CN209586418U - A kind of rail traffic subway construction ventilation device - Google Patents

A kind of rail traffic subway construction ventilation device Download PDF

Info

Publication number
CN209586418U
CN209586418U CN201920300629.6U CN201920300629U CN209586418U CN 209586418 U CN209586418 U CN 209586418U CN 201920300629 U CN201920300629 U CN 201920300629U CN 209586418 U CN209586418 U CN 209586418U
Authority
CN
China
Prior art keywords
ventilation device
ventilator
fixedly connected
exhaust fan
subway construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920300629.6U
Other languages
Chinese (zh)
Inventor
孙会勇
牛志国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201920300629.6U priority Critical patent/CN209586418U/en
Application granted granted Critical
Publication of CN209586418U publication Critical patent/CN209586418U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of rail traffic subway construction ventilation devices, including ventilation device main body, ventilator, mounting rack, exhaust fan, hair dryer and temperature sensor, the top of ventilation device main body is fixedly connected with ventilator, the bottom end overlap joint of ventilator is connected with mounting rack, the frontal left insertion of ventilator is connected with exhaust fan, the inside left end of exhaust fan is fixedly connected with filter screen, the right end insertion of exhaust fan is connected with air inlet pipe, the bottom end insertion of air inlet pipe is connected with gas-distributing pipe, gas-distributing pipe, air effectively can be transmitted separately to tunnel different location, ensure that air is sufficient in tunnel, embody the practicability of the utility model, temperature sensor, it is a degree of that existing subway construction ventilation device problems of energy consumption when working long hours itself is made improvements, embody the intelligent control of the utility model , mounting rack embodies the disassembly and protective of the utility model, in future with extensive development prospect.

Description

A kind of rail traffic subway construction ventilation device
Technical field
Originally practical to be related to aeration technology field, specially a kind of rail traffic subway construction ventilation device.
Background technique
Ventilation is exactly to hinder wind not using nature or mechanical means, can be passed through, and the environment of room or sealing is reached It is interior, to cause the technology of the suitable air environments such as health, safety.Indoor air quality can be improved in normal open wind, good for health.
But existing subway construction ventilation device is mostly to consider that device performance of ventilating itself makes improvements place Reason improves aeration, to have ignored device itself the installation the problem of, subway construction ventilation device itself is caused to exist The stabilization in the load-bearing influence tunnel for being more troublesome when installation, and a degree of increasing tunnel internal, and device itself can not Automatic ventilation adjusting is carried out with ambient temperature according in tunnel, will cause when causing for a long time using subway construction ventilation device It can a degree of energy consumption.
So how to design a kind of rail traffic subway construction ventilation device, become that we currently need to solve is asked Topic.
Utility model content
The purpose of this utility model is to provide a kind of rail traffic subway construction ventilation devices, to solve above-mentioned background It proposes to deposit in technology to be more troublesome during installation, the poor problem of energy-conserving and environment-protective performance.
To achieve the above object, the utility model provides the following technical solutions: a kind of rail traffic subway construction ventilation Device, including ventilation device main body, ventilator, mounting rack, exhaust fan, hair dryer and temperature sensor, the ventilation device master The top of body is fixedly connected with ventilator, and the bottom end overlap joint of the ventilator is connected with mounting rack, and the front of the ventilator is left Side insertion is connected with exhaust fan, and the inside left end of the exhaust fan is fixedly connected with filter screen, and the right end of the filter screen is fixed It is connected with extraction fan, the right end insertion of the exhaust fan is connected with air inlet pipe, and the bottom end insertion of the air inlet pipe is connected with a point gas The positive right side of face insertion of pipe, the ventilator is connected with hair dryer, and the inside left end of the hair dryer is fixedly connected with blower fan, The inside right end of the hair dryer is fixedly connected with fie screen, and the positive top center insertion of the ventilator is connected with temperature biography Sensor.
Preferably, the top of the mounting rack is fixedly connected with support plate, and the top two sides of the support plate are fixedly connected There is clamping joint.
Preferably, the bottom of the mounting rack is fixedly connected with support column, and the both ends insertion of the support column is connected with peace The right end centre insertion of loading board, the support column is connected with controller.
Preferably, the right end of the extraction fan is fixedly connected with air refrigerator.
Preferably, the left end of the fie screen is fixedly connected with filter cotton.
Preferably, the exhaust fan is by the extraction fan on the right side of the filter screen of internal left end, filter screen, the sky on the right side of extraction fan The gas-distributing pipe of air inlet pipe and air inlet pipe bottom end on the right side of gas refrigerator, air refrigerator collectively constitutes.
Preferably, the hair dryer of the exhaust fan and bottom right of the temperature sensor and bottom left collectively constitutes ventilation Device.
Compared with prior art, the beneficial effect of this kind of utility model is:
1. this kind of rail traffic subway construction ventilation device, exhaust fan can carry out outside air by filter screen Filter can carry out cooling processing to air is pumped by air refrigerator later, be pumped into tunnel and lead to by air inlet pipe later Crossing gas-distributing pipe effectively can be transmitted separately to tunnel different location for air, it is ensured that air is sufficient in tunnel, embodies this reality With novel practicability.
2. this kind of rail traffic subway construction ventilation device, temperature sensor can be effectively to tunnel internal and outer Portion's temperature, which detect working as, detects that temperature sensor can directly control starting ventilator to tunnel to tunnel internal when the temperature is excessively high Inside carries out ventilation treatment or unlatching air refrigerator cools down to tunnel internal, embodies the intelligent control of the utility model Property.
Detailed description of the invention
Fig. 1 is the overall structure diagram of the utility model;
Fig. 2 is the mounting rack partial structure diagram of the utility model;
Fig. 3 is the exhaust fan cut-away section structural schematic diagram of the utility model;
Fig. 4 is the blower portions the schematic diagram of the section structure of the utility model.
In figure: 1, ventilation device main body, 2, ventilator, 3, mounting rack, 301, support plate, 302, clamping joint, 303, support Column, 304, mounting plate, 305, controller, 4, exhaust fan, 401, filter screen, 402, extraction fan, 403, air refrigerator, 404, into Tracheae, 405, gas-distributing pipe, 5, hair dryer, 501, blower fan, 502, filter cotton, 503, fie screen, 6, temperature sensor.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment, based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Embodiment one please refers to Fig. 1-4, and the utility model provides a kind of technical solution: a kind of rail traffic subway construction With ventilation device, including ventilation device main body 1, ventilator 2, mounting rack 3, exhaust fan 4, hair dryer 5 and temperature sensor 6, lead to The top of wind apparatus main body 1 is fixedly connected with ventilator 2, and the bottom end overlap joint of ventilator 2 is connected with mounting rack 3, and ventilator 2 is just Left side of face insertion is connected with exhaust fan 4, and the inside left end of exhaust fan 4 is fixedly connected with filter screen 401, the right end of filter screen 401 It is fixedly connected with extraction fan 402, the right end insertion of exhaust fan 4 is connected with air inlet pipe 404, and the bottom end of air inlet pipe 404 is embedded in connection There is gas-distributing pipe 405, the positive right side of face insertion of ventilator 2 is connected with hair dryer 5, and the inside left end of hair dryer 5, which is fixedly connected with, blows Fan 501, the inside right end of hair dryer 5 are fixedly connected with fie screen 503, and the positive top center insertion of ventilator 2 is connected with Temperature sensor 6.
Preferably, the top of mounting rack 3 is fixedly connected with support plate 301, and the top two sides of support plate 301 are fixedly connected with Clamping joint 302, user, can be by quickly pushing up ventilator 2 after mounting rack 3 is mounted on tunnel inner wall in support plate 301 On the clamping joint 302 at end, by card slot and clamping joint 302 quickly splicing and the limit of 2 bottom end of ventilation blower, so that it reaches quick It installs while ensuring that it is stablized and convenient for users to embodying tearing open for the utility model to 2 regular dismounting cleaning of ventilation blower Dress property.
Preferably, the bottom of mounting rack 3 is fixedly connected with support column 303, and the both ends insertion of support column 303 is connected with installation Plate 304, the right end centre insertion of support column 303, which is connected with 305 user of controller, to be first placed in mounting rack 3 in tunnel, It is bonded by the mounting plate 304 that 303 two sides of support column are arranged with tunnel wall, later to being beaten in through-hole on mounting plate 304 Enter screw to reach fixed effect, it is ensured that tunnel inner wall is directly being pacified in its fastness, the reduction by capableing of high degree The stress condition in tunnel ensures tunnel safety when filling ventilator 2, and effectively can play branch to tunnel inner wall by mounting rack 3 Support effect, embodies the protective of the utility model.
Preferably, the right end of extraction fan 402 is fixedly connected with air refrigerator 403, can be fast by air refrigerator 403 Air for being pumped into its inside to exhaust fan 4 of speed carries out cooling processing, carries out control to tunnel internal temperature well, prevents tunnel The higher personal safety for being unable to get cooling processing influence its inside processing personnel of temperature, embodies the peace of the utility model in road Quan Xing.
Preferably, the left end of fie screen 503 is fixedly connected with filter cotton 503, can be effectively to blowing by filter cotton 503 The air in tunnel is filtered out, and the noxious gas emission for avoiding tunnel internal more damages external environment to open air, Cooperate fie screen 503 that can further promote the filter effect of hair dryer 5 simultaneously, embodies the filterability of the utility model.
Preferably, exhaust fan 4 is by the filter screen 401 of internal left end, extraction fan 402, the extraction fan on 401 right side of filter screen The gas-distributing pipe 405 of 404 bottom end of air inlet pipe 404 and air inlet pipe of air refrigerator 403,403 right side of air refrigerator on the right side of in the of 402 It collectively constitutes, passes through filter screen 401 when being pumped into outside air by extraction fan 402 first and outside air is filtered, it Cooling processing is carried out by 403 pairs of suction air of air refrigerator afterwards, air after treatment is taken out by air inlet pipe 404 later Enter in tunnel, and air effectively can be transmitted separately to tunnel by multiple gas-distributing pipes 405 that 404 bottom end of air inlet pipe is arranged Different location, it is ensured that air is sufficient in tunnel, embodies the practicability of the utility model.
Preferably, the hair dryer 5 of the exhaust fan 4 and bottom right of temperature sensor 6 and bottom left collectively constitutes ventilation Device 2 effectively can carry out detection comparison to tunnel internal and external temperature by temperature sensor 6, when detecting in tunnel Temperature sensor 6 can directly control starting ventilator 2 to tunnel internal progress ventilation treatment or open air when the temperature is excessively high in portion Refrigerator 403 cools down to tunnel internal, it is a degree of to existing subway construction with ventilation device itself in long-time work Problems of energy consumption makes improvements when making, and embodies the intelligent control of the utility model.
Working principle: firstly, mounting rack 3 can be first placed in tunnel by user, it is arranged by 303 two sides of support column Mounting plate 304 is bonded with tunnel wall, to reach fixed effect to squeezing into screw in through-hole on mounting plate 304 later, Ensure its fastness, the stress feelings in reduction tunnel when being mounted directly ventilator 2 to tunnel inner wall by capableing of high degree Condition ensures tunnel safety, and can effectively be played a supporting role to tunnel inner wall by mounting rack 3, embodies the utility model Protective;
It then, can be by the way that ventilator 2 quickly on the clamping joint 302 on 301 top of support plate, be passed through 2 bottom end of ventilation blower Card slot and clamping joint 302 quickly splicing and limit so that its reach Fast Installation and meanwhile ensure its stabilization and convenient for users to To 2 regular dismounting cleaning of ventilation blower, the disassembly of the utility model is embodied;
Then, quickly its internal air can be pumped into exhaust fan 4 by air refrigerator 403 to carry out at cooling Reason carries out control to tunnel internal temperature well, prevents in tunnel temperature is higher to be unable to get cooling processing and influence inside it The personal safety of operating personnel embodies the safety of the utility model, while can be effectively to blowout by filter cotton 503 The air in tunnel is filtered, and the noxious gas emission for avoiding tunnel internal more damages external environment to open air, together Shi Peihe fie screen 503 can further promote the filter effect of hair dryer 5, embody the filterability of the utility model;
And then, pass through filter screen 401 when being pumped into outside air by extraction fan 402 first to carry out outside air Filter, carries out cooling processing by 403 pairs of suction air of air refrigerator later, air after treatment passes through air inlet pipe later 404 are pumped into tunnel, and can effectively be transmitted air respectively by multiple gas-distributing pipes 405 that 404 bottom end of air inlet pipe is arranged To tunnel different location, it is ensured that air is sufficient in tunnel, embodies the practicability of the utility model;
Finally, effectively detection comparison can be carried out to tunnel internal and external temperature by temperature sensor 6, work as detection To tunnel internal when the temperature is excessively high temperature sensor 6 can directly control starting ventilator 2 to tunnel internal carry out ventilation treatment or Air refrigerator 403 is opened to cool down to tunnel internal, it is a degree of to exist to existing subway construction ventilation device itself Problems of energy consumption makes improvements when working long hours, and embodies the intelligent control of the utility model, and here it is this kind of tracks The working principle of traffic subway construction ventilation device.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (7)

1. a kind of rail traffic subway construction ventilation device, including ventilation device main body (1), ventilator (2), mounting rack (3), Exhaust fan (4), hair dryer (5) and temperature sensor (6), it is characterised in that: the top of the ventilation device main body (1) is fixed to be connected It is connected to ventilator (2), the bottom end overlap joint of the ventilator (2) is connected with mounting rack (3), the frontal left of the ventilator (2) Insertion is connected with exhaust fan (4), and the inside left end of the exhaust fan (4) is fixedly connected with filter screen (401), the filter screen (401) right end is fixedly connected with extraction fan (402), and the right end insertion of the exhaust fan (4) is connected with air inlet pipe (404), institute The bottom end insertion for stating air inlet pipe (404) is connected with gas-distributing pipe (405), and the positive right side of face insertion of the ventilator (2), which is connected with, blows The inside left end of blower (5), the hair dryer (5) is fixedly connected with blower fan (501), the inside right end of the hair dryer (5) It is fixedly connected with fie screen (503), the positive top center insertion of the ventilator (2) is connected with temperature sensor (6).
2. a kind of rail traffic subway construction ventilation device according to claim 1, it is characterised in that: the mounting rack (3) top is fixedly connected with support plate (301), and the top two sides of the support plate (301) are fixedly connected with clamping joint (302)。
3. a kind of rail traffic subway construction ventilation device according to claim 1, it is characterised in that: the mounting rack (3) bottom is fixedly connected with support column (303), and the both ends insertion of the support column (303) is connected with mounting plate (304), institute It states insertion among the right end of support column (303) and is connected with controller (305).
4. a kind of rail traffic subway construction ventilation device according to claim 1, it is characterised in that: the extraction fan (402) right end is fixedly connected with air refrigerator (403).
5. a kind of rail traffic subway construction ventilation device according to claim 1, it is characterised in that: the fie screen (503) left end is fixedly connected with filter cotton (502).
6. a kind of rail traffic subway construction ventilation device according to claim 1, it is characterised in that: the exhaust fan (4) by the extraction fan (402) on the right side of the filter screen (401) of internal left end, filter screen (401), the air on the right side of extraction fan (402) The gas-distributing pipe (405) of air inlet pipe (404) and air inlet pipe (404) bottom end on the right side of refrigerator (403), air refrigerator (403) is altogether With composition.
7. a kind of rail traffic subway construction ventilation device according to claim 1, it is characterised in that: the temperature passes The hair dryer (5) of the exhaust fan (4) and bottom right of sensor (6) and bottom left collectively constitutes ventilator (2).
CN201920300629.6U 2019-03-11 2019-03-11 A kind of rail traffic subway construction ventilation device Expired - Fee Related CN209586418U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920300629.6U CN209586418U (en) 2019-03-11 2019-03-11 A kind of rail traffic subway construction ventilation device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920300629.6U CN209586418U (en) 2019-03-11 2019-03-11 A kind of rail traffic subway construction ventilation device

Publications (1)

Publication Number Publication Date
CN209586418U true CN209586418U (en) 2019-11-05

Family

ID=68356763

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920300629.6U Expired - Fee Related CN209586418U (en) 2019-03-11 2019-03-11 A kind of rail traffic subway construction ventilation device

Country Status (1)

Country Link
CN (1) CN209586418U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111237002A (en) * 2020-03-06 2020-06-05 辽宁工程技术大学 Ventilation device for coal mine safety and installation method thereof
CN112049809A (en) * 2020-09-24 2020-12-08 黄春生 A ventilation blower for plastics processing
CN112696220A (en) * 2020-12-25 2021-04-23 东莞市鹏驰净化科技有限公司 Explosion-proof safe type air circulation system suitable for traffic tunnel
CN113187351A (en) * 2021-06-29 2021-07-30 中铁五局集团第一工程有限责任公司 Self-cleaning subway shielding door

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111237002A (en) * 2020-03-06 2020-06-05 辽宁工程技术大学 Ventilation device for coal mine safety and installation method thereof
CN112049809A (en) * 2020-09-24 2020-12-08 黄春生 A ventilation blower for plastics processing
CN112696220A (en) * 2020-12-25 2021-04-23 东莞市鹏驰净化科技有限公司 Explosion-proof safe type air circulation system suitable for traffic tunnel
CN113187351A (en) * 2021-06-29 2021-07-30 中铁五局集团第一工程有限责任公司 Self-cleaning subway shielding door

Similar Documents

Publication Publication Date Title
CN209586418U (en) A kind of rail traffic subway construction ventilation device
CN202734058U (en) Air-conditioner indoor unit with fresh air heat recovery device
CN103429026B (en) A kind of constant temperature energy-saving server cabinet of high accuracy high safe non-detachable mold massing design
CN206162355U (en) Server machine case temperature control device
CN107172861A (en) A kind of variable data center machine room energy-saving cooling system of airflow circulating and its control method
CN204425865U (en) Intelligent cabinet
CN208237997U (en) Air conditioner indoor unit
CN106642381A (en) Window type air conditioner
CN108923284A (en) A kind of heat-radiating dustproof device of electric power cabinet
CN204835300U (en) Can prevent air conditioning switch cabinet of condensation
CN202792256U (en) Mobile air conditioner
CN205191850U (en) New wind -heat recovery processing device
CN208237999U (en) Air conditioner indoor unit
CN208238007U (en) Air conditioner indoor unit
CN206469366U (en) Window air conditioner
CN212962533U (en) A air blast drying cabinet for concrete production
CN205593082U (en) Fresh air dehumidifier
CN209541094U (en) A kind of band heating function wall hanging air replacement main machine
CN206273945U (en) A kind of thermal insulation house structure for being provided with vent passages
CN206683106U (en) The permanent net permanent oxygen combination wind cabinet of constant temperature and humidity
CN208238010U (en) Air conditioner indoor unit and air conditioner with it
CN206648236U (en) A kind of indoor air ventilator
CN206803351U (en) Bidirectional flow fresh air dehumidifier
CN206001652U (en) A kind of novel cabinet type fresh air ventilated purification apparatus
CN205332386U (en) Fresh air purifier

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191105

Termination date: 20200311

CF01 Termination of patent right due to non-payment of annual fee