CN209589371U - A kind of chemical industry equipment Leakage Test equipment - Google Patents
A kind of chemical industry equipment Leakage Test equipment Download PDFInfo
- Publication number
- CN209589371U CN209589371U CN201920699532.7U CN201920699532U CN209589371U CN 209589371 U CN209589371 U CN 209589371U CN 201920699532 U CN201920699532 U CN 201920699532U CN 209589371 U CN209589371 U CN 209589371U
- Authority
- CN
- China
- Prior art keywords
- tube body
- shell
- chemical industry
- lateral wall
- water
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses a kind of chemical industry equipment Leakage Test equipment, including seal assembly, adjusting component, water filling component and control assembly, the seal assembly include first shell, gasket, second shell, elastic force bar, external screw thread, casing and fixed link;When testing to chemical industry equipment, by the way that second shell is sheathed on chemical industry equipment lateral wall, it then will be in the both ends insertion casing of elastic force bar, rotating casing, elastic force bar is set to tie tight gasket, gasket is tied tight chemical industry equipment, start water pump, water pump extracts water source by the second tube body out of water tank, pass through the first tube body, the water source extracted out of water tank is injected in first shell, it is then shut off water pump, when thering is bubble to occur in first shell, illustrate that chemical industry equipment leaks air phenomenon, if there is not bubble, then illustrate that chemical industry equipment leakproofness is intact, it does not need to dismantle chemical industry equipment, slinging work, it is time saving and energy saving.
Description
Technical field
The utility model relates to Leakage Test equipment technical field, specially a kind of chemical industry equipment Leakage Test is set
It is standby.
Background technique
Chemical industry equipment is a part of chemical machinery, and the type of chemical industry equipment has very much, and one of which is exactly pressure vessels for the chemical industry
Class, pressure vessels for the chemical industry class has slot, tank, kettle etc., and pressure vessels for the chemical industry is mostly cylinder, has lid, for the life and health of staff
Safety, have very stringent sealing requirements to pressure vessels for the chemical industry, chemical industry equipment is mostly large scale equipment, also be already installed on work
Make the container in workshop, not easy to disassemble, due to chemical industry equipment such as pressure vessels for the chemical industry class, volume is larger, existing inspection equipment,
It is troublesome in poeration when to chemical industry equipment Leakage Test, it is time-consuming and laborious, it is not easy to test to chemical industry equipment leakproofness, for this purpose,
It is proposed a kind of chemical industry equipment Leakage Test equipment.
Utility model content
The purpose of this utility model is to provide a kind of chemical industry equipment Leakage Test equipment, to solve above-mentioned background technique
The problem of middle proposition.
To achieve the above object, the utility model provides the following technical solutions: a kind of chemical industry equipment Leakage Test equipment,
It include first shell, gasket, second including seal assembly, adjusting component, water filling component and control assembly, the seal assembly
Shell, elastic force bar, external screw thread, casing and fixed link, the lower surface of the first shell is fixedly connected with the gasket, described
The lower surface of gasket is fixedly connected with the second shell, and the lateral wall of the gasket is arranged with the elastic force bar, described
The lateral wall of elastic force bar has the external screw thread, and the both ends of the elastic force bar are inserted into described sleeve pipe, the elastic force bar and institute
State casing threads connection, the lateral wall of the first shell is symmetrically and evenly fixedly connected with the fixed link, the fixed link with
The second shell is fixedly connected.
As the technical program further preferred that the adjusting component includes that support rod, sleeve, through-hole, screw thread are logical
Hole, screw rod and knob, the lower surface of the first shell are symmetrically and evenly fixedly connected with the support rod, the bottom of the support rod
Portion slides in the sleeve, and the lateral wall of the support rod symmetrically offers the through-hole, the lateral wall of the sleeve
The tapped through hole is offered, the tapped through hole internal screw thread is connected with the screw rod, and one end of the screw rod is far from the set
The side of cylinder is fixedly connected with knob.
As the technical program further preferred that the water filling component include the first tube body, water pump, the second tube body,
Water tank, water injection pipe, pipe close, third tube body and the 4th tube body, the side of the first shell is communicated with first tube body, described
One end of first tube body is connected to the water outlet of the water pump, and the end of drawing water of the water pump is communicated with second tube body, described
One end of second tube body is connected to the water tank, is communicated with the water injection pipe at the top of the water tank, described in the pipe close insertion
In water injection pipe.
As the technical program further preferred that the lateral wall of first tube body is communicated with the third tube body,
The third tube body is connected to the water tank, and the lateral wall of second tube body is communicated with the 4th tube body, the 4th pipe
Body is connected to the first shell.
As the technical program further preferred that the control assembly includes the first valve, the second valve, third valve
Door, the 4th valve and switch, the lateral wall of the second shell are equipped with first valve, the lateral wall of the third tube body
Side close to first tube body is equipped with the 4th valve, and the lateral wall of the 4th tube body is close to second tube body
Side second valve is installed, the lateral wall of second tube body is equipped with the third close to the side of the water tank
Valve, the lateral wall of the water tank are equipped with the switch, and the water pump and the switch are electrically connected.
As the technical program further preferred that the elastic force bar is semicircle column structure.
Compared with prior art, the utility model has the beneficial effects that when testing to chemical industry equipment, by by
Two shells are sheathed on chemical industry equipment lateral wall, and then by the both ends insertion casing of elastic force bar, rotating casing makes elastic force bar tie tight
Gasket, gasket are tied tight chemical industry equipment, and water pump is started, and water pump extracts water source by the second tube body out of water tank, passes through first
The water source extracted out of water tank is injected in first shell, is then shut off water pump, when there is bubble appearance in first shell by tube body
When, illustrate that the chemical industry equipment phenomenon that leaks air illustrates that chemical industry equipment leakproofness is intact, do not need if there is not bubble
Chemical industry equipment is dismantled, slinging work, it is time saving and energy saving.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the structural schematic diagram of the connection type figure of elastic force bar and casing in the utility model;
Fig. 3 is the connection type figure of support rod and sleeve in the utility model.
In figure: 10, seal assembly;11, first shell;12, gasket;13, second shell;14, elastic force bar;15, outer spiral shell
Line;16, casing;17, fixed link;20, component is adjusted;21, support rod;22, sleeve;23, through-hole;24, tapped through hole;25, spiral shell
Bar;26, knob;30, component is filled the water;31, the first tube body;32, water pump;33, the second tube body;34, water tank;35, water injection pipe;36,
Pipe close;37, third tube body;38, the 4th tube body;40, control assembly;41, the first valve;42, the second valve;43, third valve;
44, the 4th valve;45, it switchs.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
Every other embodiment obtained, fall within the protection scope of the utility model.
Embodiment
Fig. 1-3 is please referred to, the utility model provides a kind of technical solution: a kind of chemical industry equipment Leakage Test equipment, packet
Include seal assembly 10, adjust component 20, water filling component 30 and control assembly 40, the seal assembly 10 include first shell 11,
Gasket 12, second shell 13, elastic force bar 14, external screw thread 15, casing 16 and fixed link 17, the lower surface of the first shell 11
It is fixedly connected with the gasket 12, the lower surface of the gasket 12 is fixedly connected with the second shell 13, the sealing
The lateral wall of pad 12 is arranged with the elastic force bar 14, and the lateral wall of the elastic force bar 14 has the external screw thread 15, the elastic force
The both ends of bar 14 are inserted into described sleeve pipe 16, and the elastic force bar 14 is threadedly coupled with described sleeve pipe 16, the first shell 11
Lateral wall be symmetrically and evenly fixedly connected with the fixed link 17, the fixed link 17 is fixedly connected with the second shell 13.
Specific in the present embodiment: the adjusting component 20 includes support rod 21, sleeve 22, through-hole 23, tapped through hole
24, screw rod 25 and knob 26, the lower surface of the first shell 11 are symmetrically and evenly fixedly connected with the support rod 21, the branch
In in the sleeve 22, the lateral wall of the support rod 21 symmetrically offers the through-hole 23 for the basal sliding of strut 21,
The lateral wall of the sleeve 22 offers the tapped through hole 24, and 24 internal screw thread of tapped through hole is connected with the screw rod 25,
One end of the screw rod 25 is fixedly connected with knob 26 far from the side of the sleeve 22;First shell 11 is being mounted on chemical industry
When in equipment, sliding sleeve 22 makes bottom and the ground face contact of sleeve 22, and by turning knob 26, knob 26 drives screw rod 25
It is rotated in tapped through hole 24, is inserted into one end of screw rod 25 in the through-hole 23 of support rod 21, to sleeve 22 and support rod 21
Position is fixed, and support rod 21 is enable to be supported second shell 13.
Specific in the present embodiment: the water filling component 30 includes the first tube body 31, water pump 32, the second tube body 33, water tank
34, the side of water injection pipe 35, pipe close 36, third tube body 37 and the 4th tube body 38, the first shell 11 is communicated with described first
Tube body 31, one end of first tube body 31 are connected to the water outlet of the water pump 32, and the end of drawing water of the water pump 32 is communicated with
Second tube body 33, one end of second tube body 33 are connected to the water tank 34, and the top connection of the water tank 34 is
Water injection pipe 35 is stated, the pipe close 36 is inserted into the water injection pipe 35;With the above arrangement, 35 casees water tanks of water injection pipe 34 can be passed through
Interior injection water source, then starts water pump 32, and water pump 32 extracts water source out of water tank 34 by the second tube body 33, passes through the first tube body
31, the water source extracted out of water tank 34 is injected in first shell 11, when having bubble to occur in first shell 11, illustrates chemical industry
The equipment phenomenon that leaks air if there is not bubble illustrates that chemical industry equipment leakproofness is intact, and pipe close 36 is for sealing water filling
Pipe 35.
In the present embodiment, specific: the lateral wall of first tube body 31 is communicated with the third tube body 37, the third
Tube body 37 is connected to the water tank 34, and the lateral wall of second tube body 33 is communicated with the 4th tube body 38, the 4th pipe
Body 38 is connected to the first shell 11;With the above arrangement, can be after having inspected chemical industry equipment leakproofness, water pump 32 passes through
4th tube body 38 extracts water source out of first shell 11, the water source that then will be extracted out of first shell 11 by third tube body 37
It injects in water tank 34, is conducive to the recycling of water resource.
It is specific in the present embodiment: the control assembly 40 include the first valve 41, the second valve 42, third valve 43,
4th valve 44 and switch 45, the lateral wall of the second shell 13 are equipped with first valve 41, the third tube body 37
Lateral wall the 4th valve 44 is installed close to the side of first tube body 31, the lateral wall of the 4th tube body 38 leans on
The side of nearly second tube body 33 is equipped with second valve 42, and the lateral wall of second tube body 33 is close to the water tank
34 side is equipped with the third valve 43, and the lateral wall of the water tank 34 is equipped with the switch 45, the water pump 32 with
The switch 45 is electrically connected;With the above arrangement, can control the first tube body 31, the second tube body 33, third tube body 37 and
Whether four tube bodies 38 are in circulation status, by the way that switch 45 is arranged, can control the starting and closing of water pump 32.
Specific in the present embodiment: the elastic force bar 14 is semicircle column structure;When the both ends of elastic force bar 14 are overlapped
When, cylindrical structure can be formed, to can rotate in the lateral wall of elastic force bar 14 when rotating casing 16.
In the present embodiment: the model FQS-750 of water pump 32.
In the present embodiment: 11 acrylic materials of first shell can make people from extraneous inside first shell 11
Whether bubble generation is had, to judge whether chemical industry equipment leakproofness is intact.
Working principle or structural principle: when testing to chemical industry equipment, by by 13 being sheathed on of second shell
Then the both ends of elastic force bar 14 are inserted into casing 16, rotating casing 16, due to the lateral wall of elastic force bar 14 by construction equipment lateral wall
With external screw thread 15, so when rotating casing 16, casing 16 can be made in the lateral wall rotation of elastic force bar 14 and to close to the
The direction of one shell 11 moves, and elastic force bar 14 is made to tie tight gasket 12, and gasket 12 is tied tight chemical industry equipment, then passes through water injection pipe
Water source is injected in 35 casees water tanks 34, then starts water pump 32, and water pump 32 extracts water source out of water tank 34 by the second tube body 33, leads to
The first tube body 31 is crossed, the water source extracted out of water tank 34 is injected in first shell 11, water pump 32 is then shut off, works as first shell
When thering is bubble to occur in 11, illustrate that chemical industry equipment leaks air phenomenon, if there is not bubble, illustrates that chemical industry equipment seals
Property it is intact, pipe close 36 is for sealing water injection pipe 35, so that sealing radiator 34, is mounted on chemical industry equipment by first shell 11
When, sliding sleeve 22 makes bottom and the ground face contact of sleeve 22, and by turning knob 26, knob 26 drives screw rod 25 in screw thread
Rotation in through-hole 24 is inserted into one end of screw rod 25 in the through-hole 23 of support rod 21, to the position of sleeve 22 and support rod 21 into
Row is fixed, and support rod 21 is enable to be supported second shell 13, and second shell 13 is by fixed link 17 to first shell 11
It is supported, after having inspected chemical industry equipment leakproofness, opens the second valve 42 and the 4th valve 44, close 41 He of the first valve
Third valve 43, then starts water pump 32, and water pump 32 extracts water source by the 4th tube body 38 out of first shell 11, then passes through
Third tube body 37 injects at the water source extracted out of first shell 11 in water tank 34, is conducive to the recycling of water resource.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired
Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.
Claims (6)
1. a kind of chemical industry equipment Leakage Test equipment, including seal assembly (10), adjust component (20), water filling component (30) and
Control assembly (40), it is characterised in that: the seal assembly (10) includes first shell (11), gasket (12), second shell
(13), the lower surface of elastic force bar (14), external screw thread (15), casing (16) and fixed link (17), the first shell (11) is fixed
It is connected with the gasket (12), the lower surface of the gasket (12) is fixedly connected with the second shell (13), described close
The lateral wall of packing (12) is arranged with the elastic force bar (14), and the lateral wall of the elastic force bar (14) has the external screw thread
(15), the both ends of the elastic force bar (14) are inserted into described sleeve pipe (16), the elastic force bar (14) and described sleeve pipe (16) spiral shell
Line connection, the lateral wall of the first shell (11) are symmetrically and evenly fixedly connected with the fixed link (17), the fixed link
(17) it is fixedly connected with the second shell (13).
2. a kind of chemical industry equipment Leakage Test equipment according to claim 1, it is characterised in that: the adjusting component
It (20) include support rod (21), sleeve (22), through-hole (23), tapped through hole (24), screw rod (25) and knob (26), described first
The lower surface of shell (11) is symmetrically and evenly fixedly connected with the support rod (21), and the basal sliding of the support rod (21) is in institute
It states in sleeve (22), the lateral wall of the support rod (21) symmetrically offers the through-hole (23), the sleeve (22)
Lateral wall offers the tapped through hole (24), and tapped through hole (24) internal screw thread is connected with the screw rod (25), the spiral shell
One end of bar (25) is fixedly connected with knob (26) far from the side of the sleeve (22).
3. a kind of chemical industry equipment Leakage Test equipment according to claim 1, it is characterised in that: the water filling component
It (30) include the first tube body (31), water pump (32), the second tube body (33), water tank (34), water injection pipe (35), pipe close (36), third
Tube body (37) and the 4th tube body (38), the side of the first shell (11) are communicated with first tube body (31), and described first
One end of tube body (31) is connected to the water outlet of the water pump (32), and the end of drawing water of the water pump (32) is communicated with second pipe
One end of body (33), second tube body (33) is connected to the water tank (34), is communicated at the top of the water tank (34) described
Water injection pipe (35), the pipe close (36) are inserted into the water injection pipe (35).
4. a kind of chemical industry equipment Leakage Test equipment according to claim 3, it is characterised in that: first tube body
(31) lateral wall is communicated with the third tube body (37), and the third tube body (37) is connected to the water tank (34), and described
The lateral wall of two tube bodies (33) is communicated with the 4th tube body (38), and the 4th tube body (38) and the first shell (11) are even
It is logical.
5. a kind of chemical industry equipment Leakage Test equipment according to claim 4, it is characterised in that: the control assembly
(40) include the first valve (41), the second valve (42), third valve (43), the 4th valve (44) and switch (45), described the
The lateral wall of two shells (13) is equipped with first valve (41), and the lateral wall of the third tube body (37) is close to described first
The side of tube body (31) is equipped with the 4th valve (44), and the lateral wall of the 4th tube body (38) is close to second tube body
(33) side is equipped with second valve (42), and the lateral wall of second tube body (33) is close to the one of the water tank (34)
Side is equipped with the third valve (43), and the lateral wall of the water tank (34) is equipped with the switch (45), the water pump (32)
It is electrically connected with the switch (45).
6. a kind of chemical industry equipment Leakage Test equipment according to claim 1, it is characterised in that: the elastic force bar (14)
For semicircle column structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920699532.7U CN209589371U (en) | 2019-05-15 | 2019-05-15 | A kind of chemical industry equipment Leakage Test equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920699532.7U CN209589371U (en) | 2019-05-15 | 2019-05-15 | A kind of chemical industry equipment Leakage Test equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209589371U true CN209589371U (en) | 2019-11-05 |
Family
ID=68345254
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920699532.7U Expired - Fee Related CN209589371U (en) | 2019-05-15 | 2019-05-15 | A kind of chemical industry equipment Leakage Test equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209589371U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113280896A (en) * | 2021-06-22 | 2021-08-20 | 沈朋 | Water meter sealing performance detection device and method |
-
2019
- 2019-05-15 CN CN201920699532.7U patent/CN209589371U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113280896A (en) * | 2021-06-22 | 2021-08-20 | 沈朋 | Water meter sealing performance detection device and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209589371U (en) | A kind of chemical industry equipment Leakage Test equipment | |
CN209690071U (en) | A kind of valve production detection water test unit | |
CN203519430U (en) | Sealing device for water pressure test of gas cylinder in water jacket method | |
CN209689855U (en) | A kind of water test unit of fire-fighting steel cylinder | |
CN208921358U (en) | A kind of bonnet hydraulic pressure test fixture | |
CN106092457A (en) | A kind of detecting device for sealing property of ball valves | |
CN214426926U (en) | ISO-TANK bottom valve gas tightness detection device | |
CN204556182U (en) | A kind of device for detecting sealability of gasoline filter | |
CN203190038U (en) | Connecting structure of cylinder mouth and cylinder valve of gas cylinder | |
CN201945422U (en) | Leak testing detector for ammonia pump check valve | |
CN204679223U (en) | altitude simulation test device | |
CN207935617U (en) | Combined joint based on ship | |
CN206129231U (en) | Oil field cross valve | |
CN217479056U (en) | Safe barreled solvent partial shipment device | |
CN206161466U (en) | Gassiness flow measurement desorbing tanks | |
CN110398396A (en) | A kind of aviation fuel thief-sampler syringe | |
CN218546488U (en) | Corrosion solution circulation simulation system for metal material corrosion fatigue test | |
CN209112811U (en) | A kind of tank body pollution discharge structure | |
CN209892429U (en) | Fracturing pump hydraulic end assembly | |
CN215064801U (en) | Delay test machine with delay function for water flow indicator switch | |
CN210716229U (en) | Valve rod nut with good sealing performance for petroleum pump valve | |
CN217684416U (en) | Leak protection mechanism that gas cylinder inspection was used | |
CN209340514U (en) | A kind of water valve | |
CN108105521A (en) | Combined joint based on ship | |
CN204189376U (en) | Oil spout retracting device in a kind of electric-control motor teaching system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20191105 Termination date: 20200515 |
|
CF01 | Termination of patent right due to non-payment of annual fee |