CN209585399U - A kind of steel construction data center Integral ceiling - Google Patents
A kind of steel construction data center Integral ceiling Download PDFInfo
- Publication number
- CN209585399U CN209585399U CN201822243221.8U CN201822243221U CN209585399U CN 209585399 U CN209585399 U CN 209585399U CN 201822243221 U CN201822243221 U CN 201822243221U CN 209585399 U CN209585399 U CN 209585399U
- Authority
- CN
- China
- Prior art keywords
- ceiling
- structural framing
- system channel
- manager system
- data center
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Arrangement Of Elements, Cooling, Sealing, Or The Like Of Lighting Devices (AREA)
Abstract
The utility model provides a kind of steel construction data center Integral ceiling, including structural framing, decorative ceiling, illuminator component, access panel and air manager system channel, the interior and exterior of structural framing is separately installed with light structures and maintenance ventilation device, light structures include decorative ceiling and illuminator component, decorative ceiling, which is arranged successively, to be mounted in structural framing, it is arranged successively in structural framing and illuminator component is installed, overhauling ventilation device includes access panel and air manager system channel, air manager system channel, which is arranged successively, to be mounted in structural framing, the two sides in air manager system channel are separately installed with access panel, temperature sensor is also equipped on decorative ceiling, smoke detector and monitoring camera.For the utility model by the way that modules are integrated to after furred ceiling layer is prefabricated in the factory and is melted into module, in-site installation reduces cross-operation caused by site operation, reduces construction cost.
Description
Technical field
The utility model relates generally to integrated lighting system field more particularly to a kind of steel construction data center integrates and hangs
Top.
Background technique
Data center's furred ceiling includes electric power, and signal wire, lighting system, monitoring system etc., available data center, which is constructed, is all
Each profession of field engineering is respectively independent to be carried out, and is considerably increased cross-operation, is led to engineering time increase and cost increase.
Chinese utility model patent, application number CN201721675508.7, a kind of patent name: integrated smog report are disclosed
Alert Integral ceiling, the applying date: 20171205, the utility model relates to a kind of Integral ceilings of integrated smog alarm, including hang
Top frame, the ceiling framework are connect with installation frame by McPherson bracket, triangular keel, in the middle part of the installation frame left plate
It is provided with ventilated net, the utility model structure novel, design science effectively prevent power blackout situation that can not continue a journey work, and is arranged
Have how much electricity display lamp can monitor electricity, honeycomb vent hood assists blower to extract room air, and smog is allowed to be monitored as early as possible
It arrives, and smoke sensor device is located at right above honeycomb vent hood, smoke sensor device monitors that smog or temperature sensor monitor
Signal is passed to single-chip microcontroller by temperature anomaly, and single-chip microcontroller can dial subscriber phone alarm by dialer, while pass through buzzer
High-decibel alarm is carried out, status indicator lamp can show current device operating status, easy to use, high reliablity, well
In integrated and Integral ceiling, appearance is not influenced.
Utility model content
The utility model provides a kind of steel construction data center Integral ceiling and provides in view of the above drawbacks of the prior art
A kind of steel construction data center Integral ceiling, including structural framing 1, decorative ceiling 2, illuminator component 3,4 and of access panel
Air manager system channel 5, the interior and exterior of the structural framing 1 is separately installed with light structures and maintenance ventilation device, described
Light structures include decorative ceiling 2 and illuminator component 3, and the decorative ceiling 2, which is arranged successively, is mounted on structural framing 1
It is interior, it is arranged successively in the structural framing 1 and illuminator component 3 is installed, the maintenance ventilation device includes access panel 4 and sky
Gas management system channel 5, the air manager system channel 5, which is arranged successively, to be mounted in structural framing 1, the air administrative system
The two sides in system channel 5 are separately installed with access panel 4, are also equipped with temperature sensor 6, smoke detection on the decorative ceiling 2
Device 7 and monitoring camera 8, the temperature sensor 6, smoke detector 7 and monitoring camera 8 are respectively by being mounted on decoration day
Integrated routing inside card 2 is connect with controller.
Preferably, illuminator component 3 and air manager system channel 5 are respectively arranged with even number and are symmetrically arranged with two
The central axes in group, multiple illuminator components 3 and air manager system channel 5 central axes with decorative ceiling 2 respectively
It is overlapped.
Preferably, illuminator component 3 and air manager system channel 5 are respectively arranged with eight groups.
Preferably, the two sides up and down in air manager system channel 5 are separately installed with access panel 4.
Preferably, mounting hole 9 is respectively arranged in the upper and lower end faces of structural framing 1 with surrounding, the mounting hole 9 is arranged
Have multiple.
Preferably, it is provided with through slot in the region that multiple decorative ceilings 2 are formed, is fixedly installed in the through slot
Illuminator component 3.
Preferably, smoke detector 7 and monitoring camera 8 are respectively the two of multiple 2 forming regions of decorative ceiling
Side.
The utility model has the beneficial effects that by integrated lighting system, monitoring system, each electric power and signal wire etc. to furred ceiling
After layer is prefabricated in the factory and is melted into module, in-site installation reduces cross-operation caused by site operation, reduces construction cost.
Detailed description of the invention
Fig. 1 is the main view of the utility model;
Fig. 2 is the top view of the utility model;
Fig. 3 is the rearview of the utility model;
In figure,
1, structural framing;2, decorative ceiling;3, illuminator component;4, access panel;5, air manager system channel;6,
Temperature sensor;7, smoke detector;8, monitoring camera;9, mounting hole.
Specific embodiment
As shown in Figs. 1-3 it is found that the utility model includes: structural framing 1, decorative ceiling 2, illuminator component 3,
Access panel 4 and air manager system channel 5, the interior and exterior of the structural framing 1 are separately installed with light structures and maintenance ventilation
Structure, the light structures include decorative ceiling 2 and illuminator component 3, and the decorative ceiling 2, which is arranged successively, to be mounted on
It in structural framing 1, is arranged successively in the structural framing 1 and illuminator component 3 is installed, the maintenance ventilation device includes inspection
Plate 4 and air manager system channel 5 are repaired, the air manager system channel 5, which is arranged successively, to be mounted in structural framing 1, described
The two sides in air manager system channel 5 are separately installed with access panel 4, are also equipped with temperature sensor on the decorative ceiling 2
6, smoke detector 7 and monitoring camera 8, the temperature sensor 6, smoke detector 7 and monitoring camera 8 pass through peace respectively
Integrated routing inside decorative ceiling 2 is connect with controller.
In use, data center's furred ceiling includes electric power, signal wire, lighting system, monitoring system etc., available data center
Construction, which is all that each profession of field engineering is respectively independent, to be carried out.Cross-operation is considerably increased, engineering time increase and cost are caused
Rise.
Preferred in this embodiment, illuminator component 3 and air manager system channel 5 are respectively arranged with even number and right
Title is provided with two groups, the central axes in multiple illuminator components 3 and air manager system channel 5 respectively with decorative ceiling
2 central axes are overlapped.
Preferred in this embodiment, illuminator component 3 and air manager system channel 5 are respectively arranged with eight groups.
Above structure is set, illuminator component 3 and air manager system channel 5 are easily installed, in addition, being conducive to beauty
Property, also it is conducive to the maintenance in later period.
Preferred in this embodiment, the two sides up and down in air manager system channel 5 are separately installed with access panel 4.
Above structure is set, and access panel 4 is mounted on the both sides in air manager system channel 5, easy access air administrative system
System channel 5, improves working efficiency.
Preferred in this embodiment, in the upper and lower end faces of structural framing 1 and surrounding is respectively arranged with mounting hole 9, described
Mounting hole 9 is provided with multiple.
Above structure is set, is convenient for the connection of Integral ceiling and top structure using mounting hole 9.
It is preferred in this embodiment, through slot is provided in the region that multiple decorative ceilings 2 are formed, in the through slot
It is fixedly installed with illuminator component 3.
Above structure is set, reserves installation site to illuminator component 3 using through slot, improves the speed of later period installation.
Preferred in this embodiment, smoke detector 7 and monitoring camera 8 are respectively in multiple 2 shapes of decorative ceiling
At the two sides in region.
Above structure is set, is fitted with smoke detector 7 and monitoring camera 8 in the surrounding of ceiling, ensure that prison
The range of survey improves the prompting efficiency that accident occurs.
The principles and effects of present patent application are only illustrated in above-described embodiment, not for limitation this patent Shen
Please.Any person skilled in the art can all carry out above-described embodiment under the spirit and scope without prejudice to present patent application
Modifications and changes.Therefore, such as those of ordinary skill in the art without departing from the revealed essence of present patent application
All equivalent modifications or change completed under mind and technical idea, the claim that should be asked by this patent are covered.
Claims (7)
1. a kind of steel construction data center Integral ceiling, which is characterized in that including structural framing (1), decorative ceiling (2), shine
Bright lamp assembly (3), access panel (4) and air manager system channel (5), the interior and exterior of the structural framing (1) are installed respectively
There are light structures and maintenance ventilation device, the light structures include decorative ceiling (2) and illuminator component (3), described
Decorative ceiling (2), which is arranged successively, to be mounted in structural framing (1), is arranged successively in the structural framing (1) and is equipped with illumination
Lamp assembly (3), the maintenance ventilation device include access panel (4) and air manager system channel (5), the air administrative system
System channel (5), which is arranged successively, to be mounted in structural framing (1), and the two sides of the air manager system channel (5) are separately installed with
Access panel (4) is also equipped with temperature sensor (6), smoke detector (7) and monitoring camera on the decorative ceiling (2)
(8), the temperature sensor (6), smoke detector (7) and monitoring camera (8) are respectively by being mounted on decorative ceiling (2)
Internal integrated routing is connect with controller.
2. steel construction data center according to claim 1 Integral ceiling, it is characterised in that: the illuminator component
(3) it is respectively arranged with even number with air manager system channel (5) and is symmetrically arranged with two groups, multiple illuminator components
(3) it is overlapped respectively with the central axes of decorative ceiling (2) with the central axes of air manager system channel (5).
3. steel construction data center according to claim 2 Integral ceiling, it is characterised in that: the illuminator component
(3) and air manager system channel (5) are respectively arranged with eight groups.
4. steel construction data center according to claim 3 Integral ceiling, it is characterised in that: the air manager system is logical
The two sides up and down in road (5) are separately installed with access panel (4).
5. steel construction data center according to claim 4 Integral ceiling, it is characterised in that: the structural framing (1)
It is respectively arranged with mounting hole (9) in upper and lower end faces with surrounding, the mounting hole (9) is provided with multiple.
6. steel construction data center according to claim 5 Integral ceiling, it is characterised in that: multiple decorative ceilings
(2) it is provided with through slot in the region formed, illuminator component (3) is fixedly installed in the through slot.
7. steel construction data center according to claim 6 Integral ceiling, it is characterised in that: the smoke detector (7)
With monitoring camera (8) respectively in the two sides of multiple decorative ceiling (2) forming regions.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822243221.8U CN209585399U (en) | 2018-12-28 | 2018-12-28 | A kind of steel construction data center Integral ceiling |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822243221.8U CN209585399U (en) | 2018-12-28 | 2018-12-28 | A kind of steel construction data center Integral ceiling |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209585399U true CN209585399U (en) | 2019-11-05 |
Family
ID=68351142
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822243221.8U Active CN209585399U (en) | 2018-12-28 | 2018-12-28 | A kind of steel construction data center Integral ceiling |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209585399U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111379369A (en) * | 2018-12-28 | 2020-07-07 | 无锡天云数据中心科技有限公司 | Integrated furred ceiling of steel construction data center |
-
2018
- 2018-12-28 CN CN201822243221.8U patent/CN209585399U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111379369A (en) * | 2018-12-28 | 2020-07-07 | 无锡天云数据中心科技有限公司 | Integrated furred ceiling of steel construction data center |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204420866U (en) | For throwing light on, fire-fighting instruction and current failure emergency illumination ceiling-type lamp | |
CN209585399U (en) | A kind of steel construction data center Integral ceiling | |
CN216047379U (en) | Wisdom street lamp with environment monitoring function | |
CN110939921A (en) | Smoke collecting lampshade with dustproof insect and water mist functions | |
CN202998273U (en) | Simulate solar camera | |
CN206220005U (en) | The instruction device of windage can be reduced with intelligence control system | |
CN215951258U (en) | Energy-saving intelligent street lamp | |
CN105020800B (en) | A kind of window of general installation carries the air purifier and its installation method of formula | |
CN211452445U (en) | Environment monitoring device used in green building construction | |
CN209964192U (en) | Community security property monitoring system | |
CN210319802U (en) | Ornamental customization lamp convenient for heat dissipation for garden design | |
CN111379369A (en) | Integrated furred ceiling of steel construction data center | |
CN208260022U (en) | A kind of staircase of exhibition building | |
CN206743445U (en) | A kind of video doorbell structure | |
CN214151927U (en) | Fire control passageway detection device | |
CN207539800U (en) | A kind of new type solar energy building body ornament lamp | |
CN112492270A (en) | Video monitoring system for community security | |
CN216556822U (en) | City wisdom street lamp based on 5G technique | |
CN212873710U (en) | Large-scale parking voice prompt device | |
CN214840466U (en) | Multi-functional wisdom street lamp | |
CN217559687U (en) | Traffic intelligence response street lighting night | |
CN214958472U (en) | A mount for installing integration construction monitoring device | |
CN205508054U (en) | Photoelectric smoke detector | |
CN213341121U (en) | Municipal works are with intelligent transformer case | |
CN205224373U (en) | Furred ceiling collection moulding piece |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |