CN209601251U - Rectangular hopper - Google Patents
Rectangular hopper Download PDFInfo
- Publication number
- CN209601251U CN209601251U CN201822080985.XU CN201822080985U CN209601251U CN 209601251 U CN209601251 U CN 209601251U CN 201822080985 U CN201822080985 U CN 201822080985U CN 209601251 U CN209601251 U CN 209601251U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- sleeve
- bucket body
- elevating lever
- striker plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Filling Or Emptying Of Bunkers, Hoppers, And Tanks (AREA)
Abstract
The utility model discloses a kind of rectangular hoppers, belong to water tank drawbench field, its key points of the technical solution are that include wire drawing machine and be connected to wire drawing machine bottom end oil sump, sucking pump is connected on the oil sump, filtering ponds are connected on sucking pump, centrifugation component is connected on filtering ponds, centrifugation component is connected with the water pipe led in oil sump;Being centrifuged component includes that the motor being connected on filtering ponds, the turntable being connected on motor output shaft and the centrifugal column being connected on turntable, centrifugal column be not coaxial with turntable.The utility model solves prior art lower header wire drawing machine can the technical issues of friction of copper powder or foreign matter causes copper wire surface damage in tension silk oil in annealing, having achieved the effect that filter copper powder or other foreign matters in wire drawing oil is that wire drawing oil is more caught up with only to reduce the surface abrasion of copper wire, is applied in wire drawing machine.
Description
Technical field
The utility model relates to Architectural Equipment fields, more specifically, it is related to a kind of rectangular hopper.
Background technique
Hopper building field be as a kind of important equipment, it is most of now need using concrete scene or
Blending station can all have the presence of hopper.
In the prior art, Authorization Notice No. is that the Chinese utility model patent file of CN205975619U discloses a kind of filling
Drilled pile hopper is infused, including hopper ontology, hopper ontology include rectangular section of panel, conical section panel and conduit, rectangular section of face
Plate and conical section panel surround material trough, and material trough is connected to conduit, it is characterised in that: conduit bottom outside is equipped with pedestal, bottom
Four angles of seat are equipped with column, and the top of column is fixedly connected with rectangular section of panel, the rectangular section of panel and conical section panel
Periphery is equipped at intervals with several layers cross-brace, and several diagonal braces are additionally provided on the pedestal, and the upper end of diagonal brace is supported in conical section
In the cross-brace of panel.
Existing this bored piles hopper is when in use, it is difficult to control hopper materials inside and leak out from feed hopper bottom
Speed construction is brought certain so that operator is difficult to adjust according to operating condition and reasonably the blanking velocity of hopper
It is inconvenient.
Utility model content
In view of the deficienciess of the prior art, passing through gear the purpose of this utility model is to provide a kind of rectangular hopper
Plate, elevating lever and elevating lever can change the area of feed hopper bottom discharge outlet, and then can change discharging speed.
To achieve the above object, the utility model provides following technical solution: a kind of rectangular hopper, including bucket body, institute
The top surface for stating bucket body offers feed inlet, and the bottom surface of the bucket body offers discharge port, and the center position of discharge port is fixed to be connected
It is connected to horizontally disposed striker plate, the two sides of striker plate have been respectively articulated with two block baffles, and the side of baffle and striker plate are hinged, and two
The side opposite with striker plate side is hinged with is hinged with control-rod in block baffle, and the pivot center of control-rod is each parallel to two
The pivot center of block baffle, baffle is horizontally disposed and parallel to each other;The liter being vertically arranged is plugged on striker plate along the vertical direction
Bar drops, and the top of elevating lever is stretched out above feed inlet, and bottom end is stretched out below striker plate, and elevating lever is slided along the vertical direction with striker plate
It moves and connects, the side opposite with the side that it is hinged with baffle is hinged with elevating lever on control-rod, one end of control-rod and gear
Plate is hinged, and the other end is hinged with elevating lever.
It, can be along vertical when needing to change the blanking velocity of the material inside bucket body by using above-mentioned technical proposal
Direction slides elevating lever, and when elevating lever starts sliding, two control-rods can turn with the rising of elevating lever to horizontal direction
It is dynamic, and then baffle can also can be rotated to horizontal direction, the space between baffle and discharge port reduces at this time, bucket body materials inside
Blanking velocity can slow down, and vice versa.
It is preferable: cylinder, the fixation of the piston rod and elevating lever coaxial line of cylinder are fixedly connected at the top of the bucket body
Connection.
By using above-mentioned technical proposal, the sliding of elevating lever can be more easily controlled by cylinder, while can also
It is fixed on elevating lever on some specific position.
Preferable: the bucket body inner rotation is connected with the sleeve being vertically arranged, and the pivot center of sleeve is vertically arranged, set
Cylinder is set in the outside of elevating lever, the delivery sheet of trochoid spiral threadiness is fixedly connected on the side wall of sleeve, the top of sleeve is stretched
Out above feed inlet.
By using above-mentioned technical proposal, operator station can be allowed in other support platforms, to turn in bucket body or station
Moving sleeve, at this moment the delivery sheet of trochoid spiral threadiness can rotate together, and the material inside bucket body can leading in the delivery sheet of rotation
To be more smoothly displaced outwardly inside bucket body by discharge port under friction.
It is preferable: to be fixedly connected with stupefied on the feeding plate top surface, described stupefied have spiral multiple and along delivery sheet
Directional spreding.
By using above-mentioned technical proposal, pass through rubbing between the upper stupefied material that can increase inside delivery sheet and bucket body
It wipes, the material inside bucket body can be kept more smooth when rotating delivery sheet and be quickly displaced outwardly from discharge port.
It is preferable: be fixedly connected with down on the bottom surface of institute's delivery sheet it is stupefied, it is stupefied under described to have spiral multiple and along delivery sheet
Directional spreding.
By using above-mentioned technical proposal, under between the stupefied material that can be further increased inside delivery sheet and bucket body
Friction, the material inside bucket body can be kept more smooth when rotating delivery sheet and be quickly displaced outwardly from discharge port.
It is preferable: rust preventive coating is coated on the outer wall of the bucket body.
By using above-mentioned technical proposal, the possibility that bucket body outer wall gets rusty can be reduced by rust preventive coating, extend bucket
The service life of body.
Preferable: the end sleeve that the sleeve stretches out above feed inlet is equipped with ring gear, the fixation of ring gear and sleeve coaxial line
It connects, the Power Component of driving ring gear rotation is fixedly connected on bucket body.
By using above-mentioned technical proposal, ring gear rotation is driven by Power Component, sleeve can rotate with it at this time, in this way
Delivery sheet is just able to rotate, and removes material more smoothly out of discharge port.
It is preferable: the tooth that the Power Component includes the motor being fixedly connected on bucket body and is fixedly connected on motor
Wheel, gear is fixedly connected with the output shaft coaxial line of motor, and gear is engaged with ring gear.
By using above-mentioned technical proposal, the rotation of ring gear is realized by motor and gear cooperation, it is relatively simple quick, and
It is convenient for safeguarding.
In conclusion the utility model is had the advantages that compared with the prior art 1. by hinged with bucket body
Striker plate, the baffle hinged with striker plate can be controlled with the control-rod of panel hinge and the elevating lever hinged with control-rod
The discharging speed of material allows the operator to the blanking velocity according to Operating condition adjustment material.
Detailed description of the invention
Fig. 1 is the axonometric drawing of embodiment;
Fig. 2 is the schematic diagram to indicate cylinder location in embodiment;
Fig. 3 is the portion the A enlarged drawing in Fig. 2 to indicate Power Component structure;
Fig. 4 is the portion the B enlarged drawing in Fig. 1 to indicate lifting rod structure;
Fig. 5 is the schematic diagram in embodiment to indicate delivery sheet structure.
Appended drawing reference: 1, bucket body;11, frame body;12, cross bar;13, H-frame pole;14, discharge port;15, feed inlet;2, power
Component;21, motor;22, gear;23, ring gear;3, elevating lever;31, mobile jib;32, bottom plate;33, control-rod;34, baffle;35, it keeps off
Flitch;4, cylinder;41, connecting cylinder;5, bearing;6, delivery sheet;61, upper stupefied;62, stupefied under;7, sleeve;8, rust preventive coating.
Specific embodiment
Embodiment: a kind of rectangular hopper is fixedly connected with bucket body 1 on frame body 11 referring to Fig. 1 and Fig. 2, including frame body 11,
Bucket body 1 is in Fang Douzhuan, and the top of bucket body 1 offers feed inlet 15;The bottom of bucket body 1 offers discharge port 14.At feed inlet 15
Bucket body 1 on be fixedly connected with horizontally disposed cross bar 12, the both ends of cross bar 12 are fixedly connected with bucket body 1, the top of cross bar 12
The H-frame pole 13 being vertically arranged is fixedly connected on face.The connecting cylinder being vertically arranged is fixedly connected on the top surface of H-frame pole 13
41, cylinder 4 is fixedly connected on the top surface of connecting cylinder 41, and cylinder 4 is arranged straight down.Conical spiral is equipped with inside bucket body 1
The delivery sheet 6 of shape, the side wall of delivery sheet 6 are not abutted with the inner wall of bucket body 1.Water is fixedly connected on bucket body 1 at discharge port 14
The striker plate 35 of flat setting, the both ends of striker plate 35 are fixedly connected with bucket body 1.The two sides of striker plate 35 are hinged with baffle
34,34 pivot center of baffle is horizontally disposed, and the pivot center of two baffles 34 is parallel to each other.It is installed on the outer wall of bucket body 1
Rust preventive coating 8.
Referring to figs. 2 and 3, it is fixedly connected with bearing 5 on the cross bar 12 of 13 lower section of H-frame pole, bearing 5 is horizontally disposed, bearing
Sleeve 7 is fixedly connected on 5, sleeve 7 is fixedly connected with the inner ring of bearing 5, and the outer ring of bearing 5 is fixedly connected with cross bar 12.Set
14 top of discharge port is stretched out on the top of cylinder 7.The top of sleeve 7 is arranged with ring gear 23, and ring gear 23 and the fixed of 7 coaxial line of sleeve connect
It connects.Be fixedly connected with Power Component 2 on cross bar 12, Power Component 2 include the motor 21 being fixedly connected on H-frame pole 13 and
The gear 22 being fixedly connected on motor 21, motor 21 are arranged straight down, the output shaft coaxial line of gear 22 and motor 21
It is fixedly connected, gear 22 is engaged with ring gear 23.Delivery sheet 6 is fixedly connected on the side wall of sleeve 7, and the axis and circle of sleeve 7
The lead for boring the delivery sheet 6 of zigzag shape is conllinear, i.e., in sleeve 7 on the center line of delivery sheet 6.Along vertical on H-frame pole 13
Direction is plugged with elevating lever 3, and the piston rod of cylinder 4 runs through connecting cylinder 41, and the fixation with 3 coaxial line of elevating lever along the vertical direction
Connection, the piston rod of cylinder 4 slide connection relative to connecting cylinder 41 along the vertical direction.Elevating lever 3 is plugged on set along the vertical direction
Inside cylinder 7, and the side wall of elevating lever 3 is abutted with the inner wall of sleeve 7, and elevating lever 3 is relative to the company of sliding along the vertical direction of sleeve 7
It connects.
Include the mobile jib 31 being located inside sleeve 7 and be fixedly connected on 31 bottom end of mobile jib with Fig. 4, elevating lever 3 referring to fig. 2
Bottom plate 32, the top of mobile jib 31 is fixedly connected with cylinder 4, and 14 lower section of discharge port is stretched out in bottom end, and is fixedly connected with bottom plate 32.
Bottom plate 32 is horizontally disposed.The side of baffle 34 and striker plate 35 are hinged, in two block baffles 34 be hinged with 35 side phase of striker plate
Pair side be hinged with control-rod 33, for the pivot center of control-rod 33 each parallel to two block baffles 34, control-rod 33 shares four
Root is respectively connected with two control-rods 33 in every block baffle 34.The side opposite with the side that it is hinged with baffle 34 on control-rod 33
Bian Junyu bottom plate 32 is hinged, and one end of control-rod 33 and baffle 34 are hinged, and the other end and bottom plate 32 are hinged, and control-rod 33 is distinguished
It is hinged at four angles of bottom plate 32.
Referring to Fig. 3 and Fig. 5, it is fixedly connected with stupefied 61 on the top surface of delivery sheet 6, fixes on the bottom surface of delivery sheet 6 to connect
Be connected to down stupefied 62, upper stupefied 61 under stupefied 62 along delivery sheet 6 the hand of spiral be distributed.
Working principle when the rectangular hopper uses is as follows: when needing to change the blanking velocity of the material inside bucket body 1,
Elevating lever 3 can be slid along the vertical direction, and when elevating lever 3 starts sliding, two control-rods 33 can be with the rising of elevating lever 3
And it is rotated to horizontal direction, and then baffle 34 can also can be rotated to horizontal direction, the sky between baffle 34 and discharge port 14 at this time
Between reduce, the blanking velocity of 1 materials inside of bucket body can slow down, and vice versa.
The above is only the preferred embodiment of the utility model, and the protection scope of the utility model is not limited merely to
Above-described embodiment, technical solution belonging to the idea of the present invention belong to the protection scope of the utility model.It should refer to
Out, for those skilled in the art, it is without departing from the principle of the utility model it is several improvement and
Retouching, these improvements and modifications also should be regarded as the protection scope of the utility model.
Claims (8)
1. the top surface of a kind of rectangular hopper, including bucket body (1), the bucket body (1) offers feed inlet (15), the bucket body (1)
Bottom surface offer discharge port (14), it is characterised in that: the center position of discharge port (14) is fixedly connected with horizontally disposed
Striker plate (35), the two sides of striker plate (35) have been respectively articulated with two block baffles (34), the side and striker plate (35) of baffle (34)
Hingedly, side opposite with striker plate (35) side is hinged in two block baffles (34) is hinged with control-rod (33), control-rod
(33) for pivot center each parallel to two block baffles (34), the pivot center of baffle (34) is horizontally disposed and parallel to each other;Backgauge
The elevating lever (3) being vertically arranged is plugged on plate (35) along the vertical direction, the top of elevating lever (3) is stretched out on feed inlet (15)
Side, bottom end are stretched out below striker plate (35), and sliding connects along the vertical direction for elevating lever (3) and striker plate (35), control-rod (33)
The upper side opposite with the side that it is hinged with baffle (34) with elevating lever (3) hingedly, one end of control-rod (33) and baffle
(34) hingedly, the other end and elevating lever (3) are hinged.
2. rectangular hopper according to claim 1, it is characterised in that: be fixedly connected with cylinder at the top of the bucket body (1)
(4), the piston rod of cylinder (4) and elevating lever (3) coaxial line are fixedly connected.
3. rectangular hopper according to claim 2, it is characterised in that: bucket body (1) inner rotation is connected with to be set vertically
The sleeve (7) set, the pivot center of sleeve (7) are vertically arranged, and sleeve (7) is set in the outside of elevating lever (3), sleeve (7)
The delivery sheet (6) of trochoid spiral threadiness is fixedly connected on side wall, the top of sleeve (7) is stretched out above feed inlet (15).
4. rectangular hopper according to claim 3, it is characterised in that: be fixedly connected on delivery sheet (6) top surface
Stupefied (61), upper stupefied (61) have multiple and are distributed along the hand of spiral of delivery sheet (6).
5. rectangular hopper according to claim 4, it is characterised in that: be fixedly connected with down on the bottom surface of institute's delivery sheet (6)
Stupefied (62), (62) stupefied under described have multiple and are distributed along the hand of spiral of delivery sheet (6).
6. rectangular hopper according to claim 1, it is characterised in that: be coated with antirust paint on the outer wall of the bucket body (1)
Layer (8).
7. rectangular hopper according to claim 3, it is characterised in that: the sleeve (7) is stretched out above feed inlet (15)
End sleeve is equipped with ring gear (23), and ring gear (23) is fixedly connected with sleeve (7) coaxial line, and bucket body is fixedly connected with driving on (1)
The Power Component (2) of ring gear (23) rotation.
8. rectangular hopper according to claim 7, it is characterised in that: the Power Component (2) includes being fixedly connected on bucket
Motor (21) on body (1) and the gear (22) being fixedly connected on motor (21), the output of gear (22) and motor (21)
Axis coaxial line is fixedly connected, and gear (22) is engaged with ring gear (23).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822080985.XU CN209601251U (en) | 2018-12-11 | 2018-12-11 | Rectangular hopper |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822080985.XU CN209601251U (en) | 2018-12-11 | 2018-12-11 | Rectangular hopper |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209601251U true CN209601251U (en) | 2019-11-08 |
Family
ID=68395909
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822080985.XU Expired - Fee Related CN209601251U (en) | 2018-12-11 | 2018-12-11 | Rectangular hopper |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209601251U (en) |
-
2018
- 2018-12-11 CN CN201822080985.XU patent/CN209601251U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110052191B (en) | Low-VOC high-solid-content anticorrosive oil-resistant coating process system, process and formula | |
CN108889162A (en) | A kind of efficient coating material agitator with impurity removal function | |
CN111760645A (en) | Coating grinding device | |
CN209601251U (en) | Rectangular hopper | |
CN105771768B (en) | A kind of material mixed stirring device | |
CN206911191U (en) | Novel biax coating dispenser | |
CN117513751A (en) | Concrete pouring chute | |
CN205689218U (en) | A kind of concrete spraying unit | |
CN208340697U (en) | A kind of chemical reaction tank multi-purpose stand | |
CN111111537A (en) | Industrial sewage coagulant feeding method | |
CN1786318A (en) | Spray moisturing device of fabric | |
CN109703710A (en) | A kind of environment protection ship suitable for clearing up over-water floats | |
CN113426165B (en) | High-concentration fine-grain tailing deep cone thickener | |
CN107503517A (en) | A kind of concrete belt conveying, pumping all-in-one | |
CN113952791A (en) | Building construction sewage treatment and sedimentation device with automatic catalyst feeding proportioning function and treatment method | |
CN204485758U (en) | Water paint process equipment | |
CN109926128A (en) | A kind of particle agitating device for building | |
CN206527884U (en) | A kind of mortar machine | |
CN212942593U (en) | Emulsifying machine | |
CN220503908U (en) | Soft foundation curing equipment | |
CN219928659U (en) | Telescopic rotary unloading chute | |
CN213866015U (en) | Compound fertilizer coating device | |
CN218893481U (en) | Ecological restoration equipment for river and lake water | |
CN204485751U (en) | Coating process equipment | |
CN212954665U (en) | Building engineering sewage pretreatment device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20191108 Termination date: 20201211 |
|
CF01 | Termination of patent right due to non-payment of annual fee |