CN209576339U - RO booting automatic cleaning system - Google Patents

RO booting automatic cleaning system Download PDF

Info

Publication number
CN209576339U
CN209576339U CN201821755017.8U CN201821755017U CN209576339U CN 209576339 U CN209576339 U CN 209576339U CN 201821755017 U CN201821755017 U CN 201821755017U CN 209576339 U CN209576339 U CN 209576339U
Authority
CN
China
Prior art keywords
pure water
water tank
water pump
filter
host
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821755017.8U
Other languages
Chinese (zh)
Inventor
朱振强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Ankede Membrane Separation Engineering Technology Co Ltd
Original Assignee
Beijing Ankede Membrane Separation Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Ankede Membrane Separation Engineering Technology Co Ltd filed Critical Beijing Ankede Membrane Separation Engineering Technology Co Ltd
Priority to CN201821755017.8U priority Critical patent/CN209576339U/en
Application granted granted Critical
Publication of CN209576339U publication Critical patent/CN209576339U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Cleaning By Liquid Or Steam (AREA)

Abstract

The utility model relates to pure water equipment technical fields, and disclose RO booting automatic cleaning system, including raw water tank, raw water pump, filter, pure water host, pure water tank, pure water pump and mixed bed, water pipe connection is passed sequentially through between the raw water tank, raw water pump, filter, pure water host, pure water tank, pure water pump and mixed bed.RO booting automatic cleaning system, after the completion of installing adjustment, first turn on hand-operated valve, then automatic starting is opened in power control cabinet, flushing valve can automatically open in advance, water in raw water tank passes sequentially through filter by raw water pump, pure water host, pure water tank, pure water pump and mixed bed outflow, after rinsing cleaning, flushing valve is automatically closed, then equipment can carry out subsequent normal dress film production, which carries out automatic low-pressure washing to system after realizing pure water equipment booting, pure water equipment can be removed after the completion of installation because of reasons remaining soils in pipeline and putamina such as constructions, play the role of protecting equipment.

Description

RO booting automatic cleaning system
Technical field
The utility model relates to pure water equipment technical field, specially RO booting automatic cleaning systems.
Background technique
RO film is commonly used in existing pure water equipment, it is using mainly reverse osmosis membrane technology, its working principle It is the selectivity using RO film, applies certain pressure to raw water, the mineral matter element of hydrone and ionic state is made to pass through reverse osmosis Permeable membrane, and most inorganic salts (including heavy metal), organic matter and bacterium, virus being dissolved in water etc. can not be through anti- Permeable membrane reaches separation, purification, concentration to make the pure water penetrated and the condensed water that can not penetrate is stringent separates Purpose.
Pure water equipment needs to clean out before operation, if there are also a large amount of soils in pipe at runtime for pure water equipment If remaining in road and putamina, irreversible damage can be caused to pure water equipment, the automatic cleaning that is switched on can remove pure water equipment Because of reasons remaining soils in pipeline and putamina such as constructions after the completion of installation, play the role of protecting equipment, booting is clear The prerequisite that can not only wash the saturation equipment of the soil in pipeline and putamina and subsequent dress film trial operation is washed, more It is equivalent to and low pressure trial operation is carried out to equipment under the conditions of no film, it may when can clean discovery construction and installation by booting The problem of not noticing further functions as self-test effect.
Utility model content
(1) the technical issues of solving
In view of the deficiencies of the prior art, the utility model provides RO booting automatic cleaning system, and it is automatic clear to have booting Wash, it is efficient and convenient and safe and effective the advantages that, it is remaining dirty in pipeline and putamina after the completion of installation to solve pure water equipment The problem of object can damage pure water equipment.
(2) technical solution
To realize that above-mentioned booting is cleaned automatically, efficient and convenient, safe and effective purpose, the utility model provides following technical side Case: RO booting automatic cleaning system, including raw water tank, raw water pump, filter, pure water host, pure water tank, pure water pump and mixed bed, Water pipe connection, institute are passed sequentially through between the raw water tank, raw water pump, filter, pure water host, pure water tank, pure water pump and mixed bed State and be provided with flushing valve in mixed bed, between the outlet pipe of the raw water tank and the water inlet pipe of raw water pump, the outlet pipe of raw water pump and Between the water inlet pipe of filter, between the outlet pipe of pure water host and the water inlet pipe of pure water tank, the outlet pipe and pure water of pure water tank It is provided with hand-operated valve between the water inlet pipe of pump, is provided on the outlet pipe of the raw water pump, on filter and pure water host Diaphragm valve one is provided with check-valves on the water inlet pipe of the filter, is respectively provided on the inside of the filter and pure water host There are motor-driven valve and Pneumatic butterfly valve, exhaust valve, the outlet pipe of the pure water pump and the water inlet pipe of mixed bed are provided on the pure water tank Between be provided with regulating valve, between the outlet pipe of the pure water pump and the water inlet pipe of mixed bed and be located at regulating valve both ends be respectively provided with There is diaphragm valve two, diaphragm valve three is provided on the water inlet pipe of the mixed bed, is all provided on the filter, pure water host and pure water tank It is equipped with pressure gauge.
Preferably, the raw water pump, filter, pure water host, pure water pump, mixed bed and flushing valve are electrically connected with power control cabinet It connects, and is provided with automatic cleaning button in power control cabinet.
Preferably, the elastomer connector that can circumnutate is provided on the outlet pipe of the raw water tank.
Preferably, the nominal pressure 6kg, the nominal pressure 25kg of the diaphragm valve two of the diaphragm valve one.
Preferably, pressure switch is provided on the diaphragm valve three.
Preferably, it is provided with RO film group in the pure water host, is provided with diaphragm valve on the pure water tank.
Preferably, drainage pipeline is fixedly installed in the filter, pure water host and mixed bed.
(3) beneficial effect
Compared with prior art, the utility model provide RO booting automatic cleaning system, have it is following the utility model has the advantages that
1, RO booting automatic cleaning system first turns on hand-operated valve, then in power control cabinet after the completion of installing adjustment Automatic cleaning button is opened, flushing valve can automatically open in advance, and the water in raw water tank passes sequentially through filter, pure by raw water pump Water host is flowed into pure water tank, and then the water in pure water tank is flowed out by pure water pump and mixed bed, and after rinsing cleaning, flushing valve is automatic It closes, then equipment can carry out subsequent normal dress film production, and which carries out certainly system after realizing pure water equipment booting Dynamic low-pressure washing, can remove pure water equipment after the completion of installation because of reasons remaining soils in pipeline and putamina such as constructions, Play the role of after protecting equipment, installation to complete self-test adjusting, only need to click automatic cleaning button can clean automatically, fastly Victory is convenient, safely and effectively.
2, RO booting automatic cleaning system passes through setting raw water pump, filter, pure water host, pure water pump, mixed bed and punching It washes valve to be electrically connected with power control cabinet, worker need to only operate in power control cabinet after the completion of installation adjustment, improve safety, open The cleaning solution that uses of machine cleaning also effectively plays the role of protecting equipment, after booting cleaning, filter, pure water host and pure Pressure gauge is provided on water pot, it is whether consistent by the numerical value and desired value of observing pressure gauge, it can be determined that the operation of system Situation finds the problem of may not noticing when construction and installation, further functions as self-test effect, and this technology greatly improves Working efficiency effectively saves manpower and material resources, efficient and convenient, safely and effectively.
Detailed description of the invention
FIG. 1 is a schematic structural view of the utility model;
Fig. 2 is utility model works flow chart.
In figure: 1 raw water tank, 2 raw water pumps, 3 filters, 4 pure water hosts, 5 pure water tanks, 6 pure water pumps, 7 mixed beds, 8 flushing valves, 9 hand-operated valves, 10 diaphragm valves one, 11 check-valves, 12 motor-driven valves, 13 Pneumatic butterfly valves, 14 exhaust valves, 15 regulating valves, 16 diaphragm valves two, 17 diaphragm valves three, 18 pressure gauges.
Specific embodiment
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work Every other embodiment obtained, fall within the protection scope of the utility model.
Referring to FIG. 1-2, RO be switched on automatic cleaning system, including raw water tank 1, raw water pump 2, filter 3, pure water host 4, Pure water tank 5, pure water pump 6 and mixed bed 7, raw water tank 1, raw water pump 2, filter 3, pure water host 4, pure water tank 5, pure water pump 6 and mixed Water pipe connection is passed sequentially through between bed 7, is provided with flushing valve 8, raw water pump 2, filter 3, pure water host 4, pure water pump in mixed bed 7 6, mixed bed 7 and flushing valve 8 are electrically connected with power control cabinet, and automatic cleaning button is provided in power control cabinet, the outlet pipe of raw water tank 1 On be provided with the elastomer connector that can circumnutate, RO film group is provided in pure water host 4, is provided with diaphragm valve, filter on pure water tank 5 3, be fixedly installed with drainage pipeline in pure water host 4 and mixed bed 7, the water inlet pipe of the outlet pipe of raw water tank 1 and raw water pump 2 it Between, between the outlet pipe of raw water pump 2 and the water inlet pipe of filter 3, the water inlet pipe of the outlet pipe of pure water host 4 and pure water tank 5 it Between, be provided with hand-operated valve 9 between the outlet pipe of pure water tank 5 and the water inlet pipe of pure water pump 6, on the outlet pipe of raw water pump 2, filtering It is provided with diaphragm valve 1 on device 3 and pure water host 4, the nominal pressure 6kg of diaphragm valve 1, on the water inlet pipe of filter 3 It is provided with check-valves 11, motor-driven valve 12 and Pneumatic butterfly valve 13, pure water tank 5 are provided on the inside of filter 3 and pure water host 4 On be provided with exhaust valve 14, be provided with regulating valve 15 between the outlet pipe of pure water pump 6 and the water inlet pipe of mixed bed 7, pure water pump 6 goes out Diaphragm valve 2 16, the public affairs of diaphragm valve 2 16 are provided between water pipe and the water inlet pipe of mixed bed 7 and positioned at the both ends of regulating valve 15 Claim pressure 25kg, is provided with diaphragm valve 3 17 on the water inlet pipe of mixed bed 7, pressure switch, filter are provided on diaphragm valve 3 17 3, it is provided with pressure gauge 18 on pure water host 4 and pure water tank 5, pressure gauge 18 uses MD-S280 high-precision pressure gauge, measures model 0-100MPa is enclosed, 0.4 grade of accuracy class, after the completion of installing adjustment, hand-operated valve 9 is first turned on, is then opened in power control cabinet Automatic cleaning button, flushing valve 8 can automatically open in advance, and the water in raw water tank 1 passes sequentially through filter 3, pure by raw water pump 2 Water host 4 is flowed into pure water tank 5, and then the water in pure water tank 5 is flowed out by pure water pump 6 and mixed bed 7, after rinsing cleaning, rinses Valve 8 is automatically closed, and then equipment can carry out subsequent normal dress film production, and which realizes after pure water equipment is switched on to system Automatic low-pressure washing is carried out, pure water equipment can be removed after the completion of installation because the reasons such as construction are remaining dirty in pipeline and putamina Dirt plays the role of after protecting equipment, installation to complete self-test adjusting, and need to only click automatic cleaning button can be automatically clear It washes, it is efficient and convenient, safely and effectively, also, pass through setting raw water pump 2, filter 3, pure water host 4, pure water pump 6, mixed bed 7 and punching Valve 8 to be washed to be electrically connected with power control cabinet, worker need to only operate in power control cabinet after the completion of installation adjustment, safety is improved, The cleaning solution that booting cleaning uses also effectively plays the role of protecting equipment, after booting cleaning, filter 3, pure water host 4 With pressure gauge 18 is provided on pure water tank 5, by observe pressure gauge 18 numerical value and desired value it is whether consistent, it can be determined that be The operation conditions of system finds the problem of may not noticing when construction and installation, further functions as self-test effect, and this technology is very big Improve work efficiency, effectively save manpower and material resources, it is efficient and convenient, safely and effectively.
When in use, after the completion of installing adjustment, hand-operated valve 9 is first turned on, automatic cleaning is then opened in power control cabinet Button, flushing valve 8 can automatically open in advance, and the water in raw water tank 1 passes sequentially through filter 3, pure water host 4 by raw water pump 2 It is flowed into pure water tank 5, then the water in pure water tank 5 is flowed out by pure water pump 6 and mixed bed 7, and after rinsing cleaning, flushing valve 8 is automatic It closes, then equipment can carry out subsequent normal dress film production, by the way that raw water pump 2, filter 3, pure water host 4, pure water is arranged Pump 6, mixed bed 7 and flushing valve 8 are electrically connected with power control cabinet, and worker need to only operate in power control cabinet after the completion of installation adjustment, Safety is improved, the cleaning solution that booting cleaning uses also effectively plays the role of protecting equipment, after booting cleaning, filtering Be provided with pressure gauge 18 on device 3, pure water host 4 and pure water tank 5, by observe pressure gauge 18 numerical value and desired value whether one It causes, it can be determined that the operation conditions of system finds the problem of may not noticing when construction and installation, further functions as self-test work With.
The automatic cleaning system in conclusion RO is switched on first turns on hand-operated valve 9, then exists after the completion of installing adjustment Automatic cleaning button is opened in power control cabinet, flushing valve 8 can automatically open in advance, and the water in raw water tank 1 is successively led to by raw water pump 2 Cross filter 3, pure water host 4 is flowed into pure water tank 5, then the water in pure water tank 5 is flowed out by pure water pump 6 and mixed bed 7, is rinsed After cleaning, flushing valve 8 is automatically closed, and then equipment can carry out subsequent normal dress film production, and which realizes pure water equipment Automatic low-pressure washing is carried out to system after booting, pure water equipment can be removed after the completion of installation because the reasons such as construction are in pipeline and film Remaining soil in shell, plays the role of protecting equipment, and installation is completed after self-test adjusts, need to only click automatic cleaning by Button can clean automatically, efficient and convenient, safely and effectively.
Also, the RO be switched on automatic cleaning system, by setting raw water pump 2, filter 3, pure water host 4, pure water pump 6, Mixed bed 7 and flushing valve 8 are electrically connected with power control cabinet, and worker need to only operate in power control cabinet after the completion of installation adjustment, are improved Safety, the cleaning solution that booting cleaning uses also effectively plays the role of protecting equipment, after booting cleaning, filter 3, It is provided with pressure gauge 18 on pure water host 4 and pure water tank 5, it is whether consistent by the numerical value and desired value of observing pressure gauge 18, It may determine that the operation conditions of system, find the problem of may not noticing when construction and installation, further function as self-test effect, This technology greatly improves working efficiency, effectively saves manpower and material resources, efficient and convenient, safely and effectively.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that There is also other identical elements in process, method, article or equipment including the element.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is understood that these embodiments can be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaired Change, replacement and variant, the scope of the utility model is defined by the appended claims and the equivalents thereof.

Claims (7)

1.RO booting automatic cleaning system, including raw water tank (1), raw water pump (2), filter (3), pure water host (4), pure water tank (5), pure water pump (6) and mixed bed (7), it is characterised in that: the raw water tank (1), raw water pump (2), filter (3), pure water host (4), water pipe connection is passed sequentially through between pure water tank (5), pure water pump (6) and mixed bed (7), is provided with flushing on the mixed bed (7) Valve (8), between the outlet pipe of the raw water tank (1) and the water inlet pipe of raw water pump (2), the outlet pipe and filter of raw water pump (2) (3) between water inlet pipe, between the outlet pipe of pure water host (4) and the water inlet pipe of pure water tank (5), the outlet pipe of pure water tank (5) Be provided between the water inlet pipe of pure water pump (6) hand-operated valve (9), on the outlet pipe of the raw water pump (2), filter (3) and It is provided with diaphragm valve one (10) on pure water host (4), is provided with check-valves (11), institute on the water inlet pipe of the filter (3) It states and is provided with motor-driven valve (12) and Pneumatic butterfly valve (13), the pure water tank on the inside and pure water host (4) of filter (3) (5) it is provided on exhaust valve (14), is provided with regulating valve between the outlet pipe of the pure water pump (6) and the water inlet pipe of mixed bed (7) (15), it is provided between the outlet pipe of the pure water pump (6) and the water inlet pipe of mixed bed (7) and positioned at the both ends of regulating valve (15) Diaphragm valve two (16) is provided with diaphragm valve three (17), the filter (3), pure water host on the water inlet pipe of the mixed bed (7) (4) and on pure water tank (5) it is provided with pressure gauge (18).
The automatic cleaning system 2. RO according to claim 1 is switched on, it is characterised in that: the raw water pump (2), filter (3), pure water host (4), pure water pump (6), mixed bed (7) and flushing valve (8) are electrically connected with power control cabinet, and are provided in power control cabinet Automatic cleaning button.
The automatic cleaning system 3. RO according to claim 1 is switched on, it is characterised in that: the outlet pipe of the raw water tank (1) On be provided with the elastomer connector that can circumnutate.
The automatic cleaning system 4. RO according to claim 1 is switched on, it is characterised in that: the nominal of the diaphragm valve one (10) Pressure 6kg, the nominal pressure 25kg of the diaphragm valve two (16).
The automatic cleaning system 5. RO according to claim 1 is switched on, it is characterised in that: be arranged on the diaphragm valve three (17) There is pressure switch.
The automatic cleaning system 6. RO according to claim 1 is switched on, it is characterised in that: setting in the pure water host (4) There is RO film group, is provided with diaphragm valve on the pure water tank (5).
The automatic cleaning system 7. RO according to claim 1 is switched on, it is characterised in that: the filter (3), pure water host (4) and in mixed bed (7) it is fixedly installed with drainage pipeline.
CN201821755017.8U 2018-10-29 2018-10-29 RO booting automatic cleaning system Expired - Fee Related CN209576339U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821755017.8U CN209576339U (en) 2018-10-29 2018-10-29 RO booting automatic cleaning system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821755017.8U CN209576339U (en) 2018-10-29 2018-10-29 RO booting automatic cleaning system

Publications (1)

Publication Number Publication Date
CN209576339U true CN209576339U (en) 2019-11-05

Family

ID=68375834

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821755017.8U Expired - Fee Related CN209576339U (en) 2018-10-29 2018-10-29 RO booting automatic cleaning system

Country Status (1)

Country Link
CN (1) CN209576339U (en)

Similar Documents

Publication Publication Date Title
CN209602246U (en) Water purification machine
CN207016581U (en) A kind of water inlet water shortage detecting system of water purifier
CN105502579B (en) The ultra-filtration element of household water-purifying machine from rinse-system, from purging method and household water-purifying machine
CN202945111U (en) Power-free water purifier
CN209576339U (en) RO booting automatic cleaning system
CN203394892U (en) Pump self-washing sucker device
CN205472990U (en) Water purification pure water all -in -one
CN104587734B (en) A kind of faucet water purifier
CN206255927U (en) A kind of counter-infiltration system of auto-flushing
CN206886818U (en) The water quality water purifier of intelligent water-saving three
CN206762667U (en) Anti-penetration water purifier high efficiency water saving device
CN204550238U (en) A kind of household water-purifying machine system
CN206253019U (en) A kind of positive back cleaning system for reverse osmosis equipment reverse osmosis membrane assembly
CN215539848U (en) Water purifier
CN209576340U (en) RO shuts down automatic cleaning system
CN205392188U (en) A automatic back flush water purification system for back flush water purifier
CN205288117U (en) Air supporting membrane equipment
CN207774936U (en) A kind of secondary flusher of water treatment facilities
CN206447609U (en) Super-filtration purifying machine with pre-washing function
CN206308149U (en) A kind of follow-on intelligent reverse osmosis water purifying plant
CN206951007U (en) A kind of reverse osmosis membrane medicine washes system
CN205182306U (en) Automatic washing filter
CN111186879A (en) Double-pump double-membrane reverse osmosis equipment and water treatment method
CN205348276U (en) Paste gravel multitube parallel and filter water intaking system
CN107882125A (en) Water-saving hand washing sink

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191105

Termination date: 20211029