CN209604662U - Attaching beam air hose double-station three closes suspension clamp - Google Patents
Attaching beam air hose double-station three closes suspension clamp Download PDFInfo
- Publication number
- CN209604662U CN209604662U CN201920075775.3U CN201920075775U CN209604662U CN 209604662 U CN209604662 U CN 209604662U CN 201920075775 U CN201920075775 U CN 201920075775U CN 209604662 U CN209604662 U CN 209604662U
- Authority
- CN
- China
- Prior art keywords
- steel
- square shaft
- station
- air hose
- side clamping
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Ventilation (AREA)
Abstract
Attaching beam air hose double-station three closes suspension clamp category Building technology.Four facades of the square shaft 3 of hexagonal shape respectively have a concentric hole in a pair of opposed faces of the upper half, inside put on bolt 5, make to embrace a beam square 4 and clamp square shaft 3 and hang on steel I-beam 6;Respectively there is a concentric hole two-by-two in two pairs of opposed faces of lower half, inside wears bolt 7, two side clamping plates 1 are clamped square shaft 3.After being embedded in ventilation duct 8 between two side clamping plates 1, with perpendicular bolt 9, lower clamp plate 2 and side clamping plate 1 are connected from below for lower clamp plate 2.Side clamping plate 1 is there are two station on square shaft 3, and vertical steel I-beam is installed, and ventilation duct 8 is arranged along steel I-beam 6;Parallel steel I-beam 6 is installed, and the horizontal steel I-beam 6 of ventilation duct 8 arranges.Round air duct is using circle clamping plate 11.Lifting is reliable;It is easy for installation;Beam body is exempted from processing construction and is simplified;One folder is applicable in beam in length and breadth.For steel-structure factory building.
Description
Technical field
Attaching beam air hose double-station three closes suspension clamp and is related to Building technology, and in particular to a kind of ventilation duct of attaching steel I-beam is hung
Folder.
Background technique
Building time of the flat moulded prefabricated steel construction room at building scene greatly shortens, room good integrity;But compared to biography
The brick-and-concrete buildings of system lay implements on steel beam, column steel wall, it is necessary to study new technical solution.
Summary of the invention
Attaching beam air hose double-station three closes suspension clamp technical problems to be solved: exempting from processing lifting ventilation on steel I-beam
Pipe.
The technical solution adopted is that: double-station three closes suspension clamp.
Attaching beam air hose double-station three closes suspension clamp (attached drawing) and is made of 3, two armfuls of two side clamping plates 1, lower clamp plate 2, square shaft beam squares 4.
Four facades of the square shaft 3 of hexagonal shape respectively have a concentric hole in a pair of opposed faces of the upper half, inside put on bolt 5,
Clamp square shaft 3 in the perpendicular square side of two armfuls of beam squares 4;Horizontal square side hangs over the bottom wing of steel I-beam 6.Four facade lower half of square shaft 3
Respectively there is a concentric hole two-by-two in two pairs of opposed faces, inside wears bolt 7, two side clamping plates 1 are clamped square shaft 3.Two side clamping plates 1
Between be embedded in ventilation duct 8 after, lower clamp plate 2 with perpendicular bolt 9, connects together lower clamp plate 2 and two side clamping plates 1 from below.Two side clamping plates 1
There are two mutually perpendicular installation stations on square shaft 3, and when vertical steel I-beam 6 is installed, ventilation duct 8 is arranged along steel I-beam 6;
When parallel steel I-beam 6 is installed, the horizontal steel I-beam 6 of ventilation duct 8 is arranged.Round air duct is using circle clamping plate 11.
The beneficial effect that attaching beam air hose three closes suspension clamp is: air hose is revealed all the details subiculum, and lifting is reliable, easy for installation;Not to beam body
Processing does not hinder beam body and simplifies construction again;One folder is applicable in beam in length and breadth, there is versatility.
Detailed description of the invention
Attached drawing 1 is that attaching beam air hose three closes suspension clamp structural schematic diagram.
In figure: 1 --- side clamping plate;2 --- lower clamp plate;3 --- square shaft;4 --- embrace beam square;5 --- upper bolt;6——
Steel I-beam;7 --- lower bolt;8 --- ventilation duct;9 --- perpendicular bolt;10 --- triangle muscle;11 --- circle clamping plate.
Specific embodiment
Square shaft 3 curves a mouthful word frame, curved soldering of healing up with thickness 3mm band steel.Four alien invasion opposite side spacing are equal to steel I-beam 6
The wing is wide, so that two armfuls of beam squares 4 just clamp the bottom wing of steel I-beam 6 after assembly.When ventilation duct 8 is toward I-steel main cable and girder, side
Axis 3 is 80mm high;Two tops the Kong Xinyu distance of the upper half is 20mm;The four hole hearts of lower half and following distance are 20mm.Ventilation
For pipe 8 every crossing girder toward in upper secondary beam lifting, a height of I-steel girder height of square shaft 3 subtracts time deck-molding along with 80mm.Side
Six bore dias on 3 four facade of axis are 13mm, are passed through for upper bolt 5, the lower bolt 7 of M12.
It embraces beam square 4 and curves inverted L-shaped with 5mm thickness band steel.There is the hole diameter 13mm on perpendicular limb down, cooperates with square shaft 3;On upper horizontal limb
Tiltedly, top rade is identical as the inner airfoil surface oblique angle of matched steel I-beam.With bolt 5 two armfuls of beam squares 4 just suspension clamp in I-steel
On beam 6.
Side clamping plate 1 curves step with 3mm thickness band steel.Upper perpendicular limb has the hole diameter 13mm, is connected with lower bolt 7 with square shaft 3;
Perpendicular limb has the hole diameter 13mm down, erects bolt 9 with M12 and is connected with lower clamp plate 2.Upper perpendicular limb and cross web side are welded with thickness 3mm's
Triangle muscle 10.
Lower clamp plate 2 with 3mm thickness band steel be cut into it is flush form, there is the hole diameter 13mm at both ends, are connected with two side clamping plates 1.
Circle clamping plate 11 curves round bulb-shaped with 2mm thickness band steel, and notch circular portion and round air duct coincide;Notch circle both ends curve
Parallel short handle above has the hole diameter 13mm, connect with square shaft 3.Circle clamping plate 11 pulls open both wings by elasticity, presses and embraces round air duct, and two
Short handle is affixed with square shaft 3, is connected with lower bolt 7 with square shaft 3.
Claims (6)
1. attaching beam air hose double-station three closes suspension clamp, it is characterized in that: by two side clamping plates (1), lower clamp plate (2), square shaft (3), two armfuls of beams
Square (4) composition;Four facades of the square shaft (3) of hexagonal shape respectively have a concentric hole in a pair of opposed faces of the upper half, interior
Bolt (5) are put on, square shaft (3) are clamped on the perpendicular square side of two armfuls of beam squares (4);Two pairs of four facade lower half of square shaft (3) are right
Setting respectively has a concentric hole two-by-two on face, inside wear bolt (7), two side clamping plates (1) are clamped square shaft (3);Lower clamp plate (2)
From below with perpendicular bolt (9), lower clamp plate (2) and two side clamping plates (1) are connected together;Two side clamping plates (1) have two on square shaft (3)
A mutually perpendicular installation station;Circle air duct is using circle clamping plate (11).
2. attaching beam air hose double-station three according to claim 1 closes suspension clamp, it is characterized in that: square shaft (3) is curved with thickness 3mm band steel
At mouth word frame, curved soldering of healing up;The wing that four alien invasion opposite side spacing are equal to steel I-beam (6) is wide;The past I-steel master of ventilation duct (8)
When beam lifts, square shaft (3) high 80mm;Two tops the Kong Xinyu distance of the upper half is 20mm;Four Kong Xinyu bottom margins of lower half
From for 20mm;Every crossing girder toward in upper secondary beam lifting, a height of I-steel girder height of square shaft (3) subtracts secondary ventilation duct (8)
Deck-molding adds 80mm;Six bore dias on (3) four facade of square shaft are 13mm.
3. attaching beam air hose double-station three according to claim 1 closes suspension clamp, it is characterized in that: embracing beam square (4) uses thickness 5mm band steel
Curve inverted L-shaped;There is the hole diameter 13mm on perpendicular limb down;Upper horizontal limb top rade is identical as the inner airfoil surface oblique angle of matched steel I-beam.
4. attaching beam air hose double-station three according to claim 1 closes suspension clamp, it is characterized in that: side clamping plate (1) 3mm thickness band steel
Curve step;Upper perpendicular limb has the hole diameter 13mm;Perpendicular limb has the hole diameter 13mm down;Upper perpendicular limb and cross web side are welded with thickness
The triangle muscle (10) of 3mm.
5. attaching beam air hose double-station three according to claim 1 closes suspension clamp, it is characterized in that: lower clamp plate (2) 3mm thick steel plate
It is cut into flush form;There is the hole diameter 13mm at both ends.
6. attaching beam air hose double-station three according to claim 1 closes suspension clamp, it is characterized in that: circle clamping plate (11) is flat with 2mm thickness
Steel curves round bulb-shaped, and notch circular portion and round air duct coincide;Notch circle both ends curve parallel short handle, above there is the hole diameter 13mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920075775.3U CN209604662U (en) | 2019-01-12 | 2019-01-12 | Attaching beam air hose double-station three closes suspension clamp |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920075775.3U CN209604662U (en) | 2019-01-12 | 2019-01-12 | Attaching beam air hose double-station three closes suspension clamp |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209604662U true CN209604662U (en) | 2019-11-08 |
Family
ID=68401042
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920075775.3U Active CN209604662U (en) | 2019-01-12 | 2019-01-12 | Attaching beam air hose double-station three closes suspension clamp |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209604662U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114087514A (en) * | 2021-11-24 | 2022-02-25 | 国网山西省电力公司经济技术研究院 | Portable suspension clamp of steel construction distribution building GIS equipment fixing |
-
2019
- 2019-01-12 CN CN201920075775.3U patent/CN209604662U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114087514A (en) * | 2021-11-24 | 2022-02-25 | 国网山西省电力公司经济技术研究院 | Portable suspension clamp of steel construction distribution building GIS equipment fixing |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105805112B (en) | A kind of universal joint assembly for the connection of rod piece space structure | |
CN107338887A (en) | Only have the connection method of flat out of plane constraint and upper connecting node at the top of out-hung panel | |
CN209604662U (en) | Attaching beam air hose double-station three closes suspension clamp | |
CN206829422U (en) | A kind of two-sided dried hanging hang structure wall of indoor facing plate | |
CN104481075B (en) | A kind of mounting system of furred ceiling | |
CN108005287A (en) | Steel construction roof structure modelled after an antique | |
CN207003748U (en) | A kind of upper connecting node of precast concrete out-hung panel | |
CN209429334U (en) | A kind of seamless sunshade trellis system of the push-in type of adjustable angle | |
CN103967178B (en) | A kind of non-upright post curtain wall corner structure | |
CN111434965A (en) | Double-station three-in-one hanging clamp for auxiliary beam air pipe | |
CN210263588U (en) | Use assembled furred ceiling structure of steel construction as basic unit | |
CN204299020U (en) | A kind of mounting system of furred ceiling | |
CN209114603U (en) | A kind of connection structure of concrete frame assembled T-type beam column | |
CN113293923A (en) | Lifting point dislocation adjusting structure of keel and mounting method | |
CN102777703A (en) | Assembly type light pipeline hanger | |
CN208733881U (en) | A kind of setting multiple tracks is kept out the wind the Super High super-span single layer cable curtain wall of steel truss | |
CN206726860U (en) | A kind of scissors crossing double hanging point single lug ground wire suspension string | |
CN218346575U (en) | Super high-rise building steel construction and special-shaped curtain wall connection structure | |
CN207314542U (en) | The masonry wall structure of Box Modular Building | |
CN205735439U (en) | A kind of Precast T-Beam is just giving oblique template Quick switching structure | |
CN205369662U (en) | Passive form EPS wall body module | |
CN219080714U (en) | Suspended ceiling conversion layer suspension device | |
CN204138311U (en) | triangle hanging basket suspension | |
CN203911403U (en) | Bridge horizontal cross | |
CN216428812U (en) | Light high-strength roof board |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |