CN209585562U - A kind of construction wall plastering auxiliary frame - Google Patents
A kind of construction wall plastering auxiliary frame Download PDFInfo
- Publication number
- CN209585562U CN209585562U CN201920140691.3U CN201920140691U CN209585562U CN 209585562 U CN209585562 U CN 209585562U CN 201920140691 U CN201920140691 U CN 201920140691U CN 209585562 U CN209585562 U CN 209585562U
- Authority
- CN
- China
- Prior art keywords
- substrate
- fixed
- brace
- connecting plate
- support rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Ladders (AREA)
Abstract
The utility model provides a kind of construction wall plastering auxiliary frame, belongs to technical field of building construction.It solves the technical problems such as low to wall plastering construction efficiency in existing building construction.This construction includes substrate and ladder with wall plastering auxiliary frame, ladder includes the bracket positioned at two sides and several transverse slats between bracket, bracket includes inclined brace and the support rod that is vertically arranged, the upper end of brace and the upper end of support rod are fixed, several transverse slats are fixed between the brace between two, the brace of the two brackets and lower end of support rod is located at the two sides of substrate and side corresponding with substrate reclines, upper junction plate is fixed between the upper end of two brackets, lower connecting plate is fixed between the lower part of two brackets, four edges of lower connecting plate are equipped with idler wheel, the driving mechanism that lower connecting plate can be driven to move and position along idler wheel rotating direction is equipped between lower connecting plate and substrate.Has the advantages that improve worker to the construction efficiency of wall plastering.
Description
Technical field
The utility model belongs to technical field of building construction, is related to a kind of construction wall plastering auxiliary frame.
Background technique
Procedure when wall plastering in construction needs to spread cement outside outside.Position in the construction process
Needing to build scaffold just in the wall of eminence can get at, and building for scaffold is time-consuming and laborious, and the scaffold position after building is solid
It is fixed, it can not move, each face wall face requires to build scaffold, causes construction efficiency lower;Also have and plastered using ladder
, although ladder movement is more convenient, can just continue to construct after ramp period of the day from 11 p.m. to 1 a.m needs descend on a ladder and carry ladder,
Equally exist the low problem of construction efficiency.
Summary of the invention
The purpose of this utility model is the presence of the above problem in view of the prior art, proposes a kind of construction wall
The technical issues of plastering auxiliary frame, the utility model solves is to improve worker to the construction efficiency of wall plastering.
The purpose of this utility model can be realized by the following technical scheme:
A kind of construction wall plastering auxiliary frame, including substrate and the ladder being disposed on the substrate, which is characterized in that
The ladder includes the bracket positioned at two sides and several transverse slats between bracket, and the bracket includes inclined brace and erects
The support rod being directly arranged, the upper end of the brace and the upper end of support rod are fixed, and several transverse slats are fixed between two
Between brace, the brace of two brackets and the lower end of support rod are located at the two sides of substrate and side corresponding with substrate
It reclines, upper junction plate is fixed between the upper end of two brackets, lower connection is fixed between the lower part of two brackets
Plate, four edges of the lower connecting plate are equipped with idler wheel, and the idler wheel rolling is connected on substrate, the lower connecting plate and
The driving mechanism that lower connecting plate can be driven to move and position along idler wheel rotating direction is equipped between substrate.
Ladder realizes the left and right positioning with substrate, the rolling on lower connecting plate by the two sides that two brackets are against substrate respectively
Wheel can only scroll forward and backward, be against on substrate by the idler wheel on lower connecting plate and realize that ladder is against on substrate, while passing through driving
Mechanism realizes back-and-forth motion and positioning of the ladder on substrate;It, will in plastering by the above-mentioned connection type of ladder and substrate
Substrate, which is moved to, to be needed beside plastered wall body, and worker can be climbed up and down by stepping on transverse slat, realizes smearing for wall upper and lower position
Ash moves up and down conveniently, while the plastering of wall left-right position is realized by mobile ladder, is not necessarily to work in left-right position plastering
People swashes to get off to move the position of ladder from ladder;Worker needs repeatedly upper ladder and lower descending stair during saving wall plastering
The process of son, improves the construction efficiency to wall plastering.
In above-mentioned construction in wall plastering auxiliary frame, the driving mechanism includes screw rod and motor, the base
Elongated fixing groove is offered on the upper face of plate, the extending direction of the fixing groove and the rotation direction of idler wheel are parallel,
There is the protrusion being protruding in fixing groove on the lower face of the lower connecting plate, the screw rod is rotatably connected in fixing groove,
The motor is fixed on one end of fixing groove and screw rod can be driven to rotate, and the screw rod passes through protrusion and is spirally connected with protrusion.
It is rotated by motor drives screw mandrel, the positive and negative rotation of screw rod can drive the back-and-forth motion of lower connecting plate, realize and move before and after driving ladder
It is dynamic, by the way that the position of lower connecting plate can be locked when screw rod does not rotate, realize the fixation of ladder;Simultaneously screw rod transmission speed compared with
Stablize, can guarantee the safety of the worker on ladder;Motor is connect with a controller, and controller is placed on upper junction plate,
Ladder moving left and right with respect to wall is realized in the operating that worker can control motor by controller in plastering, is not necessarily to from ladder
On get off ramp, improve production efficiency.Driving mechanism can also be realized in such a way that cylinder pushes ladder operation.
In above-mentioned construction in wall plastering auxiliary frame, if between brace and support rod on same bracket by
Dry root reinforcing rod connection, forms triangular structure between adjacent reinforcing rod and brace or support rod.Reinforcing rod can increase bracket
Intensity guarantees the load-bearing property and stability of bracket.
In above-mentioned construction in wall plastering auxiliary frame, the outside of the bracket is between brace and support rod
Several supporting plates are fixed with, the supporting plate is located between two transverse slats.Upper junction plate and supporting plate can be used for placing plastering bucket, facilitate work
The plastering of people operates.
In above-mentioned construction in wall plastering auxiliary frame, four edges of the substrate are equipped with universal wheel,
Four edges of the substrate are also bolted with positioning column, and the lower end of the positioning column is fixed with fixed disk, the positioning column
Upper end is fixed with rotation hand handle.Universal wheel can convenient moving substrate, can easily will be auxiliary after the plastering for completing a piece of wall
Frame is helped to be moved to down beside a piece of wall;Before plastering, by the positioning column on four corners of substrate being screwed down so that fixed
Disk face contact and is supported with ground, so that substrate and ground are fixed and keeps stablizing after worker climbs up the ladder, guarantees the steady of ladder
It is qualitative.
Compared with prior art, this construction has the advantages that the efficiency for improving plastering with wall plastering auxiliary frame.
Detailed description of the invention
Fig. 1 is schematic front view of this construction with wall plastering auxiliary frame.
Fig. 2 is schematic cross-sectional view of this construction with wall plastering auxiliary frame.
In figure, 1, substrate;11, fixing groove;12, universal wheel;2, ladder;21, bracket;211, brace;212, support rod;
213, upper junction plate;214, lower connecting plate;214a, protrusion;215, idler wheel;216, reinforcing rod;22, supporting plate;23, transverse slat;3,
Screw rod;31, motor;4, positioning column;41, fixed disk;42, hand handle is rotated.
Specific embodiment
It is specific embodiment of the utility model and in conjunction with attached drawing below, the technical solution of the utility model is made further
Description, but the utility model is not limited to these examples.
As depicted in figs. 1 and 2, construction wall plastering auxiliary frame includes the ladder of substrate 1 and setting on substrate 1
2, four edges of substrate 1 are equipped with universal wheel 12, and four edges of substrate 1 are also bolted with positioning column 4, positioning column 4
Lower end is fixed with fixed disk 41, and the upper end of positioning column 4 is fixed with rotation hand handle 42.Universal wheel 12 can convenient moving substrate 1, In
Easily auxiliary frame can be moved to down beside a piece of wall after completing the plastering of a piece of wall;Before plastering, by by substrate 1
Positioning column 4 on four corners is screwed down so that fixed disk 41 face contact and is supported with ground so that substrate 1 and ground fix and
Worker, which climbs up the ladder, to keep after 2 stablizing, and guarantees the stability of ladder 2.
Ladder 2 includes the bracket 21 positioned at two sides and several transverse slats 23 between bracket 21, and bracket 21 includes inclination
Brace 211 and the support rod 212 that is vertically arranged, the upper end of brace 211 and the upper end of support rod 212 fix, several transverse slats 23
It is fixed between the brace 211 between two, the brace 211 of two brackets 21 and the lower end of support rod 212 are located at substrate 1
Two sides and side corresponding with substrate 1 recline, upper junction plate 213, two brackets are fixed between the upper end of two brackets 21
Be fixed with lower connecting plate 214 between 21 lower part, four edges of lower connecting plate 214 be equipped with can only scroll forward and backward idler wheel
215, idler wheel 215 rolls connection on substrate 1, is added between the brace 211 and support rod 212 on same bracket 21 by several
Strong bar 216 connects, and forms triangular structure between adjacent reinforcing rod 216 and brace 211 or support rod 212.The outside of bracket 21
Several supporting plates 22 are fixed between brace 211 and support rod 212, supporting plate 22 is located between two transverse slats 23.Upper junction plate
213 and supporting plate 22 can be used for placing plastering bucket, facilitate the plastering of worker to operate.
Being equipped between lower connecting plate 214 and substrate 1 can drive lower connecting plate 214 to move simultaneously along 215 rotating direction of idler wheel
The driving mechanism of positioning, driving mechanism include screw rod 3 and motor 31, and elongated fixation is offered on the upper face of substrate 1
The extending direction of slot 11, fixing groove 11 is parallel with the rotation direction of idler wheel 215, has protrusion on the lower face of lower connecting plate 214
Protrusion 214a into fixing groove 11, screw rod 3 are rotatably connected in fixing groove 11, and motor 31 is fixed on one end of fixing groove 11
And screw rod 3 can be driven to rotate, screw rod 3 passes through protrusion 214a and is spirally connected with protrusion 214a.3 turns of screw rod are driven by motor 31
Dynamic, the positive and negative rotation of screw rod 3 can drive the back-and-forth motion of lower connecting plate 214, realize and ladder 2 is driven to be moved forward and backward, by working as screw rod 3
The position of lower connecting plate 214 can be locked when not rotating, and realize the fixation of ladder 2;The speed that screw rod 3 is driven simultaneously is more stable, energy
Guarantee the safety for the worker being located on ladder 2.
Ladder 2 is realized by the two sides that two brackets 21 are against substrate 1 respectively and is positioned with the left and right of substrate 1, and lower company is passed through
Idler wheel 215 on fishplate bar 214 supports realizes that ladder 2 supports on substrate 1 on substrate 1, while realizing that ladder 2 exists by driving mechanism
Back-and-forth motion and positioning on substrate 1;By the above-mentioned connection type of ladder 2 and substrate 1, substrate 1 is moved in plastering
It needs beside plastered wall body, worker can be climbed by stepping on about 23 transverse slat, realized the plastering of wall upper and lower position, above moved down
It moves conveniently, while realizing the plastering of wall left-right position by mobile ladder 2, worker is not necessarily to when left-right position is plastered from ladder
2, which swash, gets off to move the position of ladder 2, improves the efficiency of plastering.
The specific embodiments described herein are merely examples of the spirit of the present invention.The utility model institute
Belonging to those skilled in the art can make various modifications or additions to the described embodiments or using similar
Mode substitute, but without departing from the spirit of the present application or beyond the scope of the appended claims.
Claims (5)
1. a kind of construction wall plastering auxiliary frame, including substrate and the ladder being disposed on the substrate, which is characterized in that institute
Stating ladder includes the bracket positioned at two sides and several transverse slats between bracket, and the bracket includes inclined brace and vertical
The support rod of setting, the upper end of the brace and the upper end of support rod are fixed, and several transverse slats are fixed on oblique between two
Between bar, the brace of the two brackets and lower end of support rod is located at the two sides of substrate and side corresponding with substrate is pasted
It leans on, upper junction plate is fixed between the upper end of two brackets, is fixed with lower connecting plate between the lower part of two brackets,
Four edges of the lower connecting plate are equipped with idler wheel, and the idler wheel rolling is connected on substrate, the lower connecting plate and base
The driving mechanism that lower connecting plate can be driven to move and position along idler wheel rotating direction is equipped between plate.
2. construction according to claim 1 wall plastering auxiliary frame, which is characterized in that the driving mechanism includes
Screw rod and motor offer elongated fixing groove, the extending direction of the fixing groove and rolling on the upper face of the substrate
The rotation direction of wheel is parallel, has the protrusion being protruding in fixing groove on the lower face of the lower connecting plate, and the screw rod turns
Dynamic to be connected in fixing groove, the motor is fixed on one end of fixing groove and screw rod can be driven to rotate, and the screw rod passes through protrusion
Portion is simultaneously spirally connected with protrusion.
3. construction according to claim 1 wall plastering auxiliary frame, which is characterized in that the brace on same bracket
By several reinforcing rod connections between support rod, triangular structure is formed between adjacent reinforcing rod and brace or support rod.
4. construction according to claim 1 wall plastering auxiliary frame, which is characterized in that the outside position of the bracket
Several supporting plates are fixed between brace and support rod, the supporting plate is located between two transverse slats.
5. construction according to claim 1 wall plastering auxiliary frame, which is characterized in that four sides of the substrate
Universal wheel is equipped at angle, four edges of the substrate are also bolted with positioning column, and the lower end of the positioning column is fixed with solid
Price fixing, the upper end of the positioning column are fixed with rotation hand handle.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920140691.3U CN209585562U (en) | 2019-01-28 | 2019-01-28 | A kind of construction wall plastering auxiliary frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920140691.3U CN209585562U (en) | 2019-01-28 | 2019-01-28 | A kind of construction wall plastering auxiliary frame |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209585562U true CN209585562U (en) | 2019-11-05 |
Family
ID=68380900
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920140691.3U Expired - Fee Related CN209585562U (en) | 2019-01-28 | 2019-01-28 | A kind of construction wall plastering auxiliary frame |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209585562U (en) |
-
2019
- 2019-01-28 CN CN201920140691.3U patent/CN209585562U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208137383U (en) | A kind of liftable architectural engineering scaffold | |
CN110623600B (en) | Step cleaning device | |
CN201884944U (en) | Omnibearing working floodlight | |
CN107740566B (en) | Building wall mortar strickle robot | |
CN101660357A (en) | Machinery for installing light partition battens | |
CN209585562U (en) | A kind of construction wall plastering auxiliary frame | |
CN213143762U (en) | Portable automatic caulking glue device | |
CN108277970A (en) | Elevator civil construction mobile platform | |
CN211172946U (en) | Indoor wall surface trowelling device | |
CN105544947B (en) | A kind of plastering machine of band lifting patter | |
CN209509441U (en) | A kind of automatic up-down scaffold | |
CN217993980U (en) | Device is strickleed off to non-woven fabrics wall paper for architectural decoration | |
CN215948892U (en) | Portable engineering steel structure support for construction | |
CN216766669U (en) | Wall plastering machine for building construction | |
CN216395732U (en) | Raise dust processing apparatus for building engineering | |
CN214220545U (en) | Portable scaffold | |
CN215858898U (en) | Wall plastering device for indoor construction | |
CN208977846U (en) | A kind of palletizing mechanical arm telescopic arm | |
CN109779218A (en) | A kind of facilitate carries out mobile construction and decoration finisher | |
CN108500986A (en) | A kind of fire-fighting robot | |
CN209508823U (en) | A kind of operating platform for bridge construction process | |
CN107091455A (en) | A kind of gardens LED illumination street lamp | |
CN207245125U (en) | A kind of handle adjusting mechanism of floor care machine | |
CN221060118U (en) | Stool for decoration construction | |
CN211159074U (en) | Construction site spraying type dust settling device based on environmental protection |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20191105 Termination date: 20210128 |