CN209603118U - A kind of prefabricated pile penetrating layer of sand - Google Patents
A kind of prefabricated pile penetrating layer of sand Download PDFInfo
- Publication number
- CN209603118U CN209603118U CN201822240577.6U CN201822240577U CN209603118U CN 209603118 U CN209603118 U CN 209603118U CN 201822240577 U CN201822240577 U CN 201822240577U CN 209603118 U CN209603118 U CN 209603118U
- Authority
- CN
- China
- Prior art keywords
- pile body
- shaft
- sand
- sleeve
- connector sleeve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model discloses the prefabricated piles that one kind can penetrate layer of sand, it applies in concrete stake field, solves the technical issues of concrete stake is difficult to across sandy soil layer, its key points of the technical solution are that including pile body, it is embedded the steel reinforcement cage on pile body, the casing coaxial with the pile body is equipped in the pile body, described sleeve pipe is rotatablely connected useful shaft, the shaft is equipped with spiral helicine fin, the lower surface of the shaft is equipped with the drill bit of hard alloy, the upper end of the shaft is equipped with connector sleeve, outer diameter of the outer diameter of the connector sleeve between the shaft diameter and the fin, spline is equipped in the connector sleeve;Having the technical effect that for having enables to pile body not have to extract that also pile body can be pounded to pilot hole to wear sandy soil layer.
Description
Technical field
The utility model relates to concrete stake fields, more specifically, it relates to a kind of prefabricated pile that can penetrate layer of sand.
Background technique
Concrete stake is for being embedded in underground, as the pillar of building, so as to establish high buildings and large mansions.To skyscraper, water
Mud stake needs to make a call to tens meters of depths.So that building is more firm and stablizes.
Ready-made steel reinforcement cage, is then assembled in stake holes, then use coagulation by traditional concrete stake, first pile hole on the ground
Soil pours.Modern concrete stake is directly to pour stake, then directly pound underground layer by large scale equipment, can be reduced in this way
Between link, shorten the construction period, improve efficiency simultaneously.But due to soil layer construction complexity, sandy soil layer is encountered when piling, it is husky
Soil layer soil property is more thick and solid, is difficult directly to pound stake and wears sandy soil layer.Existing method is to extract pile body, then drawn by screw rod
Then concrete stake is pounded again and wears sandy soil layer so that opening up through-hole in sandy soil layer in hole.Waste time and consume so many manpowers
Material resources are unfavorable for efficiently producing.Therefore it is badly in need of wanting a kind of concrete stake that can penetrate sandy soil layer.
Utility model content
In view of the deficienciess of the prior art, the purpose of this utility model is to provide one kind can penetrate the prefabricated of layer of sand
Stake, its advantage is that, enable to pile body not have to extract that also pile body can be pounded to pilot hole to wear sandy soil layer.
The above-mentioned technical purpose of the utility model has the technical scheme that one kind can penetrate layer of sand
Prefabricated pile is equipped with the casing coaxial with the pile body including pile body, the steel reinforcement cage being embedded on pile body in the pile body, described
Casing is rotatablely connected useful shaft, and the shaft is equipped with spiral helicine fin, and the lower surface of the shaft is equipped with hard alloy
Drill bit, the upper end of the shaft is equipped with connector sleeve, and the outer diameter of the connector sleeve is between the shaft diameter and the fin
Outer diameter, the connector sleeve is interior to be equipped with spline.
Through the above technical solutions, casing is arranged along the axial direction of pile body in pile body, shaft is set in casing, is being turned
Spiral helicine fin is set on axis.When encountering sandy soil layer, in the equipment of the upper end of pile body connection drive shaft rotation, so that turning
Axis rotation, shaft in the course of rotation so that fin is delivered up to by sandy soil, to punch in sandy soil layer, so that husky
Soil layer loosens, and is then continuing drive piles body, in this way pounding pile body into sandy soil layer bit by bit, while also avoiding extracting pile body
Pilot hole again.Connector sleeve is arranged in the upper end of shaft, starts spline in connector sleeve, to facilitate connection splined shaft or will be other
Equipment is connected in shaft, facilitates rotating shaft.
The utility model is further arranged to: the upper end of the pile body is equipped with counterbore, is equipped in the counterbore and has interior spiral shell
The fixing sleeve of line is equipped with limit sleeve in the fixing sleeve, and T-shaped hole, the taper end cooperation of the T-shaped hole are offered in the limit sleeve
In the shaft, the butt end of the T-shaped hole cooperates on the connector sleeve, and the outer wall of the limit sleeve cooperates in the fixation
The inner wall of set, the limit sleeve include two identical semicircular rings.
Through the above technical solutions, the diameter of connector sleeve is greater than the diameter of shaft, limit sleeve includes two semicircular rings, in this way
Limit sleeve is connected in shaft and connector sleeve from side, so that shaft will not be detached from from limit sleeve.Limit
External threading is connected in fixing sleeve, so that limit sleeve will not be detached from from fixing sleeve, fixing sleeve and pile body one, to make
It obtains limit sleeve and is stuck in fixing sleeve in, shaft is stuck in limit sleeve, realizes that shaft will not fall off from casing.
The utility model is further arranged to: being removably connected with splined shaft on the connector sleeve.
Through the above technical solutions, splined shaft cooperates in connector sleeve, and the diameter of splined shaft is less than or equal to connection
The diameter of set, so that drive shaft be facilitated to rotate.Since shaft is during boring soil, need, and drive shaft rotates
Equipment can not be slid in casing in company with shaft, the setting of splined shaft enables splined shaft to put in casing, thus side
Just shaft is sunk.
The utility model is further arranged to: the outer wall of the connector sleeve is equipped with the discharge launder for draining sandy soil, institute
The section of fin is stated into triangle.
Through the above technical solutions, discharge launder is used to for sandy soil being transported on the ground from underground, so that convenient further beat
Hole.The fin endurance of triangle is stronger, indeformable so as to dig thick and solid sandy soil layer.
The utility model is further arranged to: the pile body is equipped with steel reinforcement cage, and the steel reinforcement cage includes several along the stake
Reinforcing bar is arranged, along several inner ring and outer rings perpendicular to the reinforcing bar directional spreding in the axial direction and circumferential direction of body.
Through the above technical solutions, steel reinforcement cage is used to increase the ability of the tension resistance of pile body.
The utility model is further arranged to: several intubations is welded between the inner ring and outer ring, the intubation is arranged
On the reinforcing bar.
Through the above technical solutions, inner ring and outer ring is by intubation connection, reinforcing bar is plugged in intubation, to pass through intubation
Reinforcing bar is positioned.Reinforcing bar improves the ability of the axial tension resistance of pile body, and inner ring and outer ring cooperation improves pile body
The ability of radial tension resistance, to improve the enabling capabilities of pile body comprehensively.
The utility model is further arranged to: being equipped with circumferential uniformly distributed several reinforcements along the radial direction of casing in described sleeve pipe
Muscle, the semicircle snap ring of the both ends welding and the cooperation of inner ring described in described sleeve pipe of the reinforcing rib.
Through the above technical solutions, the both ends for reinforcing diameter are respectively welded on casing and inner ring, so that casing is fixed on
In steel reinforcement cage.The effect of support internally is enclosed, so that the support strength of steel ring is improved, to further increase the anti-diameter of pile body
To the ability of shearing force.Snap ring facilitates welding, so that reinforcing rib is quickly welded on casing and steel reinforcement cage.
The utility model is further arranged to: the lower end of the pile body is equipped with the boss of taper and the lower end taper end of boss
Downward.
Through the above technical solutions, the boss of taper and the contact area of soil layer are smaller, so that soil be facilitated to be obedient to the conical surface
Disperse around, further facilitates pile body sinking.
In conclusion the utility model has the following beneficial effects:
1, the setting of shaft and fin can carry out pilot hole to sandy soil layer, so that it is guaranteed that stake when pile body encounters sandy soil layer
Body is smoothly sunk in soil layer;
2, the setting of limit sleeve prevents shaft to be detached from from pile body so that shaft is fixed in pile body.
Detailed description of the invention
Fig. 1 is the whole structural schematic diagram of the present embodiment.
Fig. 2 is the structural schematic diagram of the steel reinforcement cage of the present embodiment.
Fig. 3 is the limit sleeve of the present embodiment and the structural schematic diagram of splined shaft.
Fig. 4 is the casing of the present embodiment and the structural schematic diagram of steel reinforcement cage.
Appended drawing reference: 1, pile body;11, counterbore;12, fixing sleeve;13, boss;2, steel reinforcement cage;21, reinforcing bar;22, inner ring;
23, outer ring;24, reinforcing rib;25, snap ring;26, casing;27, it is intubated;3, shaft;31, fin;32, connector sleeve;33, spline;
34, splined shaft;35, limit sleeve;351, semicircular ring;36, T-shaped hole;37, discharge launder;38, drill bit.
Specific embodiment
The utility model is described in further detail below in conjunction with attached drawing.
Embodiment: referring to Fig. 1 and Fig. 2, and a kind of prefabricated pile penetrating layer of sand including pile body 1, is embedded on pile body 1
Steel reinforcement cage 2, steel reinforcement cage 2 are used to increase the ability of 1 tension resistance of pile body, so that pile body 1 is more solid, while effectivelying prevent stake
Body 1 is broken.
Referring to figs. 2 and 3, casing 26 is set along the axial direction of pile body 1 in pile body 1, casing 26 is embedded in pile body 1
Interior, pile body 1 is cast in the outside of casing 26.Shaft 3 is set in casing 26, fin 31 is set in shaft 3, and fin 31 is at spiral shell
Rotation shape is coiled in shaft 3.When pile body 1 encounters sandy soil layer, the rotation of drive shaft 3 is connected in the upper end of shaft 3 at this time
Driving device (not shown), so that shaft 3 drills downwards, sandy soil are transported on ground, thus are avoided that by fin 31
Pile body 1 is extracted into pilot hole again.
Referring to figs. 2 and 3, connector sleeve 32 is set in the upper end of shaft 3, the outer diameter of connector sleeve 32 is greater than the diameter of shaft 3
And it is less than the diameter of casing 26, spline 33 is set along the axial direction of connector sleeve 32 on connector sleeve 32, is connected in connector sleeve 32
Splined shaft 34 is connect, the diameter of splined shaft 34 is less than or equal to the diameter of connector sleeve 32.Since shaft 3 is during pilot hole,
It needs, the diameter of connector sleeve 32 and splined shaft 34 is less than the diameter of casing 26, so that connector sleeve 32 and shaft 3 are in casing 26
Middle sliding cannot slide, the setting of splined shaft 34 solves since driving device (not shown) is bigger in casing 26
This problem.When shaft 3 sinks to certain depth, splined shaft 34 is extracted from connector sleeve 32, then proceedes to pound pile body 1
Sink, when shaft 3 will be exposed, continue to assemble shaft 3, in cycles repeatedly aforesaid operations, until pile body 1 passes through sandy soil
Layer.The section of fin 31 is triangle, so that the endurance of fin 31 is stronger, it is ensured that in the mistake for digging thick and solid sandy soil layer
It is indeformable in journey.Discharge launder 37 is opened up on the outer wall of connector sleeve 32, discharge launder 37 is discharged outside pile body 1 convenient for sandy soil.
With reference to Fig. 1, in the boss 13 of the lower end of pile body 1 setting taper, the contact area of the boss 13 of taper and soil layer is more
It is small, so that the soil compliance conical surface be facilitated to disperse around, further facilitate the sinking of pile body 1.
Referring to figs. 2 and 3, in the drill bit 38 of the lower end of shaft 3 setting alloy, so that drill bit 38 can be thick and solid
Pilot hole is without damaging in sandy soil layer.Counterbore 11 is set in the upper end of pile body 1, fixing sleeve 12 is set in counterbore 11, in fixation
Limit sleeve 35 is threadedly coupled in set 12.T-shaped hole 36 is set in limit sleeve 35, and the butt end of T-shaped hole 36 is accompanied on connector sleeve 32, T
The taper end in shape hole 36 cooperates in shaft 3, so that shaft 3 be prevented to be detached from from limit sleeve 35, limit sleeve 35 is threaded in solid
Surely in set 12, so that limit sleeve 35 be prevented to be detached from from fixing sleeve 12, fixing sleeve 12 is embedded in pile body 1, finally makes shaft 3
Being fixed in pile body 1 will not fall off.Limit sleeve 35 includes two identical semicircular rings 351, so that limit sleeve 35 can be from
Side is connected in shaft 3 and connector sleeve 32, then is threaded in fixing sleeve 12.
With reference to Fig. 4, steel reinforcement cage 2 includes that several axial directions along pile body 1 are arranged reinforcing bar 21, are fixed on 21 inside of reinforcing bar
Inner ring 22, the outer ring 23 for being fixed on 21 outside of reinforcing bar.The setting intubation 27 between inner ring 22 and outer ring 23, intubation 27 is set on
On reinforcing bar 21, and by intubation 27 reinforcing bar 21 is positioned.Reinforcing bar 21 improves the energy of the axial tension resistance of pile body 1
Power, inner ring 22 and outer ring 23 cooperate, and improve the ability of the radial tension resistance of pile body 1, to improve the support energy of pile body 1 comprehensively
Power.
With reference to Fig. 4, along the circumferentially uniformly distributed several reinforcing ribs 24 of the radial direction of casing 26 on casing 26, the two of reinforcing rib 24
End is respectively welded on casing 26 and inner ring 22, to further put on the anti-shearing ability of pile body 1.At the both ends of reinforcing rib 24
Semicircular snap ring 25 is set, and snap ring 25 is located on casing 26 on inner ring 22 convenient for reinforcing rib 24, so that reinforcing rib 24
Quickly it is welded on casing 26 and inner ring 22.
Action process: first by shaft 3 assembly in pile body 1, then by pile body 1 pounded into soil layer into;When there is no sandy soil
When layer, pile body 1, which pounds task of driving piles in underground layer, to be terminated;When encountering sandy soil layer, rotary spacing set 35 makes limit sleeve 35 and sinks
Hole 11 is detached from, and splined shaft 34 is connected on connector sleeve 32, is connected other equipment by splined shaft 34 and is rotated come drive shaft 3,
So that carrying out pilot hole to sandy soil layer, then pile body 1 is pounded into sandy soil layer again.
This specific embodiment is only the explanation to the utility model, is not limitations of the present invention, ability
Field technique personnel can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but
As long as all by the protection of Patent Law in the scope of the claims of the utility model.
Claims (8)
1. one kind can penetrate the prefabricated pile of layer of sand, including pile body (1), the steel reinforcement cage (2) being embedded on pile body (1), feature exists
In equipped with the casing (26) coaxial with the pile body (1) in the pile body (1), described sleeve pipe (26) is rotatablely connected useful shaft
(3), the shaft (3) is equipped with spiral helicine fin (31), and the lower surface of the shaft (3) is equipped with the drill bit of hard alloy
(38), the upper end of the shaft (3) is equipped with connector sleeve (32), and the outer diameter of the connector sleeve (32) is between the shaft (3) diameter
With the outer diameter of the fin (31), the connector sleeve (32) is interior to be equipped with spline (33).
2. the prefabricated pile that one kind according to claim 1 can penetrate layer of sand, which is characterized in that the upper end of the pile body (1)
Equipped with counterbore (11), it is equipped with band internal thread fixing sleeve (12) in the counterbore (11), is equipped with limit in the fixing sleeve (12)
Position set (35), the limit sleeve (35) is interior to be offered T-shaped hole (36), and the taper end of the T-shaped hole (36) cooperates in the shaft (3)
On, the butt end of the T-shaped hole (36) cooperates on the connector sleeve (32), and the outer wall of the limit sleeve (35) cooperates described solid
The inner wall of fixed set (12), the limit sleeve (35) include two identical semicircular rings (351).
3. the prefabricated pile that one kind according to claim 2 can penetrate layer of sand, which is characterized in that on the connector sleeve (32)
It is removably connected with splined shaft (34).
4. the prefabricated pile that one kind according to claim 3 can penetrate layer of sand, which is characterized in that outside the connector sleeve (32)
Wall is equipped with the discharge launder (37) for draining sandy soil, and the section of the fin (31) is at triangle.
5. the prefabricated pile that one kind according to claim 1 can penetrate layer of sand, which is characterized in that the pile body (1) is equipped with steel
Muscle cage (2), the steel reinforcement cage (2) include several axial directions along the pile body (1) and reinforcing bar (21) are circumferentially arranged, along vertical
Several inner rings (22) and outer ring (23) in the reinforcing bar (21) directional spreding.
6. the prefabricated pile that one kind according to claim 5 can penetrate layer of sand, which is characterized in that the inner ring (22) and outer ring
(23) several intubations (27) are welded between, the intubation (27) is set on the reinforcing bar (21).
7. the prefabricated pile that one kind according to claim 6 can penetrate layer of sand, which is characterized in that along set in described sleeve pipe (26)
The radial direction for managing (26) is equipped with circumferential uniformly distributed several reinforcing ribs (24), the both ends welding of the reinforcing rib (24) and described sleeve pipe
(26) the semicircle snap ring (25) of inner ring (22) cooperation.
8. the prefabricated pile that one kind according to claim 1 can penetrate layer of sand, which is characterized in that the lower end of the pile body (1)
The lower end taper end of boss (13) and boss (13) equipped with taper is downward.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822240577.6U CN209603118U (en) | 2018-12-28 | 2018-12-28 | A kind of prefabricated pile penetrating layer of sand |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822240577.6U CN209603118U (en) | 2018-12-28 | 2018-12-28 | A kind of prefabricated pile penetrating layer of sand |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209603118U true CN209603118U (en) | 2019-11-08 |
Family
ID=68397689
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822240577.6U Active CN209603118U (en) | 2018-12-28 | 2018-12-28 | A kind of prefabricated pile penetrating layer of sand |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209603118U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112609640A (en) * | 2020-12-11 | 2021-04-06 | 宁波华康陆鼎建设有限公司 | Concrete sluice gate pier structure and construction method thereof |
CN114753399A (en) * | 2022-04-18 | 2022-07-15 | 中交第二公路工程局有限公司 | Maintenance structure and construction method for treating coastal high-organic-quality soft soil foundation by using DSM (design system) cement mixing pile |
-
2018
- 2018-12-28 CN CN201822240577.6U patent/CN209603118U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112609640A (en) * | 2020-12-11 | 2021-04-06 | 宁波华康陆鼎建设有限公司 | Concrete sluice gate pier structure and construction method thereof |
CN114753399A (en) * | 2022-04-18 | 2022-07-15 | 中交第二公路工程局有限公司 | Maintenance structure and construction method for treating coastal high-organic-quality soft soil foundation by using DSM (design system) cement mixing pile |
CN114753399B (en) * | 2022-04-18 | 2023-05-16 | 中交第二公路工程局有限公司 | Maintenance structure and construction method for treating coastal high organic matter soft soil foundation by DSM cement mixing piles |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207296871U (en) | The structure-improved of full-sleeve twist bit | |
CN209603118U (en) | A kind of prefabricated pile penetrating layer of sand | |
WO2009049470A1 (en) | A bored pile drilling machine | |
CN205206779U (en) | Fracture drilling rod fishing device | |
CN105297732B (en) | Slagging promoting device for ultra-thick clay layer positive-cycle cast-in-place pile and construction method of slagging promoting device | |
CN102767337B (en) | The construction method of a kind of sleeve type helical stake machine drill head and rid | |
CN102409978A (en) | Rotary drilling hole forming method by using multi-stage alloy pilot roller bit in complex stratum cast-in-place pile construction | |
CN105317381A (en) | Drill bit for constructing cast-in-situ bored pile and hole forming method using same | |
KR101042272B1 (en) | Boring casings pipe for micro-pile with connector | |
CN217174729U (en) | Bored concrete pile structure for water conservancy bridge | |
CN206581314U (en) | Screw head muscle body posttension pile foundation | |
CN202164599U (en) | Reinforcing pile enabling reinforcing rib body to be recycled | |
CN102619219B (en) | Drilling construction method for cast-in-place concrete variable threaded tubular pile and drilling tool for implementing drilling construction method | |
CN106836228A (en) | Filling type stake hollow drill | |
JP2004137760A (en) | Construction method of double pipe digging lock bolt making use of boring rod | |
CN211312501U (en) | Gardens civil engineering is with boring a device of irritating | |
CN207177742U (en) | A kind of mixing pile spiral drill bit that can be crept into gravel layer | |
CN204691673U (en) | A kind of subgrade mud protection churning driven | |
KR101700848B1 (en) | Auger pile | |
CN102359107B (en) | Stiffening pile for reclaiming reinforcing body | |
CN207362836U (en) | Screw assemblies drill bit | |
CN206599784U (en) | Filling type stake hollow drill | |
CN217206314U (en) | Drill bit for salvaging stone slag block | |
JP6035355B2 (en) | Low strength pipe burial method and excavation head used for it | |
CN220167884U (en) | Double-core drill bit for construction engineering |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||