CN209601947U - Large-sized concrete prefabricated components boom hoisting - Google Patents
Large-sized concrete prefabricated components boom hoisting Download PDFInfo
- Publication number
- CN209601947U CN209601947U CN201920104873.5U CN201920104873U CN209601947U CN 209601947 U CN209601947 U CN 209601947U CN 201920104873 U CN201920104873 U CN 201920104873U CN 209601947 U CN209601947 U CN 209601947U
- Authority
- CN
- China
- Prior art keywords
- boom hoisting
- prefabricated components
- shaped bottom
- bottom seat
- concrete prefabricated
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 235000005121 Sorbus torminalis Nutrition 0.000 claims description 3
- 244000152100 Sorbus torminalis Species 0.000 claims description 3
- 229910000831 Steel Inorganic materials 0.000 claims description 2
- 239000010959 steel Substances 0.000 claims description 2
- 238000010586 diagram Methods 0.000 description 3
- 230000005611 electricity Effects 0.000 description 3
- 230000015271 coagulation Effects 0.000 description 2
- 238000005345 coagulation Methods 0.000 description 2
- 239000002689 soil Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 description 1
- 239000011241 protective layer Substances 0.000 description 1
- 238000010301 surface-oxidation reaction Methods 0.000 description 1
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model relates to large-sized concrete prefabricated components boom hoistings, it includes U-shaped bottom seat, it includes U-shaped bottom seat, U-shaped bottom seat bottom end surrounding is mounted on wheel, one middle side part of U-shaped bottom seat top is equipped with boom hoisting ontology, boom hoisting ontology includes support column, handrail, rotary head, adjustment base, pin shaft, adjusting rod, cross bar, electric telescopic rod, motor and switch, the outer middle side part of support column is equipped with handrail, support top end is equipped with rotary head, one middle side part of rotary head is equipped with adjustment base, adjusting rod is equipped with by pin shaft inside adjustment base, rotary head top side is equipped with cross bar, it is connected between in the middle part of support column and in the middle part of cross bar by electric telescopic rod, cross bar is equipped with motor close to one end of rotary head, support column, which is located at one side position of handrail, is equipped with switch, boom hoisting ontology one end, which is equipped with, hangs Arrangement;The utility model has the advantages that small in size, stability is high, conveniently moving, is convenient for operation, lifting fastening.
Description
Technical field
The utility model belongs to boom hoisting technical field, and in particular to large-sized concrete prefabricated components boom hoisting.
Background technique
Subway is a kind of form of urban public transport transport, and subway is gradually developed along the form of ground rail system
A kind of quick large conveying quantity urban track traffic mode with electric propulsion formed, route are usually laid in subterranean tunnel,
Some goes to system of laying on ground or overpass other than down town, from underground, and subway can build subway tunnel in construction
Road, therefore some large-sized concrete prefabricated components boom hoistings can be produced, large-sized concrete prefabricated components boom hoisting is being loaded,
Existing boom hoisting is not able to satisfy the demand of large-sized concrete prefabricated components boom hoisting;Therefore it provides it is a kind of it is structurally reasonable,
It is small in size, stability is high, conveniently moving, the large-sized concrete prefabricated components boom hoisting convenient for operating, lifting fastening are very
It is necessary to.
Summary of the invention
The purpose of this utility model is to overcome the deficiencies in the prior art, and provide a kind of structurally reasonable, small in size, steady
Qualitative height, conveniently moving, the large-sized concrete prefabricated components boom hoisting convenient for operating, lifting fastening.
Purpose of the utility model is realized as follows: large-sized concrete prefabricated components boom hoisting, it includes U-shaped bottom
Seat, the U-shaped bottom seat bottom end surrounding are mounted on wheel, and one middle side part of U-shaped bottom seat top is equipped with boom hoisting
Ontology, the boom hoisting ontology includes support column, handrail, rotary head, adjustment base, pin shaft, adjusting rod, cross bar, electronic
Telescopic rod, motor and switch, the outer middle side part of the support column are equipped with handrail, and the support top end is equipped with rotation
Head, one middle side part of rotary head are equipped with adjustment base, and the adjustment base inside is equipped with adjusting rod by pin shaft,
The rotary head top side is equipped with cross bar, passes through electric telescopic rod between cross bar middle part in the middle part of the support column and connects
It connects, the cross bar is equipped with motor close to one end of rotary head, and the support column, which is located at one side position of handrail, to be equipped with
Switch, described boom hoisting ontology one end are equipped with hanging component, and the hanging component includes mounting head, spool, steel wire
Rope, fixing head, clamp arm and intermediate plate are equipped with spool inside the mounting head, wirerope, institute are equipped with outside the spool
The wirerope one end stated is equipped with fixing head, and the fixing head middle inside is installed on clamp arm, clamp arm one end installation
Have an intermediate plate, the U-shaped bottom seat is located at boom hoisting ontology side and is equipped with battery, the electric telescopic rod, motor and
Switch is electrically connected with battery, and the electric telescopic rod and motor are electrically connected with switch.
The U-shaped bottom seat, which is located at boom hoisting body bottom portion position, is equipped with fixing seat, the U-shaped base exterior
Apply matcoveredn.
It is socketed with rubber sleeve on the outside of the handrail, is fixed with anti-skid chequer on the outside of the rubber sleeve.
Hook is uniformly fixed on the outside of the clamp arm.
The intermediate plate side is fixed with rubber sheet gasket.
The adjustment base side is fixed with support chip.
The utility model has the beneficial effects that the utility model is pressed from both sides with hanging component in use using hanging component
Large-sized concrete prefabricated components are taken, are turned on the switch, battery provides power supply, adjusts the position of fixing head, intermediate plate is pressed from both sides
Firmly large-sized concrete prefabricated components, motor start, so that the spool inside mounting head rotates, wirerope extension elongation changes, and make
Fixing head is moved at suitable position, holds clamp arm, so that intermediate plate clamps large-sized concrete prefabricated components, the structure of clamp arm makes
Intermediate plate can tightly clamp large-sized concrete prefabricated components, after clamping, be carried out transferring mobile large size with boom hoisting ontology
Concrete prefabricated element holds handrail at suitable position, pushes support column, and wheel will drive the movement of U-shaped bottom seat, so relatively
It is laborsaving, it moves conveniently, adjusts wirerope and large-sized concrete prefabricated components boom hoisting is risen, when mobile distance compares
In short-term, pull-up adjusting rod rotates rotary head, until large-sized concrete prefabricated components are put down at suitable position, to prevent from not having to
When adjusting rod, adjusting rod is met and discussed, therefore is fixed with adjustment base in adjusting rod side, passes through pin between adjustment base and adjusting rod
Axis connection, when not used, adjusting rod can fall on support column side to adjusting rod, and when mobile distance is long, height of lift compares
Gao Shi, buttresses handrail, and mobile U-shaped bottom seat adjusts electric telescopic rod, so that electric telescopic rod props up cross bar, to be adjusted
The height of large-sized concrete prefabricated components boom hoisting, is moved to suitable position and puts down;The utility model is closed with structure
Reason, small in size, stability is high, conveniently moving, is convenient for the advantages of operation, lifting fastening.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model large-sized concrete prefabricated components boom hoisting.
Fig. 2 is the boom hoisting structural schematic diagram of the utility model large-sized concrete prefabricated components boom hoisting.
Fig. 3 is the hanging component structural schematic diagram of the utility model large-sized concrete prefabricated components boom hoisting.
In figure: 1, U-shaped bottom seat 2, wheel 3, boom hoisting ontology 4, hanging component 5, battery 31, support
Column 32, handrail 33, rotary head 34, adjustment base 35, pin shaft 36, adjusting rod 37, cross bar 38, electric expansion
Bar 39, motor 310, switch 41, mounting head 42, spool 43, wirerope 46, fixing head 45, clamp arm 46,
Intermediate plate.
Specific embodiment
The utility model is described further with reference to the accompanying drawing.
Embodiment 1
As shown in Figure 1-3, large-sized concrete prefabricated components boom hoisting, it includes U-shaped bottom seat 1, the U-shaped bottom seat 1
Bottom end surrounding is mounted on wheel 2, and 1 top of U-shaped bottom seat, one middle side part is equipped with boom hoisting ontology 3, and described rises
Device for hoisting ontology 3 includes support column 31, handrail 32, rotary head 33, adjustment base 34, pin shaft 35, adjusting rod 36, cross bar 37, electricity
Dynamic telescopic rod 38, motor 39 and switch 310, the outer middle side part of support column 31 are equipped with handrail 32, the support column 31
Top is equipped with rotary head 33, and 33 1 middle side part of rotary head is equipped with adjustment base 34, in the adjustment base 34
Portion is equipped with adjusting rod 36 by pin shaft 35, and the 33 top side of rotary head is equipped with cross bar 37, the support column 31
Middle part and cross bar are connected between 37 middle part by electric telescopic rod 38, and the cross bar 37 is equipped with close to one end of rotary head 33
Motor 39, the support column 31, which is located at 32 1 side position of handrail, is equipped with switch 310, the boom hoisting ontology 3 one
End is equipped with hanging component 4, and the hanging component 4 includes mounting head 41, spool 42, wirerope 43, fixing head 44, clamp arm 45
With intermediate plate 46, spool 42 is installed inside the mounting head 41, wirerope 43 is installed outside the spool 42, it is described
43 one end of wirerope is equipped with fixing head 44, and 44 middle inside of fixing head is installed on clamp arm 45, the clamp arm 45 1
End is equipped with intermediate plate 46, and the U-shaped bottom seat 1 is located at 3 side of boom hoisting ontology and is equipped with battery 5, described electronic to stretch
Contracting bar 38, motor 39 and switch 310 are electrically connected with battery 5, the electric telescopic rod 38 and motor 39 with switch
310 are electrically connected.
The utility model uses hanging component 4, in use, carries out the clamping prefabricated structure of large-sized concrete with hanging component 4
Part turns on the switch 310, and battery 5 provides power supply, adjusts the position of fixing head 44, intermediate plate 46 is allowed to clamp large-scale coagulation
Native prefabricated components are set, and motor 39 starts, so that the spool 42 inside mounting head 41 rotates, 43 extension elongation of wirerope changes, and are made
Fixing head 44 is moved at suitable position, holds clamp arm 45, so that intermediate plate 46 clamps large-sized concrete prefabricated components, clamp arm 45
Structure allows intermediate plate 46 tightly to clamp large-sized concrete prefabricated components, after clamping, is carried out transferring shifting with boom hoisting 3
Dynamic large-sized concrete prefabricated components hold handrail 32 at suitable position, push support column 31, and wheel 2 will drive U-shaped bottom seat 1
It moves, it is relatively labor-saving in this way, it moves conveniently, adjusts wirerope 43 and large-sized concrete prefabricated components are risen, when mobile
When distance is shorter, pull-up adjusting rod 36 rotates rotary head 33, until putting down the prefabricated structure of large-sized concrete at suitable position
Part, when to prevent from not having to adjusting rod 36, adjusting rod 36 is met and discussed, therefore is fixed with adjustment base 34 in 36 side of adjusting rod, is adjusted
It being connected between pedestal 34 and adjusting rod 36 by pin shaft 35, when not used, adjusting rod 36 can fall on 31 side of support column to adjusting rod 36,
When mobile distance is long, when height of lift is relatively high, handrail 32 is buttressed, mobile U-shaped bottom seat 1 adjusts electric telescopic rod
38, so that electric telescopic rod 38 props up cross bar 37, so that the height of large-sized concrete prefabricated components boom hoisting be adjusted, move
Suitable position is moved to put down;The utility model is with structurally reasonable, small in size, stability is high, conveniently moving, is convenient for behaviour
Make, lift the advantages of fastening.
Embodiment 2
As shown in Figure 1-3, large-sized concrete prefabricated components boom hoisting, it includes U-shaped bottom seat 1, the U-shaped bottom seat 1
Bottom end surrounding is mounted on wheel 2, and 1 top of U-shaped bottom seat, one middle side part is equipped with boom hoisting ontology 3, and described rises
Device for hoisting ontology 3 includes support column 31, handrail 32, rotary head 33, adjustment base 34, pin shaft 35, adjusting rod 36, cross bar 37, electricity
Dynamic telescopic rod 38, motor 39 and switch 310, the outer middle side part of support column 31 are equipped with handrail 32, the support column 31
Top is equipped with rotary head 33, and 33 1 middle side part of rotary head is equipped with adjustment base 34, in the adjustment base 34
Portion is equipped with adjusting rod 36 by pin shaft 35, and the 33 top side of rotary head is equipped with cross bar 37, the support column 31
Middle part and cross bar are connected between 37 middle part by electric telescopic rod 38, and the cross bar 37 is equipped with close to one end of rotary head 33
Motor 39, the support column 31, which is located at 32 1 side position of handrail, is equipped with switch 310, the boom hoisting ontology 3 one
End is equipped with hanging component 4, and the hanging component 4 includes mounting head 41, spool 42, wirerope 43, fixing head 44, clamp arm 45
With intermediate plate 46, spool 42 is installed inside the mounting head 41, wirerope 43 is installed outside the spool 42, it is described
43 one end of wirerope is equipped with fixing head 44, and 44 middle inside of fixing head is installed on clamp arm 45, the clamp arm 45 1
End is equipped with intermediate plate 46, and the U-shaped bottom seat 1 is located at 3 side of boom hoisting ontology and is equipped with battery 5, described electronic to stretch
Contracting bar 38, motor 39 and switch 310 are electrically connected with battery 5, the electric telescopic rod 38 and motor 39 with switch
310 are electrically connected.
The U-shaped bottom seat 1 is located at 3 bottom position of boom hoisting ontology and is equipped with fixing seat, and fixing seat is for fixing
3 bottom of boom hoisting ontology prevents U-shaped bottom seat 1 from fractureing with 3 junction of boom hoisting ontology, applies outside the U-shaped bottom seat 1
Matcoveredn, protective layer U-shaped bottom seat 1 prevent 1 surface oxidation of U-shaped bottom seat from getting rusty.
It is socketed with rubber sleeve on the outside of the handrail 32, is fixed with anti-skid chequer on the outside of the rubber sleeve, rubber sleeve and anti-
Sliding line is convenient for holding the mobile U-shaped bottom seat 1 of handrail 32.
45 outside of the clamp arm is uniformly fixed with hook, when use clamp arm 45 and intermediate plate 46 also bad control large size coagulation
Native prefabricated components, then hang over hook with rope and controlled.
46 side of intermediate plate is fixed with rubber sheet gasket, and the fixed rubber sheet gasket in 46 side of intermediate plate prevents intermediate plate 46 from having mill
Damage only can wear rubber sheet gasket when in use, only need to change rubber sheet gasket every time.
34 side of adjustment base is fixed with support chip, and when pull-up adjusting rod 36, support chip is used for secured adjusted
Bar 36.
The utility model the utility model uses hanging component 4, in use, it is large-scale mixed to carry out clamping with hanging component 4
Solidifying soil prefabricated components, turn on the switch 310, and battery 5 provides power supply, adjusts the position of fixing head 44, intermediate plate 46 is pressed from both sides
Firmly large-sized concrete prefabricated components, motor 39 start, so that the spool 42 inside mounting head 41 rotates, 43 extension elongation of wirerope
Change, be moved to fixing head 44 at suitable position, holds clamp arm 45, so that intermediate plate 46 clamps large-sized concrete prefabricated components,
The structure of clamp arm 45 allows intermediate plate 46 tightly to clamp large-sized concrete prefabricated components, after clamping, with boom hoisting sheet
Body 3 transfer mobile large-sized concrete prefabricated components at suitable position, holds handrail 32, pushes support column 31,2 meeting of wheel
U-shaped bottom seat 1 is driven to move, it is relatively labor-saving in this way, it moves conveniently, adjusts wirerope 43 and make large-sized concrete prefabricated components liter
It rises, when mobile distance is shorter, pull-up adjusting rod 36 rotates rotary head 33, until putting down large-scale mixed at suitable position
Solidifying soil prefabricated components, when to prevent from not having to adjusting rod 36, adjusting rod 36 is met and discussed, therefore is fixed in 36 side of adjusting rod and is adjusted bottom
Seat 34 is connected between adjustment base 34 and adjusting rod 36 by pin shaft 35, and when not used, adjusting rod 36 can fall on support to adjusting rod 36
31 side of column when height of lift is relatively high, buttresses handrail 32, mobile U-shaped bottom seat 1 adjusts electricity when mobile distance is long
Dynamic telescopic rod 38, so that electric telescopic rod 38 props up cross bar 37, so that large-sized concrete prefabricated components boom hoisting be adjusted
Height, be moved to suitable position and put down;The utility model is with structurally reasonable, small in size, stability is high, movement side
Just, convenient for operation, lifting fastening the advantages of.
Claims (6)
1. large-sized concrete prefabricated components boom hoisting, it includes U-shaped bottom seat, it is characterised in that: it includes U-shaped bottom seat, described
U-shaped bottom seat bottom end surrounding be mounted on wheel, one middle side part of U-shaped bottom seat top is equipped with boom hoisting ontology, institute
The boom hoisting ontology stated include support column, handrail, rotary head, adjustment base, pin shaft, adjusting rod, cross bar, electric telescopic rod,
Motor and switch, the outer middle side part of the support column are equipped with handrail, and the support top end is equipped with rotary head, described
One middle side part of rotary head is equipped with adjustment base, and the adjustment base inside is equipped with adjusting rod by pin shaft, and described turns
Dynamic crown end side is equipped with cross bar, is connected between cross bar middle part by electric telescopic rod in the middle part of the support column, described
Cross bar motor is installed close to one end of rotary head, the support column, which is located at one side position of handrail, is equipped with switch, institute
The boom hoisting ontology one end stated is equipped with hanging component, and the hanging component includes mounting head, spool, wirerope, fixation
Head, clamp arm and intermediate plate are equipped with spool inside the mounting head, wirerope, the steel are equipped with outside the spool
Cord one end is equipped with fixing head, and the fixing head middle inside is installed on clamp arm, and described clamp arm one end is equipped with intermediate plate,
The U-shaped bottom seat is located at boom hoisting ontology side and is equipped with battery, the electric telescopic rod, motor and switch with
Battery is electrically connected, and the electric telescopic rod and motor are electrically connected with switch.
2. large-sized concrete prefabricated components boom hoisting according to claim 1, it is characterised in that: the U-shaped bottom seat
Fixing seat is installed at boom hoisting body bottom portion position, the U-shaped base exterior applies matcoveredn.
3. large-sized concrete prefabricated components boom hoisting according to claim 1, it is characterised in that: on the outside of the handrail
It is socketed rubber sleeve, is fixed with anti-skid chequer on the outside of the rubber sleeve.
4. large-sized concrete prefabricated components boom hoisting according to claim 1, it is characterised in that: on the outside of the clamp arm
Uniformly it is fixed with hook.
5. large-sized concrete prefabricated components boom hoisting according to claim 1, it is characterised in that: the intermediate plate side
It is fixed with rubber sheet gasket.
6. large-sized concrete prefabricated components boom hoisting according to claim 1, it is characterised in that: the adjustment base
Side is fixed with support chip.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920104873.5U CN209601947U (en) | 2019-01-22 | 2019-01-22 | Large-sized concrete prefabricated components boom hoisting |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920104873.5U CN209601947U (en) | 2019-01-22 | 2019-01-22 | Large-sized concrete prefabricated components boom hoisting |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209601947U true CN209601947U (en) | 2019-11-08 |
Family
ID=68401568
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920104873.5U Expired - Fee Related CN209601947U (en) | 2019-01-22 | 2019-01-22 | Large-sized concrete prefabricated components boom hoisting |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209601947U (en) |
-
2019
- 2019-01-22 CN CN201920104873.5U patent/CN209601947U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109236302B (en) | Variable section excavation trolley in tunnel | |
CN106348189B (en) | The special lifting formula stand arrangement in power distribution station | |
CN105442932A (en) | Power grid pole burying device and construction method | |
CN206447487U (en) | A kind of box culvert loop wheel machine worked under low-headroom condition | |
CN110510527A (en) | A kind of installation system and its construction method of high slope variable cross-section side slope prefabricated section | |
CN201962607U (en) | Movable elevating device for hoisting elevated bridge cantilever arm | |
CN204703761U (en) | A kind of tunnel construction trolley | |
CN209601947U (en) | Large-sized concrete prefabricated components boom hoisting | |
CN108894802A (en) | A kind of waterproof material is laid with trolley and its laying method | |
CN206144559U (en) | Portable mining lifting support that fixes | |
CN109208533A (en) | Harbour integrated construction system and method based on stake top top pushing platform | |
CN209114417U (en) | Harbour integrated construction system based on stake top top pushing platform | |
CN206319628U (en) | One kind building assembled wallboard fitting machine | |
CN106586922B (en) | A kind of lifting device being laid with monorail crane applied to coal mine tunneling machine | |
CN210885076U (en) | Water conservancy water and electricity pipeline laying and lifting device convenient for clamping pipeline | |
CN210591478U (en) | Contact net pillar intelligent operation mechanical equipment | |
CN210926885U (en) | Cable support for subway construction | |
KR101119390B1 (en) | Concrete pour installation method and apparatus thereof | |
CN208473899U (en) | A kind of waterproof material laying trolley | |
KR101108618B1 (en) | Concrete pour installation method of rail for ballast concrete in tunnel and thereof device | |
CN201972076U (en) | Automatic inverted arch trestle | |
CN216190520U (en) | Pipeline transportation and lifting device for municipal sewage disposal engineering | |
CN216381270U (en) | Automatic pole feeding device for jet grouting pile machine in subway tunnel | |
CN211342799U (en) | Novel ship-mounted stable pipe drilling and powder charging construction drilling machine | |
CN216105797U (en) | Auxiliary hanging bracket for traffic road and bridge construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20191108 |
|
CF01 | Termination of patent right due to non-payment of annual fee |