608264U (en) 2019-11-08

Family

ID=68407882

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920634779.0U Active CN209608264U (en) 2019-05-06 2019-05-06 A kind of temporary cable holder device of foldable turnover

Country Status (1)

Country Link
CN (1) CN209608264U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111778898A (en) * 2020-06-24 2020-10-16 浙江常青公路工程有限公司 Mountain region highway rail guard of dish

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111778898A (en) * 2020-06-24 2020-10-16 浙江常青公路工程有限公司 Mountain region highway rail guard of dish
CN111778898B (en) * 2020-06-24 2021-09-17 浙江常青公路工程有限公司 Mountain region highway rail guard of dish

Similar Documents

Publication Publication Date Title
CN105538342A (en) Rail support
CN110450131B (en) Robot track for coal conveying inspection and installation method
CN209608264U (en) A kind of temporary cable holder device of foldable turnover
CN105024310A (en) Adjustable slewing bearing device for laying cable bridge
CN210482377U (en) Assembled gallows of utility tunnel pipeline
CN204113295U (en) A kind of municipal shield tunnel
CN203867601U (en) Tunnel arch replacing construction supporting structure
CN206364481U (en) A kind of comprehensive adjustable rotary cable support
CN106836242B (en) Deep foundation pit anchor cable tensioning assembly type operation platform
CN210976098U (en) Underground pipe gallery pre-buried support
CN210665728U (en) Indoor landslide simulation test platform
CN205333072U (en) Portable whole hangs gravity anping building laser measuring instrument
CN211951871U (en) Guide device for trenchless repair of pipeline by thermoplastic forming method
CN110258528B (en) Assembled and inserted self-clamping type prefabricated hollow underground continuous wall and construction method thereof
CN208074270U (en) A kind of fixing device of petroleum pipeline
CN203336518U (en) Combined type metal halide lamp overhead support
CN208687123U (en) A kind of device passing through casing convenient for large-scale steel pipe
CN203395395U (en) Detachable pipeline buttress
CN206829183U (en) A kind of city piping lane using porous pre-buried channel flow mounting system
CN207514385U (en) A kind of support of pipelines for lightweight wall plate
CN220565778U (en) Support frame of TBM lining concrete face pavement board installation is exclusively used in
CN215009543U (en) Arc-shaped cable support
CN220816787U (en) Pre-buried base water supply pipe hanger
CN214643558U (en) Civil engineering pipeline that is difficult for droing puts frame
CN204000921U (en) The pre-buried ground connection copper billet of a kind of ultra-high voltage transformer station GIS fastening devices

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant