CN209601374U - A kind of Novel hoist reducing job failure - Google Patents

A kind of Novel hoist reducing job failure Download PDF

Info

Publication number
CN209601374U
CN209601374U CN201920212391.1U CN201920212391U CN209601374U CN 209601374 U CN209601374 U CN 209601374U CN 201920212391 U CN201920212391 U CN 201920212391U CN 209601374 U CN209601374 U CN 209601374U
Authority
CN
China
Prior art keywords
oil
grease
box
job failure
elevator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201920212391.1U
Other languages
Chinese (zh)
Inventor
倪永明
沈颖
刘明晖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Qishen Plastics Co.,Ltd.
Original Assignee
Shanghai Qi Shen Engineering Plastics Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Qi Shen Engineering Plastics Co Ltd filed Critical Shanghai Qi Shen Engineering Plastics Co Ltd
Application granted granted Critical
Publication of CN209601374U publication Critical patent/CN209601374U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Types And Forms Of Lifts (AREA)

Abstract

The utility model provides a kind of Novel hoist for reducing job failure, the Novel hoist for reducing job failure includes: pedestal, pedestal upper vertical is connected with elevator ontology, elevator ontology includes door-plate, holding bay, discharge port and feed inlet, door-plate is hingedly connected to elevator ontology front lower by hinge, it is adapted to the production and application of elevator technical field, lubricating oil is added into grease-box simultaneously, and start oil pump, after pump start, the lubricating oil that will be extracted by oil pick-up tube in grease-box, and it extracts to oil pump, then uniformly spilt by jet pipe, and it is sputtered on chain, reduce friction of chain during operating between upper roller and bottom roll simultaneously, the durability of lifting chain, prevent chain breakage, improve the practicability that this kind reduces the Novel hoist of job failure, it solves The problem of existing Novel hoist for reducing job failure is easily damaged.

Description

A kind of Novel hoist reducing job failure
Technical field
The utility model relates to elevator technical field, specially a kind of Novel hoist for reducing job failure.
Background technique
Elevator is the heavy mechanical equipment transported by changing potential energy, such as mine hoist, mistake dam elevator. In a broad sense, elevator, overhead traveling crane, elevator, stable car, crane, headstock gear etc. can be described as elevator, elevator refer generally to power compared with Greatly, the stronger heavy mechanical equipment of hoisting power, but after existing elevator long-time use, chain can generate abrasion, transport During material, the phenomenon that being easy to produce chain breakage, working efficiency that is not only dangerous but also influencing elevator, while in feeding process In, material is fewer and fewer, and the material of bottom is difficult to be dug by conveyer bucket, and feeding is difficult.
Utility model content
(1) the technical issues of solving
In view of the deficiencies of the prior art, the utility model provides a kind of Novel hoist for reducing job failure, solves The existing Novel hoist for reducing job failure, safety coefficient is low and the problem of feeding difficulty.
(2) technical solution
To achieve the above object, the utility model provides the following technical solutions: a kind of Novel hoisting reducing job failure Machine, the Novel hoist for reducing job failure includes: pedestal, and the pedestal upper vertical is connected with elevator ontology, institute Stating elevator ontology includes door-plate, holding bay, discharge port and feed inlet, and the door-plate is hingedly connected to elevator sheet by hinge Body front lower, and the holding bay, discharge port and feed inlet are located at elevator ontology lower right-hand side, in left and right side Side, and the holding bay, discharge port and feed inlet are integrated with elevator ontology, and blanking is equipped on the right side of the feed inlet Slot is equipped with electric pushrod inside the holding bay, and elevator body interior bottom end is fixed with storage hopper, and the storing Bucket includes the transverse slat in storage hopper, and the transverse slat bottom is welded with the axis of the power output end fixation of one end and electric pushrod Bar, the storage hopper top are respectively equipped with bottom roll and upper roller, the bottom roll and upper rolling with elevator body interior top Cylinder it is equal in magnitude, and the second motor and the first motor are respectively equipped in front of the bottom roll and upper roller, described the The power output end of two motor and the first motor is fixed with bottom roll and upper roller respectively, second motor and first It is electrically connected between motor by conducting wire, and second motor rear is electrically connected with external plug, the bottom roll Chain is wrapped around with upper roller, and the bottom roll is connected by chain with upper roller, has passed through lock on the outside of the chain Tight bolt is fixed at least five conveyer buckets, and the conveyer bucket is equidistant is arranged on the outside of chain;Grease-box, the lubrication Below fuel tank discharge port, notch is equipped with above the grease-box, and the grease-box includes being embedded at the top of grease-box Oil inlet pipe, be equipped with oil pump on the left of the chain, and the electric pushrod is electrically connected by conducting wire and oil pump, and the electricity Dynamic push rod rear electric wire is connected with external plug, and the oil pump includes oil inlet and oil outlet, and the oil inlet is fixed on oil Pump top, and the oil outlet is fixed on oil pump bottom, the oil pick-up tube through notch is plugged with above the oil inlet, and described Oil pumping bottom of the tube is extended in grease-box by oil inlet pipe, is plugged with jet pipe on the left of the oil outlet.
According to the utility model: the grease-box, oil pick-up tube, oil pump and jet pipe communicate, and the jet pipe spout is punished It is furnished with aperture.
According to the utility model: the transverse slat is connected by shaft with electric pushrod.
According to the utility model: the feed inlet is communicated by blanking groove with storage hopper.
According to the utility model: in front of the elevator ontology and be located at door-plate and be fixedly arranged above form, the form by Outer framework and iron net are constituted, and the iron net is stuck in outer framework.
According to the utility model: the volume of the grease-box is 10L, and the grease-box, oil pick-up tube, oil pump and spray Pipe forms oil injection mechanism.
(3) beneficial effect
Compared with prior art, the utility model provides a kind of Novel hoist for reducing job failure, has following The utility model has the advantages that
1, this kind reduces the Novel hoist of job failure, can will connect at external plug and power supply first, and unlatching the One motor, the second motor and electric pushrod, while material being poured into feed inlet, material will pour into storage by blanking groove It in hopper, and is covered on transverse slat, upper roller and bottom roll will be driven respectively after the first motor and the second motor start-up, And rotate roller and bottom roll, while chain being driven to rotate, and shaft will be made to be lifted upwards after electric pushrod starting, axis Transverse slat will move up during bar is lifted upwards, and push up material, and conveyer bucket is enable to take the material to bottom, In order to rapid material-feeding, the working efficiency that this kind reduces the Novel hoist of job failure is improved, solves existing reduction The problem of the Novel hoist feeding difficulty of job failure;
2, lubricating oil is added into grease-box simultaneously, and start oil pump, after pump start, will be extracted by oil pick-up tube Lubricating oil in grease-box, and extract to oil pump, then uniformly spilt by jet pipe, and be sputtered on chain, simultaneously Reduce friction of chain during operating between upper roller and bottom roll, the durability of lifting chain prevents chain disconnected It splits, improves the practicability that this kind reduces the Novel hoist of job failure, solve the novel of existing reduction job failure The problem of elevator is easily damaged.
Detailed description of the invention
Fig. 1 is the utility model overall structure diagram;
Fig. 2 is that the utility model structure elevator ontology faces diagrammatic cross-section;
Fig. 3 is the utility model structure notch A partial enlargement diagram.
In figure: 1 pedestal, 2 elevator ontologies, 3 feed inlets, 4 door-plates, 5 holding bays, 6 grease-boxs, 7 oil inlet pipes, 8 dischargings Mouth, 9 blanking grooves, 10 storage hoppers, 11 transverse slats, 12 shafts, 13 electric pushrods, 14 bottom rolls, 15 chains, 16 conveyer buckets, 17 oil pumping Pipe, 18 oil pumps, 19 jet pipes, 20 second motor, roller, 22 first motor, 23 notches, 24 forms on 21.
Specific embodiment
Described embodiment that the following will be combined with the drawings in the embodiments of the present invention, is only the utility model one Divide embodiment, instead of all the embodiments.
Please refer to Fig. 1-3, a kind of Novel hoist reducing job failure, the Novel hoist for reducing job failure It include: pedestal 1,1 upper vertical of pedestal is connected with elevator ontology 2, and the elevator ontology 2 includes door-plate 4, holding bay 5, discharge port 8 and feed inlet 3, the door-plate 4 are hingedly connected to 2 front lower of elevator ontology, and the storage by hinge Cabin 5, discharge port 8 and feed inlet 3 are located at 2 lower right-hand side of elevator ontology, left and right side top, and the holding bay 5, discharge port 8 and feed inlet 3 are integrated with elevator ontology 2, and blanking groove 9, the holding bay are equipped on the right side of the feed inlet 3 Electric pushrod 13 is installed, 2 inner bottom of elevator ontology is fixed with storage hopper 10, under the feed inlet 3 passes through inside 5 Hopper 9 is communicated with storage hopper 10, and the storage hopper 10 includes the transverse slat 11 in storage hopper 10,11 bottom of the transverse slat weldering Be connected to the fixed shaft 12 of the power output end of one end and electric pushrod 13,10 top of storage hopper in elevator ontology 2 Portion top is respectively equipped with bottom roll 14 and upper roller 21, and the bottom roll 14 is equal in magnitude with upper roller 21, and it is described under The second motor 20 and the first motor 22, second motor 20 and first are respectively equipped in front of roller 14 and upper roller 21 The power output end of motor 22 is fixed with bottom roll 14 and upper roller 21 respectively, second motor 20 and the first motor It is electrically connected between 22 by conducting wire, and 20 rear of the second motor is electrically connected with external plug, the bottom roll 14 Chain 15 is wrapped around with upper roller 21, and the bottom roll 14 is connected by chain 15 with upper roller 21, the chain 15 outsides by clamping screw are fixed at least five conveyer buckets 16, and the conveyer bucket 16 is equidistant is arranged in outside chain 15 Side can will be connect at external plug and power supply first, and open the first motor 22, the second motor 20 and electric pushrod 13, Material is poured into feed inlet 3 simultaneously, material will be poured into storage hopper 10 by blanking groove 9, and be gradually accumulated in transverse slat 11 On, upper roller 21 and bottom roll 14 will be driven respectively after the first motor 22 and the starting of the second motor 20, and make roller 21 and bottom roll 14 rotate, while drive chain 15 rotate, and electric pushrod 13 start after will make shaft 12 upwards be lifted, axis Bar 12 will move upwardly together during upward lifting with motion plate 11, and push up material, enable conveyer bucket 16 Take the material to 10 bottom of storage hopper, in order to rapid material-feeding, after feeding, user can open door-plate 4, and clear up The material of 10 internal residual of storage hopper out, and the material fallen in gap is taken out, avoid material shape from influencing elevator at accumulation Operation improves the working efficiency that this kind reduces the Novel hoist of job failure, solves existing reduction job failure The problem of Novel hoist feeding difficulty;
Grease-box 6, the grease-box 16 are located at 8 lower section of discharge port, are equipped with notch 23 above the grease-box 16, And the grease-box 16 includes the oil inlet pipe 7 for being embedded in 16 top of grease-box, is equipped with oil pump 18, institute on the left of the chain 15 It states electric pushrod 13 to be electrically connected by conducting wire and oil pump 18, and 13 rear electric wire of the electric pushrod is connected with outer patch Head, and the oil pump 18 includes oil inlet and oil outlet, the oil inlet is fixed on 18 top of oil pump, and the oil outlet is fixed The oil pick-up tube 17 through notch 23 is plugged with above 18 bottom of oil pump, the oil inlet, and 17 bottom of the oil pick-up tube passes through Oil inlet pipe 7 extends in grease-box 6, and jet pipe 19, the grease-box 6, oil pick-up tube 17, oil are plugged on the left of the oil outlet Pump 18 and jet pipe 19 communicate, and aperture is distributed in 19 nozzle of the jet pipe, and the volume of the grease-box 6 is 10L, and described Grease-box 6, oil pick-up tube 17, oil pump 18 and jet pipe 19 form oil injection mechanism, while user can be by oil inlet pipe 7 to lubricating oil Lubricating oil is added in case 6, and starts oil pump 18, after oil pump 18 starts, will pass through the profit in the extraction grease-box 6 of oil pick-up tube 17 Lubricating oil, and extract to oil pump 18, it is then uniformly sprayed by the aperture of 19 nozzle of jet pipe, and be sputtered on chain 15, Since lubricating oil has good lubricity, can reduce chain 15 during operating with upper roller 21 and bottom roll 14 it Between friction, the abrasion on 14 surface of roller 21 and bottom roll in reduction, and the durability of lifting chain 15 prevents chain 15 from making Used time fracture improves the practicability that this kind reduces the Novel hoist of job failure, solves existing reduction job failure Novel hoist the problem of being easily damaged.
In embodiment: 1 front of the elevator ontology and be located at door-plate 4 and be fixedly arranged above form 24, the form 24 by Outer framework and iron net are constituted, and the iron net is stuck in outer framework, and during elevator operating, user can pass through form The case where 24 observation 1 inner body of elevator ontology operating, if discovery failure, can stop the operation of elevator immediately, avoid Elevator damage.
1 pedestal, 2 elevator ontologies, 3 feed inlets, 4 door-plates, 5 holding bays, 6 grease-boxs, 7 used in above-described embodiment Oil inlet pipe, 8 discharge ports, 9 blanking grooves, 10 storage hoppers, 11 transverse slats, 12 shafts, 13 electric pushrods, 14 bottom rolls, 15 chains, 16 fortune Hopper, 17 oil pick-up tubes, 18 oil pumps, 19 jet pipes, 20 second motor, roller, 22 first motor, 23 notches, 24 forms on 21, It can be bought by market or private customization obtains, wherein the model FDR95 of electric pushrod, the model BIG40- of oil pump The model of A01F-1, the first motor and the second motor is the pole 22KW-4 B35.
Above-described embodiment is served only for that the utility model is further described, no to the specific descriptions of the utility model It can be interpreted as the restriction to scope of protection of the utility model, the technician of this field is according to the content pair of above-mentioned utility model The utility model is made some nonessential modifications and adaptations and is each fallen within the protection scope of the utility model.

Claims (6)

1. a kind of Novel hoist for reducing job failure, which is characterized in that the Novel hoist packet for reducing job failure It includes:
Pedestal (1), pedestal (1) upper vertical are connected with elevator ontology (2), and the elevator ontology (2) includes door-plate (4), holding bay (5), discharge port (8) and feed inlet (3), the door-plate (4) are hingedly connected to elevator ontology (2) by hinge Front lower, and the holding bay (5), discharge port (8) and feed inlet (3) are located at elevator ontology (2) lower right-hand side, a left side Above side and right side, and the holding bay (5), discharge port (8) and feed inlet (3) are integrated with elevator ontology (2), institute It states and is equipped with blanking groove (9) on the right side of feed inlet (3), be equipped with electric pushrod (13) inside the holding bay (5), the elevator sheet Body (2) inner bottom is fixed with storage hopper (10), and the storage hopper (10) includes the transverse slat (11) in storage hopper (10), Transverse slat (11) bottom is welded with one end shaft (12) fixed with the power output end of electric pushrod (13), the storage hopper (10) top is respectively equipped with bottom roll (14) and upper roller (21), the bottom roll (14) with elevator ontology (2) inner tip It is equal in magnitude with upper roller (21), and the second motor is respectively equipped in front of the bottom roll (14) and upper roller (21) (20) with the first motor (22), the power output end of second motor (20) and the first motor (22) respectively with lower rolling Cylinder (14) and upper roller (21) are fixed, are electrically connected between second motor (20) and the first motor (22) by conducting wire It connects, and second motor (20) rear is electrically connected with external plug, the bottom roll (14) and upper roller (21) outside It is surrounded with chain (15), and the bottom roll (14) is connected by chain (15) with upper roller (21), the chain (15) is outside Side is fixed at least five conveyer buckets (16) by clamping screw, and the conveyer bucket (16) is equidistant is arranged in chain (15) outside Side;
Grease-box (6), grease-box (6) discharge port (8) lower section, grease-box (6) top are equipped with notch (23), And the grease-box (6) includes the oil inlet pipe (7) being embedded at the top of grease-box (6), is equipped with oil on the left of the chain (15) It pumps (18), the electric pushrod (13) is electrically connected by conducting wire and oil pump (18), and the electric pushrod (13) rear electricity Line is connected with external plug, and the oil pump (18) includes oil inlet and oil outlet, and the oil inlet is fixed on oil pump (18) top Portion, and the oil outlet is fixed on oil pump (18) bottom, is plugged with the oil pick-up tube through notch (23) above the oil inlet (17), and the oil pick-up tube (17) bottom is extended in grease-box (6) by oil inlet pipe (7), grafting on the left of the oil outlet There are jet pipe (19).
2. a kind of Novel hoist for reducing job failure according to claim 1, it is characterised in that: the grease-box (6), oil pick-up tube (17), oil pump (18) and jet pipe (19) communicate, and aperture is distributed in the jet pipe (19) nozzle.
3. a kind of Novel hoist for reducing job failure according to claim 1, it is characterised in that: the transverse slat (11) It is connected by shaft (12) with electric pushrod (13).
4. a kind of Novel hoist for reducing job failure according to claim 1, it is characterised in that: the feed inlet (3) it is communicated by blanking groove (9) with storage hopper (10).
5. a kind of Novel hoist for reducing job failure according to claim 1, it is characterised in that: the elevator sheet It is fixedly arranged above form (24) in front of body (2) and positioned at door-plate (4), the form (24) is made of outer framework and iron net, and institute Iron net is stated to be stuck in outer framework.
6. a kind of Novel hoist for reducing job failure according to claim 1, it is characterised in that: the grease-box (6) volume is 10L, and the grease-box (6), oil pick-up tube (17), oil pump (18) and jet pipe (19) form oil injection mechanism.
CN201920212391.1U 2018-09-21 2019-02-18 A kind of Novel hoist reducing job failure Active CN209601374U (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201821556258X 2018-09-21
CN201821556258 2018-09-21

Publications (1)

Publication Number Publication Date
CN209601374U true CN209601374U (en) 2019-11-08

Family

ID=68403927

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920212391.1U Active CN209601374U (en) 2018-09-21 2019-02-18 A kind of Novel hoist reducing job failure

Country Status (1)

Country Link
CN (1) CN209601374U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113816104A (en) * 2021-09-07 2021-12-21 徐浩波 Chain bucket type elevator
CN115215023A (en) * 2022-05-19 2022-10-21 无锡承方科技有限公司 Folder access path intelligent security analysis system and method based on big data

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113816104A (en) * 2021-09-07 2021-12-21 徐浩波 Chain bucket type elevator
CN115215023A (en) * 2022-05-19 2022-10-21 无锡承方科技有限公司 Folder access path intelligent security analysis system and method based on big data
CN115215023B (en) * 2022-05-19 2023-12-19 无锡承方科技有限公司 File access path intelligent security analysis system and method based on big data

Similar Documents

Publication Publication Date Title
CN209601374U (en) A kind of Novel hoist reducing job failure
CN205025106U (en) Novel automatic slip casting machine
CN106955773A (en) A kind of construction waste break process equipment
CN210259901U (en) Bucket type lifting device
CN109065835A (en) A kind of battery grid production line promoting grid coating paste amount
KR101104345B1 (en) multipurpose dredging apparatus composed open circuit type hydraulic system
CN111111842A (en) Novel double-geared roller crusher
CN208265174U (en) A kind of dregs conveying equipment
CN109176961A (en) A kind of plastic products grinding device
CN209854363U (en) Oiling device of elasticizer
CN107159625A (en) Ramp type cleaning case for component of machine Integral cleaning
CN104550111B (en) A kind of bearing cleaning drying integral machine
CN109119638A (en) A kind of accumulator for fork-lift truck grid production line
CN205927761U (en) Harbour traveling hoist round pin axle dismouting device
CN106759042A (en) Accumulated snow cleaning compaction moulding output machine
CN210480624U (en) Full hydraulic lifting type grab bucket
CN206279489U (en) Accumulated snow is swept, moves, storing up, transporting one machinery
CN201574063U (en) Portable multipurpose hydraulic jack
CN220404917U (en) Turbid circulating pool sludge treatment structure of cooling tower
CN203739261U (en) Lifting movable garbage compressor for garbage transfer station
CN101829627A (en) Integrated hydraulic driven dual-shaft moving mill feed trolley
CN215515550U (en) Easy-to-clean elevator
CN206407505U (en) A kind of scrapper conveyor with chilling roll
CN208087184U (en) A kind of mechanical and electric equipment installation frame
CN214347424U (en) Oiling station is used in wire rope production

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 1188 Fengliang Road, Fengxian District, Shanghai, 201411

Patentee after: Shanghai Qishen Plastics Co.,Ltd.

Address before: 1188 Fengliang Road, Fengxian District, Shanghai, 201411

Patentee before: SHANGHAI QISHEN ENGINEERING PLASTICS Co.,Ltd.

CP01 Change in the name or title of a patent holder